A sealed wall construction device suitable for carbon dioxide hydration solidification and storage and coal mine fire zones.
The method of rapidly constructing sealed walls using umbrella-type expansion filling solves the problems of gas-liquid permeability barrier and structural load-bearing in fire-prone areas of coal mines. It achieves efficient and stable construction of sealed walls and hydrate storage, adapts to complex geological conditions, and meets the dual needs of fire prevention and control and goaf areas in permafrost regions.
Patent Information
- Application Number
- CN202611407661.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-11
- Publication Date
- 2026-11-17
AI Technical Summary
Existing sealed wall technology is insufficient in blocking gas and liquid permeation in fire-prone areas of coal mines, has a high risk of structural failure under high stress conditions, poor adaptability to complex geological conditions, low emergency construction efficiency, and is difficult to meet the needs of disaster emergency sealing. Furthermore, it lacks the dual requirements of fire prevention and control and hydrate-type geological sealing in coal mine goaf areas in permafrost regions.
The method of rapidly constructing a sealed wall using umbrella-type expansion filling utilizes an umbrella-type support and deployment system, a rapid sealing and seepage prevention system, and an environmental monitoring and filling material injection system. It achieves rapid construction and adaptive sealing through an umbrella-type skeleton, Kevlar fiber capsules, and high-pressure fluid filling. Combined with an internally flexible and externally rigid composite structure and an environmental monitoring system, it ensures structural stability and sealing effect.
It enables the rapid construction of airtight walls in a very short time, improves construction efficiency, adapts to complex geological conditions, ensures structural integrity and airtightness under high stress environment, provides dual functions of fire prevention and hydrate solidification and sealing, and reduces construction costs and maintenance time.
Smart Images

Figure CN123109779A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of coal mine safety technology, and in particular to a device for constructing airtight walls suitable for carbon dioxide hydration solidification and sealing, and for coal mine fire zones. Background Technology
[0002] Goaf areas are the highest-risk areas for underground coal mine fires. Goaf areas with large amounts of loose coal and incomplete or ineffective sealing are highly susceptible to spontaneous combustion of coal under continuous oxygen supply and heat accumulation. Based on the three necessary conditions for spontaneous combustion of coal—coal with a tendency to spontaneously combust, continuous oxygen supply, and a heat-accumulating environment—effective sealing of goaf areas is crucial. Effective sealing of goaf areas not only prevents the leakage of toxic gases but also hinders the entry of fresh air, reducing the oxygen content—a necessary condition for spontaneous combustion. Sealing walls are an effective measure to address both general coal mine fires and spontaneous combustion of coal in goaf areas. These walls, constructed using building materials such as brick, stone, concrete, and polymer materials, are highly airtight and stable wall structures built in specific locations underground in coal mines, physically separating different areas underground.
[0003] Meanwhile, guided by my country's "dual-carbon" strategic goals, the country has established a comprehensive carbon dioxide governance policy system centered on source reduction, ecological carbon sequestration, resource utilization, and carbon capture, utilization, and storage (CCUS). Carbon dioxide storage has become an important safety net for achieving deep carbon reduction in the coal sector. Currently, my country's coal mine carbon dioxide geological storage technology system is still immature, with high costs, limited processing capacity, and insufficient stability and security of storage space. Prone to leakage, hindering large-scale application. To address these issues, mined-out areas in cold, permafrost regions offer unique advantages. Under the low-temperature conditions of coal mine goafs in permafrost regions, sealed walls can be used... Reacts with water to produce Hydrates form a closed space, achieving Stable solidification and sealing. Using mined-out areas as sealing spaces reduces construction costs. The permafrost environment provides natural cold energy, eliminating the need for external refrigeration, resulting in significant economic advantages. This is suitable for coal mine mined-out areas in permafrost regions. A feasible solution is provided for the large-scale application of hydration solidification and sealing.
[0004] Currently, the common method for sealing off mine disaster areas is to construct airtight walls. Existing airtight wall technologies are mainly divided into two categories: temporary airtight walls and permanent airtight walls. Temporary airtight walls emphasize rapid construction and are used for temporary isolation; the main types include: 1) Temporary air-sealed walls with air curtains are constructed by combining air curtains with steel wire ropes and frames. Although they are easy to install, the materials have large pores and poor sealing, which cannot effectively block gas penetration. Their strength depends on external fixation and they are easily displaced by airflow impact. They age and break down quickly when exposed to humid and dusty environments for a long time.
[0005] 2) Temporary sealed walls made of wood boards and yellow mud: Although the strength is improved by using wood boards and filling with yellow mud or cement mortar, the yellow mud softens and is lost when it comes into contact with water and has poor water resistance. The wood boards are prone to cracking under the pressure of the surrounding rock, especially in high stress areas. The wood is also prone to decay when it is in contact with humid air or corrosive gases for a long time.
[0006] 3) Sandbag temporary airtight walls are made by filling woven bags with sand and stacking them. They have good stability, but they rely on manual filling and stacking. In an emergency, it takes a long time to build. The required thickness of the stack can easily occupy the tunnel space. The sandbags are prone to displacement and collapse under pressure. They cannot withstand the deformation pressure of the tunnel. There are many gaps between the sandbags, which cannot meet the high airtightness requirements in a high gas environment.
[0007] 4) Temporary sealing walls made of quick-setting materials: These walls are constructed using high-polymer quick-setting materials such as polyurethane foam, water glass, and cement, along with metal mesh. They can solidify within minutes, but the cost is much higher than traditional materials. The material performance is unstable in low-temperature and complex environments, and once solidified, they are hard and difficult to remove. Some materials shrink during solidification, creating gaps that affect the long-term sealing effect.
[0008] 5) Inflatable temporary airtight walls use rubber or plastic inflatable airbags as the core. They expand and fit against the tunnel wall through inflation. They can be erected in minutes and can be reused. However, they have limited pressure resistance and cannot withstand high gas pressure or surrounding rock compression. The airbags are easily punctured by sharp objects or aged and damaged due to high temperature and dust. In low temperature environments, the airbags harden and become brittle, which seriously limits their application scenarios.
[0009] Permanent airtight walls focus on long-term, stable sealing and protection; the main types include: 1) Reinforced concrete permanent sealed walls are constructed with steel bars as the skeleton and concrete as the main body. They have high strength and high toughness and can withstand large surrounding rock pressure and gas pressure. However, the construction process is complicated, the concrete curing period is long, the construction period is long, and the wall is heavy. It requires high bearing capacity of the tunnel foundation and is difficult and costly to demolish.
[0010] 2) Permanent airtight walls are constructed using stone masonry. Stone masonry is combined with cement mortar, resulting in a dense structure with strong resistance to weathering. However, it relies on manual selection of materials and masonry, which requires high technical skills from construction workers and results in high labor and time costs. Furthermore, differences in stone size may lead to the existence of tiny pores in the mortar joints, making it difficult to achieve the ultimate airtightness.
[0011] 3) Permanent sealed brick-concrete structure: refractory bricks are laid in layers with cement mortar. The technology is mature and the cost is relatively low, but the compressive strength and durability are low. It is difficult to withstand long-term high stress and high pressure environment, and cracks and deformation are prone to occur in areas with frequent geological activity.
[0012] 4) Composite permanent sealed walls are constructed by combining a variety of high-performance materials. They are suitable for places with high requirements for sealing, heat insulation and strength. However, the raw material cost is high. The construction process requires precise control of the laying sequence and process of different materials, which is technically difficult. The difference in thermal expansion coefficient between different materials can easily lead to interlayer separation and hollowing, making later maintenance extremely difficult.
