By determining the tower base type using a preset tolerance threshold and calculating the eight-section layout points using angle superposition, the problem of misjudgment of tower base geometry type and insufficient control points in existing technologies is solved, achieving high-precision tower base layout and ensuring construction reliability and accuracy.
Patent Information
- Application Number
- CN202611336373.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-17
AI Technical Summary
The existing method for setting out the foundation of power transmission towers cannot automatically determine the geometric type of the foundation, resulting in errors in the calculation of point coordinates. It is also unable to generate additional control points covering the perpendicular bisectors of the long and short sides of the foundation, which cannot meet the requirements of high-precision construction of large foundations and affects the reliability of construction.
A tower base width comparison and judgment mechanism based on a preset tolerance threshold is adopted. The tower base type is determined by floating-point tolerance. The angle is superimposed by combining the azimuth angle, offset angle and the geometric angle of the tower base to calculate the set of eight cross-section layout points. The geometric angle of the tower base is calculated by using the cosine theorem to generate an eight-section control network to ensure the accuracy of the layout guidance data.
It eliminates misjudgments caused by floating-point storage errors, achieves accurate positioning of eight-section layout points, meets the high-precision construction requirements of large tower foundations, and avoids navigation target distortion caused by projection points crossing boundaries.
Smart Images

Figure CN123111185A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power engineering construction surveying technology, and in particular to a method for laying out eight sections of power tower foundations and related equipment. Background Technology
[0002] In power line construction, tower foundation layout is a crucial step in foundation construction. Currently, surveyors use total stations or RTK equipment to manually calculate the coordinates of tower foundation points based on design drawings and then lay them out point by point. Alternatively, a four-section layout method is used, where coordinate calculations and on-site calibration are performed only for the four diagonal points (A, B, C, and D). While these existing technologies can meet basic construction needs in conventional engineering scenarios, their limitations are becoming increasingly apparent as transmission lines extend into complex terrain and large tower foundations are widely used.
[0003] The existing technology has the following technical problems: First, the layout method cannot automatically determine the geometric type of the tower base based on the length and width parameters of the tower base. The geometric parameter calculation of square and rectangular tower bases needs to be manually distinguished and processed, which is prone to errors in point coordinate calculation due to judgment mistakes. Second, it only supports the coordinate calculation of four diagonal cross-section points and cannot be extended to generate additional control points covering the perpendicular bisectors of the long and short sides of the tower base. This cannot meet the densified control requirements of high-precision construction of large foundations, resulting in distorted layout guidance data. On-site personnel cannot obtain accurate direction and distance indications, which seriously affects the reliability of construction layout. Summary of the Invention
[0004] This invention provides a method and related equipment for laying out eight sections of a power transmission tower base. This invention solves the problem that a square tower base is misjudged as a rectangle due to floating-point number storage errors, and ensures that the laying out guidance data points to the nearest valid point on the line segment at any deviation position, thus avoiding distortion of the navigation target caused by the projection point going out of bounds.
[0005] In a first aspect, embodiments of this application provide a method for laying out eight sections of a power tower foundation, including: The tower base geometry type is determined based on the input tower base length and the preset tolerance threshold, and the extreme diameter length and tower base geometry angle are calculated based on the tower base geometry type. The azimuth and offset angles of the power line obtained in advance are superimposed with the geometric angle of the tower base to obtain the starting azimuth angle, and the coordinate offset compensation of the first center pile coordinates obtained in advance is performed to obtain the second center pile coordinates. The azimuth and plane coordinates of the four tower base corner points are calculated based on the starting azimuth, the extreme diameter length and the coordinates of the second center stake. The azimuth and plane coordinates of the four extended section points are calculated based on the power line azimuth and the offset angle. The four tower base corner points and the four extended section points constitute an eight-section layout point set. The line layout guidance data is obtained by calculating the layout points based on the planar coordinates of the four tower base corner points or the planar coordinates of the four extended section points and the pre-acquired real-time positioning coordinates, or by performing projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the planar coordinates of the four tower base corner points or the four extended section points based on the azimuth angle of the power line.
[0006] Optionally, in a first implementation of the first aspect of the present invention, the step of determining the tower base geometry type based on the input tower base length and a preset tolerance threshold, and calculating the polar diameter length and the tower base geometry angle based on the tower base geometry type, includes: Compare the input tower base width with the preset tolerance threshold; When the width of the tower base is less than the preset tolerance threshold, the geometry of the tower base is determined to be square and the length of the tower base is directly used as the polar diameter length; When the width of the tower base is not less than the preset tolerance threshold, the geometric type of the tower base is determined to be rectangular, and half of the tower base length and half of the tower base width are Pythagorean theorem to obtain the extreme diameter length. The geometric angle of the tower base is obtained by performing cosine theorem calculation based on the semi-long side, semi-short side corresponding to the geometric type of the tower base and the polar diameter length.
[0007] Optionally, in a second implementation of the first aspect of the present invention, the step of superimposing the pre-acquired azimuth angle and offset angle of the power line with the geometric angle of the tower base to obtain the initial azimuth angle, and performing coordinate offset compensation on the pre-acquired first center stake coordinates to obtain the second center stake coordinates, includes: The initial azimuth angle is obtained by superimposing the pre-acquired azimuth angle and offset angle with the geometric angle of the tower base; Subtract the preset northward offset compensation, eastward offset compensation, and elevation offset compensation from the north, eastward, and elevation coordinates of the first center stake coordinates to obtain the second center stake coordinates.
[0008] Optionally, in a third implementation of the first aspect of the present invention, the calculation of the azimuth and plane coordinates of the four tower base corner points based on the initial azimuth, the extreme diameter length, and the coordinates of the second center stake, and the calculation of the azimuth and plane coordinates of the four extended section points based on the power line azimuth and the offset angle, wherein the four tower base corner points and the four extended section points constitute an eight-section layout point set, including: The starting azimuth angle is used as the azimuth angle of the first tower base corner point; the azimuth angle of the second tower base corner point is calculated with a step size of twice the included angle of the tower base geometry; the azimuth angle of the third tower base corner point is calculated with a step size of the difference between 180° and twice the included angle of the tower base geometry; and the azimuth angle of the fourth tower base corner point is calculated with a step size of twice the included angle of the tower base geometry. Using the coordinates of the second central pile as the origin of polar coordinates and the polar diameter length as the polar diameter, the azimuth angles of the four tower base corner points are converted into corresponding planar coordinates; The extended reference azimuth angle is obtained by adding the azimuth angle of the power line and the offset angle together and then superimposing 90°. Using the extended reference azimuth as the starting angle, the azimuth of the four extended section points is calculated at 90° intervals. The coordinates of the second center stake are used as the origin of the polar coordinates, and the polar diameter length is used as the polar diameter. The azimuth of the four extended section points is then converted into corresponding plane coordinates.
