A staged composite fracturing device and method for coal and rock mass

By using a staged composite fracturing device for coal and rock mass, and employing water pre-fracturing and gel temporary plugging technologies, initial main fractures are generated and branch fractures are induced. This solves multiple defects of existing underground hydraulic fracturing in coal mines, and achieves low-energy consumption, high-efficiency fracture modification and safe construction.

CN123109658APending Publication Date: 2026-11-17安徽恒源煤电股份有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611224478.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-13
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing hydraulic fracturing technology in coal mines suffers from several problems, including limited generation of a single main fracture, high energy consumption due to high gel viscosity, poor adaptability to confined underground spaces, severe gel residue blockage, and insufficient construction safety.

Method used

A staged composite fracturing device for coal and rock mass is adopted, including a clean water supply unit, a gel mixing unit, a sealing injection component, a switching valve group unit, and a monitoring unit. The initial main fracture is generated by pre-fracturing with clean water, and branch fractures are created by temporary plugging with gel. Combined with automatic media switching and gel breaking flushing design, the formation of fracture network and gel degradation are realized.

Benefits of technology

It reduces fracturing pressure and energy consumption, reduces the amount of gel consumables and residual blockage, improves the fracturing effect and construction safety, shortens the construction cycle, and enhances the downhole applicability and versatility of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109658A_ABST
    Figure CN123109658A_ABST
Patent Text Reader

Abstract

This invention discloses a staged composite fracturing device and method for coal and rock masses, relating to the field of hydraulic fracturing technology. The fracturing device includes: a clean water supply unit configured to pump water from a clean water storage tank into the borehole for fracturing or flushing; a gel mixing unit configured to pump biodegradable gel fracturing fluid into the borehole; a sealing injection assembly configured to inject water or biodegradable gel fracturing fluid into the target fracturing section; a switching valve group unit configured to control the opening and closing of the clean water channel and gel channel connected to the clean water supply unit and gel mixing unit, respectively; a monitoring unit configured to monitor the pressure and flow information of clean water, gel, breaker fluid, and flushing waste liquid, as well as monitor the micro-vibration signal of the target fracturing section; and a breaker tank configured to inject breaker fluid into the borehole after gel fracturing to degrade and flush residual gel in the borehole and pipelines.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of hydraulic fracturing technology, and in particular to a staged composite fracturing device and method for coal and rock masses. Background Technology

[0002] Underground coal mining often encounters hard roofs, high-gas, low-permeability coal seams, hard interbedded rock, and areas of concentrated mining stress and rock bursts. The industry commonly uses hydraulic fracturing to modify coal and rock masses, achieving pressure relief, permeability enhancement, and pre-fracking operations. Existing fracturing technologies are mainly divided into three categories: simple hydraulic fracturing, direct gel fracturing, and traditional temporary plugging fracturing. However, these technologies have several shortcomings in actual construction. ① Simple hydraulic fracturing can only generate a single main fracture along the direction of dominant geostress, resulting in a small number of fractures, a limited range of modification, and poor roof weakening and gas extraction improvement effects. ② When using gel to initiate fracturing directly, the gel viscosity is high, the pumping resistance is high, the fracturing pressure increases significantly, the equipment energy consumption is high, the overall gel consumption is large, and the downhole pipeline is very prone to residual gel causing blockage. ③ Traditional oil and gas well temporary plugging and fracturing equipment cannot be adapted to the narrow space in coal mines. It lacks a continuous automatic switching structure for water and gel. The switching of media relies on on-site personnel to manually observe the pressure curve and judge the timing of switching. The switching time is delayed or advanced, and the fracturing effect is unstable. ④ Existing fracturing equipment lacks a matching flushing and return structure. After the operation is completed, a large amount of gel remains in the borehole and pipeline, which will block the borehole and pump body in the later stage, increasing the labor cost of cleaning. ⑤ The fracturing equipment on the market has a fragmented function, with fluid supply, mixing, monitoring and control arranged separately. Downhole transportation and assembly are cumbersome, and there is no explosion-proof integrated design, resulting in insufficient safety during downhole construction.

[0003] Therefore, there is an urgent need for a staged composite fracturing process and integrated automated fracturing device in underground coal mines, which can meet multiple requirements such as low initiation pressure, complex fracture network formation, automatic media switching, low gel residue, and explosion-proof compatibility in underground mines. Summary of the Invention

[0004] This solution addresses the problems and needs raised above by proposing a staged composite fracturing device and method for coal and rock masses. Due to the adoption of the following technical features, it can achieve the above-mentioned technical objectives and bring about several other technical benefits.

[0005] One object of the present invention is to provide a staged composite fracturing device for coal and rock masses, comprising: A clean water supply unit includes: a clean water storage tank and a first pump assembly connected thereto, the first pump assembly being configured to pump water from the clean water storage tank into the borehole for fracturing or flushing; The gel mixing unit includes: a stirring mixer and a second pump assembly, wherein the stirring mixer is configured to mix biodegradable gel fracturing fluid and the second pump assembly is configured to pump the biodegradable gel fracturing fluid into the borehole. The well sealing and injection assembly includes: a well sealer, a high-pressure injection pipe, and a bottom-hole injection screen. The well sealers are spaced apart at both ends of the target fracturing section in the borehole. The high-pressure injection pipe is laid along the borehole and extends such that the bottom-hole injection screen connected to it is located in the target fracturing section. The bottom-hole injection screen is configured to inject water or biodegradable gel fracturing fluid into the target fracturing section. The switching valve unit has multiple input terminals and output terminals, wherein two input terminals are respectively connected to the first pump body assembly and the second pump body assembly, and the output terminal is connected to the sealing injection assembly. The switching valve unit is configured to control the opening and closing of the water channel and the gel channel connected to the water supply unit and the gel mixing unit, respectively. The breaker tank, which is connected to one of the inputs of the switching valve assembly unit, is configured to inject breaker fluid into the borehole after gel fracturing to degrade and flush out residual gel in the borehole and pipeline.

[0006] In addition, the coal and rock mass staged composite fracturing device and method according to the present invention may also have the following technical features: In one example of the present invention, the clean water supply unit further includes: A filter, disposed between the clean water storage tank and the first pump assembly, is configured to filter impurity particles from the water source within the clean water storage tank.

[0007] In one example of the present invention, the first pump assembly includes: a low-pressure clean water delivery pump and a high-pressure clean water pump connected in series, and an on / off valve connected in parallel with the high-pressure clean water pump. The low-pressure clean water delivery pump is used to pump clean water from a clean water storage tank into the borehole to flush the borehole. The high-pressure clean water pump is used to further pressurize the water source after it has been pressurized by the low-pressure clean water delivery pump and pump it into the borehole in a high-pressure form to achieve the purpose of fracturing the borehole.

[0008] In one example of the present invention, the gel mixing unit further includes: a gel base liquid tank, a crosslinking agent tank, and a biodegradable temporary plugging particle funnel. The gel base liquid tank, the crosslinking agent tank, and the biodegradable temporary plugging particle funnel are all connected to a mixer, configured to fully mix the gel base liquid, the crosslinking agent, and the biodegradable temporary plugging particles in the mixer to form a biodegradable gel fracturing fluid.