[0013] In summary, existing airtight wall technology mainly faces the following technical bottlenecks: insufficient gas and liquid permeability blocking capacity, making it difficult to achieve effective isolation of disaster areas; high risk of structural load failure under high stress environment, with airtight walls prone to cracking and failure under surrounding rock stress disturbance; poor adaptability to complex geological conditions, making it difficult to adapt to different tunnel cross-sectional shapes and terrain changes; low emergency construction efficiency, with traditional construction methods having long cycles, making it difficult to meet the emergency sealing needs of disasters. Summary of the Invention
[0014] Given the following technical bottlenecks faced by existing airtight wall technologies: insufficient gas-liquid permeability barrier capacity, making it difficult to effectively isolate disaster areas; high risk of structural failure under high stress environments, with airtight walls prone to cracking and failure under surrounding rock stress disturbance; poor adaptability to complex geological conditions, making it difficult to adapt to different roadway cross-sectional shapes and terrain changes; low emergency construction efficiency, with traditional construction methods having long cycles, making it difficult to meet disaster emergency sealing needs, and lacking the ability to simultaneously address fire prevention and control and coal mine goaf areas in permafrost regions. This invention addresses the problem of high-performance sealed wall technology that meets the dual requirements of hydrate-type geological storage.
[0015] Therefore, the purpose of this invention is to provide a method for rapidly constructing a sealed wall using an umbrella-type expansion filling system. The purpose is to: adopt an umbrella-type folding design to make the sealed wall components retractable and easy to transport downhole; and to quickly assemble them after reaching the target area to efficiently construct the sealed wall.
[0016] To solve the above-mentioned technical problems, the present invention provides the following technical solution: a method for rapidly constructing a sealed wall using umbrella-type expansion filling, comprising: An umbrella-type support and deployment system includes a central support rod, an annular slide rail disposed at the top of the central support rod, a hinge disposed on the annular slide rail, a radial support rod hinged to the hinge, a radial connecting rod hinged to the end of the radial support rod away from the hinge, a spring disposed on the central support rod, and a switch disposed below the central support rod, wherein the switch and the spring are connected for controlling the extension and retraction of the spring. A buckle is provided on the surface of the central support rod, a central connecting rod is provided on the top of the central support rod, a locking seam is provided on the surface of the central connecting rod, and a probe is provided on the top of the central connecting rod; The rapid sealing and seepage prevention system includes a pre-installed Kevlar fiber sealed bladder and quick-release locking clamps. The surface of the central connecting rod is provided with quick-release locking clamps. The pre-installed Kevlar fiber sealed bladder is hung on the umbrella-type support and deployment system and fixed by the quick-release locking clamps to form a sealed wall. The gas injection pipeline and monitoring pipeline are installed at a predetermined position on the roadway floor and fixed to the roadway wall anchors by pipe clamps. The end of the pipeline passes through a predetermined position in the sealed wall and a sealing barrier is installed at the contact surface between the pipeline and the bag. This multi-functional orifice device features a pre-reserved drainage hole and a stainless steel short-connector structure. Both ends have flange interfaces; one end connects to a drainage pipe, and the other end has a pre-installed flange blind plate. The flange blind plate is used for... Injection is enabled during sealing operations. ; An environmental monitoring and filling material injection system includes a self-locking Kevlar fiber sealed capsule, a grouting interface, an observation port, a grouting pipe, a probe, monitoring sensors, and a data display screen. The grouting interface is connected to the grouting pipe for injecting filling material into the pre-installed Kevlar fiber sealed capsule. The probe and monitoring sensors are used to collect environmental parameters of the sealed area, and the data display screen is used to display the environmental parameters. The monitoring sensors include... Concentration sensor, in Continuous monitoring of the goaf area during the sealing and operation period Pressure and concentration changes.
[0017] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, wherein: an edge connector is provided at the end of the radial connecting rod away from the radial support rod, an annular connecting rod is provided at the end of the edge connector away from the radial connecting rod, and a Kevlar fiber wall is provided between multiple sets of the radial connecting rods and the edge connector.
[0018] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, wherein: the umbrella-type support and deployment system and the Kevlar fiber wall together form a composite closed structure that is flexible inside and rigid outside, wherein: the outer layer is a high-strength alloy steel umbrella-type frame, used to withstand compressive stress and shear stress; the inner layer is a flexible Kevlar fiber material, used to absorb the tension generated by the deformation of the surrounding rock and suppress cracks.
[0019] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, the pre-installed Kevlar fiber airtight capsule and the Kevlar fiber wall are both made of Kevlar fiber material, and the Kevlar fiber material maintains structural stability below 500℃, does not melt, and does not support combustion.
[0020] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, wherein: in the environmental monitoring and filling material injection system, the probe and observation port are fixed to the transmission line via a flange connection; the monitoring sensor converts the physical signals acquired by the probe into electrical signals, which are transmitted to the data display screen via the transmission line; the data display screen analyzes the data in real time and presents the environmental parameters in a digital interface.
[0021] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, the monitoring sensor and data display screen adopt a detachable component structure with slot installation, which can realize quick plug-and-play replacement.
[0022] To achieve the above objectives, the present invention provides the following technical solution: a method for rapidly constructing a sealed wall using umbrella-type expandable filling, comprising the following steps: Step 1: After transporting the device to the target area, lay it at a predetermined position on the tunnel floor or sidewall. The gas injection pipeline and the monitoring pipeline are fixed to the anchor bolts on the roadway wall by pipe clamps. The end of the pipeline passes through the predetermined position of the airtight wall and a sealing barrier is set at the contact surface between the pipeline and the bag. Step 2: After transporting the device to the target area, activate the switch to trigger the spring in the central support rod to release elastic potential energy, push the annular slide rail to slide along the central support rod axially, and drive the radial support rod to unfold outward. The radial support rod drives the radial connecting rod through the hinge, so that the umbrella-shaped frame opens up to form the basic frame structure of the sealed wall. Step 3: After the umbrella-shaped frame is fully deployed, the buckles automatically lock and secure the radial support rods, the quick-release locking clamps secure the front frame, and the rear frame is moved backward to the width of the pouch and secured. Step 4: Hang the pre-installed Kevlar fiber sealed capsule on the two side frames. Connect one end of the capsule to the front frame interface and the other end to the central connecting rod to complete the capsule arrangement. Step 5: Connect the external grouting equipment through the grouting interface, and inject the filling material into the pre-installed Kevlar fiber sealed bag through the grouting pipe. The bag expands adaptively during the filling process, tightly adhering to the tunnel wall to form a sealed wall. Step 6: Collect environmental parameters such as temperature, pressure, and gas concentration in the enclosed area in real time through the probe and monitoring sensors, and transmit them to the data display screen for display and monitoring through the transmission line.
[0023] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, in step four, the filling material is injected into the bladder through the principle of high-pressure fluid extrusion, and the grouting pressure and flow rate are adjusted to make the material uniformly fill the inside of the bladder. After the bladder expands, it fits tightly against the roadway wall to form a gapless sealing layer.
[0024] As a preferred embodiment of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, in step five, the environmental parameters include temperature, pressure, humidity and concentration of harmful gases; when the monitoring data is abnormal, the staff can quickly locate the abnormal situation through the data display screen and confirm the problem by combining it with manual monitoring at the observation port.