[0009] Optionally, in a fourth implementation of the first aspect of the present invention, the step of calculating the point layout guidance data based on the planar coordinates of the four tower base corner points or the planar coordinates of the four extended section points and the pre-acquired real-time positioning coordinates, or the step of performing projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the planar coordinates of the four tower base corner points or the four extended section points based on the power line azimuth angle to obtain the line layout guidance data, includes: The difference between the pre-acquired real-time positioning coordinates and the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points is used as the coordinate increment. The coordinate increment is calculated by Pythagorean theorem and arctangent theorem to obtain the horizontal distance and the layout azimuth. The difference between the layout azimuth and the power line azimuth is normalized to the range of 0° to 180° to obtain the point layout guidance data. Alternatively, taking the coordinates of the second center stake as the origin, the azimuth difference is calculated based on the plane coordinates of the target section point and the real-time positioning coordinates. The distance between the real-time positioning coordinates and the coordinates of the second center stake is multiplied by the cosine and sine values of the azimuth difference to obtain the projected distance and the offset distance. The projected distance is compared with the preset line segment length. When the projected distance exceeds the preset line segment length or the azimuth difference falls within the range of 90° to 270°, the distance from the real-time positioning coordinates to the two ends of the target lofting line segment is calculated respectively. The endpoint with the smaller distance is switched as the navigation target point to obtain the line lofting guidance data.
[0010] Optionally, in a fifth implementation of the first aspect of the present invention, the step of calculating the azimuth difference based on the plane coordinates of the target section point and the real-time positioning coordinates, using the coordinates of the second center stake as the origin, and multiplying the distance between the real-time positioning coordinates and the coordinates of the second center stake by the cosine and sine values of the azimuth difference to obtain the projected distance and the offset distance, includes: Using the coordinates of the second center stake as the origin, the difference between the north coordinate and the east coordinate of the target section point and the coordinates of the second center stake is input into the arctangent function for calculation to obtain the azimuth of the target section. The difference between the north coordinate and the east coordinate of the real-time positioning coordinates and the coordinates of the second center stake is input into the arctangent function for calculation to obtain the positioning azimuth. Calculate the azimuth difference between the positioning azimuth and the target section azimuth; The north and east coordinate differences between the real-time positioning coordinates and the second center stake coordinates are calculated using Pythagorean theorem to obtain the reference distance. The reference distance is then multiplied by the cosine of the azimuth difference to obtain the projected distance. Finally, the reference distance is multiplied by the sine of the azimuth difference to obtain the offset distance.
[0011] Secondly, embodiments of this application provide an eight-section layout device for power tower foundations, comprising: The type analysis module is used to determine the geometric type of the tower base based on the input tower base length and the preset tolerance threshold, and to calculate the extreme diameter length and the geometric angle of the tower base based on the tower base geometric type. The offset compensation module is used to superimpose the pre-acquired azimuth angle and offset angle of the power line with the geometric angle of the tower base to obtain the starting azimuth angle, and to perform coordinate offset compensation on the pre-acquired first center stake coordinates to obtain the second center stake coordinates. The calculation module is used to calculate the azimuth and plane coordinates of the four tower base corner points based on the starting azimuth, the extreme diameter length and the coordinates of the second center stake, and to calculate the azimuth and plane coordinates of the four extended section points based on the power line azimuth and the offset angle, wherein the four tower base corner points and the four extended section points constitute an eight-section layout point set. The layout guidance module is used to calculate layout guidance data based on the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points and the pre-acquired real-time positioning coordinates, or to perform projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the plane coordinates of the four tower base corner points or the four extended section points based on the azimuth angle of the power line, so as to obtain line layout guidance data.
[0012] Thirdly, embodiments of this application provide a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the steps of the above-described method for laying out eight sections of the power tower foundation.
[0013] Fourthly, embodiments of this application provide a readable storage medium storing a computer program that, when executed by a processor, implements the steps of the above-described method for laying out eight sections of a power tower foundation.
[0014] Fifthly, embodiments of this application provide a computer program product, which includes a computer program that, when executed by a processor, implements the steps of the above-described method for laying out eight sections of a power tower foundation.
[0015] In one of the solutions provided by the above-mentioned method and related equipment for laying out eight sections of power tower foundation, this invention introduces a tower foundation width comparison and judgment mechanism based on a preset tolerance threshold. It replaces strict equality judgment with floating-point tolerance, which solves the problem that square tower foundations are misjudged as rectangles due to floating-point storage errors. Based on this, the extreme diameter length is obtained by two paths, direct assignment and Pythagorean theorem, according to the geometric type of the tower foundation. Then, the geometric angle of the tower foundation is uniformly calculated using the cosine theorem, so that the acquisition path of geometric parameters is completely covered in the type branch, eliminating the error risk introduced by the manual judgment link. This invention algebraically synthesizes the three parameters—power line azimuth, offset angle, and tower base geometric angle—into a starting azimuth. Using this angle as the starting point for a chain-like recursion, the azimuths of the four tower base corner points are calculated sequentially using a non-uniform angular step size strictly corresponding to the tower base's length-to-width ratio. A unified polar-to-rectangular coordinate conversion formula is then used to complete the coordinate transformation, ensuring that the azimuth distribution of the four corner points perfectly matches the rectangular geometry of the tower base. Simultaneously, the offset angle parameter is retained as a channel for manual adjustment on-site, balancing the needs of following the line's direction and flexible on-site adjustments. This invention independently establishes an extended point angle system, using the sum of the power line azimuth and offset angles (90°) as the extended reference azimuth. This causes a fixed offset of the extended point angle reference relative to the four tower base corner points, corresponding to the perpendicular bisectors of the long and short sides of the tower base. Four extended section points are then generated at 90° equal intervals, forming a uniform and complementary relationship with the four tower base corner points in terms of angular distribution, constituting a complete eight-section control network. This meets the requirements for denser section control points in the construction of large tower foundations. This invention uses the coordinates of the second center stake as a unified projection reference. By using the cosine and sine components of the azimuth difference to correspond to the projection distance and offset distance respectively, the positional relationship between the current positioning coordinates and the target line segment is decomposed into two independent components: the advance / retreat along the line direction and the offset perpendicular to the line. A projection point boundary judgment mechanism is introduced. When the projection distance exceeds the preset line segment length or the azimuth difference falls into the invalid interval, the distance from the current coordinates to the two ends of the line segment is automatically compared and the nearest endpoint is switched as the navigation target. This ensures that the staking guidance data points to the nearest valid point on the line segment at any deviation position, avoiding distortion of the navigation target caused by the projection point boundary. Attached Figure Description
[0016] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a schematic diagram of a structure of an eight-section layout system for power tower base in one embodiment of the present invention; Figure 2This is a schematic flowchart of an eight-section layout method for the base of a power transmission tower according to an embodiment of the present invention; Figure 3 yes Figure 2 A schematic diagram of the implementation process of step S101; Figure 4 yes Figure 2 A schematic diagram of the implementation process of step S102; Figure 5 yes Figure 2 A schematic diagram of the implementation process of step S103; Figure 6 yes Figure 2 A schematic diagram of the implementation process of step S104; Figure 7 This is a schematic diagram of the structure of an eight-section layout device for the base of a power transmission tower according to an embodiment of the present invention; Figure 8 This is a schematic diagram of the structure of a computer device according to an embodiment of the present invention. Detailed Implementation
[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0019] It should be understood that, when used in this specification and the appended claims, the term "comprising" indicates the presence of the described features, integrals, steps, operations, elements, and / or components, but does not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components, and / or collections thereof. It should also be understood that, as used in this specification and the appended claims, the term "and / or" refers to any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.
