A method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission.

By arranging top-cutting boreholes along the strike of the roadway roof and carrying out directional shaped charge blasting, a continuous weakening zone is formed, which solves the problem of roadway damage caused by mining stress transmission, and realizes that stress is blocked and attenuated in front of the roadway, reducing the deformation and damage of the surrounding rock.

CN123109661APending Publication Date: 2026-11-17PINGDINGSHAN TIANAN COAL MINING +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611574609.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-12
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing methods for controlling surrounding rock are prone to exceeding limits after mining stress is transferred to the surrounding area of ​​the roadway. Traditional reinforcement methods only passively bear the stress after it is transferred to the roadway, and discrete pressure relief holes are prone to stress bypass and secondary concentration.

Method used

By arranging multiple top-cutting boreholes along the direction of the roadway roof, a continuous weakened zone is formed by directional shaped charge blasting. The cracks between adjacent boreholes are connected, forming a top-cutting weakened structure along the direction of the roadway. The top-cutting weakening parameters are optimized and adjusted to block stress transmission.

Benefits of technology

It effectively blocks mining-induced stress from being continuously blocked in front of the roadway, reduces the peak stress on the roadway side, reduces roof subsidence, sidewall convergence and floor heave, and reduces the frequency of roadway repairs and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109661A_ABST
    Figure CN123109661A_ABST
Patent Text Reader

Abstract

This invention discloses a method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission, belonging to the field of roadway surrounding rock control technology. The method includes: determining the stress-transmitting rock strata within the roof that experience stress concentration as the target layer for roof-cutting weakening based on roadway depth, ground stress testing, and mining-induced influence conditions; determining the depth, length, spacing, and arrangement of the roof-cutting weakening structure according to the target layer parameters; arranging multiple roof-cutting boreholes along the roadway roof strike, and using directional shaped charge blasting to connect the fractures of adjacent boreholes, forming a continuously extending roof-cutting weakening structure along the roadway strike; and monitoring and optimizing parameters based on surrounding rock deformation and stress changes during roadway service. This invention places the weakened zone along the mining-induced stress transmission path, achieving active blocking and dissipation of mining-induced stress, effectively reducing the stress concentration in the roadway surrounding rock, reducing the frequency of repairs, and is suitable for long-term stable control of deep, high-stress roadways.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel surrounding rock control technology, and specifically relates to a method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission. Background Technology

[0002] Mining stress is concentrated and transmitted along intact rock strata to the surrounding rock of the roadway, often causing severe deformation and damage such as roof subsidence, sidewall convergence, and floor heave.

[0003] Currently, the main methods for controlling surrounding rock include reinforced support, localized pressure relief drilling, hydraulic fracturing, roof cutting for pressure relief, and grouting reinforcement. Reinforced support and grouting reinforcement resist external stress by increasing the bearing capacity of the surrounding rock itself and the strength of the support structure. Localized pressure relief drilling, hydraulic fracturing, and roof cutting release some elastic energy by creating fracture spaces in localized areas of the surrounding rock, thereby alleviating the stress state of the roadway. However, reinforced support and grouting reinforcement are applied after the stress has been transferred to the roadway perimeter, at which point the support structure must bear most of the mining-induced stress, making it prone to exceeding its limits under high-stress and strong-disturbance conditions. The fracture zones formed by localized pressure relief drilling and fracturing are spatially discrete, with weakened areas still connected by intact rock mass. Mining-induced stress can bypass individual weakened areas and continue to be transmitted to the roadway through remaining rock bridges. Furthermore, the stress flowing around the weakened areas is superimposed at the ends, easily forming new stress-increasing zones around the roadway. The roof cutting and pressure relief technology is also limited by the borehole spacing design. If the boreholes are not sufficiently connected, the roof stress can still be transmitted to the roadway along the uncut rock bridge around the roof cutting line. Summary of the Invention

[0004] To address the aforementioned problems, the purpose of this invention is to provide a method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission.

[0005] The technical solution of this invention is: a method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission, comprising: Based on the tunnel burial depth, ground stress test results, and mining influence conditions, the stress distribution characteristics of the tunnel under the disturbance of tunneling and mining are analyzed, and the mining stress transmission strata that bear the stress concentration effect in the roof are identified as the target strata for roof cutting and weakening.

[0006] Based on the burial depth, lithology, and stress state of the target stratum, determine the depth range, cut length, cut spacing, and continuous arrangement of the top-cutting weakening structure.