[0025] As a preferred embodiment of the airtight wall construction device applicable to carbon dioxide hydration solidification and sealing and coal mine fire zones described in this invention, wherein: in step one, the sealing barrier includes a first sealing barrier and a second sealing barrier, a first seal is formed by applying high-strength sealant to the contact surface between the pipeline and the bag and installing a flange-type compression sealing gasket, and a second seal is formed by wrapping a water-swellable water-stop strip around the pipeline passage outside the bag, so that the pipeline and the airtight wall are solidified into an integral structure; After the sealed wall is constructed, high-pressure shut-off valves, check valves, pressure gauges, and flow meters are installed on the pipelines on the outside of the wall; during the gas injection operation, The gas is injected into the goaf through this pipeline to the design pressure; after injection, the shut-off valve is closed, and a blind flange is installed at the end of the pipeline to seal it, forming a closed space to ensure the formation of carbon dioxide hydrate; During the sealed operation period, monitoring sensors continuously collect data from the goaf area. Pressure and concentration changes enable remote real-time monitoring of the sealed storage status; A multi-functional orifice device is installed at the reserved drainage hole. This device is a stainless steel short-connector structure with flange interfaces at both ends. One end connects to the drainage pipeline for natural drainage of accumulated water in the goaf area; during this stage, the air injection interface is closed. After drainage is completed, the drainage valve is closed. The other end has a reserved flange blind plate for... Injection is initiated during the sealing process; when When abnormal fluctuations occur in pressure or concentration, the system automatically issues an early warning and prompts staff to check the sealing performance of the airtight wall; in the low-temperature conditions of coal mine goaf areas in permafrost regions, the airtight wall is used for... Reacts with water to produce Hydrates form a closed space, achieving Stable solidification and sealing.
[0026] Compared with the prior art, the present invention has at least the following beneficial effects: 1. This invention utilizes a power transmission structure centered on a central support rod, coupled with an annular slide rail, radial support rods, and a linkage spring. Upon startup, the energy storage spring releases preload, propelling the annular slide rail to slide rapidly along the central support rod's axial direction. This causes the radial support rods to expand outward synchronously around the hinge point, completing the process of the skeleton's contraction and full expansion in a very short time. This covers the tunnel cross-section, forming a basic support structure. Compared to the traditional manual construction of sealed walls, which involves cumbersome processes such as material handling, wall construction, and gap filling (a traditional method requires an 8-person construction team to build a sealed wall in an average of 3 shifts), this invention can be started and operated by a single person. Combined with a rapid sealing and seepage prevention system and a filling material injection system, the overall construction time is reduced to 1 shift, increasing efficiency by over 67%. The umbrella-like folding design allows the device to be compressed to a smaller volume when not in operation, facilitating rapid transport by mine railcars and avoiding the time-consuming problem of long-distance material transport in traditional methods. The rapid deployment of the sealing project provided technical support.
[0027] 2. This invention, based on the combination of an umbrella-shaped frame multi-stage telescopic structure and a high-pressure fluid filling system, achieves adaptability to complex tunnel environments. The radial connecting rods rotate freely via hinges, dynamically adjusting the unfolded area and angle according to the tunnel cross-sectional geometry (arched, trapezoidal, irregular, etc.) to ensure a tight fit between the frame and the tunnel wall. Multi-stage self-locking buckles, combined with ring-shaped connecting rods and edge connectors, allow Kevlar fibers to adaptively fill gaps created by the tunnel wall's unevenness, achieving an initial seal. After the frame fits against the tunnel wall, the filling material injection system injects material into the bags using the high-pressure fluid extrusion principle, enabling the sealed wall to perfectly adapt to complex conditions such as terrain undulations and tunnel deformation, achieving highly efficient sealing. This invention overcomes the limitations of different tunnel cross-sections and can achieve sealing construction in various complex cross-section tunnels, ensuring... The sealing project is not limited by the geometry of the tunnel.
[0028] 3. This invention pioneers an inner-flexible, outer-rigid composite system, designed based on the principle of stress division and control. The inner layer of Kevlar fiber flexible material, with its excellent tensile strength, is specifically designed to absorb the tension generated by the deformation of the surrounding rock and inhibit the initiation and propagation of cracks. The outer layer of high-strength alloy umbrella-shaped skeleton forms a stress arch, mainly bearing compressive and shear stresses. The filling material strengthens the connection between the inner and outer layers and evenly distributes the load, achieving structural integrity and airtightness even under high stress and large deformation environments. Tested by an electro-hydraulic proportional fully automatic pressure testing machine, the compressive strength of the concrete-Kevlar fiber composite airtight wall reaches 76 MPa, which is 62.4% higher than that of conventional concrete airtight walls, 2.62 times that of rubble masonry airtight walls, 3.04 times that of brick-concrete structure airtight walls, and 3.22 times that of quick-setting material airtight walls. This high compressive strength is sufficient to withstand... The additional internal pressure formed within the goaf after injection ensures the long-term structural stability of the sealed space, which can provide... The formation of hydrates and solidification provides a robust structural barrier.
[0029] 4. This invention uses Kevlar fiber material as the contact surface, which has a decomposition temperature of approximately 500℃. It does not melt, does not support combustion, and possesses excellent heat insulation and flame retardancy. Heat insulation performance tests show that under a heat source of 239.3℃, the temperature of the non-heated surface only rises to 73.8℃ after covering with Kevlar fiber for 50 seconds. Under a heat source of 380.8℃, the temperature of the non-heated surface remains stable at 24.4℃ for the first 20 seconds, and only rises to 134.7℃ after 50 seconds, far below the material's decomposition limit, demonstrating significant heat insulation effect. Its excellent flame retardant properties can effectively suppress the spread of fire and reduce the generation of toxic and harmful gases in underground fires and gas explosion scenarios, buying time for personnel escape and emergency response, while simultaneously ensuring... The sealed-off facilities will not lose their isolation function in the event of extreme conditions such as fire.
[0030] 5. The monitoring sensors and data display screens in the environmental monitoring system of this invention adopt a detachable component design with slot installation, enabling quick plug-and-play replacement. When a component malfunctions, staff can quickly replace a single sensor or display screen, avoiding the cumbersome operation of disassembling the entire system required by traditional integrated systems. This significantly shortens maintenance time, ensures the continuity of monitoring data, and reduces replacement costs by replacing only damaged parts while preserving intact components, thus improving reusability and economic viability. During the period of storage and operation, this design ensures the long-term stable operation of the monitoring system.
[0031] 6. This invention is the first to propose the simultaneous application of umbrella-type expandable filling sealing walls to fire prevention and control in coal mine goaf areas. This system addresses two major areas: hydrate solidification and storage, achieving compatibility between a single device and two different scenarios. Utilizing the same umbrella-shaped frame, bag-filling structure, and environmental monitoring system, it provides fireproof isolation during fires and simultaneously creates a sealed space in the goaf of coal mines in permafrost regions. Hydrate solidification and sealing provides technical support, greatly expanding the functional boundaries and application value of sealed walls. Attached Figure Description
[0032] Figure 1 This is a schematic diagram of the overall structure of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to the present invention. Figure 2 This is a three-dimensional structural diagram of the device for sealing carbon dioxide hydration solidification and storage and for constructing airtight walls in coal mine fire zones, as described in this invention. Figure 3 This is a partial three-dimensional structural diagram of the airtight wall construction device of the present invention, applicable to carbon dioxide hydration solidification and sealing and coal mine fire zones. Figure 4 This is a side-view sectional three-dimensional structural schematic diagram of the airtight wall construction device of the present invention, applicable to carbon dioxide hydration solidification and sealing and coal mine fire zones. Figure 5 This is a side view of the structure of the airtight wall construction device of the present invention, which is applicable to carbon dioxide hydration solidification and sealing and coal mine fire zone. Figure 6 This is a schematic diagram of the central support rod of the airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to the present invention. Figure 7 Stress-strain curve diagram of the sealing wall construction device of the present invention applicable to carbon dioxide hydration solidification and storage and coal mine fire zone; Figure 8 This is a before-and-after comparison of the experimental setup of the device for sealing carbon dioxide hydration solidification and storage and for building airtight walls in coal mine fire zones, which is applicable to the present invention. Figure 9 This is a comparison chart of the compressive strength of different sealing wall filling materials for the sealing wall construction device of the present invention, which is applicable to carbon dioxide hydration solidification and sealing and coal mine fire zone. Figure 10 This is a comparison diagram of the thermal insulation of the device for carbon dioxide hydration solidification and sealing and the construction of sealed walls in coal mine fire zones under 239.3℃ conditions according to the present invention. Figure 11 This is a schematic diagram showing the thermal insulation comparison of the device for carbon dioxide hydration solidification and sealing and the construction of sealed walls in coal mine fire zones under 380.8℃ conditions.