[0020] Furthermore, in the description of this invention and the appended claims, the terms "first," "second," "third," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.
[0021] References to "one embodiment" or "some embodiments" as described in this specification mean that one or more embodiments of the invention include a specific feature, structure, or characteristic described in connection with that embodiment. Therefore, the phrases "in one embodiment," "in some embodiments," "in other embodiments," "in still other embodiments," etc., appearing in different parts of this specification do not necessarily refer to the same embodiment, but rather mean "one or more, but not all, embodiments," unless otherwise specifically emphasized. The terms "comprising," "including," "having," and variations thereof mean "including but not limited to," unless otherwise specifically emphasized.
[0022] It should be understood that the sequence number of each step in the following embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0023] To illustrate the technical solution of the present invention, specific embodiments are described below.
[0024] To address the problems mentioned above in the background art, this application proposes a method and related equipment for laying out eight sections of power tower foundations. The method for laying out eight sections of power tower foundations provided by this invention can be applied to applications such as... Figure 1 The power tower foundation eight-section layout system shown includes: a foundation parameter input device 1, used to input parameters such as foundation length, width, line azimuth, offset angle, and layout mode; a GNSS positioning acquisition device 2, used to acquire real-time positioning coordinates of the measuring equipment; a foundation eight-section coordinate calculation device 3, used to perform adaptive judgment of foundation type, geometric parameter calculation, offset angle compensation, calculation of coordinates of four sections (ABCD) and four extended sections (EFGH); a layout guidance display device 4, used to display layout guidance information such as target point distance, azimuth, projection distance, and offset; and a data storage and communication device 5, used to save and load foundation data and realize data communication between the devices.
[0025] In one embodiment, such as Figure 2 As shown, a method for laying out eight sections of a power transmission tower foundation is provided, which is then applied to... Figure 1 Taking the eight-section layout system of the power tower foundation as an example, the following steps are included: S101: Determine the base geometry type based on the input base length and the preset tolerance threshold, and calculate the extreme diameter length and base geometry angle based on the base geometry type; S102: The azimuth angle and offset angle of the pre-acquired power line are superimposed with the geometric angle of the tower base to obtain the starting azimuth angle, and the coordinate offset compensation of the pre-acquired first center stake coordinates is performed to obtain the second center stake coordinates. S103: Calculate the azimuth and plane coordinates of the four tower base corner points based on the starting azimuth, extreme diameter length, and coordinates of the second center pile. Calculate the azimuth and plane coordinates of the four extended section points based on the power line azimuth and offset angle. The four tower base corner points and the four extended section points constitute an eight-section layout point set. S104: Calculate the layout guidance data based on the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points and the pre-acquired real-time positioning coordinates; or, based on the azimuth of the power line, perform projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the plane coordinates of the four tower base corner points or the four extended section points to obtain the line layout guidance data.
[0026] This embodiment introduces a tower base width comparison and judgment mechanism based on a preset tolerance threshold. It replaces strict equality judgment with floating-point tolerance, solving the problem of square tower bases being misjudged as rectangular due to floating-point storage errors. Furthermore, based on the tower base geometry, it uses two paths—direct assignment and Pythagorean theorem—to obtain the extreme diameter length. Then, it uniformly uses the cosine theorem to calculate the tower base geometric angle, ensuring complete coverage of the geometric parameter acquisition path across the type branches and eliminating the error risk introduced by manual judgment. This embodiment algebraically synthesizes the power line azimuth angle, offset angle, and tower base geometric angle into a starting azimuth angle. Using this angle as the starting point for chain-like recursion, the azimuth angles of the four tower base corner points are calculated sequentially using a non-uniform angle step size strictly corresponding to the tower base length-to-width ratio. A unified polar-to-rectangular coordinate conversion formula is then used to complete the coordinate transformation, ensuring that the azimuth angle distribution of the four corner points perfectly matches the rectangular geometry of the tower base. Simultaneously, the offset angle parameter is retained as a channel for on-site manual adjustment, balancing the needs of following the line direction and flexible on-site adjustments. In this embodiment, an extension point angle system is independently established. The sum of the azimuth angle and the offset angle of the power line is superimposed at 90° as the extension reference azimuth angle. This causes the extension point angle reference to have a fixed offset relative to the four tower base corner points. Corresponding to the perpendicular bisector direction of the long and short sides of the tower base, four extension section points are generated at 90° equal intervals. This forms a uniform and complementary relationship with the four tower base corner points in terms of angle distribution, constituting a complete eight-section control network, which meets the requirements of large tower foundation construction for dense section control points. This embodiment uses the coordinates of the second center stake as a unified projection reference. By using the cosine and sine components of the azimuth difference to correspond to the projection distance and offset distance respectively, the positional relationship between the current positioning coordinates and the target line segment is decomposed into two independent components: the advance / retreat along the line direction and the offset perpendicular to the line. A projection point boundary judgment mechanism is introduced. When the projection distance exceeds the preset line segment length or the azimuth difference falls into the invalid interval, the distance from the current coordinates to the two ends of the line segment is automatically compared and the nearest endpoint is switched as the navigation target. This ensures that the staking guidance data points to the nearest valid point on the line segment at any deviation position, avoiding distortion of the navigation target caused by the projection point boundary.
