Switching paper grades in a paper production flow

By automating the switching of control variables in paper production, the problem of complex and time-consuming paper type switching has been solved, resulting in faster, more reliable type switching and higher production efficiency.

CN123113703APending Publication Date: 2026-11-17VOITH PATENT GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610672994.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2025-05-15
Filing Date
2026-05-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In paper production, the process of switching paper types is complex and time-consuming, resulting in waste paper and affecting economic benefits.

Method used

By planning a method for switching from the first paper type to the second paper type, and utilizing the configuration of control variables in an automated system, including the parameter transition of the first and second control variables, the production process can be optimized and changeover time reduced.

Benefits of technology

It simplifies the paper type switching process, making it faster and more reliable, reduces the professional knowledge required of operators, and improves the efficiency of the production process and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123113703A_ABST
    Figure CN123113703A_ABST
Patent Text Reader

Abstract

The invention relates to a method of planning a switch from a first paper grade to a second paper grade in a production process, producing the first paper grade based on a first control variable configuration in a first process section of the production process, subsequently producing the second paper grade based on a second control variable configuration in a second process section, the first control variable configuration having one value for a first parameter and one value for at least one further parameter, the second control variable configuration having another value for the first parameter and another value for the further parameter, the transition from the first control variable configuration to the second control variable configuration comprising a transition from the value for the first parameter to the other value for the first parameter and a transition from the value for the further parameter to the other value for the further parameter; the transition from the first control variable configuration to the second control variable configuration is planned automatically based on the production of the first paper grade. The invention also relates to a method for implementing a production process and a system and computer program (product).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a method for planning a switch in a papermaking process from producing a first type of paper to subsequently producing a second type of paper, a method for implementing a production process to manufacture different types of paper, and a system, computer program, or computer program product for implementing the method. Background Technology

[0002] In a paper mill, equipment can sequentially produce different types of paper. In the context of this invention, different types of paper may differ, particularly in basis weight and / or surface properties and / or the type and / or composition and / or pretreatment of the raw materials used.

[0003] Although the same equipment can produce different types of paper, the production process differs in many parameters. These parameters include the proportion of raw materials, fiber pretreatment, machine settings such as vacuum and pressure, and finishing processes such as calendering and / or coating, to name just a few.

[0004] This type of changeover is a complex process, and depending on the type of changeover, it can take anywhere from several minutes to half an hour or even longer to produce a new type of paper that meets sales quality standards. Paper produced during this transition period is typically considered waste. Therefore, for economic reasons, operators want to minimize changeover time as much as possible. Summary of the Invention

[0005] The technical problem to be solved by the present invention is to improve the production of different types of paper by a single device, and to improve the switching between these types of paper in the production process used for papermaking.

[0006] The technical problem described herein is solved by a method for planning a switch from a first paper type to a second paper type in the production process.

[0007] - In the first process segment of the production process, the first type of paper is produced by equipment configured based on a first control variable.

[0008] - Subsequently, in the second process segment of the production process, the equipment is configured to produce a second type of paper based on a second control variable.

[0009] Wherein, the first control variable configuration has

[0010] - A value for the first parameter and

[0011] - At least one value of another parameter,

[0012] The second control variable configuration has

[0013] - Another value of the first parameter and

[0014] - Another value for the other parameter,

[0015] And the transition from the first control variable configuration to the second control variable configuration includes

[0016] - A first transition from the value of the first parameter to another value of the first parameter, and

[0017] - Another transition from the value of the other parameter to another value of the other parameter;

[0018] In this process, the transition from the first control variable configuration to the second control variable configuration is automatically planned based on the production of the first paper type.

[0019] The technical problem described above is also solved according to the present invention by a method for implementing a production process, wherein the method is used to manufacture different types of paper using equipment, wherein...

[0020] - In the first process segment of the production process, the first type of paper is manufactured by the equipment based on a first control variable;

[0021] - The method according to any one of the preceding claims plans to switch from producing a first type of paper to producing a second type of paper;

[0022] - Switching the execution plan; and

[0023] - In the second process segment of the production process, the equipment is configured to produce a second type of paper based on a second control variable.

[0024] The technical problem described herein is also solved by a system for planning a switch from a first paper type to a second paper type in a production process.