[0009] In one example of the present invention, the plurality of input terminals include: a clean water inlet, a gel inlet, a rinsing inlet, and a pressure relief-return port; The switching valve group unit includes: Four check valves are connected to the corresponding clean water inlet, gel inlet, flushing inlet, and pressure relief / return port, respectively. The check valves connected to the clean water inlet, gel inlet, and flushing inlet are configured to allow fluid to flow only from the input end to the output end; the check valve connected to the pressure relief / return port is configured to allow flushing waste liquid and degraded gel to flow only from the output end to the input end. The water valve, gel valve, flushing valve, and safety relief valve are connected at one end to the corresponding check valve and at the other end to the output.

[0010] In one example of the present invention, a monitoring unit is further included, comprising a pressure sensor, a flow sensor, and an acoustic emission sensor. The pressure sensor and the flow sensor are disposed between the sealing injection assembly and the switching valve group unit, and are configured to monitor the pressure and flow information of the clean water, gel, gel breaking liquid, and flushing waste liquid. The acoustic emission sensor is disposed in the fracturing target section and is configured to monitor the micro-vibration signal of the target fracturing section. The control unit is coupled to the water supply unit, gel mixing unit, sealing injection assembly, switching valve assembly unit, monitoring unit, and breaker tank. The control unit controls the switching valve assembly unit to switch the on / off state of different channels based on the micro-vibration signal obtained by the emission sensor to achieve switching between the water pre-fracturing stage, gel filling stage, gel diversion fracturing stage, and water rinsing stage. The control unit adjusts the rotation speed of the first pump assembly and the second pump assembly based on the difference between the target flow information and the actual flow information at the current stage.

[0011] In one example of the invention, a waste liquid return collection tank is further included, which is connected to one of the input terminals of the switching valve group unit and configured to discharge fluid in the high-pressure injection pipe from the output terminal side to the input terminal via a pressure relief return channel.

[0012] Another object of the present invention is to provide a fracturing method for a staged composite fracturing device for coal and rock masses as described above, comprising the following steps: S10: During construction, the first pump body assembly first pressurizes the water source in the clean water storage tank and pumps it to the switching valve group unit. Then, it is injected into the target fracturing section through the sealing injection assembly to complete the first stage of hydraulic pre-fracturing. S20: After the parameter signals detected by the monitoring unit determine that the target coal and rock mass has formed an initial main fracture, the control switching valve group unit closes the clear water channel and opens the gel channel; S30: The gel base liquid, crosslinking agent, and temporary plugging particles are added to the mixer and stirred to form a gel fracturing fluid containing temporary plugging particles. The mixed gel fracturing fluid is pressurized by the second pump body assembly and injected into the target fracturing section through the gel channel of the switching valve group unit to form temporary plugging in the initial main fracture and induce the propagation of branch fractures. S40: After gel fracturing is completed, gel injection is stopped and pressure is maintained. Then, the control unit controls the switching valve unit to close the gel channel and open the gel breaking and flushing channel. The gel breaking agent in the gel breaking agent tank is injected into the high-pressure injection pipe, the bottom hole jet screen pipe and the near-hole area of ​​the target fracturing section to break the residual gel fracturing fluid and reduce viscosity. After the gel breaking is completed, the control unit controls the switching valve unit to switch to the clean water channel. The clean water supply unit injects clean water into the high-pressure injection pipe, the bottom hole jet screen pipe and the near-hole area of ​​the target fracturing section to replace and flush the degraded gel fracturing fluid and the residual gel breaking agent. S50: After the gel breaking and water rinsing are completed, the injection is stopped. The control unit controls the switching valve group unit to close the water channel and open the pressure relief and return channel, so that the gel breaking fluid, water and degraded gel in the borehole and high-pressure injection pipe are discharged into the waste liquid-return collection box through the pressure relief and return channel of the switching valve group unit until the system pressure is reduced to a safe range, and the entire phased composite fracturing construction is completed.

[0013] In one example of the present invention, in step S20, when it is determined that the target coal and rock mass has formed an initial main fracture, at least one of the following should be satisfied: (1) A significant pressure drop occurs after the pressure is increased to the initiation pressure; (2) The pressure change rate dP / dt changes from positive to negative and continues for more than the set time; (3) The pressure drop reaches the preset threshold under the same pumping displacement; (4) The amount of liquid absorbed per unit time increased significantly; (5) The cumulative water injection volume has reached the design standard; (6) The external acoustic emission sensor detected the crack formation signal.

[0014] In one example of the present invention, step S30, forming a temporary plug within the initial main fracture and inducing the propagation of branch fractures, specifically includes the following steps: Three modes of continuous injection of gel fracturing fluid were adopted: stepped pressurization, pulse pressurization, and pump stop-pressure holding circulation. The temporary plug prevented the fluid from continuing to extend along the main fracture. The high pressure was transferred to the rock bedding, natural fissures, and fracture ends. When the local net pressure exceeded the fracturing strength of coal and rock, a large number of branch fractures were generated around the main fracture, forming a complex network of interconnected fractures.

[0015] Compared with the prior art, the present invention has the following beneficial effects: ① This invention adopts a two-stage process of "pre-cracking with clear water and gel diversion". First, the initial main crack is generated by low-viscosity clear water. The gel is only used to temporarily plug and create branch cracks. The two-stage process is carried out continuously, which balances the difficulty of crack initiation and the effect of crack modification, greatly reduces the crack initiation pressure of coal and rock mass, and reduces the energy consumption of high-pressure pumps during long-term high-load operation. The gel does not need to undertake the crack initiation task, and the overall gel consumption is significantly reduced. At the same time, the probability of gel residue blockage in pipelines is reduced.

[0016] ② This invention is equipped with a switching valve group unit, which is paired with a pressure curve recognition program built into the explosion-proof control unit. It automatically judges the formation of cracks and switches the medium based on pressure and flow data, completely eliminating the need for manual observation of instruments and manual switching of pipelines. The switching timing is uniformly determined by a preset algorithm, which is standard, objective and free from human experience deviation. There is no need to disassemble or assemble pipelines, and two stages of fracturing can be completed continuously without interruption, which greatly shortens the construction cycle.

[0017] ③ The gel of this invention enters the initial main fracture to form a temporary plug, which changes the flow resistance and local stress distribution inside the fracture. Combined with the step or pulse pressurization process, the pressure is no longer extended solely along the initial main fracture. Instead, it actively induces the development of multiple branch fractures, forming a high-density, large-scale interconnected composite fracture network inside the rock strata. This significantly improves the effects of roof pressure relief, coalbed gas permeability enhancement, and interbedded rock pre-fracture modification.

[0018] ④ The complete set of equipment of this invention integrates water supply, gel mixing, high-pressure pumping, automatic valve group, monitoring and sealing, flushing and drainage, and explosion-proof control into one integrated design. All modules meet the underground explosion-proof standards. The equipment is movable as a whole and can be adapted to the narrow construction space of underground roadways in coal mines. The equipment is easy to transport and assemble. One set of equipment can be flexibly used for various fracturing conditions such as roof, coal seam, and interbedded rock, and the equipment has strong versatility.

[0019] ⑤ The gel degradable automatic flushing and backflow design of the present invention: It is equipped with a gel breaking agent and an independent flushing channel. After construction, the gel is automatically degraded and discharged, solving the problem of gel residue blockage in traditional fracturing.

[0020] The preferred embodiments of the invention will be described in more detail below with reference to the accompanying drawings, so as to facilitate an understanding of the features and advantages of the invention. Attached Figure Description

[0021] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings of the embodiments of the present invention will be briefly described below. The drawings are merely illustrative of some embodiments of the present invention and are not intended to limit the scope of the present invention to all embodiments.

