A method for coordinated prevention and control of rockburst, spontaneous combustion of coal and gas disasters in steeply inclined coal seams

By arranging working faces from bottom to top in steeply inclined coal seams, constructing control roadways and connecting roadways, and carrying out pre-splitting and depressurization, gas pre-drainage, and fire prevention and extinguishing, the problem of coordinated prevention and control of rockburst, gas accumulation, and spontaneous combustion of coal in steeply inclined coal seam mining has been solved, enabling safe and efficient multi-face continuous mining.

CN123109758APending Publication Date: 2026-11-17XINWEN MINING GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611288336.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When mining steeply inclined coal seams, it is difficult to coordinate and control rock bursts, gas accumulation, and coal spontaneous combustion disasters, and the depressurization and gas pre-drainage work affects the working face layout and production cycle.

Method used

Working faces are arranged from bottom to top along the dip of the coal seam, with construction control roadways and connecting roadways. Pre-splitting and depressurization and gas pre-drainage are carried out through fan-shaped boreholes, and mine pillars are filled for fire prevention and extinguishing. Combined with special ventilation schemes, parallel operation of each process is achieved.

Benefits of technology

Effectively coordinate and prevent rock bursts, gas accumulation, and coal spontaneous combustion disasters, reduce operation cycles, improve ventilation quality, reduce gangue transportation costs, and achieve safe and efficient multi-face continuous mining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109758A_ABST
    Figure CN123109758A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of coal mine disaster prevention and control, specifically relating to a method for the coordinated prevention and control of rockburst, spontaneous combustion of coal, and gas disasters in steeply inclined coal seams. This invention employs a bottom-up mining sequence for each working face; during the mining of each working face, a control roadway is simultaneously excavated, and fan-shaped boreholes are drilled from the control roadway to the next working face for pre-fracking, pressure relief, and gas pre-drainage; simultaneously, a connecting roadway is constructed from the control roadway to the track roadway, and the suspended roof area is filled at intervals to form filled pillars, with fire-fighting materials filled into the fire prevention and extinguishing zones between the filled pillars; a ventilation scheme is adopted where air is simultaneously introduced into the transport roadway and the track roadway, and exhausted from the control roadway. This invention transforms pressure relief and pre-drainage, suspended roof filling, and fire prevention and extinguishing into parallel operations synchronized with mining, achieving coordinated and comprehensive prevention and control of multiple disasters such as rockburst prevention in steeply inclined coal seams, spontaneous combustion of residual coal in goaf areas, and gas accumulation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of coal mine disaster prevention and control, specifically relating to a method for the coordinated prevention and control of rockburst, spontaneous combustion of coal and gas disasters in steeply inclined coal seams. Background Technology

[0002] Deeply inclined coal seams generally refer to coal seams with a dip angle of 35° to 55°, and are recognized by the mining industry both domestically and internationally as complex and difficult to mine. The lower limit of the dip angle of deeply inclined coal seams, 35°, is determined by the natural angle of repose of the gangue, but the upper limit of the dip angle, 55°, was determined based on the maximum angle achievable under the mining technology at the time (1996). In recent years, with the continuous innovation of coal mining equipment and technology, the dip angle of coal seams that can be adapted to by longwall fully mechanized mining has been continuously increasing, reaching 70° in some mines.

[0003] For steeply inclined coal seams, the gangue in the goaf tends to slide under its own weight towards the haulage roadway, forming a suspended roof area on the side of the goaf. When this suspended roof area is large, it can cause large-scale roof fractures, leading to rockburst disasters. When the coal seam contains gas, the gas easily accumulates in the suspended roof space, increasing the risk of gas explosions. This is especially true for coal seams with spontaneous combustion properties, where residual coal in the goaf is prone to spontaneous combustion, further increasing the risk of gas explosions at the suspended roof location.