[0033] Explanation of reference numerals in the attached figures: 1. Switch; 2. Central support rod; 201. Spring; 202. Circular slide rail; 203. Hinge; 204. Central connecting rod; 205. Buckle; 206. Locking joint; 3. Radial support rod; 301. Radial connecting rod; 302. Edge connecting piece; 303. Circular connecting rod; 4. Kevlar fiber wall panel; 5. Self-locking Kevlar fiber sealed capsule; 501. Pre-set Kevlar fiber sealed capsule; 6. Grouting interface; 601. Grouting pipe; 7. Quick-release locking clamp; 8. Observation port; 9. Sensor line; 901. Nut locking connector; 10. Probe head; 11. Data display screen; 12. Transmission line; 1201. Monitoring sensor; 13. Connecting shaft section. Detailed Implementation
[0034] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0035] This invention proposes a device and method for constructing airtight walls suitable for carbon dioxide hydration solidification and sealing in coal mine fire zones. It aims to address technical bottlenecks such as insufficient gas-liquid permeability barrier capacity, high risk of structural failure under high stress conditions, poor adaptability to complex geological conditions, and low emergency construction efficiency in sealing disaster areas of underground coal mines. Simultaneously, it utilizes hydrate technology for solidification in coal mine goaf areas in permafrost regions. This invention, which is currently in a blank area, constructs a sealed wall that can form a sealed space in the goaf of coal mines in permafrost regions, effectively maintaining the temperature and pressure conditions required for storage. It also makes the geological storage of carbon dioxide possible by using hydrate technology, thereby achieving the synergistic goal of carbon sequestration and spatial resource utilization.
[0036] The device mainly comprises three parts: an umbrella-type support and deployment system, a rapid sealing and seepage prevention system, and an environmental monitoring and filling material injection system. The technical solution of this invention will be described in detail below with reference to its specific structure and working process.
[0037] The umbrella-type support and deployment system includes a switch 1, a central support rod 2, a spring 201, an annular slide rail 202, a hinge 203, a central connecting rod 204, a self-locking buckle 205, and a locking seam 206; radial support rods 3, radial connecting rods 301, edge connecting parts 302, annular connecting rods 303, and a Kevlar fiber wall 4. The switch serves as the power source, and the spring acts as the direct controller. The spring controls the annular slide rail to deploy the radial support rods 3. The radial support rods 3, through the hinge 203, drive the radial connecting rods 301 to support the framework of the sealed wall, thus achieving rapid opening of the sealed wall. The multi-stage self-locking buckles 205, combined with the annular connecting rods 303 and the edge connecting parts 302, seal the Kevlar fiber umbrella surface, allowing adaptation to different terrains and tunnel shapes. The "flexible inside, rigid outside" sealing structure maintains the structural stability of the sealed area, thereby achieving safe isolation of coal mine goaf areas. It is used in… Storage or fire prevention scenarios.
[0038] The environmental monitoring and filling material injection system includes a grouting interface 6, a grouting pipe 601, an observation port 8, a sensor line 9, a nut locking connector 901, a probe 10, a data display 11, a transmission line 22, and a monitoring sensor 1201; a self-locking Kevlar fiber sealed capsule 5; and an adaptable grouting interface 6 for connecting external grouting equipment to transfer materials to the target area via the grouting pipe 601. The observation port 8, transmission line 22, and probe 10 work together to facilitate manual observation of the internal environment; the monitoring sensor 1201 can collect environmental parameters such as temperature, humidity, pressure, and gas concentration within the sealed area in real time. The data is transmitted to the data display 11 via the transmission line 22, presenting the environmental parameters and providing data support for filling operations and safety monitoring. During the storage and operation period, the system can continuously monitor the goaf area. Key parameters such as pressure and concentration enable remote, real-time, and continuous monitoring of the sealed-up status.
[0039] The rapid sealing and seepage prevention system includes pre-installed Kevlar fiber sealed bags 501 and quick-release locking clamps 7. After the umbrella-shaped frame structure of the sealed wall is fully deployed, the front frame position is fixed, and the quick-release locking clamps 7 are used to prevent movement. The rear frame, connected via a straight shaft, is moved backward by the width of the bag, and the rear frame is fixed. The Kevlar fiber bags are then manually hung on the side frames, with one end of the bag connected to the front frame interface and the other end connected to the central connecting rod. The grouting interface 6 and the nut locking connector 901 are connected accordingly. Combined with the filling material injection system, the disaster area is completely sealed. The sealed wall constructed in this way has extremely low permeability and can effectively prevent seepage. Molecules escape through the micropores in the wall.
[0040] Before the umbrella-shaped frame is deployed, it is laid at a predetermined location on the tunnel floor or sidewall. Injection and monitoring pipelines. Corrosion-resistant stainless steel pipes or high-pressure rubber hoses are used, secured to the roadway wall anchors with pipe clamps to ensure they do not shift during subsequent skeleton deployment and bag filling. A specified distance is reserved at the front end of the pipeline to the outside of the sealed wall for connection to the ground. The delivery system and pipelines pass through predetermined locations within the sealed wall. High-strength sealant is applied to the contact surfaces between the pipelines and the bladder, and flange-type compression gaskets are installed and tightened with bolts to form the first sealing barrier. At the points where the pipelines pass outside the bladder, water-swellable sealing strips are wrapped around them. After the bladder is filled with grout, the expanding sealing strips, under pressure, tightly seal any remaining gaps between the pipelines and the bladder, forming a second seal. This ensures that the pipelines and the sealed wall solidify into a unified structure, guaranteeing... During high-pressure injection, no interface peeling or gas leakage occurs. After the sealed wall is constructed, high-pressure shut-off valves, check valves, pressure gauges, and flow meters are installed on the pipelines outside the wall. During the gas injection operation, The gas is injected into the goaf through this pipeline; after the injection is completed, the shut-off valve is closed, and a blind flange is installed at the end of the pipeline to seal it, forming a closed space to ensure the formation of carbon dioxide hydrate; In addition, a multi-functional orifice device is added to the reserved drainage hole. This device is a stainless steel short-connector structure with flange interfaces at both ends, connecting to the drainage pipeline. One end is used for natural drainage of water accumulated in the goaf. During this stage, the air injection interface is in the closed state to maintain the overall sealing of the sealed wall. After drainage is completed, the drainage valve is closed. A flange blind plate is reserved at the other end. Open during sealing operations. Gas is injected into the goaf through the orifice device. After the gas is injected to the design pressure, the gas injection valve is closed and the flange blind plate is reinstalled, which also forms a closed space to ensure the formation of carbon dioxide hydrate.