[0027] In one embodiment, such as Figure 3 As shown, step S101 specifically includes the following steps: S201: Compare the input tower base width with the preset tolerance threshold; S202: When the tower base width is less than the preset tolerance threshold, the tower base geometry is determined to be square and the tower base length is directly used as the extreme diameter length; S203: When the width of the tower base is not less than the preset tolerance threshold, the geometric type of the tower base is determined to be rectangular, and half of the tower base length and half of the tower base width are Pythagorean theorem to obtain the extreme diameter length. S204: Based on the semi-long side, semi-short side and polar diameter length corresponding to the tower base geometry type, the cosine theorem is used to calculate the included angle of the tower base geometry.
[0028] In this embodiment, the tower base length dLength and tower base width dWidth input from the tower base parameter input terminal are read, and the preset tolerance threshold is 1×10. 6 Where dLength represents the base length and dWidth represents the base width. A preset tolerance threshold is used to distinguish the parameter input states corresponding to square bases from those corresponding to rectangular bases, avoiding the influence of numerical storage errors caused by directly using a floating-point number strictly equal to zero judgment method. dWidth is then compared with 1×10... 6 Numerical comparisons are performed. If dWidth is less than the tolerance threshold, the calculation path for the square base is entered; if dWidth is greater than or equal to the tolerance threshold, the calculation path for the rectangular base is entered. In actual data processing, a numerical validity check can be performed after parameter input to confirm that dLength is positive and that dWidth does not contain any illegal negative values before performing base type determination. This avoids abnormal inputs directly entering the geometric parameter calculation process.
[0029] When dWidth is less than 1×10 6 When the current base is determined to be a square base, the dLength is directly assigned to the extreme diameter length dOA according to the parameter expression method corresponding to the square base. That is, the input base length is used as the extreme diameter length from the center stake to the base corner. At this time, the half-long side and half-short side can be determined according to the symmetrical geometry of the square itself, and the two are kept equal, thereby establishing the geometric relationship between the center stake, the base corner, and the corresponding side directions. Since the square has four-way symmetry about the center stake, after obtaining a unified extreme diameter length through this calculation path, it is not necessary to calculate different radial distances for the four base corners separately. The four corners can all share this extreme diameter length, and their respective planar coordinates are generated by combining the different azimuth angles obtained by subsequent recursion. Using tolerance judgment instead of judging whether dWidth is strictly equal to zero can also reduce the probability of incorrect switching of calculation paths caused by extremely small non-zero values during floating-point storage.
[0030] When dWidth is not less than 1×10 6When the current tower base is determined to be a rectangular tower base, half of the tower base length and half of the tower base width are obtained as the geometric dimensions from the center of the rectangle to the two sides. Specifically, half of the tower base length is taken as the half-long side dOP, and half of the tower base width is taken as the half-short side dAP. In this embodiment, these two sides form the two legs of a right triangle, and the extreme diameter dOA from the center stake to the corner of the tower base is obtained through Pythagorean theorem. Where dOA represents the distance from the center stake to the corner point of the tower base, dOP represents the half-long side, and dAP represents the half-short side. The length and width of the rectangular tower base are converted into polar coordinate radial parameters directly needed for coordinate calculation. For example, when the tower base length is 8 m and the tower base width is 6 m, the half-long side dOP is 4 m, the half-short side dAP is 3 m, and after Pythagorean theorem calculation, dOA is 5 m. Therefore, the four corner points of the tower base are all located on a circle with a radius of 5 m relative to the center stake. However, their specific azimuth angles are not determined by simple equal intervals of 90°, but require further calculation of the geometric angles in conjunction with the length-to-width ratio of the tower base.
[0031] In this embodiment, after obtaining the lengths of the semi-long side, semi-short side, and polar radius, the cosine theorem is used to calculate the geometric angle JiaAngle of the tower base based on the triangle formed by these three elements. The calculation uses: Here, JiaAngle represents the geometric angle formed by the lines connecting the center stake to the corner points of the tower base, with the long side of the base as a reference. The result obtained from the inverse cosine operation is first expressed in radians, and then multiplied by 180 / π to convert it to an angle. For a square tower base, since the corresponding two halves are equal in size, the geometric angle is 45°; for a rectangular tower base, this angle varies with the length-to-width ratio. For example, when the tower base is 8 m long and 6 m wide, dOP is 4 m, dAP is 3 m, and dOA is 5 m, resulting in a calculated JiaAngle of approximately 36.87°.
[0032] In one embodiment, such as Figure 4 As shown, step S102 specifically includes the following steps: S301: The azimuth angle and offset angle of the power line obtained in advance are superimposed with the geometric angle of the tower base to obtain the starting azimuth angle; S302: Subtract the preset northward offset compensation, eastward offset compensation, and elevation offset compensation from the north, eastward, and elevation coordinates of the first center stake coordinates to obtain the second center stake coordinates.
[0033] In this embodiment, the azimuth angle (Azimuth), offset angle (OffsetAngle), and the geometric angle (JiaAngle) of the tower base calculated from the tower base geometric parameters are obtained, and then these three are converted to angles and superimposed. Azimuth represents the designed azimuth angle of the power line, with true north as 0° and measured clockwise, ranging from 0° to 360°. OffsetAngle represents the additional rotation angle set for line turns, special terrain, or on-site design adjustments; clockwise adjustments are positive, and counterclockwise adjustments are negative. When there are no additional tower base orientation adjustment requirements on site, the default value of OffsetAngle can be set to 0°. JiaAngle represents the geometric angle of the tower base determined by its length, width, and polar diameter, reflecting the degree of geometric deflection of the diagonal point of the tower base relative to the tower base reference direction. The initial azimuth angle is calculated according to the angle superposition relationship: ,in, This represents the starting azimuth angle corresponding to the first tower base corner point. After angle superposition, the calculation results are normalized to an azimuth angle range of 0° to 360°. For example, if the superposition result exceeds 360°, it is converted to the corresponding equivalent azimuth angle; if the superposition result is less than 0°, it is also converted to the range of 0° to 360°. The line design direction is responsible for determining the overall foundation orientation of the tower base, the offset angle is responsible for providing on-site manual adjustment capability, and the tower base geometric angle is responsible for maintaining the geometric relationship of the square or rectangular tower base body. Therefore, these three types of angle parameters with different physical meanings can be unified into the same azimuth angle system.
