A method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe.

By monitoring the pressure difference inside and outside the sand control pipe, the sand output is determined in real time and the submersible pump discharge rate is adjusted, which solves the problems of delayed sand output determination and equipment wear in geothermal wells and achieves long-term stable operation of geothermal wells.

CN123109628APending Publication Date: 2026-11-17SINOPEC GREEN ENERGY GEOTHERMAL DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611443926.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-17
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing methods for determining sand production in geothermal wells are outdated and highly subjective, failing to provide real-time quantitative analysis. This leads to blockage of sand control pipes and equipment wear, affecting the long-term stable operation of geothermal wells.

Method used

By monitoring the pressure difference inside and outside the sand control pipe, a calibration function is established to calculate the sand output in real time, and the submersible pump discharge rate is adjusted in stages according to the sand output, so as to realize the real-time monitoring and judgment of the sand output.

Benefits of technology

It enables timely identification of sand pipe blockage and automatic control of submersible pumps, reducing equipment wear and ensuring long-term stable operation of geothermal wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109628A_ABST
    Figure CN123109628A_ABST
Patent Text Reader

Abstract

This invention discloses a method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference between the inside and outside of the sand control pipe, belonging to the field of geothermal well operation monitoring and sand control technology. The method involves setting paired pressure sampling points on the inside and outside of the sand control pipe to simultaneously collect external and internal pressure, submersible pump displacement or frequency, and downhole water temperature. A baseline pressure difference curve is established based on stable operating conditions with no or low sand production. The real-time pressure difference is corrected for elevation difference, displacement, temperature density, and the baseline pressure difference to obtain the equivalent blockage pressure difference. This equivalent blockage pressure difference is then substituted into the pressure difference-sand production calibration function of the corresponding mesh size sand control pipe to calculate the real-time sand production. This method can achieve real-time quantitative identification of downhole sand production when sand particles cause blockage of the sand control pipe and near-wellbore seepage channels. It also triggers frequency reduction or pump shutdown protection based on threshold values, reducing the amount of sand entering the wellbore and minimizing equipment wear.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of geothermal well operation monitoring and sand control technology, specifically relating to a method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe. Background Technology

[0002] During the development of geothermal wells in sandstone reservoirs, submersible pumps continuously extract hot water from the wellbore. Fine sand, silt, or weakly cemented particles from the surrounding reservoir can easily enter the wellbore with seepage. Although sand control pipes or screens are installed downhole, these pipes themselves still need to maintain water flow channels. Once sand production occurs in the reservoir, sand particles will form varying degrees of bridging and accumulation in the pores and fissures of the sand control pipes and in the near-wellbore area, leading to increased flow resistance between the inside and outside of the sand control pipes. When the sand production continues to increase, it will not only wear down the submersible pump, tubing, and surface heat exchange equipment, but also reduce the downhole flow area, ultimately affecting the geothermal well's water supply and long-term stable operation.

[0003] There are two main methods for determining sand production in existing geothermal wells. One is the direct observation method, which involves observing the amount of sand returned during surface drainage or filtration. This method requires waiting for the sand particles to return to the surface before making a judgment, resulting in a significant time lag and being greatly affected by drainage sampling time and operational experience. The other method is the well logging data analysis method, which typically uses sonic transit time, rock density, clay content, or cementation strength to qualitatively assess the formation's sand production risk. This method can reflect whether the reservoir is prone to sand production, but it cannot provide real-time sand production during operation, nor can it promptly adjust the pump discharge rate in the early stages of increased sand production.

[0004] The inventors discovered during geothermal well operation and sand control pipe testing that sand production is not simply a manifestation of surface sand return, but rather primarily a change in the degree of blockage in the sand control pipe and its near-wellbore seepage channels. For sand control pipes of the same mesh size, after correction for discharge rate, temperature, and fluid properties, a calibrable functional relationship exists between the pressure difference inside and outside the sand control pipe and the sand production rate. Taking a 60-mesh sand control pipe as an example, experiments show that a stable fitting relationship can be formed between its internal and external pressure difference and the sand production rate. Based on this relationship, the change in the internal and external pressure difference of the downhole sand control pipe can be converted into a real-time determination result of the sand production rate, and further used for the frequency conversion control of submersible pumps. Current methods have not yet formed a closed loop integrating the functional relationship between the internal and external pressure difference of the sand control pipe, the degree of blockage, the sand production rate, and frequency conversion control; therefore, there is still room for improvement. Summary of the Invention