[0007] Multiple top-cutting boreholes are arranged along the roadway roof, with a preset spacing between adjacent top-cutting boreholes. Top-cutting operations are carried out in the top-cutting boreholes by directional shaped charge blasting to form weakened holes with cracks in the top, and the cracks between adjacent weakened holes are interconnected. The multiple weakened holes form a top-cutting weakened structure that extends continuously along the roadway within the target stratum.

[0008] Furthermore, the preset spacing satisfies: ,in, For preset spacing, The radius of the crack propagation in the energy-focusing direction.

[0009] Furthermore, the crack propagation radius in the energy focusing direction is determined by the following formula: ;in, The energy-concentrating influence coefficient and , The radius of the crack in the non-focusing direction. The radius of the borehole is... The initial impact pressure on the borehole wall. For the dynamic tensile strength of rock, The stress attenuation coefficient is... , It is Poisson's ratio.

[0010] Furthermore, during the service period of the roadway, the displacement of the roadway roof and floor, the deformation of the two sides and the stress changes are continuously monitored, and the roof cutting weakening parameters are optimized and adjusted based on the monitoring results.

[0011] Furthermore, the roof cutting weakening parameters are optimized and adjusted, including: arranging stress monitoring points on both sides of the constructed weakening zone to monitor the approach of the roadway roof and floor and the convergence of the two sides; obtaining the stress source side stress and roadway side stress of the weakening zone, and determining the stress transfer coefficient; when the stress transfer coefficient is higher than the design allowable value or the roadway deformation rate exceeds the design allowable value, adjusting the roof cutting weakening parameters of the subsequent unconstructed sections.

[0012] Furthermore, the stress transfer coefficient is based on the formula... It is confirmed that, among them, The stress transfer coefficient; To weaken the stress on the stress source side of the barrier; To reduce the stress on the side of the barrier zone roadway.

[0013] Further, determining the mining stress transmission strata includes: using the initial stress of each stratum when it is not affected by mining as a benchmark, comparing the stress peak value, stress increment and spatial continuity of stress concentration areas in different strata, and selecting the stratum with the largest stress increment or the highest degree of stress concentration as the mining stress transmission stratum.

[0014] Furthermore, the energy-concentrating direction of the top-cutting borehole is oriented towards the rock bridge direction between adjacent top-cutting boreholes.

[0015] Compared with existing technologies, the advantages of this invention are as follows: This invention involves continuously arranging roof-cutting boreholes along the roadway direction within the critical bearing layer of the roof. Directional shaped charge blasting interconnects the fractures between adjacent boreholes, forming a spatially continuous roof-cutting weakening structure. This weakening zone is placed directly on the necessary path for mining stress to be transmitted to the roadway, ensuring that the mining stress is continuously blocked before reaching the roadway. This avoids the drawback of traditional reinforcement methods where stress is passively borne only after it has been transmitted to the roadway. The continuously connected weakening structure overcomes the problem of stress bypass and secondary concentration caused by the connection of discrete stress relief boreholes with complete rock bridges, ensuring that stress blocking is continuous and effective along the roadway direction. Meanwhile, the weakened structure has reduced stiffness due to the development of fractures, which causes the mining stress to attenuate and deflect during the crossing. Some stress is transferred to the outside of the weakened zone or to the deep rock mass. Furthermore, the closure and slippage of the fracture surface can consume a large amount of elastic energy and disturbance energy, thereby significantly reducing the peak stress on the roadway side. The roof subsidence, sidewall convergence and floor heave are effectively controlled, reducing the frequency of roadway repairs and maintenance costs. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 , Figure 3 This is a schematic diagram of the stress control for barrier weakening according to the present invention; wherein, Figure 2 This is an overall schematic diagram. Figure 3 This is a partial schematic diagram; Figure 4 This is a schematic diagram illustrating the mechanism of the weakening barrier effect of the present invention; Figure 5 This is a schematic diagram of stress wave reflection and transmission according to the present invention. Detailed Implementation

[0017] The following is in conjunction with the appendix Figure 1 To the attached Figure 5 The specific embodiments of the present invention will be described in detail below. In the description of the present invention, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the present invention.

[0018] Example like Figure 1As shown, a method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission includes: Based on the tunnel burial depth, ground stress test results, and mining influence conditions, the stress distribution characteristics of the tunnel under the disturbance of tunneling and mining are analyzed, and the mining stress transmission strata that bear the stress concentration effect in the roof are identified as the target strata for roof cutting and weakening.

[0019] Based on the burial depth, lithology, and stress state of the target stratum, determine the depth range, cut length, cut spacing, and continuous arrangement of the top-cutting weakening structure.