[0034] In this embodiment, after obtaining the initial azimuth, the north coordinate N, east coordinate E, and elevation coordinate H of the first center stake coordinates are read, and the corresponding north offset compensation amounts dOffsetN, east offset compensation amounts dOffsetE, and elevation offset compensation amounts dOffsetH are obtained. These three offset compensation amounts describe the systematic coordinate deviations of the first center stake coordinates in the north, east, and vertical directions, respectively. Their length units are consistent with the units used for the first center stake coordinates, for example, meters. If the current center stake coordinates are already in the target construction coordinate system and there is no known coordinate reference offset, the initial values of the three offset compensation amounts can be preset to 0.000 m. If actual compensation values are obtained through control point re-measurement, coordinate system transformation, or equipment calibration, the corresponding measured compensation amounts are used to replace the default values. Coordinate compensation is completed by subtracting the coordinate components one by one. ,in, , and These represent the compensated north, east, and elevation coordinates, respectively, which together form the second centerline coordinates. By compensating the three coordinate components separately, deviations in the north, east, and elevation directions can be handled independently. For example, if there is a 0.015 m systematic deviation in the north direction but no deviation in the east direction, it is only necessary to set dOffsetN to 0.015 m and keep dOffsetE at 0.000 m, without changing other coordinate components. Therefore, it is possible to avoid the coordinate correction in one direction affecting the positioning results in the other two directions.
[0035] In one embodiment, such as Figure 5 As shown, step S103 specifically includes the following steps: S401: Take the initial azimuth as the azimuth of the first tower base corner point; calculate the azimuth of the second tower base corner point with a step size of twice the included angle of the tower base geometry; calculate the azimuth of the third tower base corner point with a step size of the difference between 180° and twice the included angle of the tower base geometry; calculate the azimuth of the fourth tower base corner point with a step size of twice the included angle of the tower base geometry. S402: Using the coordinates of the second center stake as the origin of polar coordinates and the polar diameter length as the polar diameter, convert the azimuth angles of the four tower base corner points into corresponding plane coordinates; S403: Add the azimuth angle and offset angle of the power line and then superimpose 90° to obtain the extended reference azimuth angle; S404: Using the extended reference azimuth as the starting angle, calculate the azimuth of the four extended section points at 90° intervals, and use the coordinates of the second center stake as the origin of the polar coordinates and the polar diameter length as the polar diameter to convert the azimuth of the four extended section points into the corresponding plane coordinates.
[0036] In this embodiment, the initial azimuth angle is used as the starting point for recursively calculating the azimuth angles of the four base corner points. The directions of the four base corner points A, B, C, and D are determined sequentially according to the geometric relationship of the base rectangle. The azimuth angle of the first base corner point A is directly taken from the initial azimuth angle. Using twice the geometric angle JiaAngle of the tower base as the first angular recursive step size, the azimuth angle of the second tower base corner point B is obtained, i.e. Since the included angle between two adjacent diagonal directions of a rectangle is not always the same, when proceeding from the second base corner to the third base corner, the angle will be... As the corresponding step size, we get In this embodiment, the azimuth angle of the fourth tower base corner point D is obtained by recursively calculating twice the geometric angle of the tower base. .in, , , and These represent the azimuth angles of the four corner points of the tower base, A, B, C, and D. By employing an alternating angle recursion method, the azimuth angle distribution of the corner points can be made to change synchronously with the length-to-width ratio of the tower base. For example, when the JiaAngle of a square tower base is 45°, both recursion steps are 90°, naturally resulting in a 90° equally spaced distribution of the four corner points. When the tower base length is 8 m and the width is 6 m, and the JiaAngle is approximately 36.87°, the corresponding two angle steps are approximately 73.74° and 106.26°, respectively. This maintains the actual geometric relationship of the four corner points of the rectangle being symmetrical about the center pile, rather than simply forcing all corner points to be evenly divided into 90° intervals.
[0037] In this embodiment, the coordinates of the second center pile are used as the unified polar coordinate origin, and the aforementioned polar diameter length dOA is used as the polar diameter shared by the four tower base corner points. Then, the polar coordinates of each corner point are converted into construction plane coordinates, specifically according to... and Calculations are performed, in which, and These are the north and east coordinates of the second center stake, respectively. and These are the north and east coordinates of the corresponding corner points of the tower base. ,and The azimuth angles are the corresponding corner points. Using the same center stake coordinates and the same extreme diameter length, the planar positions of the four tower base corner points are obtained at once through different azimuth angles, ensuring that their center, dimensions, and rotation direction are consistent with the aforementioned tower base parameters.
[0038] In this embodiment, after calculating the coordinates of the four tower base corner points, an independent extended cross-section azimuth system is established. The azimuth angle of the power line is added to the offset angle, and then 90° is superimposed to obtain the extended reference azimuth angle, i.e. This results in a fixed orthogonal offset of the directional system of the extended cross-section relative to the line direction, and a complementary relationship with the tower base corner points in the four diagonal directions mentioned above. Using the extended reference azimuth as the angular recursive reference, the azimuths of the four extended cross-section points E, F, G, and H are generated sequentially at fixed intervals of 90°. Specifically… , , as well as This ensures that the four extended section points are evenly distributed along the circumference of the tower base. After obtaining the azimuths of the four extended section points, the coordinates of the second center stake are used as the origin of the polar coordinates, and dOA is used as the polar diameter. The north and east coordinates of the four extended section points E, F, G, and H are calculated using the same plane coordinate transformation method as the four tower base corner points A, B, C, and D. Since the two sets of points share the same center stake center and polar diameter length, the eight layout points obtained in the end can maintain a unified spatial reference. Among them, the four points A, B, C, and D are used to characterize the four diagonal control directions of the tower base, while the four extended section points E, F, G, and H are used to supplement the construction control positions between adjacent diagonal control directions, thus forming a set of eight section layout points composed of the four tower base corner points and the four extended section points.
[0039] In one embodiment, such as Figure 6 As shown, step S104 specifically includes the following steps: S501: The difference between the pre-acquired real-time positioning coordinates and the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points is used as the coordinate increment. The coordinate increment is calculated by Pythagorean theorem and arctangent to obtain the horizontal distance and the layout azimuth. The difference between the layout azimuth and the power line azimuth is normalized to the range of 0° to 180° to obtain the point layout guidance data. S502: Alternatively, taking the coordinates of the second center stake as the origin, calculate the azimuth difference based on the plane coordinates and real-time positioning coordinates of the target section point, and multiply the distance between the real-time positioning coordinates and the coordinates of the second center stake by the cosine and sine values of the azimuth difference to obtain the projected distance and offset distance. S503: Compare the projected distance with the preset line segment length. When the projected distance exceeds the preset line segment length or the azimuth difference falls within the range of 90° to 270°, calculate the distance from the real-time positioning coordinates to the two ends of the target lofting line segment, and switch the endpoint with the smaller distance to the navigation target point to obtain the line lofting guidance data.