[0005] The purpose of this invention is to provide a method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference between the inside and outside of the sand control pipe. The method uses the pressure difference between the inside and outside of the downhole sand control pipe as a quantitative characterization of the blockage of the seepage channel caused by sand production. The sand production is calculated in real time through a calibration function, and the submersible pump discharge rate is adjusted in stages according to the sand production. This method overcomes the problems of existing sand production determination being lagging, subjective, and unable to be quantified in real time.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: a method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe, comprising the following steps:

[0007] S1. After the geothermal well is put into production, the well is cleaned, or it is overhauled, determine the mesh size, installation depth, and monitoring section location of the downhole sand control pipe. Set up paired pressure sampling points on the inside and outside of the sand control pipe. Under stable conditions with no or low sand production, collect the pressure difference between the inside and outside of the sand control pipe at different discharge rates or pump frequencies, and establish a benchmark pressure difference curve.

[0008] S2. During pumping operation, simultaneously collect data on the pressure Po outside the sand control pipe, the pressure Pi inside the sand control pipe, the submersible pump displacement Q or pump frequency f, the downhole water temperature T, the sampling time t, and the equipment operating status. The pressure sampling points inside and outside the sand control pipe are preferably arranged in the same axial monitoring section. If an elevation difference exists, elevation correction will be performed in subsequent calculations.

[0009] S3, to and Outlier removal and steady-state filtering are performed to calculate the real-time pressure difference. After deducting the effects of elevation difference, baseline pressure difference, displacement fluctuation, and temperature and density, the equivalent blockage pressure difference is obtained. The equivalent clogging pressure differential is used to indicate the degree of additional clogging caused by sand particles entering the sand control pipe and its near-wellbore seepage channels.

[0010] S4. Call the pressure difference-sand discharge calibration function of the corresponding mesh size sand control pipe to calculate the equivalent blockage pressure difference. This is converted to real-time sand output Qs. For a 60-mesh sand control pipe, a quadratic function obtained from experimental calibration can be used. Perform calculations, where The unit is MPa, and the unit of Qs is m³ / h.

[0011] S5. Compare the real-time sand output Qs with the preset threshold to obtain the sand output levels such as normal, early warning, limited discharge, and pump stop protection. When the sand output exceeds the threshold, the ground control center outputs a frequency reduction or pump stop protection command to the submersible pump frequency converter cabinet to match the pumping discharge rate with the sand output status in the well.

[0012] Compared with the prior art, the present invention has at least the following beneficial effects:

[0013] (1) This invention does not wait until the sand particles return to the ground before making a judgment, but rather identifies the sand discharge by the change in pressure difference inside and outside the sand control pipe when the sand particles cause blockage of the sand control pipe and the near-well seepage channel. This makes the sand discharge judgment more timely.

[0014] (2) The present invention converts the pressure difference between the inside and outside of the sand control pipe into an equivalent blockage pressure difference after correction by the benchmark pressure difference, discharge rate, temperature and elevation, and then obtains the sand discharge rate through the calibration function, avoiding the reliance on operational experience to make judgments and enabling quantitative judgment.

[0015] (3) This invention provides a direct-use pressure difference-sand output function relationship for 60-mesh sand control pipes, while retaining the calibration method for other mesh sand control pipes. It is applicable to specific engineering applications and also facilitates expansion for different well types and different sand control pipe specifications.

[0016] (4) The present invention links the real-time sand output with the submersible pump frequency converter cabinet. When the sand output increases, the discharge rate is reduced in time to reduce the large amount of sand particles entering the well barrel and equipment wear. After the sand output recovers, the discharge rate is gradually restored, which is conducive to the long-term stable operation of the geothermal well.