[0022] Figure 1 This is a schematic diagram of the structure of a staged composite fracturing device for coal and rock mass according to an embodiment of the present invention; Figure 2 This is a schematic diagram of the sealing injection assembly according to an embodiment of the present invention; Figure 3 This is a schematic diagram of the structure of a switching valve group unit according to an embodiment of the present invention; Figure 4 This is a control logic diagram of a switching valve group unit according to an embodiment of the present invention.

[0023] Figure 5This is a control logic diagram of a staged composite fracturing device for coal and rock mass according to an embodiment of the present invention; Figure 6 This is a flowchart of a staged composite fracturing device for coal and rock mass according to an embodiment of the present invention.

[0024] List of reference numerals in the attached diagram: Fracturing device 100; Clean water supply unit 10; Clean water storage tank 11; First pump body assembly 12; Clean water delivery low-pressure pump 121; 122 high-pressure water pump; On / off valve 123; Filter 13; Gel mixing unit 20; Mixing and stirring device 21; Second pump body assembly 22; Gel-based liquid tank 23; Crosslinking agent box 24; Biodegradable temporary plugging particle funnel 25; Sealing injection assembly 30; 31; High-pressure injection tube 32; Bottom-hole spray screen 33; Target fracturing section 34; Switching valve unit 40; Input terminal 41; Clear water entrance A; Gel inlet B; Flushing inlet C; Pressure relief - return port D; Output terminal 42; Check valve 43; Clear water valve Vw; Gel valve Vg; Flushing valve Vf; Safety relief valve Vs; Monitoring Unit 50; Pressure sensor 51; Flow sensor 52; Acoustic emission sensor 53; Demolition agent box 60; Waste liquid return collection box 70; Control unit 80; Drill a hole 200. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. The same reference numerals in the drawings represent the same components. It should be noted that the described embodiments are only some, not all, of the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the described embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0026] Unless otherwise defined, the technical or scientific terms used herein shall have the ordinary meaning understood by one of ordinary skill in the art to which this invention pertains. The terms “first,” “second,” and similar terms used in this patent application specification and claims do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Similarly, “an” or “a” and similar terms do not necessarily indicate a quantity limitation. Terms such as “comprising” or “including” mean that the element or object preceding the word encompasses the element or object listed following the word and its equivalents, without excluding other elements or objects. Terms such as “connected” or “linked” are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as “upper,” “lower,” “left,” and “right” are used only to indicate relative positional relationships; these relative positional relationships may change accordingly when the absolute position of the described object changes.

[0027] According to a first aspect of the present invention, a staged composite fracturing device 100 for coal and rock masses, such as... Figure 1 , Figure 2 As shown, it includes: The clean water supply unit 10 includes: a clean water storage tank 11 and a first pump assembly 12 connected thereto. The first pump assembly 12 is configured to pump the water source in the clean water storage tank 11 into the borehole 200 for fracturing or flushing. The gel mixing unit 20 includes: a stirring mixer 21 and a second pump assembly 22. The stirring mixer 21 is configured to mix biodegradable gel fracturing fluid, and the second pump assembly 22 is configured to pump the biodegradable gel fracturing fluid into the borehole 200. The borehole sealing and injection assembly 30 includes: a borehole sealer 31, a high-pressure injection pipe 32, and a bottom-hole injection screen pipe 33. The borehole sealers 31 are spaced apart at both ends of the target fracturing section 34 in the borehole 200. The high-pressure injection pipe 32 is laid along the borehole 200 and extends such that the bottom-hole injection screen pipe 33, which is connected to it, is located in the target fracturing section 34. The bottom-hole injection screen pipe 33 is configured to inject water or biodegradable gel fracturing fluid into the target fracturing section 34. Specifically, the high-pressure injection pipe 32 is connected to the bottom-hole injection screen pipe 33. For example, it can be understood that the high-pressure injection pipe 32 is connected to both ends of the bottom-hole injection screen pipe 33, and the bottom-hole injection screen pipe 33 is located between the two borehole sealers 31. The borehole sealing and injection assembly 30 includes at least two borehole sealers 31, which are installed in the borehole. Within the borehole 200, adjacent sealing devices 31 are connected in series via high-pressure pipes, with at least one sealing device 31 connected to an external high-pressure water source via a high-pressure pipe. A high-pressure injection pipe 32 passes through the sealing devices 31 sequentially along the extension direction of the borehole 200, with both ends extending out of the sealing devices 31 to form a first protruding end and a second protruding end. The bottom injection screen pipe 33 between two adjacent expansion capsules is equipped with a screen hole connected to the borehole 200. The first protruding end is connected to the clean water supply unit 10 and the gel mixing unit 20 via the switching valve group unit 40 described below. The second protruding end is connected to a one-way valve, so that when the internal water pressure of the high-pressure injection pipe 32 is less than the water pressure inside the borehole 200 other than the sealing devices 31, the one-way valve is activated. Water is injected into the sealing device 31 from an external high-pressure water source, causing the sealing device 31 to expand and forming a sealed space in the borehole 200 between two adjacent sealing devices 31. Then, liquid is injected into the high-pressure injection pipe 32. The high-pressure liquid is discharged into the sealed space through the bottom injection screen pipe 33 and fracturing the rock layer. During this process, the water pressure inside the high-pressure injection pipe 32 is greater than the pressure inside the external borehole 200, and the one-way valve is closed. After the fracturing is completed, the injection of liquid into the high-pressure injection pipe 32 is stopped, and the water pressure inside the high-pressure injection pipe 32 gradually decreases. When the water pressure in the high-pressure injection pipe 32 drops to zero, the one-way valve is opened, and the high-pressure water that flows back from the rock layer in the borehole 200 flows out through the one-way valve until the water pressure in both the high-pressure injection pipe 32 and the borehole 200 decreases to 0 MPa.

[0028] The switching valve unit 40 has multiple input terminals 41 and output terminals 42, wherein two input terminals 41 are respectively connected to the first pump body assembly 12 and the second pump body assembly 22, and the output terminal 42 is connected to the sealing injection assembly 30. The switching valve unit 40 is configured to control the opening and closing of the water channel and the gel channel connected to the water supply unit 10 and the gel mixing unit 20, respectively. A breaker tank 60, connected to one of the input terminals 41 of the switching valve assembly unit 40, is configured to inject breaker fluid into the borehole 200 after gel fracturing to degrade and flush residual gel in the borehole 200 and pipelines. Preferably, a third pump assembly (not shown in the figure) is also provided between the breaker tank 60 and the switching valve assembly unit 40. The third pump assembly pumps the breaker fluid into the borehole 200 and is coupled to the control unit 80 described below. The control method is similar to that of the first pump assembly 12 and the second pump assembly 22, and will not be described again here.