[0020] like Figure 2 , Figure 3 As shown, multiple top-cutting boreholes are arranged in the roof of the roadway along the roadway direction, with a preset distance between adjacent top-cutting boreholes. Top-cutting operations are carried out in the top-cutting boreholes by directional shaped charge blasting to form weakened holes with cracks in the top, and the cracks between adjacent weakened holes are interconnected. The multiple weakened holes form a top-cutting weakening structure that extends continuously along the roadway direction in the target layer.

[0021] During the service period of the roadway, the displacement of the roof and floor, the deformation of the two sides and the stress changes are continuously monitored, and the roof cutting and weakening parameters are optimized and adjusted according to the monitoring results.

[0022] Preferably, the preset spacing satisfies: ,in, For preset spacing, The radius of the crack propagation in the energy-focusing direction.

[0023] Preferably, the roadway depth is determined based on the mine geological profile, borehole column data, and roadway elevation measurements, calculated from the difference between the corresponding surface elevation and the roadway roof elevation. The in-situ stress test results are obtained through on-site in-situ stress testing, using methods such as hydraulic fracturing or stress relief, to obtain the vertical stress, maximum horizontal principal stress, minimum horizontal principal stress, and principal stress direction in the roadway area. For vertical stress, the average unit weight and depth of the overlying strata can also be used for verification. Mining-related impact conditions are obtained based on the mine's mining engineering plan, working face layout parameters, and mining parameters, including the spatial relationship between the working face and the roadway, the working face advance direction, the distance between the working face and the roadway, mining height, advance speed, coal pillar width, and the range of mining-related impact.

[0024] A preferred method for analyzing the stress distribution characteristics of a roadway under the disturbance of tunneling and mining is as follows: Based on the obtained roadway burial depth, original rock stress state, rock strata structure, and mining parameters, combined with on-site stress monitoring, the stress distribution of each rock stratum in the roadway roof under different advancing positions of the working face is obtained. Taking the initial stress of each rock stratum before mining as a benchmark, the maximum principal stress, vertical stress, or stress increment of each roof rock stratum is extracted after roadway excavation and as the working face gradually approaches the roadway. The stress peak value, stress increment, and spatial continuity of stress concentration areas in different rock strata are compared, thereby obtaining the main transmission path of mining stress from the working face to the roadway.

[0025] Preferably, the method for determining the stress-transferring rock stratum is as follows: the roadway roof is divided into several rock strata, and the stress of each rock stratum before and after mining is obtained; the stress increment or stress concentration coefficient of each rock stratum is calculated; among the rock strata located on the stress transmission path, the rock stratum with a larger stress increment, a higher stress peak value and better continuity of stress concentration area is selected as the stress-transferring rock stratum.

[0026] Preferably, the burial depth and lithology of the target stratum are determined based on mine borehole columnar sections, comprehensive geological columnar sections, and core sampling results, obtaining the distance, thickness, and lithology of the target stratum from the roadway roof. The rock mechanical parameters of the target stratum are obtained through laboratory rock mechanics tests, including elastic modulus, Poisson's ratio, compressive strength, and tensile strength. The stress state of the target stratum is obtained through the aforementioned in-situ stress tests and field stress monitoring.

[0027] Preferably, the depth range of the top-cutting weakening structure is set to allow the blasting weakening section to completely penetrate the target stratum, and the top-cutting length is set to cover the thickness of the target stratum. The continuous arrangement is as follows: multiple top-cutting boreholes are arranged sequentially along the roadway direction, the preset spacing between adjacent top-cutting boreholes satisfies the penetration criterion of S≤2Rj, and the energy-concentrating direction faces the rock bridge direction between adjacent top-cutting boreholes, so that the main fracture generated by each borehole expands along the direction of the adjacent borehole.

[0028] Preferably, the specific method for optimizing and adjusting the roof weakening parameters during roadway service is as follows: Stress monitoring points are arranged on both sides of the test section of the constructed weakened zone, and the approach of the roadway roof and floor and the convergence of the sidewalls are monitored. The stress at the stress source side of the weakened zone is obtained respectively. and tunnel side stress According to the formula Calculate the stress transfer coefficient. If the stress transfer coefficient is higher than the design allowable value, the stress isolation rate is lower than the design requirements, or the roadway deformation rate exceeds the design allowable value, the existing weakening level is deemed insufficient, and the weakening parameters for subsequent unconstructed sections are adjusted. Adjustment methods include: reducing the spacing between adjacent top-cutting boreholes, adjusting the shaped charge amount, and adjusting the shaped charge direction so that the main fracture faces the adjacent borehole. If monitoring results indicate that the weakened zone already meets the isolation requirements, construction continues with the existing parameters maintained.