[0017] (5) The present invention can periodically check the model by ground sand collector or filter sand volume, which can compensate for deviations caused by changes in well conditions, changes in thermal reservoirs and long-term operation of sand control pipes, and improve field adaptability. Attached Figure Description

[0018] Figure 1 This is a flowchart of the method for real-time monitoring and determination of sand production in geothermal wells according to the present invention;

[0019] Figure 2 This is a schematic diagram of the pressure difference acquisition and ground linkage arrangement of the sand control pipe in this invention;

[0020] Figure 3 This is a schematic diagram of the pressure difference-sand output calibration curve of the 60-mesh sandproof pipe of the present invention;

[0021] Figure 4 This is a schematic diagram of the graded frequency modulation control logic for sand output of the present invention. Detailed Implementation

[0022] The present invention will be further described below with reference to the accompanying drawings and specific embodiments. It should be understood that the described embodiments are used to illustrate the technical concept of the present invention and are not intended to limit the scope of protection of the present invention; any equivalent substitutions made by those skilled in the art in terms of the sequence of steps, sensor installation method, data transmission method or calibration function form without departing from the essence of the present invention shall fall within the scope of protection of the present invention.

[0023] Example 1:

[0024] like Figure 1 and Figure 2As shown, this embodiment is applied to a sandstone geothermal well. A 60-mesh sand control pipe is installed downhole, and the submersible pump is located above or adjacent to the upper section of the sand control pipe. An external pressure sampling point Po is arranged on the outside of the sand control pipe to reflect the near-wellbore geothermal reservoir water pressure outside the sand control pipe; an internal pressure sampling point Pi is arranged on the inside of the sand control pipe to reflect the wellbore flow pressure inside the sand control pipe. The two pressure sampling points are located in the same axial monitoring section as much as possible to avoid calculation errors caused by the difference in liquid column height. The data collected by the pressure sensor is uploaded to the surface receiving device via the downhole acquisition and transmission unit. The surface receiving device simultaneously receives data on the submersible pump displacement, pump frequency, water temperature, and operating status.

[0025] In the initial stage of production or after well washing, benchmark calibration should be performed under stable sand control conditions. Specifically, the submersible pump is controlled to operate sequentially at multiple pump frequencies, such as low frequency, medium frequency, and stable operating conditions near the rated frequency. After the discharge and pressure of each operating condition reach a steady state, Po and Pi are recorded to form the benchmark pressure difference ΔP0 under the current well condition. The benchmark pressure difference represents the normal flow resistance of the sand control pipe under clean or low sand conditions, and it is subsequently used to remove the normal flow resistance from the real-time pressure difference.

[0026] During operational monitoring, the ground control center reads data according to the set sampling cycle. First calculate ;when and When there is an axial height difference, deduct Then, determine the reference pressure difference based on the current displacement or pump frequency. And perform flow and temperature corrections to obtain the equivalent blockage pressure difference. One possible calculation formula is:

[0027] in, The calibration discharge rate used to establish the pressure difference-sand output function is Q, which is the current discharge rate. n is taken as 1.6 to 2.2 according to the downhole flow resistance characteristics. K(T) is used to correct for density or viscosity differences caused by changes in geothermal water temperature.

[0028] In this embodiment, the pressure difference-sand output calibration function for the 60-mesh sand control pipe can be:

[0029] in, Units are , The unit is m³ / h. When the ground control center calculates... Then, the real-time sand output can be output. .like If the value is less than the effective starting range of the calibration function or the calculation result is negative, then... Set to zero or below the detection limit; if If the value exceeds the calibration range, the endpoint limit is used to prompt excessive sand production, and re-verification or manual check is required.

[0030] To reduce the impact of pump frequency switching, downhole water hammer or transient sensor interference on the results, this embodiment performs steady-state filtering on Po and Pi. Specifically, median filtering is performed on continuously sampled data to eliminate isolated abnormal points, and then a sliding time window is used to obtain a stable pressure difference; when the variation of pump frequency exceeds a set value or the slope of pressure fluctuation exceeds a set value, the calculation of Qs is suspended, and the judgment result is output after the operation state returns to stability.

[0031] Embodiment 2: Sand production threshold judgment and variable frequency control

[0032] As shown in Figure 4 the ground control center presets a first threshold Q1, a second threshold Q2 and a third threshold Q3. The three thresholds can be determined according to the specification of the sand control pipe, the wear resistance of the submersible pump, the allowable sand content of the ground heat exchange equipment and the historical operation data of the well.