[0029] Specifically, during construction, the first pump assembly 12 pressurizes the water in the clean water storage tank and pumps it to the switching valve unit 40. The water is then injected into the target fracturing section 34 through the sealing injection assembly 30, completing the first stage of hydraulic pre-fracturing. After the monitoring unit 50 detects parameters indicating that the target coal and rock mass has formed an initial main fracture, the switching valve unit 40 is controlled to close the clean water channel and open the gel channel. The gel base liquid, crosslinking agent, and temporary plugging particles are added to the mixer and stirred to form a gel fracturing fluid containing temporary plugging particles. The mixed gel fracturing fluid is pressurized by the second pump assembly 22 and injected into the target fracturing section 34 through the gel channel of the switching valve unit 40, forming a temporary plug within the initial main fracture and inducing the propagation of branch fractures. After gel fracturing is completed, injection is stopped and pressure is maintained. Subsequently, the switching valve unit 40 is controlled to close the gel channel and open the gel-breaking flush. The process begins with a flushing channel. The gel-breaking fluid in the breaker tank 60 is injected into the high-pressure injection pipe 32, the bottom-hole jet screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to break down and reduce the viscosity of the residual gel fracturing fluid. After gel breaking is complete, the control switching valve unit 40 switches to the clean water channel. The clean water supply unit 10 injects clean water into the high-pressure injection pipe 32, the bottom-hole jet screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to replace and flush the degraded gel fracturing fluid and residual gel-breaking fluid. After gel breaking and clean water flushing are completed, injection is stopped. The control switching valve unit 40 closes the clean water channel and opens the pressure relief and return channel, allowing the gel-breaking fluid, clean water, and degraded gel in the borehole 200 and high-pressure injection pipe 32 to be discharged into the waste fluid-return collection tank 70 through the pressure relief and return channel of the switching valve unit 40 until the system pressure drops to a safe range, completing the entire phased composite fracturing operation.

[0030] The fracturing device 100 adopts a two-stage process of "pre-fracturing with water and gel diversion". First, it relies on low-viscosity water to generate the initial main fracture. The gel is only used to temporarily plug and create branch fractures. The two stages are carried out continuously to balance the difficulty of fracturing and the effect of fracture modification, which greatly reduces the fracturing pressure of coal and rock mass and reduces the energy consumption of high-pressure pumps during long-term high-load operation. The gel does not need to undertake the fracturing task, and the overall gel consumption is significantly reduced, while reducing the probability of gel residue blockage in pipelines.

[0031] The fracturing device 100 is equipped with a switching valve group unit 40 and an explosion-proof control unit 80 with a built-in pressure curve recognition program. It automatically judges the formation of fractures and switches media based on pressure and flow data, completely eliminating the need for manual observation of instruments and manual switching of pipelines. The switching timing is uniformly determined by a preset algorithm, which is standard, objective and free from human experience bias. There is no need to disassemble or assemble pipelines, and two stages of fracturing can be completed continuously without interruption, which greatly shortens the construction cycle.

[0032] The gel from the fracturing device 100 enters the initial main fracture to form a temporary plug, changing the flow resistance and local stress distribution inside the fracture. Combined with the step or pulse pressurization process, the pressure is no longer solely extended along the initial main fracture, but actively induces the development of multiple branch fractures. A high-density, large-scale interconnected composite fracture network is formed inside the rock strata, significantly improving the effects of roof pressure relief, coalbed gas permeability enhancement, and interbedded rock pre-fracturing.

[0033] The complete set of fracturing equipment 100 integrates clean water supply, gel mixing, high-pressure pumping, automatic valve group, monitoring and sealing, flushing and drainage, and explosion-proof control into one integrated design. All modules meet the underground explosion-proof standards. The equipment is mobile and adaptable to the narrow construction space of underground coal mine roadways. The equipment is easy to transport and assemble. One set of equipment can be flexibly used for various fracturing conditions such as roof, coal seam, and interbedded rock, and the equipment has strong versatility.

[0034] The fracturing device 100 features a gel biodegradable automatic flushing and return design: it is equipped with a gel-breaking agent and an independent flushing channel, and automatically degrades and discharges the gel after construction, solving the problem of gel residue blockage in traditional fracturing.

[0035] In one example of the present invention, the clean water supply unit 10 further includes: The filter 13 is disposed between the clean water storage tank 11 and the first pump assembly 12 and is configured to filter impurity particles from the water source in the clean water storage tank 11.

[0036] The water source in the clean water storage tank 11 can be filtered by the filter 13, thereby preventing impurities from entering other equipment and causing blockages that affect its use.

[0037] In one example of the present invention, the first pump assembly 12 includes: a clean water delivery low-pressure pump 121 and a clean water high-pressure pump 122 connected in series, and an on / off valve 123 connected in parallel with the clean water high-pressure pump 122. The clean water delivery low-pressure pump 121 is used to pump clean water from the clean water storage tank into the borehole 200 to flush the borehole 200. The clean water high-pressure pump 122 is used to further pressurize the water source after it has been pressurized by the clean water delivery low-pressure pump 121 and pump it into the borehole 200 in a high-pressure form to achieve the purpose of fracturing the borehole 200.

[0038] During the water fracturing stage, the on / off valve 123 is closed, and the low-pressure water delivery pump 121 and the high-pressure water delivery pump 122 are started. The low-pressure water delivery pump 121 mainly serves as the water source, providing a stable fluid supply to the high-pressure water delivery pump during the hydraulic pre-fracturing stage. At this time, both the low-pressure and high-pressure pumps work together. The high-pressure water delivery pump 122 is responsible for further pressurization to complete the hydraulic pre-fracturing. During the water flushing stage, the on / off valve 123 is opened, the low-pressure water delivery pump 121 is started, and the high-pressure water delivery pump 122 is closed. Water should not continue to pass through the stopped high-pressure water delivery pump 122; therefore, a bypass flushing branch bypassing the high-pressure pump needs to be added at the outlet of the low-pressure water delivery pump 121. During flushing, the high-pressure water delivery pump 122 is closed, and the low-pressure pump delivers water to the flushing inlet of the valve assembly through the bypass branch.

[0039] In one example of the present invention, the gel mixing unit 20 further includes: a gel base liquid tank 23, a crosslinking agent tank 24, and a biodegradable temporary plugging particle funnel 25. The gel base liquid tank 23, the crosslinking agent tank 24, and the biodegradable temporary plugging particle funnel 25 are all connected to a mixer 21 and are configured to fully mix the gel base liquid, crosslinking agent, and biodegradable temporary plugging particles in the mixer 21 to form a biodegradable gel fracturing fluid.

[0040] In other words, the outlets of the gel-based liquid tank 23 and the crosslinking agent tank 24 are connected to the mixer 21 through pipelines, and the biodegradable temporary plugging particle funnel 25 is connected to the mixer 21 through pipelines. In the mixer 21, the gel-based liquid, crosslinking agent and biodegradable temporary plugging particles are fully stirred to form a biodegradable gel fracturing fluid. The switching valve group unit 40 switches the gel fracturing channel, and the gel fills the temporary plug. The control unit 80 sends a command to the automatic switching valve group unit 40 to close the clean water channel and open the gel channel. The gel mixing unit 20 mixes the raw materials online to generate biodegradable gel fracturing fluid, and the gel high-pressure pump injects the gel into the initial main fracture. The gel forms a stable temporary plug inside the main fracture by relying on viscosity and the bridging effect of the temporary plugging particles, which increases the flow resistance and local net pressure inside the fracture.

[0041] Preferably, valves are respectively installed between the gel-based liquid tank 23, the crosslinking agent tank 24, and the biodegradable temporary plugging particle funnel 25 and the mixer 21. These valves allow for control of the flow rate and on / off state of these components. More preferably, to further facilitate control of the flow rate of the gel-based liquid tank 23, the crosslinking agent tank 24, and the biodegradable temporary plugging particle funnel 25, a pump body can also be installed between each of these components and the mixer 21.