[0004] When an upward mining sequence is adopted, the formation of a suspended roof on one side of the track level can lead to stress concentration in the transport level of the adjacent next working face, or it may be necessary to leave a wide section of coal pillar between the track level and the transport level of the next working face, resulting in coal loss. Therefore, how to solve the combined disasters of rockburst, gas and spontaneous combustion of residual coal under steeply inclined coal seams has become a technical challenge in this field.

[0005] In addition, for mines with rock bursts and gas hazards, it is necessary to depressurize the coal seam and pre-drain the gas before the working face is excavated, or at least before the working face is mined. However, the depressurization and gas pre-drainage work will affect the working face layout and production cycle. Therefore, how to coordinate the work between various processes and reduce the impact of gas pre-drainage and coal seam depressurization on the working face layout and production is also an urgent problem to be solved in this field. Summary of the Invention

[0006] To address the technical problems in existing technologies for mining steeply inclined coal seams, where the large dip angle, complex working face connections, and continuous mining disturbances lead to limitations in the prevention and control of multiple disasters such as rockburst, spontaneous combustion of residual coal in the goaf, and gas accumulation, making it difficult to achieve coordinated control due to the constraints of single working spaces and the resulting mutual interference between control measures, this invention provides a method for the coordinated prevention and control of rockburst, spontaneous combustion of coal, and gas disasters in steeply inclined coal seams, comprising the following steps: S1: Working faces are arranged sequentially from bottom to top along the dip of the coal seam; for this working face, transport roadways and track roadways are arranged along the strike of the working face; the upper part of this working face is the next working face to continue the production of this working face, and a section coal pillar is left between the two. S2: Simultaneously excavating a control roadway along the strike of the working face during the recovery of the working face; S3: Drill fan-shaped boreholes from the control roadway to the next working face to pre-fracturing and depressurizing coal seams and pre-draining gas in the next working face; S4: From the control roadway to the track level roadway of this working face, construct the connecting roadway; from the connecting roadway to the overhead area, construct the filling pillar; the overhead area between adjacent filling pillars is the fire prevention and extinguishing zone; from the fire prevention and extinguishing zone, fire prevention and extinguishing materials are filled into the goaf. S5: Fresh air is introduced simultaneously from the transport level tunnel and the track level tunnel, and discharged from the control tunnel.

[0007] Furthermore, in step S2, the control roadway is excavated along the strike at the same elevation level as the track roadway, ahead of the current working face's mining position; the starting position of the control roadway is the same as the starting position of the current working face's mining; the control roadway is connected to the return airway, providing conditions for subsequent coal seam pre-splitting and depressurization, gas pre-drainage, and roof overhang area treatment.

[0008] Furthermore, in step S3, several rows of fan-shaped boreholes are drilled at intervals along the direction of the self-control roadway to the next working face, and all the fan-shaped boreholes pass through the coal seam in the next working face; then, gas pre-drainage is carried out based on the fan-shaped boreholes that have been pre-splitting and depressurized.

[0009] Furthermore, in step S4, several connecting roadways are constructed at intervals along the strike direction. The connecting roadways are constructed along the cross vein direction. Along the working face advance direction, the even-numbered connecting roadways are used to construct filling pillars towards the overhead area. The material for filling the pillars is gangue generated during the excavation of the control roadway and connecting roadways. The construction of the filling pillars lags behind the mining work of this working face.

[0010] Furthermore, in step S4, during the construction of the filling pillar, a metal or plastic mesh bag with the same volume as the filling pillar is prepared in advance, and the entrance of the mesh bag is set at the even-numbered connecting roadway, and gangue is poured into the mesh bag from the connecting roadway.

[0011] Furthermore, in step S4, after the gangue filling is completed, concrete material is poured into the gaps in the gangue filling pillar.

[0012] Furthermore, in step S4, the process of filling fire-fighting materials into the goaf from the odd-numbered connecting roadway in the fire prevention and extinguishing zone along the working face advance direction is delayed after the construction of the filling pillars. That is, fire prevention and extinguishing work is carried out in the fire prevention and extinguishing zone between the two filling pillars after the construction of two adjacent filling pillars is completed and stabilized.