[0041] Specific structure and connection method of the device The support frame of the sealed wall adopts a retractable umbrella-type frame topology design. A central main support rod 2 is connected to a ring-shaped slide rail 202 at its top. One end of a radial support rod 3 is connected to the ring-shaped slide rail 202 via a hinge 203, and the other end is connected to a radial connecting rod 301. A switch 1 of this device is connected to a spring 201 in the central support rod 2 to control the spring's extension and retraction. When the switch is activated, the spring 201 in the central support rod 2 is triggered, pushing the ring-shaped slide rail 202 upwards, which in turn causes the radial support rod 3 to rotate around its connection point with the ring-shaped slide rail 202, causing the entire umbrella-type frame to quickly open.
[0042] During the opening process, the multi-level self-locking buckles 205, quick-release locking clamps 7, combined with the hinges 203 and radial connecting rods 301, can adjust their angle and length according to the cross-sectional shape and terrain of the tunnel, ensuring a tight fit. The Kevlar fiber wall panel possesses high flexibility and strong extensibility. During the deployment of the frame, it can adaptively stretch with the deformation of the radial connecting rods 301 and be fixed in conjunction with the edge connectors 302 and circumferential connecting rods 303, enhancing the sealing effect and achieving efficient sealing of the enclosed area.
[0043] The radial support rods 3 and radial connecting rods 301 of the umbrella-shaped frame are made of high-strength alloy steel, possessing excellent strength and toughness, and effectively supporting the roof and sidewalls of the tunnel. Self-locking buckles 205 are installed between adjacent radial support rods 3, and quick-release locking clamps 7 are installed at the front end. After the umbrella-shaped frame is fully extended, the self-locking buckles 205 further fix the position of the radial support rods 3, enhancing the structural compressive strength. The umbrella-shaped frame adopts a trapezoidal structure, which lowers the center of gravity, optimizes stress distribution, and ensures the stability of the overall frame. Simultaneously, the Kevlar fiber wall surface 4 at the edge of the tunnel wall is also reinforced by edge connectors 302, and the Kevlar fiber umbrella surface can withstand 500℃ for 30 minutes. The Kevlar fiber umbrella surface 4 and the umbrella-shaped frame constitute a "flexible inside, rigid outside" closed structure, effectively ensuring the structural stability of the enclosed area.
[0044] The filling bag device of the present invention is simply hung on the skeleton at both ends by hand, which is easy to operate and not prone to errors. A data transmission line is set inside the bag. One side of the bag has a threaded nut and the other side has a threaded seat, which correspond to the interfaces of the skeleton at both ends, so as to realize the normal operation of filling the bag. The high-pressure fluid extrusion principle of the grouting interface 6 completes the filling work of the material to fit tightly against the roadway wall, realizing efficient and self-adaptive sealing of the sealed wall.
[0045] The environmental monitoring and filling material injection system of this device is located inside the central support rod 2 and the central connecting rod 204. The grouting interface 6 is located in the device and can be adapted to various types of grouting trucks. The grouting interface 6 is connected to the grouting pipe 601 by a thread to achieve stable delivery of filling material; based on the high-pressure fluid compression sealing principle of the grouting interface 6, it works in conjunction with the rapid sealing and seepage prevention system to achieve complete closure of the coal mine goaf.
[0046] The detector head 10 and observation port 8 in the environmental monitoring system are connected to the transmission line 12 via flanges, enabling manual monitoring of the environmental conditions inside the enclosed area. The monitoring sensor 1201 is connected to the data display 11 via the transmission line 12. The monitoring sensor 1201 and the data display 11 are mounted in slots, allowing for reusability and timely replacement. The monitoring sensor 1201 collects key environmental parameters such as gas concentration, temperature, and pressure within the enclosed area in real time, converts them into electrical signals, and transmits them to the data display 11 via the transmission line 12. The data display 11 can quickly analyze and process the received signals, displaying various monitoring parameters in real time with intuitive digital data. This allows for timely detection of anomalies and the implementation of corresponding measures, ensuring the safe and stable operation of the sealed wall. During the sealed operation period, the monitoring system continuously collects data from the goaf area. Key parameters such as pressure and concentration, when When abnormal fluctuations occur in pressure or concentration, the system will automatically issue an early warning and prompt staff to check the sealing of the airtight wall.
[0047] Working principle (I) Working principle of umbrella-type support and deployment system The principle of the umbrella-type support and deployment system of this invention is based on mechanical transmission and structural mechanics design. When the switch 1 is activated, it connects with the spring 201 on the central support rod 2, triggering the spring 201 to release its elastic potential energy. The spring 201 pushes the annular slide rail 202 to slide upward along the axial direction of the central support rod 2. Utilizing the connection between the hinge 203 and the annular slide rail 202, the radial support rod 3 rotates around the hinge point. The radial support rod 3 then pulls the radial connecting rod 301, causing the entire umbrella frame to deploy rapidly within 30 seconds.
[0048] The radial support rod 3 and radial connecting rod 301 are made of high-strength alloy steel, with a trapezoidal structure design to lower the center of gravity and optimize stress distribution. Combined with the self-adjustable circumferential connecting rod 303, multi-stage self-locking buckle 205, and quick-release locking clamp 7, the umbrella-shaped frame can fit tightly against the tunnel wall. When the frame is deployed, the self-locking buckle 205 locks the radial support rod 3, forming an "inner flexible and outer rigid" structure with the Kevlar fiber wall 4, which can withstand high lateral pressure and high temperature, ensuring structural stability.
[0049] From a mechanical perspective, the principle behind the synergistic operation of this "flexible inside, rigid outside" structure can be explained using the Mohr-Coulomb strength theory. The rigid umbrella frame, through its high strength and trapezoidal stability, bears the main compressive stress, maintaining the stress state of the entire sealed wall system at a low confining pressure level. The flexible Kevlar fiber fabric actively bears and evenly distributes local tension, effectively suppressing the initiation and propagation of microcracks. This stress management strategy, combining rigidity and flexibility, enables the entire sealed wall system to adapt to complex downhole stress environments.
[0050] (II) Working principle of rapid sealing and seepage prevention system The rapid sealing and seepage prevention system relies on automated control and manual operation. Once the umbrella-shaped frame is fully deployed and the front frame position is fixed, the quick-release locking clamp 7 is secured to prevent movement. The rear frame, connected via a straight shaft, is moved backward by the width of the bag, and the rear frame is fixed. The Kevlar fiber bag is then manually hung on the side frames. One end of the bag is connected to the front frame interface, and the other end is connected to the central connecting rod. The grouting interface 6 and the nut locking connector 901 are connected accordingly. Together with the filling material injection system, the disaster area is completely sealed.
[0051] Kevlar fiber bags possess high flexibility and strong extensibility. During the expansion of the skeleton, they can adaptively stretch with the deformation of the radial connecting rod 301 to fill tiny gaps. Combined with the edge connector 302 and circumferential connecting rod 303 for fixation, the sealing effect is further enhanced, achieving efficient sealing of the sealed area.
[0052] (III) Working principle of the filler material injection system The filling material injection system is based on fluid mechanics principles. The grouting interface 6 is compatible with different grouting equipment and is connected to the grouting pipe 601 via a thread to ensure stable material delivery. The grouting pipe 601 and the grouting interface 6 are securely connected to ensure a stable connection under high pressure, allowing the filling material to be accurately injected into the pre-placed Kevlar fiber sealed capsule 501.
[0053] One end of the grouting interface 6 is connected to external grouting equipment. The filling material is transported through the grouting pipe 601 to the pre-installed Kevlar fiber sealed capsule 501, utilizing the principle of high-pressure fluid compression sealing. The high-pressure fluid causes the filling material to adhere tightly to the tunnel wall, and the pre-installed Kevlar fiber sealed capsule 501 expands and deforms under the material pressure, achieving efficient sealing and reducing leakage rate.