[0042] In one example of the present invention, such as Figure 3 , Figure 4As shown, the multiple input terminals 41 include: a clean water inlet A, a gel inlet B, a rinsing inlet C, and a pressure relief-return port D; the output terminal 42 includes: a liquid outlet E; The switching valve group unit 40 includes: Four check valves 43 are respectively connected to the corresponding clean water inlet A, gel inlet B, flushing inlet C, and pressure relief-return port D. Among them, the check valves 43 connected to the clean water inlet A, gel inlet B, and flushing inlet C are configured to allow fluid to flow only from the input end 41 to the output end 42; the check valve 43 connected to the pressure relief-return port D is configured to allow flushing waste liquid and degraded gel to flow only from the output end 42 to the input end 41. The water valve Vw, gel valve Vg, flushing valve Vf, and safety relief valve Vs are connected at one end to the corresponding check valve 43, and at the other end to the output terminal 42.

[0043] Specifically, during the hydraulic pre-fracturing stage: the control unit 80 opens the clean water valve Vw and closes the gel valve Vg, flushing valve Vf, and safety relief valve Vs. Clean water enters the valve group through the clean water inlet A and is delivered to the sealing injection assembly 30 and the target fracturing section 34 via the output end 42. The flow path is A→E, i.e., the clean water channel.

[0044] Gel fracturing stage: Once the system determines that the initial main fracture has formed, the clean water valve Vw is closed and the gel valve Vg is opened. The gel fracturing fluid enters the valve assembly through the gel inlet B and is injected into the target fracturing section 34 through the output end 42. The flow path is: B→E, i.e., the gel channel.

[0045] Gel breaking and flushing stage: After gel fracturing and pressure holding are completed, close the clean water valve Vw and the gel valve Vg, and open the flushing valve Vf. The gel breaking fluid or flushing fluid enters the valve group through the flushing inlet C, and enters the pipeline and borehole 200 through the output end 42 to degrade and flush the residual gel. After flushing is completed, open the safety relief valve Vs to allow the flushing waste fluid and degraded gel to flow back from the output end 42 side and be discharged from the pressure relief-return port D. Therefore, this stage in the figure can be represented as: C→E, i.e., the gel breaking and flushing channel, followed by E→D, i.e., the pressure relief and return channel; the overall representation is C→E→D.

[0046] Overpressure protection phase: When pressure sensor 51 detects that the system pressure exceeds the set safety value, control unit 80 closes the corresponding clean water valve Vw, gel valve Vg, or flushing valve Vf, and simultaneously opens the safety relief valve Vs, allowing the fluid in the high-pressure pipeline to be discharged from the output end 42 side through the pressure relief channel to the pressure relief-return outlet D. The flow path is: E→D, i.e., the pressure relief return channel. Simultaneously, the high-pressure pump can be interlocked to stop, preventing damage to the pipeline, valve assembly, and sealing injection component 30 due to overpressure.

[0047] Overall switching sequence: hydraulic pre-fracturing (A→E) → gel fracturing (B→E) → gel breaking and flushing (C→E→D); In case of overpressure, perform (E→D) safety relief.

[0048] In one example of the present invention, such as Figure 5 As shown, it also includes: a monitoring unit 50, comprising: a pressure sensor 51, a flow sensor 52, and an acoustic emission sensor 53. The pressure sensor 51 and the flow sensor 52 are located between the sealing injection assembly 30 and the switching valve group unit 40, and are configured to monitor the pressure and flow information of the clean water, gel, gel breaking fluid, and flushing waste fluid; the acoustic emission sensor 53 is located in the fracturing target section and is configured to monitor the micro-vibration signal of the target fracturing section 34. The control unit 80 is coupled to the clean water supply unit 10, the gel mixing unit 20, the sealing injection assembly 30, the switching valve assembly unit 40, the monitoring unit 50, and the gel breaking agent tank 60. The control unit 80 controls the switching valve assembly unit 40 to switch the on and off of different channels based on the micro-vibration signal obtained by the transmitting sensor 53 to achieve switching between the clean water pre-fracturing stage, the gel filling stage, the gel turning fracturing stage, and the clean water rinsing stage. The control unit 80 adjusts the rotation speed of the first pump assembly 12 and the second pump assembly 22 based on the difference between the target flow information and the actual flow information of the current stage.

[0049] During construction, the control unit 80 first pressurizes the water in the clean water storage tank using the first pump assembly 12, then pumps it to the switching valve unit 40, and finally injects it into the target fracturing section 34 through the sealing injection assembly 30, completing the first stage of hydraulic pre-fracturing. After the monitoring unit 50 determines that the target coal and rock mass has formed an initial main fracture based on the micro-vibration signal from the acoustic emission sensor 53, the control unit 80 controls the switching valve unit 40 to close the clean water channel and open the gel channel. The gel base liquid, crosslinking agent, and temporary plugging particles are added to the mixer and stirred to form a gel fracturing fluid containing temporary plugging particles. The mixed gel fracturing fluid is pressurized by the control unit 80 using the second pump assembly 22 and injected into the target fracturing section 34 through the gel channel of the switching valve unit 40, forming a temporary plug in the initial main fracture and inducing the propagation of branch fractures. After gel fracturing is completed, the injection is stopped and pressure is maintained. Subsequently, the control unit 80 controls the switching valve unit 40 to close the... The gel channel is closed and the gel breaking and flushing channel is opened. The gel breaking fluid in the gel breaking agent tank 60 is injected into the high-pressure injection pipe 32, the bottom injection screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to break the residual gel fracturing fluid and reduce its viscosity. After the gel breaking is completed, the control unit 80 controls the switching valve group unit 40 to switch to the clean water channel. The clean water supply unit 10 injects clean water into the high-pressure injection pipe 32, the bottom injection screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to replace and flush the degraded gel fracturing fluid and the residual gel breaking fluid. After the gel breaking and clean water flushing are completed, the injection is stopped. The control unit 80 controls the switching valve group unit 40 to close the clean water channel and open the pressure relief and return channel. The gel breaking fluid, clean water, and degraded gel in the borehole 200 and the high-pressure injection pipe 32 are discharged into the waste liquid-return collection tank 70 through the pressure relief and return channel of the switching valve group unit 40 until the system pressure is reduced to a safe range, thus completing the entire staged composite fracturing operation.

[0050] In other words, the controller unit 80 performs the following actions: It constructs a fracturing hole in the target coal and rock mass, completes hole cleaning and pressure testing, and installs a sealing injection component to isolate the fracturing section; the explosion-proof control unit 80 starts the clean water supply unit and the clean water high-pressure pump to inject clean water into the borehole for hydraulic pre-fracturing, simultaneously collecting pressure, flow rate, pressure change rate, and cumulative injection volume; the control unit 80 identifies any fracture formation characteristic such as a sudden pressure drop, a change in pressure change rate from positive to negative, or an increase in fluid absorption, and determines that the initial main fracture has formed; the control unit 80 controls the switching valve assembly 40 to close the clean water channel and open the gel channel, the gel mixing unit prepares gel fracturing fluid and pumps it into the initial main fracture; the gel forms a temporary plug in the main fracture, increasing the local net pressure, and continuous gel injection is performed using stepped or pulsed pressure increases to induce multiple branch fractures in the surrounding rock layers; after reaching the designed fracturing parameters, the pump is stopped and pressure is maintained, and the system switches to the flushing channel to inject gel-breaking fluid or clean water to degrade and discharge the gel, completing the composite fracture network modification.

[0051] It should be noted that the principle of using acoustic emission sensors to monitor microseismic signals and switch fracturing stages in hydraulic fracturing is as follows: When microcracks are generated, propagate, or penetrate within a rock mass, they release elastic energy instantaneously, forming short-duration stress waves. Acoustic emission sensor 53 receives these micro-vibration signals, converts them into electrical signals, and then control unit 80 analyzes the number, amplitude, energy, and frequency of these events. Existing hydraulic fracturing research indicates that acoustic emission monitoring can reflect the initiation, propagation, closure, and reopening of cracks.