[0013] Furthermore, in step S4, when there is a surplus of gangue generated during the excavation of the control tunnel and connecting tunnel as a material source for filling the mine pillars, gangue is filled into the fire prevention and extinguishing zone where fire prevention and extinguishing work has been completed.

[0014] Furthermore, in step S4, connecting alleys that are no longer in use are sealed off by means of isolation.

[0015] Furthermore, in step S5, the fresh airflow entering from the transport level roadway reaches the overhead area between the filling pillar and the stope through the stope, and converges with the fresh air coming in from the track level roadway. Then, carrying the gas from the overhead area, it enters the control roadway through the connecting roadway and is discharged. At the same time, fresh air from the track level roadway is introduced to the tunneling face, filling pillar construction area, and fire prevention and extinguishing area of ​​the control roadway by fans and air ducts. After becoming exhaust air, it enters the control roadway and is discharged, thus combining working face ventilation with disaster prevention and control.

[0016] Furthermore, this also includes S6: continue mining until the current working face is completely mined and the rockburst control and gas pre-drainage work for the next working face is completed; for the next working face, arrange transport level roadways and track level roadways along the working face strike; then refer to the current working face for mining the next working face, and refer to the rockburst control and gas pre-drainage work for the next working face during mining the current working face for mining the next working face for rockburst control and gas pre-drainage.

[0017] Furthermore, this working face is a successor to the previous working face; the construction plan during the mining of the previous working face is the same as that of this working face, that is, as a successor to the previous working face, the coal seam inside this working face has already undergone rockburst control and gas pre-drainage during the mining of the previous working face.

[0018] The beneficial effects of this invention are as follows: 1. By relying on the special layout of the control roadway, the timing of construction, and the coordination scheme with the working face, this invention can transform the rockburst prevention and gas pre-drainage process of the next working face, the construction of the control roadway and connecting roadway, the breaking of the roof area and gas disaster control, and the fire prevention and extinguishing of the goaf into parallel operations that are carried out at the same time as the mining of this working face, which greatly reduces the problems of long cycle and low efficiency caused by some or all of the schemes being carried out sequentially (serially).

[0019] 2. For steeply dipped coal seams, this invention employs a bottom-up mining sequence for each working face. During the mining of a current working face, a control roadway is constructed in the floor of the track roadway. Fan-shaped boreholes are drilled in the control roadway to prevent rockbursts and pre-drain gas from the next working face, providing a safe foundation for the safe arrangement of transport and track roadways and for mining operations in the next working face. Simultaneously, connecting roadways are used to connect the track roadways of this working face. From the even-numbered connecting roadways, the overhanging roof area is filled to form a filling pillar, effectively achieving comprehensive prevention and control of roof fracture disasters.

[0020] 3. This invention provides fire prevention and extinguishing services to the goaf by entering the fire prevention and extinguishing zone between the backfill pillars from the odd-numbered connecting roadway, thus solving the problem of spontaneous combustion of residual coal in the goaf. In conjunction with a special ventilation scheme, this invention adopts simultaneous air intake from the transport roadway and the track roadway, and effectively solves the problem of gas accumulation in the overhead area and upper corner by returning air through the control roadway, thereby improving the ventilation quality of the working face and solving the problems of fresh air supply and exhaust air discharge for the control roadway tunneling face, the backfill pillar construction area, and the fire prevention and extinguishing zone.

[0021] 4. Using the gangue generated during the excavation of control and connecting roadways as raw material for filling pillars not only realizes the on-site consumption of gangue underground and reduces the cost of transporting gangue to the surface, but also, by pre-fabricating nets to confine the gangue and filling the gaps with concrete, the filling pillars form a stable composite structure, which greatly enhances the support stability and shear resistance of the pillars; when there is any gangue left, it can also be filled into the fire prevention and extinguishing zone to achieve further airtightness and oxygen isolation.