[0054] (iv) Working principle of environmental monitoring system The environmental monitoring system achieves real-time monitoring and control of the environment in a confined area through signal conversion. The probe 10 and observation port 8 are fixed to the transmission line 12 via a flange connection. The observation port supports manual monitoring of the environment within the confined area. The monitoring sensor 1201 converts the physical signals acquired by the probe into electrical signals, which are then transmitted to the data display 11 via the transmission line 12. The data display analyzes the data in real time, presenting the environmental status intuitively on a digital interface. When anomalies are detected (such as excessive gas concentration or sudden pressure changes), it facilitates timely manual detection of problems and the implementation of corresponding measures, ensuring the safe and stable operation of the sealed wall. During the storage and operation period, the system can continuously monitor the goaf area. Pressure and concentration are used to ensure the safety and traceability of the entire sealing process.
[0055] Mining goaf areas in cold, permafrost regions possess unique advantages. Under the low-temperature conditions of coal mine goaf areas in permafrost regions, combined with... Hydrate technology, utilizing sealed walls as Reacts with water to produce Hydrates form a closed space, achieving Stable solidification and sealing. The permafrost environment provides natural cold energy, eliminating the need for external refrigeration, resulting in significant economic advantages.
[0056] Specific work process Step 1: Quickly deploy the umbrella-shaped frame When it is necessary to construct a sealed wall in a coal mine goaf, the operator activates switch 1, which drives the spring 201 inside the central support rod 2 to release its elastic potential energy, pushing the annular slide rail 202 to slide vertically upward along the axis of the central support rod 2. During the upward movement of the annular slide rail 202, the radial support rod 3 rotates around its hinge point through the hinge 203. The radial support rod 3, together with the radial connecting rod 301, the central connecting rod 204, the edge connecting rod 302, and the annular connecting rod 303, constitute a retractable umbrella-shaped frame topology. As the annular slide rail 202 rises, the entire umbrella-shaped frame is fully expanded within 30 seconds.
[0057] When the radial support rods 3 are extended to the predetermined angle, the self-locking buckles 205 automatically lock, fixing the relative positions of adjacent radial support rods 3 and ensuring the stability of the umbrella-shaped frame structure. Simultaneously, when the basic frame is fully extended, the circumferential connecting rods 303 and the Kevlar fiber wall 4 are adaptively adjusted according to the shape and angle of the tunnel by the edge connectors 302, effectively resisting external pressure and ensuring the initial stability of the sealed wall. The umbrella-shaped frame structure, together with the Kevlar fiber wall 4, forms a support system that is "flexible inside and rigid outside," constituting the basic framework structure of the sealed wall.
[0058] Before the umbrella-shaped frame is deployed, it is laid at a predetermined location on the tunnel floor or sidewall. Injection and monitoring pipelines. Corrosion-resistant stainless steel pipes or high-pressure rubber hoses are used, secured to the roadway wall anchors with pipe clamps to ensure they do not shift during subsequent skeleton deployment and bag filling. A specified distance is reserved at the front end of the pipeline to the outside of the sealed wall for connection to the ground. The delivery system and pipeline end pass through the sealed wall at predetermined locations. High-strength sealant is applied to the contact surface between the pipeline and the bag, and a flange-type compression sealing gasket is installed and tightened with bolts to form the first sealing barrier. At the point where the pipeline passes through the outside of the bag, water-swellable waterstop strips are wrapped around it. After the bag is filled with grout, the expansion waterstop strips are compressed and tightly fill the remaining gaps between the pipeline and the bag, forming the second seal, so that the pipeline and the sealed wall solidify into an integral structure.
[0059] Step 2: Hanging the Kevlar Fiber Bag After the umbrella-shaped frame is deployed, the front frame is fixed in position and secured with quick-release locking clamps 7 to prevent movement. The rear frame, connected via a straight shaft, is moved backward by the width of the bladder, and the rear frame is then fixed. The pre-installed Kevlar fiber sealed bladder 501 is manually hung on the two side frames, with one end of the bladder connected to the front frame interface and the other end connected to the central connecting rod 204. The grouting interface 6 and the nut locking connector 901 are then properly connected.
[0060] The Kevlar fiber bags are made of Kevlar fiber material, which has high flexibility and strong elongation properties. During installation, they can adaptively stretch according to the cross-sectional shape of the tunnel, filling the gaps formed by the unevenness of the tunnel wall. After the bags are installed, they are fixed by edge connectors 302 and annular connecting rods 303 to ensure a tight connection between the bags and the frame. A multi-functional orifice device is installed at the reserved drainage hole. This device is a stainless steel short-connector structure with flange interfaces at both ends. One end connects to the drainage pipeline for natural drainage of accumulated water in the goaf. During this stage, the air injection interface is in the closed state to maintain the overall airtightness of the sealed wall. After drainage is completed, the drainage valve is closed. A flange blind plate is reserved at the other end. Open during sealing operations.
[0061] Step 3: Injection of filler material After the filling bags are arranged, the filling material injection operation begins. External grouting equipment is connected to the system via grouting interface 6, which is compatible with different models of grouting equipment. The filling material is transported to the target area via grouting pipe 601. By adjusting the grouting pressure and atomization particle size, the material is evenly sprayed into the filling bags in the tunnel gaps or sealed walls.
[0062] Based on the principle of high-pressure fluid extrusion, the filling material is used to tightly adhere the bags to the irregular roadway cross-section through the grouting nozzle. The pre-installed Kevlar fiber sealed bags 501 expand adaptively during the filling process, tightly adhering to the roadway wall to form a gapless sealing layer, achieving efficient sealing of the irregular roadway cross-section. After filling, the filling material inside the bags solidifies, forming a complete and well-sealed sealed wall together with the Kevlar fiber wall 4, effectively isolating the goaf from the outside space.
[0063] After the sealed wall is constructed, high-pressure shut-off valves, check valves, pressure gauges, and flow meters are installed on the pipelines outside the wall. During the gas injection operation... The gas is injected into the goaf through this pipeline to the design pressure; after the injection is completed, the shut-off valve is closed, and a blind flange is installed at the end of the pipeline to seal it, forming a closed space to ensure the formation of carbon dioxide hydrate.
[0064] Step 4: Start the environmental monitoring system After the filling material is injected, the environmental monitoring system begins operation. The probe 10 and observation port 8 are securely installed at the designated location on the sensor line 9 via a flange connection, forming an integrated monitoring structure. The observation port 8 is sealed with a high-strength transparent material, providing a visual window for staff to directly observe any abnormalities within the enclosed area.
[0065] Simultaneously, monitoring sensor 1201 enters real-time monitoring mode, continuously collecting parameters such as gas concentration, temperature, and pressure within the enclosed area. Monitoring sensor 1201 converts the acquired physical signals into electrical signals, transmitting the parameters to data display 11 via transmission line 12. When abnormal monitoring data occurs, such as harmful gas concentration exceeding safety thresholds or sudden pressure changes, staff can quickly locate the anomaly. Combined with manual monitoring at observation port 8, they can further confirm the problem and take timely and targeted measures. During the sealed operation period, monitoring sensors continuously collect data from the goaf area. Pressure and concentration changes, when When abnormal fluctuations occur in pressure or concentration, the system will automatically issue an early warning and prompt personnel to check the airtightness of the sealing wall to ensure safety. Safety and stability of the entire process of solidification and storage of hydrates.
[0066] The umbrella-type support and deployment system of the present invention adopts an umbrella-type folding design, which can quickly open and close the sealed wall, facilitating underground transportation and assembly.