[0052] The acoustic emission sensor 53 operates as follows: Water is injected and pressurized; a sudden pressure drop or increase in liquid absorption occurs. Simultaneously, a significant increase in the number or energy of acoustic emission events is detected, confirming the formation of the initial main fracture. The water channel is then closed, and the gel channel is opened. During the gel fracturing stage, if acoustic emission events continue to occur, it can further indicate that branch fractures are still expanding. During the initiation and propagation of fractures in coal and rock masses, transient elastic energy is released, generating acoustic emission signals. After the acoustic emission sensor 53 collects the signals, the control unit 80 analyzes the number, amplitude, energy, or frequency of acoustic emission events. During the water pre-fracturing stage, when pressure and flow parameters exhibit characteristics of fracture formation, accompanied by a significant increase in acoustic emission activity, it can further confirm that the initial main fracture has formed. During the gel fracturing stage, acoustic emission activity can be used to help determine whether branch fractures continue to expand.

[0053] The switching valve unit 40 is mainly responsible for medium switching and safety pressure relief. The flow rate is regulated by the corresponding high-pressure pump in a closed loop.

[0054] Before construction, the target injection flow rate is preset in the explosion-proof control unit 80 according to different fracturing stages. For example: (1) set the target flow rate of clean water in the clean water pre-fracturing stage; (2) set a lower gel flow rate in the gel filling stage; (3) set a step flow rate or pulse flow rate in the gel diversion fracturing stage; (4) set the flushing flow rate in the clean water flushing stage.

[0055] After construction begins, the control unit 80 opens the corresponding medium channel. For example, during water pre-cracking, the water valve is opened, the gel valve, flushing valve, and pressure relief valve are closed, and then the water delivery low-pressure pump and water high-pressure pump are started.

[0056] The flow sensor measures the actual flow rate entering the sealing injection assembly in real time and transmits the measurement result to the explosion-proof control unit 80. The control unit 80 compares the actual flow rate with the target flow rate for the current stage. When the actual flow rate is less than the target flow rate, it indicates that the current pumping volume is insufficient. The control unit 80 sends an acceleration command to the frequency converter or speed control device corresponding to the first pump body assembly 12 and the second pump body assembly 22, increasing the speed of the high-pressure pump motor or increasing the pump displacement to increase the output flow rate. When the actual flow rate is greater than the target flow rate, the control unit 80 sends a deceleration command, reducing the speed of the first pump body assembly 12 and the second pump body assembly 22 or decreasing the pump displacement to decrease the output flow rate. When the actual flow rate is within the allowable error range of the target flow rate, the control unit 80 maintains the current speed of the first pump body assembly 12 and the second pump body assembly 22 to stabilize the flow rate near the set value.

[0057] In one example of the invention, a waste liquid return collection tank 70 is also included, which is connected to one of the input terminals 41 of the switching valve group unit 40 and configured to discharge fluid in the high-pressure injection pipe 32 from the output terminal 42 side to the input terminal 41 via a pressure relief return channel.

[0058] Specifically, after gel fracturing is completed, gel injection is stopped and pressure is maintained. Then, the gel breaking and flushing channel of the switching valve group unit 40 is opened, and the gel breaking liquid in the gel breaking agent tank 60 is injected into the high-pressure injection pipe 32, the bottom injection screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to break the residual gel fracturing fluid and reduce viscosity. After the gel breaking is completed, the switching valve group unit 40 switches to the clean water channel, and the clean water supply unit 10 injects clean water into the high-pressure injection pipe 32, the bottom injection screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to replace and flush the degraded gel fracturing fluid and the residual gel breaking liquid. After the gel breaking and clean water flushing are completed, the injection is stopped, the switching valve group unit 40 closes the clean water channel and opens the pressure relief and return channel, so that the gel breaking liquid, clean water, and degraded gel in the borehole 200 and the high-pressure injection pipe 32 are discharged into the waste liquid-return collection tank 70 through the pressure relief and return channel of the switching valve group unit 40 until the system pressure is reduced to a safe range, thus completing the entire staged composite fracturing operation.

[0059] According to a second aspect of the present invention, a fracturing method using the staged composite fracturing device 100 for coal and rock masses as described above is provided. Figure 5 , Figure 6 As shown, it includes the following steps: S10: During construction, the first pump body assembly 12 pressurizes the water source in the clean water storage tank and pumps it to the switching valve group unit 40. Then, it is injected into the target fracturing section 34 through the sealing injection assembly 30 to complete the first stage of hydraulic pre-fracturing. It should be noted that in the early stage, the drilling 200 and sealing installation are carried out according to the construction requirements of the roof, coal seam or interbedded rock. The fracturing holes are constructed, the rock powder in the holes is cleaned, and the hole diameter is checked. The sealing injection assembly is lowered into the target depth of the drilling hole to complete the hole sealing pressure test and ensure that there is no leakage.

[0060] S20: After the parameter signals detected by the monitoring unit 50 determine that the target coal and rock mass has formed an initial main fracture, the control switching valve group unit 40 closes the clear water channel and opens the gel channel. S30: The gel base liquid, crosslinking agent and temporary plugging particles are added to the mixer and stirred to form a gel fracturing fluid containing temporary plugging particles. The mixed gel fracturing fluid is pressurized by the second pump body assembly 22 and injected into the target fracturing section 34 through the gel channel of the switching valve group unit 40 to form temporary plugging in the initial main fracture and induce the propagation of branch fractures. S40: After gel fracturing is completed, gel injection is stopped and pressure is maintained. Then, the control unit 80 controls the switching valve group unit 40 to close the gel channel and open the gel breaking flushing channel. The gel breaking liquid in the gel breaking agent tank 60 is injected into the high-pressure injection pipe 32, the bottom hole injection screen pipe 33 and the near-hole area of ​​the target fracturing section 34 to break the residual gel fracturing fluid and reduce viscosity. After the gel breaking is completed, the control unit 80 controls the switching valve group unit 40 to switch to the clean water channel. The clean water supply unit 10 injects clean water into the high-pressure injection pipe 32, the bottom hole injection screen pipe 33 and the near-hole area of ​​the target fracturing section 34 to replace and flush the degraded gel fracturing fluid and the residual gel breaking liquid. S50: After the gel breaking and water rinsing are completed, the injection is stopped. The control unit 80 controls the switching valve group unit 40 to close the water channel and open the pressure relief and return channel, so that the gel breaking fluid, water and degraded gel in the borehole 200 and high pressure injection pipe 32 are discharged into the waste liquid-return collection tank 70 through the pressure relief and return channel of the switching valve group unit 40 until the system pressure is reduced to a safe range, thus completing the entire phased composite fracturing operation.