[0022] 5. By stipulating that after the completion of mining at one working face, the next working face is treated as the new working face, and the steps of anti-rock-blocking, gas pre-drainage, and fire prevention and extinguishing are repeated, following a bottom-up sequential mining sequence, this invention constructs a safe and virtuous cycle mechanism for multi-working face successive operations. The previous working face has already cleared potential hazards for this working face during mining, and this working face, in turn, creates safe conditions for the next working face, thereby ensuring long-term continuous, efficient, and safe mining in the entire steeply inclined coal seam mining area. Attached Figure Description

[0023] Figure 1 This is a schematic cross-sectional view of the collaborative prevention and control method for coal seam disasters at steep inclination angles according to the present invention; Figure 2 This is a schematic diagram of the collaborative prevention and control method for coal seam disasters at steep inclination angles according to the present invention. In the diagram, 1-This working face, 2-Next working face; 11-Transport level roadway of this working face, 12-Track level roadway of this working face, 13-Block, 14-Section coal pillar, 15-Connecting roadway, 16-Prevention and control roadway; 21-Transport level roadway of the next working face, 22-Track level roadway of the next working face, 23-Borehole; 31-Fire prevention and extinguishing zone, 32-Fire filling pillar, 33-Goaf; 34-Fire prevention and extinguishing materials; 35-Overhanging roof area; 36-Mining area. Detailed Implementation

[0024] To enable those skilled in the art to better understand the technical solutions of this invention, the technical solutions of the embodiments of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this invention, and not all embodiments. Based on the embodiments of this invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of this invention.

[0025] like Figure 1-2 As shown, this invention provides a synergistic prevention and control system for rockburst, spontaneous combustion of coal, and gas disasters in steeply inclined coal seams, comprising the following steps: S1: Several working faces are arranged sequentially from bottom to top along the steeply inclined coal seam, and each working face is designed to be mined sequentially from bottom to top; for this working face 1, a transport roadway 11 and a track roadway 12 are arranged along the coal seam strike, with the track roadway 12 being higher than the transport roadway 11; the upper part of this working face 1 is the next working face 2 that continues the production of this working face 1, and a section coal pillar 14 is left between this working face 1 and the next working face 2.

[0026] S2: After mining this working face 1, the roof breaks and collapses. The gangue in the goaf 33 moves towards the haulage level 11 under its own weight and forms a suspended roof area in the track level 12. Slightly ahead (5-10m in this embodiment) of the mining position of this working face 1, the control roadway 16 is excavated along the strike at the same elevation level as the track level 12. The starting position of the control roadway 16 is the same as the starting position of the mining of this working face 1. The control roadway 16 is connected to the return airway (such as the return air uphill or return air main roadway).

[0027] S3: Several rows of fan-shaped boreholes 23 are drilled at intervals along the strike of the control roadway 16 to the next working face 2. All fan-shaped boreholes 23 penetrate the coal seam in the next working face 2. The rock pressure problem of the next working face 2 is solved by pre-fracture and depressurization (hydraulic fracturing or loosening blasting) of the coal seam in the next working face 2 through the fan-shaped boreholes 23. Then, gas pre-drainage is carried out based on the pre-fractured and depressurized fan-shaped boreholes 23 to solve the gas problem of the next working face 2.

[0028] S4: From the control tunnel 16, a connecting tunnel 15 is constructed at intervals along the strike towards the track level tunnel 12 of the working face 1. The connecting tunnel 15 is constructed along the cross-cutting direction and perpendicular to the control tunnel 16 and the track level tunnel 12. Along the working face advancement direction, starting from the even-numbered connecting tunnel 15, filling pillars 32 are constructed towards the overhead area 35. The material for the filling pillars 32 is the gangue generated during the excavation of the control tunnel 16 and the connecting tunnel 15. The overhead area between adjacent filling pillars 32 serves as a fire prevention and extinguishing zone 31. Fire zone 31 fills the goaf 33 with fire-prevention and extinguishing material 34 (the type of fire-prevention and extinguishing material 34 is known in the art and is not limited here). The fire-prevention and extinguishing material 34 can fill the gaps between the gangue in the goaf 33, prevent air and gas from entering the goaf, and achieve the purpose of fire prevention and extinguishing. In this embodiment, the spacing of the connecting roadway 15 along the direction is 10m, and the width of the fire-prevention and extinguishing zone 31 and the filling pillar 32 is 10m. The construction of the filling pillar 32 is delayed in the mining work of this working face 1.