[0029] Preferably, after each weakening hole is constructed, a certain range of fracture propagation zone and fracture weakening zone is formed around it. For the shaped charge structure used in this embodiment, the steps for determining the fracture propagation radius are as follows: when the blast stress wave generates tangential tensile stress in the rock mass... Exceeding the dynamic tensile strength of rock At this point, the fracture begins to propagate. Considering the attenuation characteristics of stress waves in the rock mass, the fracture radius in the non-focusing direction is determined according to equation... Determined; among them, The radius of the crack in the non-focusing direction. The radius of the borehole is... The initial impact pressure on the borehole wall. For the dynamic tensile strength of rock, The stress attenuation coefficient is... , Poisson's ratio. Due to the directional focusing effect of the shaped jet on energy, a focusing influence coefficient is introduced. ( Then, the main fracture propagation radius in the energy-focusing direction is corrected as follows: .

[0030] Assuming the density of the intact rock mass is The stress wave propagation speed is The density of the rock mass within the weakened barrier zone is The stress wave propagation speed is Then, by the conservation of wavefront momentum, the transmitted stress of the stress wave after passing through a certain structural plane of the weakened barrier rock mass from the intact rock mass can be determined as follows: ;in, Let be the transmitted stress of the stress wave through the structural surface, in MPa; For the incident stress of the stress wave, MPa.

[0031] The formula Simplified to Because the rock mass within the weakened barrier zone has well-developed pores and fractures, its density is lower than that of normal rock mass, i.e. Simultaneously, the propagation velocity of stress waves in the rock mass satisfies the equation [equation missing]. ;in, The velocity of stress wave propagation is given in m / s. Let be the stress wave propagation velocity of the rock skeleton, in m / s; The stress wave propagation velocity of the pore filling material is given in m / s. This refers to the porosity of the rock.

[0032] Because the pores and fissures of the rock mass in the barrier zone are mostly filled with water and air, and the propagation speed of liquids and gases is lower than that of solids, the stress wave propagation speed in the porous and fissured fault zone rock mass is lower than that in normal rock mass. .because , , , All are greater than 1 ( ), can obtain Therefore, it can be seen that the weakened barrier zone has a significant blocking effect on the transmission of mining stress in the overlying strata, such as Figure 5 As shown.

[0033] like Figure 4 As shown, the mechanism of stress transmission after the formation of the artificial weakened barrier zone includes: First, the weakened barrier zone reduces the equivalent elastic modulus and overall bearing stiffness of the rock mass. After the originally continuous and intact rock strata are cut by fissures, a low-stiffness, weak structure is formed, making it difficult for mining stress to continue to be transmitted to the roadway along the original intact rock strata. Second, the weakened barrier zone cuts off the continuous transmission path of mining stress. When mining stress is transmitted to the roadway, it needs to cross the weakened zone; due to the development of fissures, loose structure, and reduced strength within the weakened zone, the stress attenuates at this point, and the stress transmitted to the roadway side is significantly reduced. Third, the weakened barrier zone provides space for deformation release. After mining stress acts on the weakened zone, the fissures within the weakened zone close, open, and shear slip, and the rock blocks undergo slight rotation and displacement, thereby consuming elastic energy and mining disturbance energy. Fourth, the weakened barrier zone induces stress to transfer to the surrounding intact rock mass. Because the weakened zone has low stiffness, the mining stress is deflected when it passes through the weakened zone. Some of the stress is transferred to the outside of the weakened zone or to the deep intact rock mass, instead of being concentrated and transmitted to the surrounding rock of the roadway. As a result, the stress concentration in the area where the roadway is located is reduced, and the deformation and damage of the surrounding rock of the roadway are controlled.

[0034] To verify the barrier effect of the artificially weakened barrier strip, this embodiment introduces the stress transfer coefficient η as an evaluation index: The smaller η is, the more obvious the weakening effect of the weakening barrier band on stress transmission.

[0035] Meanwhile, the stress barrier ratio can be used to represent the barrier effect of the weakened zone: ;in, This represents the stress barrier efficiency. When... When the design requirements are met, it is believed that the artificially weakened barrier zone can effectively block the transmission of mining stress to the surrounding rock of the roadway.

[0036] Through the above methods, this embodiment realizes the transformation from "passive reinforcement support" to "active isolation of stress transmission", which can effectively reduce the stress concentration of the surrounding rock in the roadway and control deformation and damage such as roof subsidence, sidewall convergence and floor bulging.