[0040] In this embodiment, when using the point layout mode, the target point to be laid out is selected from the four tower base corner points or the four extended section points, and the real-time positioning coordinates output by the GNSS positioning acquisition device are acquired simultaneously, so that the target point and the real-time positioning point are both in the same north and east coordinate plane coordinate system. Let the north and east coordinates of the target point be respectively... and The north and east coordinates of the real-time positioning are respectively and Subtracting the corresponding coordinates of the two yields the northward and eastward coordinate increments, i.e. , ,in, and These reflect the remaining distance components of the current position relative to the target stakeout point in the north and east directions, respectively. A Pythagorean theorem is performed on the two coordinate increments, according to... The horizontal distance from the current position to the target point is obtained, and the two coordinate increments are input into the arctangent function to obtain the azimuth angle of the current position pointing to the target point. This determines the distance and direction that the personnel on site need to move. The difference between the azimuth angle and the azimuth angle of the power line is calculated, and the resulting angle is converted to a range of 0° to 180° based on the periodicity of the angle. When the original difference exceeds 180°, the smaller angle is taken, so that the result always represents the minimum angle between the azimuth direction and the power line direction. The horizontal distance, azimuth angle, and normalized angle are used together as point azimuth guidance data, and the above data is continuously updated according to the continuous updates of the real-time positioning coordinates. This allows the personnel on site to adjust their movement direction according to the gradually decreasing trend of the horizontal distance and the change of the azimuth angle until they reach the corresponding tower base corner point or extended section point.
[0041] In this embodiment, when using the line layout mode, the coordinates of the second center stake are used as the unified geometric origin, and the current target cross-section point is determined from the four tower base corner points or the four extended cross-section points. The target layout line segment is jointly defined by the second center stake and the target cross-section point. In this embodiment, the azimuth angle of the target cross-section point relative to the second center stake is calculated based on the planar coordinates and real-time positioning coordinates. The difference between the positioning azimuth angle corresponding to the real-time positioning position and the azimuth angle of the target cross-section is obtained. At the same time, the Pythagorean theorem is performed on the north coordinate difference and the east coordinate difference between the real-time positioning coordinates and the second center stake coordinates to obtain the reference distance between the current position and the second center stake. The reference distance is multiplied by the cosine and sine values of the azimuth angle difference to obtain the projected distance dL and the offset distance dOffset. Here, dL is used to represent the longitudinal position of the current position relative to the second center stake along the target layout line direction, and dOffset is used to represent the lateral distance of the current position from the target layout line. In this way, the two-dimensional spatial relationship between the real-time positioning position and the target stakeout line can be decomposed into a distance component along the line direction and an offset component perpendicular to the stakeout line direction. This allows the stakeout interface to provide on-site personnel with guidance information for moving forward and backward along the target line and for moving left and right towards the target line. The projected distance is compared with the preset line segment length corresponding to the current target stakeout line segment, and the azimuth difference is used simultaneously to determine whether the current projected point is still within the effective target line segment range. The preset line segment length corresponds to the effective stakeout length between the second center stake and the current target section point. When the projected distance does not exceed the length of the line segment and the azimuth relationship is within the effective range, the projected distance and offset distance continue to be used as the guide for line layout, allowing on-site personnel to move along the target line direction and gradually reduce lateral deviation. However, when the projected distance exceeds the preset line segment length, it indicates that the projection of the current position in the target layout direction has crossed the target section point, or when the azimuth difference falls within the 90° to 270° range, it indicates that the current position is in an area where navigation using the projection point inside the line segment is not advisable relative to the target section direction. In this case, the distances from the real-time positioning coordinates to the two endpoints of the target layout line segment are calculated and compared. If the current position is close to the second center stake, the second center stake is switched to the navigation target point; if the current position is close to the target section point, the corresponding tower base corner point or extended section point is switched to the navigation target point, so that the navigation target always falls on the actual effective line segment, instead of continuing to point to an invalid projection position in the extension direction of the line segment. By using projection distance and offset distance for continuous guidance within the line segment and automatically switching to the nearest endpoint outside the line segment, line layout guidance data that can adapt to different real-time positioning positions is formed, avoiding the projection point from going out of bounds and causing on-site personnel to continue moving in the wrong direction.
[0042] In one embodiment, step S502 specifically includes the following steps: Using the coordinates of the second center stake as the origin, the differences between the north and east coordinates of the target section point and the coordinates of the second center stake are input into the arctangent function for calculation to obtain the azimuth of the target section. The differences between the north and east coordinates of the real-time positioning coordinates and the coordinates of the second center stake are also input into the arctangent function for calculation to obtain the positioning azimuth. Calculate the azimuth difference between the positioning azimuth and the target section azimuth; The difference between the north coordinate and the east coordinate between the real-time positioning coordinate and the second center stake is calculated using Pythagorean theorem to obtain the reference distance. The reference distance is multiplied by the cosine of the azimuth difference to obtain the projected distance. The reference distance is multiplied by the sine of the azimuth difference to obtain the offset distance.
[0043] In this embodiment, the coordinates of the second center stake are used as the unified plane calculation origin. Let the north and east coordinates of the second center stake be respectively... and The north and east coordinates of the target section point are respectively and The north and east coordinates of the real-time positioning are respectively and The target cross-section point can be either the currently selected corner point of the tower base or an extended cross-section point. Calculate the northward coordinate difference between the target cross-section point and the second center pile. Difference between east and east coordinates The difference between the two coordinates is then input into the arctangent function for calculation to obtain the target section azimuth angle from the second center stake to the target section point. Simultaneously, calculate the difference in northward coordinates between the real-time positioning coordinates and the second center stake. Difference between east and east coordinates The same arctangent calculation method is used to obtain the positioning azimuth angle from the second center stake to the real-time positioning position. This ensures that the second center stake is used as the same direction calculation reference for both azimuth angles.
[0044] In this embodiment, the azimuth difference between the positioning azimuth and the target section azimuth is calculated, i.e. Furthermore, when the difference is less than 0°, an additional 360° is added to normalize it to the range of 0° to 360°, so as to unify the subsequent projection relationship judgment. At the same time, the Pythagorean theorem calculation is performed on the north coordinate difference and east coordinate difference between the real-time positioning coordinate and the second center stake to obtain the reference distance from the real-time positioning position to the second center stake. This reference distance reflects the actual horizontal distance of the current position relative to the second center stake. After obtaining the reference distance and azimuth difference, and Multiply by the cosine values, according to Obtain the projected distance At the same time and Multiply by the sine values, according to Obtain the offset distance The projection distance represents the distance component of the current real-time positioning position along the direction from the second center stake to the target cross-section point, while the offset distance represents the lateral deviation of the current position relative to the target staking direction. This allows the two-dimensional positional relationship between the real-time positioning position and the target staking line to be decomposed into a longitudinal component along the target line and a lateral component perpendicular to the target line. The projection distance and offset distance are continuously output to the line staking guidance interface and recalculated synchronously as the GNSS real-time positioning coordinates are updated. This provides a calculation basis for determining whether the projected position is within the effective line segment formed by the second center stake and the target cross-section point, and whether it is necessary to switch the navigation target point.