[0029] As a further limitation of this embodiment, during the construction of the filling pillar 32, a metal or plastic mesh bag with the same volume as the filling pillar is prefabricated, and the mesh bag entrance is set at the even-numbered connecting roadway 15. Gangue is poured into the mesh bag from the connecting roadway 15, thereby limiting the movement range of the filling pillar and forming a stable working face space for the fire prevention and extinguishing zone 31. In order to improve the stability of the filling pillar 32, after the gangue is poured, concrete material can be poured into the gaps of the gangue in the filling pillar 32 from the even-numbered connecting roadway 15. The small gaps between the gangue in the filling pillar can reduce the flow range of the concrete, and at the same time, the stability of the filling pillar 32 can be guaranteed after the concrete material is poured.

[0030] As a further limitation of this embodiment, the process of filling fire-fighting material 34 into the goaf 33 from the odd-numbered connecting roadway 15 in the fire prevention and extinguishing zone 31 along the working face advance direction is delayed after the construction of the filling pillar 32. That is, fire prevention and extinguishing work is carried out in the fire prevention and extinguishing zone 31 between the two filling pillars 32 after the construction of two adjacent filling pillars 32 is completed and stabilized.

[0031] As a further limitation of this embodiment, when there is surplus gangue generated during the excavation of the control tunnel 16 and the connecting tunnel 15 as a material source for filling the mine pillar 32, gangue is filled into the fire prevention and extinguishing zone 31, where fire prevention and extinguishing work has been completed. The connecting tunnel 15, which is no longer to be used, is sealed off using the partition 13.

[0032] S5: Ventilation and Gas Control in Overhead Area: Fresh air is introduced simultaneously from the transport level roadway 11 and the track level roadway 12. The fresh air flow from the transport level roadway 11 passes through the stope 36 and reaches the overhead area 35 between the filling pillar 32 and the stope 36 (the upper corner where gas easily accumulates is also located here). It then converges with the fresh air from the track level roadway 12 here, and then carries the gas from the overhead area 35 into the control roadway 16 through the connecting roadway 15, and then is discharged through the return airway. At the same time, fresh air from the track level roadway 12 is introduced to the tunneling face of the control roadway 16, the construction area of ​​the filling pillar 32, and the fire prevention and extinguishing area 31 through the fan and the duct. After becoming exhaust air, it enters the control roadway 16 and is discharged through the return airway.

[0033] S6: Continue this process until the mining of this working face 1 is completed and the rockburst control and gas pre-drainage work for the next working face 2 is finished; for the next working face 2, arrange the transport level 21 and the track level 22 along the coal seam strike, with the track level 22 being higher than the transport level 21; then, with reference to this working face 1, carry out the mining of the next working face 2, and with reference to the rockburst control and gas pre-drainage work carried out on the next working face after that, carry out rockburst control and gas pre-drainage work on the next working face after that.

[0034] It should be noted that: This working face 1 is the successor to the previous working face; the construction plan during the mining of the previous working face is the same as that of this working face 1. That is, as the successor to the previous working face, the coal seam inside this working face 1 has already undergone rock burst control and gas pre-drainage during the mining of the previous working face.

[0035] Although the invention has been described in detail with reference to the accompanying drawings and preferred embodiments, the invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this invention without departing from the spirit and essence of the invention should be included within the protection scope of this invention.