[0037] Experimental Example The main inclined shaft of Pingmei No. 8 Mine was selected as the implementation object. The lithology of the floor in this area is mainly fine sandstone and sandy mudstone. Based on the above theoretical model, the field measured parameters were substituted for calculation.

[0038] Rock parameters: Dynamic tensile strength of sandy mudstone The stress wave attenuation coefficient is approximately 4MPa to 6MPa. Approximately 1.5. Blasting parameters: borehole radius. The diameter is 40 mm (corresponding to an 80 mm cartridge diameter), and the detonation velocity of the emulsion explosive is 3600 m / s. Substitute the parameters into... The effective fracture propagation radius in the single-pore focusing direction was obtained. The value is 1000mm~1100mm. Based on this, the theoretically calculated critical penetration spacing is 2. The spacing should be between 2.0m and 2.2m. Existing spacing (S): set at 2.0m. Judgment result: S≤2Rj, Judgment: The existing spacing is within the theoretically calculated effective penetration range.

[0039] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above descriptions are merely specific embodiments of the present invention and do not limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention are included within the protection scope of the present invention.

Claims

1. A method for controlling surrounding rock by artificially weakening a belt barrier to stress transmission, characterized by, The application relates to a roof cutting and weakening method for a roadway in a coal mine. Based on the roadway buried depth, the ground stress test results and the mining influence conditions, stress distribution characteristics of the roadway under the disturbance of tunneling and mining are analyzed, mining stress transfer rock layers in the roof under the stress concentration effect are determined, and the target layer position of the roof cutting and weakening is determined; According to the buried depth, the lithology and the stress state of the target layer position, the depth range, the roof cutting length, the cutting seam interval and the continuous arrangement mode of the roof cutting and weakening structure are determined; A plurality of roof cutting boreholes are arranged in the roof along the roadway, and a preset interval is kept between adjacent roof cutting boreholes; roof cutting work is carried out in the roof cutting boreholes through directional energy-gathering blasting, a weakened hole with cracks is formed by the roof cutting, the cracks between adjacent weakened holes are mutually penetrated, and the plurality of weakened holes form a roof cutting and weakening structure continuously extending along the roadway in the target layer position.

2. The method according to claim 1, wherein the artificial construction is a belt-like structure. The preset interval satisfies: wherein, is the preset interval, is the crack propagation radius of the energy focusing direction.

3. The method according to claim 2, wherein the artificial construction is a belt-like structure. The crack expansion radius of the energy-gathering direction is determined by the following formula: ; wherein, is the coefficient of energy concentration and , is the radius of the non-energy-concentrating directional fracture, is the borehole radius, is the initial impact pressure of the borehole wall, is the dynamic tensile strength of the rock, is the stress decay coefficient, , is the Poisson's ratio.

4. The method of claim 1, wherein the artificial construction of the weakened zone is performed by a method comprising: drilling a plurality of holes in the rock mass; and filling the holes with a material having a lower strength than the rock mass. During the service period of the roadway, the displacement of the roof and floor of the roadway, the deformation of the two sides and the stress change are continuously monitored, and the roof cutting and weakening parameters are optimized and adjusted according to the monitoring results.

5. The method of claim 4, wherein the artificial weakening belt is formed by a plurality of holes formed in the tunnel wall, and the holes are formed in a direction in which the stress is applied to the tunnel wall. The optimization and adjustment of the roof cutting and weakening parameters include: arranging stress monitoring points on both sides of the constructed weakened zone to monitor the convergence of the roof and floor and the convergence of the two sides; obtaining the stress on the stress source side of the weakened zone and the stress on the side of the roadway to determine the stress transfer coefficient; when the stress transfer coefficient is higher than the design allowable value or the deformation rate of the roadway exceeds the design allowable value, the roof cutting and weakening parameters of the subsequent unconstructed section are adjusted.

6. The method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission as described in claim 1, characterized in that, The stress transfer coefficient is determined according to the formula wherein is the stress transfer coefficient; is the stress on the stress source side of the weakening barrier; is the stress on the roadway side of the weakening barrier.

7. The method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission as described in claim 1, characterized in that, The determination of the mining stress transfer rock layer includes: taking the initial stress of each rock layer when not affected by mining as the benchmark, comparing the stress peak value, the stress increment and the spatial continuity of the stress concentration area in different rock layers, and selecting the rock layer with the maximum stress increment or the highest stress concentration degree as the mining stress transfer rock layer.

8. The method for controlling surrounding rock by artificially constructing weakened zones to block stress transmission as described in claim 1, characterized in that, The energy-gathering direction of the roof cutting borehole is towards the rock bridge direction between adjacent roof cutting boreholes.