[0033] When Qs<Q1, it is judged as normal sand production or no obvious sand production, and the submersible pump maintains the current pump frequency; when Q1≤Qs<Q2, it is judged as mild sand production, the ground control center issues an early warning and outputs a small frequency reduction instruction to the frequency conversion cabinet; when Q2≤Qs<Q3, it is judged as moderate sand production, the frequency conversion cabinet reduces the frequency in sections according to the preset step size, and limits the target displacement at the same time; when Qs≥Q3, it is judged as severe sand production or rapid aggravation of sand control pipe blockage, and the system outputs instructions for pump shutdown protection, backwashing maintenance or manual check.

[0034] After the frequency is reduced, the system does not immediately restore the displacement, but continues to collect the pressure inside and outside the sand control pipe within the stabilization time, and recalculates Qs. If Qs is lower than the recovery threshold and remains stable, the displacement is gradually restored according to a frequency increase step smaller than the frequency reduction step; if Qs continues to rise after the frequency reduction, it indicates that the blockage of the near-well seepage channel of the sand control pipe is aggravated or the formation sand production is still developing, the system prohibits automatic frequency increase and records this event, which is convenient for subsequent well washing, backwashing or pump inspection maintenance.

[0035] Embodiment 3: On-site verification of pressure difference - sand production function

[0036] The pore plugging characteristics of sand control pipes with the same mesh number in different geothermal wells are affected by the particle size composition of sand grains, the cementation degree of the geothermal reservoir, downhole water temperature, salinity and long-term scaling state. To ensure long-term use accuracy, this embodiment sets a model verification step.

[0037] On-site sand collectors or filter weighing devices can be installed on the surface drainage pipeline to statistically analyze the amount of filtered sand or sand content in the return water at fixed intervals, and compare it with the sand output obtained by integrating the pressure difference function during the same time period. When the deviation between the two exceeds the allowable range, the coefficient of the pressure difference-sand output calibration function should be corrected, or the correction result should be used as the specific lookup curve for that well. For wells with changed sand control pipe mesh size, altered well conditions after well washing, or significant scaling after long-term operation, a new benchmark pressure difference curve should be established, and the calibration function should be verified.

[0038] Example 4: Application of Sand Control Pipes with Other Mesh Sizes

[0039] This invention is not limited to 60-mesh sand control pipes. For 40-mesh, 80-mesh, or other specifications of sand control pipes, a corresponding pressure difference-sand discharge calibration function can be established using the same approach. During calibration, the structure of the sand control pipe, fluid discharge rate, and sampling method should be kept consistent. The sand content should be changed, and the internal and external pressure differences and actual sand discharge should be recorded to form a polynomial function, piecewise function, or two-dimensional lookup table model.

[0040] When different well sections or different mesh sizes of sand control pipes exist on site, the calibration functions corresponding to each monitoring section can be stored in the ground control center. During calculation, the corresponding function is called according to the monitoring section number, thereby realizing the determination of sand production in each well section.

Claims

1. A method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe, characterized in that, comprising the following steps: S1. After a geothermal well is put into production or overhauled, determine the mesh number and installation depth of the downhole sand control pipe, set paired pressure sampling points on the inner side and outer side of the sand control pipe, and establish a reference pressure difference curve of the sand control pipe under stable working conditions with no sand production or low sand production; S2. During the pumping operation, the pressure outside the sand control pipe is collected simultaneously. Pressure inside the sand control pipe Submersible pump displacement or pump frequency Well water temperature and sampling time ; S3. Calculate the real-time pressure difference inside and outside the sand control pipe based on Po and Pi, and correct the real-time pressure difference for elevation difference, discharge fluctuation, temperature density, and reference pressure difference to obtain the equivalent blockage pressure difference. ; S4. Equivalent blockage pressure difference Substituting the pressure difference-sand discharge rate calibration function of the corresponding mesh size sand control pipe, the real-time sand discharge rate Qs is calculated; S5. Compare the real-time sand production Qs with a preset sand production threshold, generate a sand production level, and output an alarm signal, a frequency reduction signal or a pump shutdown protection signal to the surface control center or the submersible pump frequency conversion cabinet according to the sand production level.

2. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, In step S1, the pressure sampling point inside the sand control pipe and the pressure sampling point outside the sand control pipe are located in the same axial monitoring section, and the axial height difference between them does not exceed 1.5m; when there is an axial height difference between them, according to Elevation correction is performed on the real-time differential pressure, whereby... The density of the downhole fluid. It is the acceleration due to gravity. The elevation difference between the two pressure sampling points.

3. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, The reference differential pressure curve in step S1 is The pressure difference inside and outside the sand control pipe is obtained by fitting the data after collecting the pressure difference at at least three stable discharge points or pump frequency points; in step S3, the reference pressure difference corresponding to the current discharge Q or the current pump frequency f is deducted to eliminate the influence of normal flow resistance on the sand discharge judgment.

4. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, The equivalent blockage pressure difference ΔPe in step S3 is determined according to the following formula: in, This is the reference pressure difference under the current displacement or pump frequency. To calibrate the displacement, Q is the current displacement, and n is the velocity-drag correction index between 1.6 and 2.

2. This is the temperature-density correction factor.

5. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, The pressure difference-sand production calibration function in step S4 is obtained through laboratory or on-site calibration. During calibration, sand-containing fluid is supplied to the outer side of the sand control pipe with the same mesh number, the pressure difference inside and outside the sand control pipe and the actual sand production under different sand contents are recorded respectively, and the calibration function is formed by means of polynomial fitting, piecewise linear fitting or look-up table interpolation.

6. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 5, characterized in that, When the sand control pipe is a 60-mesh sand control pipe, the pressure difference-sand discharge rate calibration function is: in, The unit is , The unit is m³ / h; when When the differential pressure exceeds the calibrated range, the calculation is performed using the extrapolated limit value from the adjacent endpoints or the recalibrated function.

7. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, Before step S3, for and Anomaly point removal and steady-state filtering are performed; when the pump frequency change of continuous sampling points is greater than the set value or the pressure fluctuation slope is greater than the set value, the calculation of the sand output function is paused, and the calculation is resumed after the pump frequency and pressure enter the steady-state window.

8. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, The preset sand production thresholds in step S5 at least include a first threshold Q1, a second threshold Q2 and a third threshold Q3; when Qs is less than Q1, the current pump frequency is maintained; when Q1≤Qs<Q2, an early warning is output and the pump frequency is reduced by a first frequency reduction amplitude; when Q2≤Qs<Q3, the pump frequency is reduced in sections by a second frequency reduction amplitude and the displacement is limited; when Qs≥Q3, a pump shutdown protection or backwashing maintenance instruction is output; after frequency reduction, the pressure inside and outside the sand control pipe is continuously collected and Qs is recalculated; if Qs is lower than the recovery threshold within the set stabilization time, the displacement is recovered according to the set frequency increase step; if Qs continues to rise after frequency reduction, automatic frequency increase is prohibited and recorded as an event of aggravated sand control pipe blockage.

9. The method for real-time monitoring and determination of sand production in geothermal wells based on the pressure difference inside and outside the sand control pipe according to claim 1, characterized in that, It also includes a model verification step: periodically check the real-time sand production Qs through the sand deposition amount of the surface sand collector, the filter, or the sand content of the return drainage, and correct the coefficient of the pressure difference-sand production calibration function or correct the threshold according to the verification result; the outer pressure Po of the sand control pipe and the inner pressure Pi of the sand control pipe are collected by downhole pressure sensors, then transmitted to the surface receiving device by the downhole acquisition and transmission unit through cable, optical fiber or wireless short-distance relay, and the surface receiving device performs data interaction with the submersible pump frequency conversion cabinet.

10. A real-time monitoring and determination system for sand production in geothermal wells based on the pressure difference inside and outside a sand control pipe, applied to the real-time monitoring and determination method for sand production in geothermal wells based on the pressure difference inside and outside a sand control pipe as described in any one of claims 1-9, characterized in that, The system includes: a sand control pipe inner pressure sensor, a sand control pipe outer pressure sensor, a downhole acquisition and transmission unit, a surface receiving device, a sand production calculation module and a frequency conversion control module; The sand production calculation module is used for calculating the equivalent blockage pressure difference according to the pressure difference inside and outside the sand control pipe and calling the pressure difference-sand production calibration function to output the real-time sand production, and the frequency conversion control module is used for outputting frequency modulation control instructions to the submersible pump frequency conversion cabinet according to the real-time sand production.