[0025] - In the first process segment of the production process, the first type of paper is produced by equipment configured based on a first control variable.

[0026] - Subsequently, in the second process segment of the production process, the equipment is configured to produce a second type of paper based on a second control variable.

[0027] Wherein, the first control variable configuration has

[0028] - A value for the first parameter and

[0029] - At least one value of another parameter,

[0030] The second control variable configuration has

[0031] - Another value of the first parameter and

[0032] - Another value for the other parameter,

[0033] And the transition from the first control variable configuration to the second control variable configuration includes

[0034] - A first transition from the value of the first parameter to another value of the first parameter, and

[0035] - Another transition from the value of the other parameter to another value of the other parameter;

[0036] The system is configured to perform methods of the aforementioned type, and / or the system has devices for automatically planning the transition from the first control variable configuration to the second control variable configuration based on the production of a first paper type.

[0037] The technical problem described herein is also solved by a computer program or computer program product, wherein the computer program or computer program product includes instructions, in particular, stored on a computer-readable and / or non-volatile storage medium, which, when executed by one or more computers or a system of the aforementioned type, cause the computer or system to perform a method of the aforementioned type.

[0038] According to an embodiment of the present invention, in order to plan the switch from a first paper type to a second paper type in the production process,

[0039] - The first type of paper is manufactured in the first process segment of the production process, preferably in the equipment and / or by the equipment configured based on the first control variable;

[0040] - Another second type of paper is subsequently manufactured in another second process segment of the production process by equipment, within equipment and / or by equipment configured based on another second control variable;

[0041] Based on the preferred (already) at least partially planned and / or (already) at least partially executed manufacturing of a first paper type, the transition from a first control variable configuration to a second control variable configuration is automatically planned. In this invention, "automatic" means at least partially automated, and in improved embodiments, the automated steps, method steps, or process segments (respectively) can be fully automated.

[0042] The equipment preferably operates without stopping between the production of the first paper type and the production of the second paper type, or continues to operate during the switchover, in particular by continuing to supply fiber suspension or allow processed materials to pass through. Accordingly, this is preferably the first and second process segments in a continuous production process.

[0043] According to an embodiment of the present invention, the first control variable configuration has

[0044] - A (first) one-dimensional or multi-dimensional value with a first parameter; and

[0045] - (each) has a (first) value of one or more other one-dimensional or multi-dimensional parameters.

[0046] And the second control variable configuration has

[0047] - Another (second) value for the first parameter; and

[0048] - (respectively) another (second) value of one or more other parameters.

[0049] And the transition from the first control variable configuration to the second control variable configuration includes

[0050] - The first transition from the (first) value of the first parameter to another (second) value of the first parameter, and

[0051] - (respectively) an additional transition from the (each) (first) value of one or more other parameters to the (each) (second) value of the (each) other parameter.

[0052] In other words, the transition from the first control variable configuration to the second control variable configuration involves changes in the parameter values ​​of at least two parameters, while the parameter values ​​of one or more other parameters in the control variable configuration can remain unchanged during the transition.

[0053] By automatically planning the switching of parameter values ​​for two or more parameters based on the production situation of the first paper type, such switching can be particularly advantageous, especially as it is simpler, faster, and / or more reliable, and / or even if there is no in-depth experience, or if it is planned by less qualified personnel, and / or it is particularly advantageous as it is simpler, faster, and / or more reliable to operate, and / or improves the production process to be faster and / or more reliable, and / or achieves better production results.

[0054] Automatic transitions can be achieved in several ways. For example, operators can be alerted to an impending type switch via visual, auditory, or similar signals at the trigger point. Alternatively or additionally, the system can be designed to automatically initiate the transition from the first control variable configuration to the second control variable configuration.

[0055] Another advantageous implementation is that the transition from one value of the first parameter to another is initiated automatically by the system, while subsequent transitions from one value of another parameter to another are only prompted by a signal but not automatically initiated. This may be necessary or desirable for safety reasons. For example, in such transitions, equipment not used in the first process stage (e.g., pulper, refiner, or vacuum pump) can be started. In this case, it can be stipulated that active operator intervention is required to confirm that the equipment is safe to start before it starts automatically. Even in this case, operator intervention is still required, but the required expertise of the operator is lower.