[0067] The umbrella-type support and deployment system of this invention uses a central support rod as its core, combined with an annular slide rail, radial support rods, and a linkage spring to form a power transmission structure. Upon startup, the energy storage spring releases its preload, propelling the annular slide rail to slide rapidly along the central support rod's axial direction. This causes the radial support rods to expand outward synchronously around the hinge point, completing the process of the framework from contraction to full deployment in a short time, covering the tunnel cross-section to form a basic support structure. Compared to the cumbersome processes of material handling, wall construction, and gap filling required for traditional manual construction of sealed walls, this invention replaces manual operation with mechanical transmission. Traditionally, an 8-person construction team takes an average of 3 shifts to construct a sealed wall, while this device can be started and operated by a single person. Combined with the subsequent rapid sealing and seepage prevention system and filling material injection system, the overall construction time is reduced to 1 shift, increasing efficiency by over 67%. Furthermore, the umbrella-type folding design facilitates transportation, allowing for rapid transfer to the sealed area via a mining railcar, avoiding the time-consuming problem of long-distance material transport and improving the efficiency of sealed wall construction.
[0068] This invention employs a multi-stage telescopic structure with an umbrella-like frame combined with a high-pressure fluid extrusion filling material injection system, which can ignore the influence of terrain and tunnel cross-section, and has strong adaptability.
[0069] This invention utilizes a multi-stage telescopic umbrella-shaped frame structure combined with a high-pressure fluid filling system to achieve adaptability to complex tunnel environments. The multi-stage telescopic umbrella-shaped frame design, combined with the self-locking buckle of the central support rod, allows for adjustment of the size of the umbrella-shaped sealing wall according to the tunnel area. Its radial connecting rods, through hinges, allow free rotation, dynamically adjusting the unfolded area and angle based on the tunnel's cross-sectional geometry (arched, trapezoidal, etc.) to ensure a tight fit between the frame and the tunnel wall. The circumferential connecting rods and edge connectors adaptively fill gaps created by the unevenness of the tunnel wall with Kevlar fibers, achieving an initial seal. After the frame fits against the tunnel wall, the filling material injection system, relying on the principle of high-pressure fluid compression, injects material into the bladder, enabling the sealing wall to perfectly adapt to complex conditions such as terrain undulations and tunnel deformation, achieving efficient sealing and improving its adaptability to various mining environments.
[0070] This invention utilizes a closed structure with "soft interior and rigid exterior" combined with molded closed materials to construct a support system with stress arch effect. The core purpose is to overcome the performance shortcomings of traditional materials in complex underground environments and strengthen the safety production line in mines.
[0071] This invention has the advantage of high compressive strength, which can resist the pressure of surrounding rock, gas accumulation pressure and sudden impact load, and avoid the risk of gas leakage caused by wall cracking and collapse.
[0072] To verify the high compressive strength advantage of this invention, a systematic test of the material's compressive strength was conducted in a laboratory simulating actual working conditions. The test used an electro-hydraulic proportional fully automatic pressure testing machine.
[0073] The specific experimental setup is as follows: A cylindrical specimen was used, with a material composition of 74.4% aggregate and 25.6% adhesive; both the diameter and height were 75 mm. Uniaxial loading was applied at a rate of 0.4 MPa / s. The stress-strain curve was obtained and plotted as follows: Figure 7 As shown; Based on the analysis of the stress-strain curve data, the mechanical properties of the material were finally obtained: compressive strength of 76 MPa, elastic modulus of 1.98 GPa, and peak strain of 1.832%, indicating the mechanical properties of the material with an aggregate content of 74.4% and a binder content of 25.6%. During the experiment, the failure mode was characterized by the initial appearance of longitudinal cracks in the center, followed by oblique propagation of the cracks, ultimately leading to the crushing and spalling of the outer material. Figure 8 ; To clarify the differences in compressive strength among different airtight wall infill materials, a bar chart comparing the compressive strength of different airtight wall infill materials was drawn, with reference to... Figure 9 ; Through quantitative comparison, the compressive strength of the concrete-Kevlar fiber sealed wall reached 76 MPa, which is 62.4% higher than that of conventional concrete sealed walls. Compared with traditional materials, its strength is 2.62 times that of rubble masonry sealed walls, 3.04 times that of brick-concrete sealed walls, and 3.22 times that of quick-setting material sealed walls. In summary, this experiment proves that the compressive performance of the concrete-Kevlar fiber composite material far exceeds that of various traditional sealed walls, indicating that it has good crack control and deformation coordination under high pressure, and can provide a reliable basis for the selection of sealed wall filling materials under high pressure. This also proves that the material has good mechanical properties when the aggregate ratio is 74.4% and the adhesive system ratio is 25.6%. This invention uses Kevlar fiber material as the contact surface. Based on its aramid properties, its decomposition temperature is as high as approximately 500℃. It does not melt, does not support combustion, and possesses excellent thermal insulation and flame retardancy. The good thermal insulation exhibits thermal stability at high temperatures, while the excellent flame retardancy suppresses the spread of fire and reduces the generation of toxic and harmful gases in underground fires and gas explosion scenarios, buying time for personnel escape and emergency response.
[0074] The Kevlar fiber used in this invention underwent thermal insulation performance tests at heat sources of 239.3℃ and 380.8℃. During continuous heating, a high-end infrared thermal imager was used to record the temperature of the non-heated surface of the material every 10 seconds, thereby obtaining its thermal insulation data under different high-temperature conditions (see reference). Figure 10 and Figure 11 ); according to Figure 10 and Figure 11 Two sets of experimental data quantitatively demonstrate the thermal insulation performance of Kevlar fiber: In the first set of experiments, the initial heat source temperature was 239.3°C, and after covering the fiber for 50 seconds, the measured temperature only rose to 73.8°C; In the second set of experiments, the initial heat source temperature was as high as 380.8°C, and the measured temperature remained stable at 24.4°C for the first 20 seconds. Even after 50 seconds, when the temperature rose to 134.7°C, it still demonstrated good thermal insulation performance.
[0075] The temperature obtained in this experiment was far below the decomposition limit of Kevlar fiber material. Therefore, this verifies that the present invention can effectively block heat transfer, especially with a very significant initial heat insulation effect at high temperatures, thus confirming the reliability of its heat insulation performance. The environmental monitoring system of this invention uses detachable components, which facilitates maintenance and quick replacement, and is highly economical and applicable.
[0076] The monitoring sensors and data display screens in the environmental monitoring system of this invention adopt a detachable component design with slot installation, which can realize quick plug-and-play replacement. When a component fails, the staff can replace a single sensor or display screen in a short time, avoiding the cumbersome operation of traditional integrated systems that require overall disassembly. This greatly shortens maintenance time, ensures the continuity of monitoring data, and allows for the replacement of only damaged parts while retaining intact components, reducing replacement costs. It also has strong recyclability and effectively improves economic applicability.
[0077] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.