[0061] Specifically, during construction, the control unit 80 first pressurizes the water in the clean water storage tank using the first pump assembly 12, then pumps it to the switching valve group unit 40, and finally injects it into the target fracturing section 34 through the sealing injection assembly 30, completing the first stage of hydraulic pre-fracturing. After the monitoring unit 50 detects the parameter signals and confirms that the target coal and rock mass has formed an initial main fracture, the control unit 80 controls the switching valve group unit 40 to close the clean water channel and open the gel channel. The gel base liquid, crosslinking agent, and temporary plugging particles are added to the mixer and stirred to form a gel fracturing fluid containing temporary plugging particles. The mixed gel fracturing fluid is pressurized by the control unit 80 using the second pump assembly 22 and injected into the target fracturing section 34 through the gel channel of the switching valve group unit 40, forming a temporary plug in the initial main fracture and inducing the propagation of branch fractures. After the gel fracturing is completed, the injection is stopped and pressure is maintained. Subsequently, the control unit 80 controls the opening of the switching valve group unit 40. In the 0-stage composite fracturing operation, the gel breaking agent in the breaker tank 60 is injected into the high-pressure injection pipe 32, the bottom injection screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to break down and reduce the viscosity of the residual gel fracturing fluid. After the gel breaking is completed, the control unit 80 controls the switching valve group unit 40 to switch to the clean water channel. The clean water supply unit 10 injects clean water into the high-pressure injection pipe 32, the bottom injection screen pipe 33, and the near-hole area of ​​the target fracturing section 34 to replace and flush the degraded gel fracturing fluid and the residual gel breaking agent. After the gel breaking and clean water flushing are completed, the injection is stopped. The control unit 80 controls the switching valve group unit 40 to close the clean water channel and open the pressure relief and return channel. The gel breaking agent, clean water, and degraded gel in the borehole 200 and the high-pressure injection pipe 32 are discharged into the waste liquid-return collection tank 70 through the pressure relief and return channel of the switching valve group unit 40 until the system pressure is reduced to a safe range, thus completing the entire staged composite fracturing operation.

[0062] This fracturing method employs a two-stage process of "pre-fracturing with clear water and gel diversion". First, low-viscosity clear water is used to generate the initial main fracture, while the gel is only used to temporarily plug and create branch fractures. The two stages are carried out continuously, balancing the difficulty of fracturing and the effect of fracture modification, significantly reducing the fracturing pressure of coal and rock mass, and reducing the energy consumption of high-pressure pumps operating at high loads for a long time. The gel does not need to undertake the fracturing task, and the overall gel consumption is significantly reduced, while also reducing the probability of gel residue blockage in pipelines.

[0063] This fracturing method is equipped with a switching valve group unit 40 and an explosion-proof control unit 80 with a built-in pressure curve recognition program. It automatically judges the formation of fractures and switches the medium based on pressure and flow data, completely eliminating the need for manual observation of instruments and manual switching of pipelines. The switching timing is uniformly determined by a preset algorithm, which is standard, objective and free from human experience bias. There is no need to disassemble or reassemble pipelines, and two stages of fracturing can be completed continuously without interruption, which greatly shortens the construction cycle.

[0064] This fracturing method allows gel to enter the initial main fracture to form a temporary plug, changing the flow resistance and local stress distribution inside the fracture. Combined with a stepped or pulsed pressurization process to continuously increase pressure, the pressure no longer extends solely along the initial main fracture, but actively induces the development of multiple branch fractures. This results in a high-density, large-scale interconnected composite fracture network within the rock strata, significantly improving the effects of roof pressure relief, coalbed gas permeability enhancement, and interbedded rock pre-fracturing.

[0065] This fracturing method integrates water supply, gel mixing, high-pressure pumping, automatic valve assembly, monitoring and sealing, flushing and drainage, and explosion-proof control into a single integrated design. All modules meet underground explosion-proof standards. The equipment is mobile and adaptable to the confined working space of underground coal mine roadways, making it easy to transport and assemble. One set of equipment can be flexibly used for various fracturing conditions such as roof, coal seam, and interbedded rock, demonstrating strong versatility.

[0066] The fracturing method features a gel degradable automatic flushing and drainage design: it is equipped with a gel-breaking agent and an independent flushing channel, and the gel is automatically degraded and discharged after construction, solving the problem of gel residue blockage in traditional fracturing.

[0067] In one example of the present invention, in step S20, when it is determined that the target coal and rock mass has formed an initial main fracture, at least one of the following should be satisfied: (1) A significant pressure drop occurs after the pressure is increased to the initiation pressure; (2) The pressure change rate dP / dt changes from positive to negative and continues for more than the set time; (3) The pressure drop reaches the preset threshold under the same pumping displacement; (4) The amount of liquid absorbed per unit time increased significantly; (5) The cumulative water injection volume has reached the design standard; (6) An external acoustic emission or micro-vibration device (e.g., acoustic emission sensor 53) detects crack formation signals.

[0068] In one example of the present invention, step S30, forming a temporary plug within the initial main fracture and inducing the propagation of branch fractures, specifically includes the following steps: Three modes of continuous injection of gel fracturing fluid were adopted: stepped pressurization, pulse pressurization, and pump stop-pressure holding circulation. The temporary plug prevented the fluid from continuing to extend along the main fracture. The high pressure was transferred to the rock bedding, natural fissures, and fracture ends. When the local net pressure exceeded the fracturing strength of coal and rock, a large number of branch fractures were generated around the main fracture, forming a complex network of interconnected fractures.

[0069] In one example of this invention, the accompanying parameter control logic of the method is as follows: 1) Pressure parameters: The pressure Pw in the hydraulic pre-fracturing stage is ≤ 80% of the rated pressure of the sealing assembly; the pressure Pg in the gel fracturing stage is higher than the pre-fracturing stable pressure, and the Pg / Pw ratio is controlled in the range of 1.05~1.60. 2) Gel type: Water-based crosslinked gel, shear-thinning gel, and gel containing biodegradable particles / fibers can be selected. The gel can automatically break down at a set time in a normal downhole environment. 3) Gel circulation pressurization method: low displacement fills the main crack → high displacement pressurization to create crack → short-term pump stop to maintain pressure → pressurization again, repeated cycles to induce new branch cracks.

[0070] The foregoing description, with reference to preferred embodiments, details an exemplary implementation of the coal and rock mass staged composite fracturing device 100 and method proposed in this invention. However, those skilled in the art will understand that various modifications and alterations can be made to the above specific embodiments without departing from the concept of this invention, and various combinations can be made to the various technical features and structures proposed in this invention without exceeding the protection scope of this invention, which is determined by the appended claims.

Claims

1. A device for staged composite fracturing of coal rock mass, characterized in that, include: The clean water supply unit (10) includes: a clean water storage tank (11) and a first pump assembly (12) connected thereto, the first pump assembly (12) being configured to pump water from the clean water storage tank (11) into the borehole (200) for fracturing or flushing; The gel mixing unit (20) includes: a stirring mixer (21) and a second pump assembly (22), the stirring mixer (21) being configured to mix biodegradable gel fracturing fluid, and the second pump assembly (22) being configured to pump the biodegradable gel fracturing fluid into the borehole (200); The sealing injection assembly (30) includes: a sealing device (31), a high-pressure injection pipe (32), and a bottom-hole injection screen (33). The sealing devices (31) are spaced apart at both ends of the target fracturing section (34) in the borehole (200). The high-pressure injection pipe (32) is laid along the borehole (200) and passes through two sealing devices (31). The bottom-hole injection screen (33) connected to the sealing device (31) is located in the target fracturing section (34). The bottom-hole injection screen (33) is configured to inject water or biodegradable gel fracturing fluid into the target fracturing section (34). The switching valve unit (40) has multiple input terminals (41) and output terminals (42), wherein two input terminals (41) are respectively connected to the first pump body assembly (12) and the second pump body assembly (22), and the output terminal (42) is connected to the sealing injection assembly (30). The switching valve unit (40) is configured to control the opening and closing of the water channel and the gel channel connected to the water supply unit (10) and the gel mixing unit (20), respectively. A breaker tank (60), which is connected to one of the inputs (41) of a switching valve assembly unit (40), is configured to inject breaker fluid into the borehole (200) after gel fracturing to degrade and flush residual gel in the borehole (200) and pipeline.