[0056] In all implementations, the types and scope of changes to be implemented, or the required control variable configurations, can be stored in the technical system, for example, in the form of parameter tables. The maintenance of these control variable configurations is centrally performed by appropriately trained experts. Therefore, operators do not need such expertise when switching between categories.

[0057] In one embodiment, the type switching time, referred to as the type switching time point or triggering condition in the improved scheme, is automatically determined based on the output of the first paper type in the first process segment, especially based on the output of paper already produced in the first process segment when planned according to the present invention and / or the expected output of paper to be produced in the first process segment, and / or based on the preset rated output of the first paper type. Preferably, after the type switching time (point) is reached, preferably at the time (point) reached, the output of the first paper type produced in the first process segment is expected or predicted to meet the preset rated output of the first paper type.

[0058] After comprehensive consideration

[0059] - A preset rated paper production capacity, preferably provided by or calculated from a production plan; and

[0060] - The projected paper production is preferably based on the paper production already produced, which is preferably provided or calculated by the equipment or machine monitoring and / or control system;

[0061] A particularly advantageous switchover can be planned, especially to reduce or even avoid overproduction of the first paper type and to start the expected production of the second paper type as early as possible, so that it can be put into use sooner.

[0062] In a preferred embodiment, the automatic transition from the first control variable configuration to the second control variable configuration can be based on the equipment's production plan. For this purpose, it is advantageous that the (computer) system (= technical system) for planning paper type switching is able to exchange information with, or at least receive information from, a (computer) system (= business system) that typically operates independently for formulating production plans.

[0063] Therefore, the start time (trigger point) for switching from the first control variable configuration to the second control variable configuration does not need to be determined by operator intervention, but can be calculated automatically. For example, the actual output of the first paper type in the papermaking machine technology system can be compared with the planned output of the first paper type in the commercial system, and this can be used as the trigger condition.

[0064] In one implementation, the transition from the first control variable configuration to the second control variable configuration is automatically planned based on at least one previously performed switch from a first paper type produced by the equipment and / or to a second paper type produced by the equipment.

[0065] In the improvement plan,

[0066] - Based on the selection of particularly successful and / or rapid category switching (“Golden Switch”); or

[0067] - Based on the type switching that results in a particularly high-quality final product (“Golden Run”),

[0068] The transition is planned by preferably using parameter values ​​configured with first and / or second control variables.

[0069] Specifically, it can be stipulated that when a particularly successful product switching is discovered, or when a product switching results in a particularly high-quality final product, the computer system should be notified through the intervention of the appropriate operators. Subsequently, the configuration of the control variables used in this product switching will be recorded and stored in the technical system as the basis for future product switching.

[0070] In this way, the equipment can also achieve continuous process optimization. If circumstances permit, i.e., when there are appropriately trained operators and / or production conditions allow for flexibility, the automatic transition from the first control variable configuration to the second control variable configuration can be temporarily disabled to try the new configuration and test its effectiveness. If the test is successful, the new control variable configuration will be saved for future switchovers, and automatic switchover can be re-enabled. If the test is unsuccessful, the old control variable configuration will continue to be used.

[0071] This approach makes it very easy to ensure that process optimizations have an immediate effect on the entire production process when switching product types, without the need for coordination between different shifts through training or similar means.

[0072] By taking into account past switchover scenarios, especially empirical parameter values, the switchover will become particularly advantageous, especially simpler, faster and / or more reliable, and can be planned and / or implemented particularly advantageously, especially simply, faster and / or more reliable, and / or improve production to be particularly fast and / or more reliable, and / or produce better production results, even without extensive experience or by less qualified personnel.

[0073] During product type switching, a transition period typically occurs where paper produced does not meet the specifications of either the first or second paper type. This paper is usually considered unsellable waste. Therefore, for economic reasons, it is crucial for operators to minimize this transition period.

[0074] Therefore, in one implementation method, it is recommended that:

[0075] - Plan the first starting point for the first transition; and

[0076] - Plan another later start date for another transition or one or more of the other transitions.

[0077] In one improved approach, the first starting time point is located or planned within the first process segment.