Claims
1. A device for constructing airtight walls suitable for carbon dioxide hydration solidification and sealing, and for use in coal mine fire zones, characterized in that, include: The umbrella-type support and deployment system includes a central support rod (2), an annular slide rail (202) disposed on the top of the central support rod (2), a hinge (203) disposed on the annular slide rail (202), a radial support rod (3) hinged to the hinge (203), a radial connecting rod (301) hinged to the end of the radial support rod (3) away from the hinge (203), a spring (201) disposed on the central support rod (2), and a switch (1) disposed below the central support rod (2), wherein the switch (1) and the spring (201) are connected to control the extension and retraction of the spring (201); The buckle (205) is provided on the surface of the central support rod (2), the central connecting rod (204) is provided on the top of the central support rod (2), the locking seam (206) is provided on the surface of the central connecting rod (204), and the probe (10) and (21) are provided on the top of the central connecting rod (204). The rapid sealing and seepage prevention system includes a pre-installed Kevlar fiber sealed bladder (501) and a quick-release locking clamp (7). The surface of the central connecting rod (204) is provided with a quick-release locking clamp (7). The pre-installed Kevlar fiber sealed bladder (501) is hung on the umbrella-type support and deployment system and fixed by the quick-release locking clamp (7) to form a sealed wall. The gas injection pipeline and monitoring pipeline are installed at a predetermined position on the roadway floor and fixed to the roadway wall anchors by pipe clamps. The end of the pipeline passes through a predetermined position in the sealed wall and a sealing barrier is installed at the contact surface between the pipeline and the bag. This multi-functional orifice device features a pre-reserved drainage hole and a stainless steel short-connector structure. Both ends have flange interfaces; one end connects to a drainage pipe, and the other end has a pre-installed flange blind plate. The flange blind plate is used for... Injection is enabled during sealing operations. ; An environmental monitoring and filling material injection system includes a self-locking Kevlar fiber sealed capsule (5), a grouting interface (6), an observation port (8), a grouting pipe (601), a probe (10), a monitoring sensor (1201), and a data display screen (11). The grouting interface (6) is connected to the grouting pipe (601) and is used to inject filling material into the pre-installed Kevlar fiber sealed capsule (501). The probe (10) and the monitoring sensor (1201) are used to collect environmental parameters of the sealed area. The data display screen (11) is used to display the environmental parameters. The monitoring sensor (1201) includes... Concentration sensor, in Continuous monitoring of the goaf area during the sealing and operation period Pressure and concentration changes.
2. The airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to claim 1, characterized in that: An edge connector (302) is provided at one end of the radial connecting rod (3) away from the radial support rod (3), an annular connecting rod (303) is provided at one end of the edge connector (302) away from the radial connecting rod (301), and a Kevlar fiber wall (4) is provided between multiple sets of the radial connecting rods (301) and the edge connector (302).
3. The airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to claim 2, characterized in that: The umbrella-type support and deployment system and the Kevlar fiber wall (4) together form a composite closed structure that is flexible inside and rigid outside. The outer layer is a high-strength alloy steel umbrella-type frame, which is used to bear compressive stress and shear stress; the inner layer is a flexible Kevlar fiber material, which is used to absorb the tension generated by the deformation of the surrounding rock and suppress cracks.
4. The airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to claim 3, characterized in that: The pre-installed Kevlar fiber sealed capsule (501) and Kevlar fiber wall (4) are both made of Kevlar fiber material, and the Kevlar fiber material maintains structural stability below 500℃, does not melt, and does not support combustion.
5. The airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to claim 4, characterized in that: In the environmental monitoring and filling material injection system, the probe (10) and the observation port (8) are fixed to the transmission line (12) by a flange connection; the monitoring sensor (1201) converts the physical signal obtained by the probe (10) into an electrical signal and transmits it to the data display screen (11) through the transmission line (12); the data display screen (11) analyzes the data in real time and presents the environmental parameters in a digital interface.
6. The airtight wall construction device for carbon dioxide hydration solidification and sealing and coal mine fire zones according to claim 5, characterized in that: The monitoring sensor (1201) and data display screen (11) adopt a detachable component structure with slot installation, which can be quickly plugged in and replaced.
7. A method for rapidly constructing a sealed wall using an umbrella-type expansion filling system, employing the apparatus described in any one of claims 1 to 6, characterized in that... Includes the following steps: Step 1: After transporting the device to the target area, lay it at a predetermined position on the tunnel floor or sidewall. The gas injection pipeline and the monitoring pipeline are fixed to the anchor bolts on the roadway wall by pipe clamps. The end of the pipeline passes through the predetermined position of the airtight wall and a sealing barrier is set at the contact surface between the pipeline and the bag. Step 2: After transporting the device to the target area, start the switch (1) to trigger the spring (201) in the central support rod (2) to release elastic potential energy, push the annular slide rail (202) to slide along the central support rod (2) axially, and drive the radial support rod (3) to unfold outward. The radial support rod (3) drives the radial connecting rod (301) through the hinge (203), so that the umbrella frame is opened to form the basic frame structure of the sealed wall. Step 3: After the umbrella-shaped frame is unfolded into place, the buckle (205) automatically locks and fixes the radial support rod (3), the quick-release locking clamp (7) fixes the front frame, and the rear frame is moved backward to the width of the pouch and fixed. Step 4: Hang the pre-installed Kevlar fiber sealed capsule (501) on the two side frames, connect one end of the capsule to the front frame interface, and connect the other end to the central connecting rod (204) to complete the capsule arrangement. Step 5: Connect the external grouting equipment through the grouting interface (6), and inject the filling material into the pre-installed Kevlar fiber sealed bag (501) through the grouting pipe (601). The bag expands adaptively during the filling process, closely adhering to the tunnel wall to form a sealed wall. Step 6: Collect environmental parameters such as temperature, pressure and gas concentration in the enclosed area in real time through the probe (10) and monitoring sensor (1201), and transmit them to the data display screen (11) through the transmission line (12) for display and monitoring.
8. The method for rapidly constructing a sealed wall using umbrella-type expandable filling according to claim 7, characterized in that: In step four, the filling material is injected into the bag using the principle of high-pressure fluid extrusion. The grouting pressure and flow rate are adjusted to ensure that the material fills the inside of the bag evenly. After the bag expands, it fits tightly against the roadway wall to form a gapless sealing layer.
9. The method for rapidly constructing a sealed wall using umbrella-type expandable filling according to claim 8, characterized in that: In step five, the environmental parameters include temperature, pressure, humidity and concentration of harmful gases. When the monitoring data is abnormal, the staff can quickly locate the abnormal situation through the data display screen (11) and confirm the problem by manual monitoring through the observation port (8).
10. The method for rapidly constructing a sealed wall using umbrella-type expandable filling according to claim 9, characterized in that: In step one, the sealing barrier includes a first sealing barrier and a second sealing barrier. A high-strength sealant is applied to the contact surface between the pipeline and the bag and a flange-type compression sealing gasket is installed to form the first seal. A water-swellable water-stop strip is wrapped around the pipeline passage outside the bag to form the second seal, so that the pipeline and the sealed wall are solidified into an integral structure. After the sealed wall is constructed, high-pressure shut-off valves, check valves, pressure gauges, and flow meters are installed on the pipelines on the outside of the wall; during the gas injection operation, The gas is injected into the goaf through this pipeline to the design pressure; after injection, the shut-off valve is closed, and a blind flange is installed at the end of the pipeline to seal it, forming a closed space to ensure the formation of carbon dioxide hydrate; During the sealed operation period, monitoring sensors continuously collect data from the goaf area. Pressure and concentration changes enable remote real-time monitoring of the sealed storage status; A multi-functional orifice device is installed at the reserved drainage hole. This device is a stainless steel short-connector structure with flange interfaces at both ends. One end connects to the drainage pipeline for natural drainage of accumulated water in the goaf area; during this stage, the air injection interface is closed. After drainage is completed, the drainage valve is closed. The other end has a reserved flange blind plate for... Injection is initiated during the sealing process; when When abnormal fluctuations occur in pressure or concentration, the system automatically issues an early warning and prompts staff to check the sealing performance of the airtight wall; in the low-temperature conditions of coal mine goaf areas in permafrost regions, the airtight wall is used for... Reacts with water to produce Hydrates form a closed space, achieving Stable solidification and sealing.