[0045] It should be understood that the sequence number of each step in the above embodiments does not imply the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0046] In one embodiment, an eight-section layout device 700 for power tower foundations is provided, which corresponds one-to-one with the eight-section layout method for power tower foundations described in the above embodiments. For example... Figure 7 As shown, the eight-section layout device 700 for the power tower foundation includes: The type analysis module 701 is used to determine the geometric type of the tower base based on the input tower base length and the preset tolerance threshold, and to calculate the extreme diameter length and the geometric angle of the tower base based on the geometric type of the tower base; The offset compensation module 702 is used to superimpose the pre-acquired azimuth angle and offset angle of the power line with the geometric angle of the tower base to obtain the starting azimuth angle, and to perform coordinate offset compensation on the pre-acquired first center stake coordinates to obtain the second center stake coordinates. The calculation module 703 is used to calculate the azimuth and plane coordinates of the four tower base corner points based on the starting azimuth, extreme diameter length, and second center pile coordinates, and to calculate the azimuth and plane coordinates of the four extended section points based on the power line azimuth and offset angle, wherein the four tower base corner points and the four extended section points constitute an eight-section layout point set. The layout guidance module 704 is used to calculate the layout guidance data based on the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points and the pre-acquired real-time positioning coordinates, or to perform projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the plane coordinates of the four tower base corner points or the four extended section points based on the azimuth angle of the power line, so as to obtain the line layout guidance data.
[0047] It should be noted that the information interaction and execution process between the above-mentioned devices / units are based on the same concept as the method embodiments of this application. For details on their specific functions and technical effects, please refer to the method embodiments section, and they will not be repeated here.
[0048] Those skilled in the art will clearly understand that, for the sake of convenience and brevity, the above-described division of functional units and modules is merely an example. In practical applications, the above functions can be assigned to different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiments can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The integrated unit can be implemented in hardware or as a software functional unit. Furthermore, the specific names of the functional units and modules are only for easy differentiation and are not intended to limit the scope of protection of this application. The specific working process of the units and modules in the above system can be referred to the corresponding process in the foregoing method embodiments, and will not be repeated here.
[0049] This application also provides a computer device, such as... Figure 8 As shown, the computer device includes: at least one processor, a memory, and a computer program stored in the memory and executable on the at least one processor. When the processor executes the computer program, it implements the steps in any of the above method embodiments, or when the processor executes the computer program, it implements the functions of each module / unit in the above device embodiments.
[0050] For example, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to complete this application. The one or more modules / units may be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of the computer program in the computer device.
[0051] Those skilled in the art will understand that Figure 8 The computer device described is merely an example and does not constitute a limitation on the computer device. It may include more or fewer components than shown, or combine certain components, or different components. For example, the computer device may also include input / output devices, network access devices, buses, etc.
[0052] The aforementioned processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), or field-programmable gate arrays (FPGAs). Programmable Gate Array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor or any conventional processor.
[0053] The memory can be an internal storage unit of the computer device, such as a hard drive or RAM. The memory can also be an external storage device of the computer device, such as a plug-in hard drive, Smart Media Card (SMC), Secure Digital (SD) card, or Flash Card. Furthermore, the memory can include both internal and external storage units of the computer device.
[0054] This application also provides a readable storage medium storing a computer program, which, when executed by a processor, can implement the steps in the above-described method embodiments.
[0055] This application provides a computer program product that, when run on an electronic device, enables the electronic device to implement the steps described in the various method embodiments above.
[0056] If the integrated unit is implemented as a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the methods of the above embodiments of this application can be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include at least: any entity or device capable of carrying computer program code to a photographing device / terminal device, a recording medium, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electrical carrier signal, a telecommunication signal, and a software distribution medium. Examples include USB flash drives, portable hard drives, magnetic disks, or optical disks. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electrical carrier signals or telecommunication signals.
[0057] In the above embodiments, the descriptions of each embodiment have different focuses. For parts that are not described in detail or recorded in a certain embodiment, please refer to the relevant descriptions of other embodiments.
[0058] Those skilled in the art will recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.
[0059] In the embodiments provided in this application, it should be understood that the disclosed apparatus / devices and methods can be implemented in other ways. For example, the apparatus / device embodiments described above are merely illustrative. For instance, the division of modules or units is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between apparatuses or units may be electrical, mechanical, or other forms.
[0060] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.
[0061] The above-described embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be included within the protection scope of this application.
Claims
1. A method for laying out eight sections of a power transmission tower foundation, characterized in that, include: The tower base geometry type is determined based on the input tower base length and the preset tolerance threshold, and the extreme diameter length and tower base geometry angle are calculated based on the tower base geometry type. The azimuth and offset angles of the power line obtained in advance are superimposed with the geometric angle of the tower base to obtain the starting azimuth angle, and the coordinate offset compensation of the first center pile coordinates obtained in advance is performed to obtain the second center pile coordinates. The azimuth and plane coordinates of the four tower base corner points are calculated based on the starting azimuth, the extreme diameter length and the coordinates of the second center stake. The azimuth and plane coordinates of the four extended section points are calculated based on the power line azimuth and the offset angle. The four tower base corner points and the four extended section points constitute an eight-section layout point set. The line layout guidance data is obtained by calculating the layout points based on the planar coordinates of the four tower base corner points or the planar coordinates of the four extended section points and the pre-acquired real-time positioning coordinates, or by performing projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the planar coordinates of the four tower base corner points or the four extended section points based on the azimuth angle of the power line.
2. The method for laying out eight sections of the power tower foundation as described in claim 1, characterized in that, The step of determining the tower base geometry type based on the input tower base length and a preset tolerance threshold, and calculating the polar diameter length and tower base geometry angle based on the tower base geometry type, includes: Compare the input tower base width with the preset tolerance threshold; When the width of the tower base is less than the preset tolerance threshold, the geometry of the tower base is determined to be square and the length of the tower base is directly used as the polar diameter length; When the width of the tower base is not less than the preset tolerance threshold, the geometric type of the tower base is determined to be rectangular, and half of the tower base length and half of the tower base width are Pythagorean theorem to obtain the extreme diameter length. The geometric angle of the tower base is obtained by performing cosine theorem calculation based on the semi-long side, semi-short side corresponding to the geometric type of the tower base and the polar diameter length.