[0078] This implementation method is advantageous because the time required for different parameters to transition from one value to another varies. For example, the effect of increasing vacuum pump suction is more rapid than increasing equipment operating speed. In this case, although there is no actual demand due to the relatively low equipment operating speed, the additional cost required to generate a higher vacuum has already been incurred. In this situation, it can be specified that the transition of "increasing equipment speed" and "increasing vacuum" begins separately at different time points.

[0079] In one embodiment, additionally or alternatively, one or more subsequent start points (also respectively) are located or planned within the first process segment. Furthermore, in one embodiment, one or more other subsequent start points (each respectively) are located or planned outside the first process segment. Alternatively, in one embodiment, one or more subsequent start points (each respectively) may also be located or planned outside the first process segment.

[0080] For some or all parameters, the transition can be initiated before the trigger point for the type switch.

[0081] In one implementation, additionally or alternatively, the variable time interval between the first start time point and one or more other start time points is dynamically planned, preferably within the first process segment.

[0082] This allows for the advantageous consideration or at least partial compensation for downtime or similar situations. For example, it can be determined how long the equipment can continue producing a new paper type using the stock in the machine feeder. During this period, for example, 10 minutes before the paper change or trigger point, the processes at the front end of the machine feeder, such as grinding, mixing, and / or filler metering, can be adjusted in advance to accommodate the requirements of the new paper type.

[0083] Furthermore, the second paper type may require some equipment that is completely unnecessary for the first paper type (such as pulpers, pumps, etc.). This equipment takes time to become fully operational. Therefore, it makes sense to start such equipment before the trigger point.

[0084] Therefore, the switchover can be planned in a particularly advantageous, simpler, faster and / or more reliable manner without the need for extensive experience or less qualified personnel, and / or the switchover can be implemented in a particularly advantageous, simpler, faster and / or more reliable manner, and / or such planning can improve production, making it particularly faster and / or more reliable, and / or producing better production results.

[0085] In one implementation, the transition from the first control variable configuration to the second control variable configuration is automatically planned based on the control and / or monitoring of the equipment during the production of the first type of paper.

[0086] In one improvement, based on the control and / or monitoring of the equipment during the production of the first type of paper, the planned transition from the first control variable configuration to the second control variable configuration is automatically changed, preferably (dynamically and / or adaptively) during the first process segment.

[0087] Therefore, the switchover can be planned in a particularly advantageous, simpler, faster and / or more reliable manner and / or without the need for extensive experience or less qualified personnel, and / or the switchover can be implemented in a particularly advantageous, simpler, faster and / or more reliable manner, and / or such planning can improve production, making it particularly faster and / or more reliable, and / or producing better production results.

[0088] Combining two or more of the above features is particularly advantageous. Therefore, transition planning can be dynamically conducted based on the analysis and iterative optimization of existing production data, with the preference being to pre-set targets. This can achieve faster changeover times in a particularly effective manner. Additionally or alternatively, operators no longer need the expertise to determine a "golden run" or similar concept.

[0089] Preferably, the switching or transition interval is not fixed and preset, but determined according to the current equipment status. For example, if the second paper type requires a large amount of filler, while the first paper type requires only a small amount, and the filler tank still has sufficient reserves, then the replenishment of the filler can begin later. However, if the tank is nearly empty, it is more advantageous to start the process as early as possible.

[0090] Connecting machine or equipment control and / or monitoring systems directly to production planning, especially production planning procedures, can make the automatic planning of changeovers particularly efficient, simple, and / or reliable.

[0091] In one implementation, the system additionally automatically plans a switch from manufacturing a first paper type in the first process segment using the equipment based on a first control variable configuration to manufacturing a third paper type in an intermediate process segment of the production process located between the first and second process segments using the equipment based on a third control variable configuration; wherein the production based on the first paper type automatically plans the transition from the first control variable configuration to the third control variable configuration, and preferably implements one or more features in the planning, such as switching from the first paper type to the second paper type or transitioning from the first control variable configuration to the second control variable configuration.

[0092] In one implementation, the transition planning from the first control variable configuration to the third control variable configuration includes planning the transition from the first control variable configuration to the third control variable configuration, which occurs during the transition from the first control variable configuration to the second control variable configuration.