Claims

1. A method for the coordinated prevention and control of rockburst, spontaneous combustion of coal, and gas disasters in steeply inclined coal seams, characterized in that, Includes the following steps: S1: Working faces are arranged sequentially from bottom to top along the dip of the coal seam; for this working face, transport roadways and track roadways are arranged along the strike of the working face; the upper part of this working face is the next working face to continue the production of this working face, and a section coal pillar is left between the two. S2: Simultaneously excavating a control roadway along the strike of the working face during the recovery of the working face; S3: Drill fan-shaped boreholes from the control roadway to the next working face to pre-fracturing and depressurizing coal seams and pre-draining gas in the next working face; S4: From the control roadway to the track level roadway of this working face, construct the connecting roadway; from the connecting roadway to the overhead area, construct the filling pillar; the overhead area between adjacent filling pillars is the fire prevention and extinguishing zone; from the fire prevention and extinguishing zone, fire prevention and extinguishing materials are filled into the goaf. S5: Fresh air is introduced simultaneously from the transport level tunnel and the track level tunnel, and discharged from the control tunnel.

2. The method according to claim 1, characterized in that, In step S2, the control roadway is excavated along the strike at the same elevation level as the track roadway, ahead of the current working face's mining position; the starting position of the control roadway is the same as the starting position of the current working face's mining; the control roadway is connected to the return airway.

3. The method according to claim 1, characterized in that, In step S3, several rows of fan-shaped boreholes are drilled at intervals along the direction of the self-control roadway to the next working face. All of the fan-shaped boreholes pass through the coal seam in the next working face. Then, gas pre-drainage is carried out based on the fan-shaped boreholes that have been pre-fractured and depressurized.

4. The method according to claim 1, characterized in that, In step S4, several connecting roadways are constructed at intervals along the strike direction. The connecting roadways are constructed along the cross vein direction. Along the working face advance direction, the even-numbered connecting roadways are used to construct the filling pillars towards the overhead area. The filling pillars are made from the gangue generated during the excavation of the control roadway and connecting roadway. The construction of the filling pillars lags behind the mining work of this working face.

5. The method according to claim 1, characterized in that, In step S4, during the construction of the filling pillar, a metal or plastic mesh bag with the same volume as the filling pillar is prepared in advance. The entrance of the mesh bag is set at the even-numbered connecting roadway, and gangue is poured into the mesh bag from the connecting roadway. After the gangue is poured, concrete material is poured into the gaps of the gangue in the filling pillar.

6. The method according to claim 5, characterized in that, In step S4, the process of filling the goaf with fire-prevention and extinguishing materials in the fire prevention and extinguishing zone from the odd-numbered connecting roadway along the working face advance direction is delayed after the construction of the filling pillars. That is, fire prevention and extinguishing work is carried out in the fire prevention and extinguishing zone between the two filling pillars after the construction of two adjacent filling pillars is completed and stabilized. When there is a surplus of gangue generated from the excavation of the control roadway and connecting roadway as a material source for filling pillars, gangue is filled into the fire prevention and extinguishing zone where the fire prevention and extinguishing work has been completed.

7. The method according to claim 6, characterized in that, In step S4, connecting alleys that are no longer in use are sealed off by means of isolation.

8. The method according to claim 1, characterized in that, In step S5, the fresh air flow entering from the transport level roadway reaches the overhead area between the filling pillar and the stope through the stope, and converges with the fresh air entering from the track level roadway. Then, carrying the gas in the overhead area, it enters the control roadway through the connecting roadway and is discharged. At the same time, the fresh air in the track level roadway is drawn to the tunneling face, filling pillar construction area and fire prevention and extinguishing area of ​​the control roadway by the fan and air duct, and is discharged into the control roadway after becoming exhaust air.

9. The method according to any one of claims 1-8, characterized in that, After the mining of this working face is completed, the next working face will be used as the new working face, and the above steps will be repeated.

10. The method according to claim 9, characterized in that, Multiple working faces are mined sequentially from bottom to top according to the dip of the coal seam.