3. The method for laying out eight sections of the power tower foundation as described in claim 2, characterized in that, The step of superimposing the pre-acquired azimuth angle and offset angle of the power line with the geometric angle of the tower base to obtain the initial azimuth angle, and performing coordinate offset compensation on the pre-acquired first center stake coordinates to obtain the second center stake coordinates, includes: The initial azimuth angle is obtained by superimposing the pre-acquired azimuth angle and offset angle with the geometric angle of the tower base; Subtract the preset northward offset compensation, eastward offset compensation, and elevation offset compensation from the north, eastward, and elevation coordinates of the first center stake coordinates to obtain the second center stake coordinates.
4. The method for laying out eight sections of the power tower foundation as described in claim 3, characterized in that, The azimuth and plane coordinates of the four tower base corner points are calculated based on the initial azimuth, the extreme diameter length, and the coordinates of the second center stake. The azimuth and plane coordinates of the four extended section points are also calculated based on the power line azimuth and the offset angle. The four tower base corner points and the four extended section points constitute an eight-section layout point set, including: The starting azimuth angle is used as the azimuth angle of the first tower base corner point; the azimuth angle of the second tower base corner point is calculated with a step size of twice the included angle of the tower base geometry; the azimuth angle of the third tower base corner point is calculated with a step size of the difference between 180° and twice the included angle of the tower base geometry; and the azimuth angle of the fourth tower base corner point is calculated with a step size of twice the included angle of the tower base geometry. Using the coordinates of the second central pile as the origin of polar coordinates and the polar diameter length as the polar diameter, the azimuth angles of the four tower base corner points are converted into corresponding planar coordinates; The extended reference azimuth angle is obtained by adding the azimuth angle of the power line and the offset angle together and then superimposing 90°. Using the extended reference azimuth as the starting angle, the azimuth of the four extended section points is calculated at 90° intervals. The coordinates of the second center stake are used as the origin of the polar coordinates, and the polar diameter length is used as the polar diameter. The azimuth of the four extended section points is then converted into corresponding plane coordinates.
5. The method for laying out eight sections of the power tower foundation as described in claim 4, characterized in that, The step of calculating point layout guidance data based on the plane coordinates of the four tower base corner points or the four extended section points and the pre-acquired real-time positioning coordinates, or calculating and switching navigation target points based on the projection rotation of the real-time positioning coordinates and the plane coordinates of the four tower base corner points or the four extended section points according to the power line azimuth angle, to obtain line layout guidance data, includes: The difference between the pre-acquired real-time positioning coordinates and the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points is used as the coordinate increment. The coordinate increment is calculated by Pythagorean theorem and arctangent theorem to obtain the horizontal distance and the layout azimuth. The difference between the layout azimuth and the power line azimuth is normalized to the range of 0° to 180° to obtain the point layout guidance data. Alternatively, taking the coordinates of the second center stake as the origin, the azimuth difference is calculated based on the plane coordinates of the target section point and the real-time positioning coordinates. The distance between the real-time positioning coordinates and the coordinates of the second center stake is multiplied by the cosine and sine values of the azimuth difference to obtain the projected distance and the offset distance. The projected distance is compared with the preset line segment length. When the projected distance exceeds the preset line segment length or the azimuth difference falls within the range of 90° to 270°, the distance from the real-time positioning coordinates to the two ends of the target lofting line segment is calculated respectively. The endpoint with the smaller distance is switched as the navigation target point to obtain the line lofting guidance data.
6. The method for laying out eight sections of a power tower foundation as described in claim 5, characterized in that, The process involves using the coordinates of the second center stake as the origin, calculating the azimuth difference based on the plane coordinates of the target section point and the real-time positioning coordinates, and multiplying the distance between the real-time positioning coordinates and the coordinates of the second center stake by the cosine and sine values of the azimuth difference to obtain the projected distance and offset distance, including: Using the coordinates of the second center stake as the origin, the difference between the north coordinate and the east coordinate of the target section point and the coordinates of the second center stake is input into the arctangent function for calculation to obtain the azimuth of the target section. The difference between the north coordinate and the east coordinate of the real-time positioning coordinates and the coordinates of the second center stake is input into the arctangent function for calculation to obtain the positioning azimuth. Calculate the azimuth difference between the positioning azimuth and the target section azimuth; The north and east coordinate differences between the real-time positioning coordinates and the second center stake coordinates are calculated using Pythagorean theorem to obtain the reference distance. The reference distance is then multiplied by the cosine of the azimuth difference to obtain the projected distance. Finally, the reference distance is multiplied by the sine of the azimuth difference to obtain the offset distance.
7. A device for laying out eight sections of a power transmission tower foundation, characterized in that, The steps for implementing the eight-section layout method for power tower foundations as described in any one of claims 1 to 6 include: The type analysis module is used to determine the geometric type of the tower base based on the input tower base length and the preset tolerance threshold, and to calculate the extreme diameter length and the geometric angle of the tower base based on the tower base geometric type. The offset compensation module is used to superimpose the pre-acquired azimuth angle and offset angle of the power line with the geometric angle of the tower base to obtain the starting azimuth angle, and to perform coordinate offset compensation on the pre-acquired first center stake coordinates to obtain the second center stake coordinates. The calculation module is used to calculate the azimuth and plane coordinates of the four tower base corner points based on the starting azimuth, the extreme diameter length and the coordinates of the second center stake, and to calculate the azimuth and plane coordinates of the four extended section points based on the power line azimuth and the offset angle, wherein the four tower base corner points and the four extended section points constitute an eight-section layout point set. The layout guidance module is used to calculate layout guidance data based on the plane coordinates of the four tower base corner points or the plane coordinates of the four extended section points and the pre-acquired real-time positioning coordinates, or to perform projection rotation calculation and navigation target point switching on the real-time positioning coordinates and the plane coordinates of the four tower base corner points or the four extended section points based on the azimuth angle of the power line, so as to obtain line layout guidance data.
8. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the steps of the eight-section layout method for the power tower foundation as described in any one of claims 1 to 6.
9. A readable storage medium storing a computer program, characterized in that, When the computer program is executed by the processor, it implements the steps of the eight-section layout method for the power tower foundation as described in any one of claims 1 to 6.
10. A computer program product, characterized in that, The computer program product includes a computer program that, when executed by a processor, implements the steps of the eight-section layout method for the power tower foundation as described in any one of claims 1 to 6.