2. The staged composite fracturing device for coal and rock mass according to claim 1, characterized in that, The clean water supply unit (10) also includes: A filter (13) is disposed between the clean water storage tank (11) and the first pump assembly (12) and is configured to filter impurity particles from the water source in the clean water storage tank (11).

3. The staged composite fracturing device for coal and rock mass according to claim 1, characterized in that, The first pump assembly (12) includes: a clean water delivery low-pressure pump (121) and a clean water high-pressure pump (122) connected in series, and an on / off valve (123) connected in parallel with the clean water high-pressure pump (122). The clean water delivery low-pressure pump (121) is used to pump clean water from the clean water storage tank into the borehole (200) to flush the borehole (200). The clean water high-pressure pump (122) is used to further pressurize the water source after it has been pressurized by the clean water delivery low-pressure pump (121) and pump it into the borehole (200) in a high-pressure form to achieve the purpose of fracturing the borehole (200).

4. The staged composite fracturing device for coal and rock mass according to claim 1, characterized in that, The gel mixing unit (20) further includes: a gel base liquid tank (23), a crosslinking agent tank (24), and a biodegradable temporary plugging particle funnel 25. The gel base liquid tank (23), the crosslinking agent tank (24), and the biodegradable temporary plugging particle funnel 25 are all connected to the mixer (21) and are configured to fully mix the gel base liquid, crosslinking agent, and biodegradable temporary plugging particles in the mixer (21) to form a biodegradable gel fracturing fluid.

5. The staged composite fracturing device for coal and rock mass according to claim 1, characterized in that, Multiple input ports (41) include: a clean water inlet (A), a gel inlet (B), a flushing inlet (C), and a pressure relief-return port (D); The switching valve group unit (40) includes: Four check valves (43) are respectively connected to the corresponding clean water inlet (A), gel inlet (B), flushing inlet (C) and pressure relief-return port (D). Among them, the check valve (43) connected to the clean water inlet (A), gel inlet (B) and flushing inlet (C) is configured to allow fluid to flow only from the input end (41) to the output end (42); the check valve (43) connected to the pressure relief-return port (D) is configured to allow flushing waste liquid and degraded gel to flow only from the output end (42) to the input end (41). The water valve (Vw), gel valve (Vg), flushing valve (Vf) and safety relief valve (Vs) are connected at one end to the corresponding check valve (43) and at the other end to the output end (42).

6. The coal rock mass staged composite fracturing device according to claim 1, characterized in that, Also includes: The monitoring unit (50) includes a pressure sensor (51), a flow sensor (52), and an acoustic emission sensor (53). The pressure sensor (51) and the flow sensor (52) are located between the sealing injection assembly (30) and the switching valve group unit (40) and are configured to monitor the pressure and flow information of the clean water, gel, gel breaking liquid, and flushing waste liquid. The acoustic emission sensor (53) is located in the fracturing target section and is configured to monitor the micro-vibration signal of the target fracturing section (34). The control unit (80) is coupled to the water supply unit (10), the gel mixing unit (20), the sealing injection assembly (30), the switching valve assembly unit (40), the monitoring unit (50), and the de-icing agent tank (60). The control unit (80) controls the switching valve assembly unit (40) to switch the on / off of different channels based on the micro-vibration signal obtained by the emission sensor (53) to achieve switching in the water pre-fracturing stage, the gel filling stage, the gel turning fracturing stage, and the water flushing stage. The control unit (80) adjusts the rotation speed of the first pump assembly (12) and the second pump assembly (22) based on the difference between the target flow information and the actual flow information of the current stage.

7. The staged composite fracturing device for coal and rock mass according to claim 6, characterized in that, It also includes a waste liquid return collection tank (70), which is connected to one of the input terminals (41) of the switching valve group unit (40) and is configured to discharge fluid in the high pressure injection pipe (32) from the output terminal (42) side to the input terminal (41) via the pressure relief return channel.

8. The method for fracturing of coal rock mass staged composite fracturing device according to claim 7, characterized in that, Includes the following steps: S10: During construction, the first pump body assembly (12) controlled by the control unit (80) pressurizes the water source in the clean water storage tank and pumps it to the switching valve group unit (40), and then injects it into the target fracturing section (34) through the sealing injection assembly (30) to complete the first stage of hydraulic pre-fracturing. S20: After the control unit (80) determines that the target coal and rock mass has formed an initial main fracture based on the micro-vibration signal obtained by the acoustic emission sensor (53), it controls the switching valve group unit (40) to close the clear water channel and open the gel channel. S30: The gel base liquid, crosslinking agent and temporary plugging particles are added to the mixer (21) and stirred to form a gel fracturing fluid containing temporary plugging particles. The control unit (80) controls the second pump assembly (22) to pressurize the mixed gel fracturing fluid and inject it into the target fracturing section (34) through the gel channel of the switching valve group unit (40) to form temporary plugging in the initial main fracture and induce the extension of branch fractures. S40: After gel fracturing is completed, gel injection is stopped and pressure is maintained. Then, the control unit (80) controls the switching valve group unit (40) to close the gel channel and open the gel breaking flushing channel. The gel breaking liquid in the gel breaking agent tank (60) is injected into the high pressure injection pipe (32), the bottom hole injection screen pipe (33) and the near hole area of ​​the target fracturing section (34) to break the residual gel fracturing liquid and reduce viscosity. After the gel breaking is completed, the control unit (80) controls the switching valve group unit (40) to switch to the clean water channel. The clean water supply unit (10) injects clean water into the high pressure injection pipe (32), the bottom hole injection screen pipe (33) and the near hole area of ​​the target fracturing section (34) to replace and flush the degraded gel fracturing liquid and the residual gel breaking liquid. S50: After the gel breaking and water rinsing are completed, the injection is stopped. The control unit (80) controls the switching valve group unit (40) to close the water channel and open the pressure relief and return channel, so that the gel breaking liquid, water and degraded gel in the borehole (200) and high pressure injection pipe (32) are discharged into the waste liquid-return collection box (70) through the pressure relief and return channel of the switching valve group unit (40) until the system pressure is reduced to a safe range, and the entire phased composite fracturing construction is completed.

9. The fracturing method of the staged composite fracturing device for coal and rock mass according to claim 8, characterized in that, In step S20, when it is determined that the target coal and rock mass has formed an initial main fracture, at least one of the following conditions should be met: (1) A significant pressure drop occurs after the pressure is increased to the initiation pressure; (2) The pressure change rate dP / dt changes from positive to negative and continues for more than the set time; (3) The pressure drop reaches the preset threshold under the same pumping displacement; (4) The amount of liquid absorbed per unit time increased significantly; (5) The cumulative water injection volume has reached the design standard; (6) An external acoustic emission sensor (53) detected the crack formation signal.

10. The fracturing method of the staged composite fracturing device for coal and rock mass according to claim 8, characterized in that, In step S30, a temporary plug is formed within the initial main fracture, and the propagation of branch fractures is induced. This specifically includes the following steps: Three modes of continuous injection of gel fracturing fluid were adopted: stepped pressurization, pulse pressurization, and pump stop-pressure holding circulation. The temporary plug prevented the fluid from continuing to extend along the main fracture. The high pressure was transferred to the rock bedding, natural fissures, and fracture ends. When the local net pressure exceeded the fracturing strength of coal and rock, a large number of branch fractures were generated around the main fracture, forming a complex network of interconnected fractures.