[0093] This is particularly advantageous because it allows for minor adjustments to the first paper type (up to the third paper type), implementing small and / or rapidly effective changes, such as increasing the pressing pressure. During the type switch from the first to the third paper type, long-term preparations can begin for a subsequent switch from the third to the second paper type, or for an overall switch from the first paper type → (the third paper type →) the second paper type, such as beginning to disperse waste paper and place it in a stacking trough or similar device.

[0094] In one embodiment, the parameters in the first and second control variable configurations (and an improved version of the third control variable configuration) represent control variables for the equipment section used to provide the fiber suspension; in another improved version, the control variable represents

[0095] - Control variables for one or more stacking towers, wherein (each) preferably, individual fiber components are stored, such as (in one or more stacking towers) long fiber pulp and / or (in one or more stacking towers) short fiber pulp and / or (in one or more stacking towers) recycled fibers and / or (in one or more stacking towers) production waste; and / or

[0096] - One or more mixing tanks; and / or

[0097] - One or more machine feed troughs.

[0098] In one embodiment, additionally or alternatively, the parameters of the first and second control variable configurations (and an improved version of the third control variable configuration) are control variables of the stabilizing unit.

[0099] In one implementation, additionally or alternatively, the parameters of the first and second control variable configurations (and an improved version of the third control variable configuration) are the control variables of the headbox.

[0100] In one embodiment, additionally or alternatively, the parameters of the first and second control variable configurations (and an improved version of the third control variable configuration) are control variables of the screen section.

[0101] In one embodiment, additionally or alternatively, the parameters of the first and second control variable configurations (and an improved version of the third control variable configuration) are control variables of the pressing section.

[0102] In one embodiment, additionally or alternatively, the parameters of the first and second control variable configurations (and an improved version of the third control variable configuration) are control variables of the drying section.

[0103] In one implementation, additionally or alternatively, the parameters of the first and second control variable configurations (and an improved version of the third control variable configuration) are control variables of the leveling machine.

[0104] The present invention has particularly significant advantages for the planning of these parameters or control variables and their transitions, especially based on their dynamic characteristics, interactions and their impact on the production process; therefore, the switchover can be planned particularly advantageously, particularly simply, quickly and / or reliably, and / or without the need for extensive experience or less qualified personnel, and / or the switchover can be implemented particularly advantageously, particularly simply, quickly and / or reliably, and / or such planning can improve production, making it particularly quick and / or reliable, and / or produce better production results.

[0105] According to one embodiment of the present invention, (in one method) in order to utilize the equipment to perform a production process to manufacture different types of paper, in a first process segment of the production process, the equipment is configured to manufacture a first type of paper based on a first control variable.

[0106] Prior to or particularly advantageously during the production process of the first paper type, at least in part during or before the production process of the first paper type, and in part during the production process of the first paper type, the plan to switch from the production of the first paper type to the production of another second paper type is made in accordance with the aforementioned method.

[0107] The switch to the plan is executed, and then in the second process segment of the production process, the equipment is configured to produce a second type of paper based on a second control variable.

[0108] In one embodiment, the production of a third paper type is planned to be switched from the production of a first paper type according to the aforementioned method. The planned switch is executed and the production of the third paper type is configured to be produced based on a third control variable in the middle process segment of the production process. Then, the production of the second paper type is configured to be produced based on a second control variable in the second process segment of the production process.

[0109] According to one embodiment of the invention, a system for planning a switch from a first paper type to a second paper type in a production process performs the aforementioned method, particularly through hardware and / or software (especially programming techniques), and / or the system has devices for automatically planning the transition from the first control variable configuration to the second control variable configuration based on the production of the first paper type.

[0110] In one embodiment, the system or its device includes:

[0111] A device that automatically plans the type-change time based on the quantity of the first paper type produced in the first process segment and / or a preset rated quantity of the first paper type; and / or

[0112] A device that automatically plans the transition from a first control variable configuration to a second control variable configuration based on at least one previously executed switch from a first paper type produced by the equipment and / or to a second paper type produced by the equipment.

[0113] Devices for automatically planning a first start time point for a first transition and a subsequent, later start time point, particularly for dynamically planning a variable time interval between the first start time point and the other start time point; and / or

[0114] Devices that automatically plan the transition from a first control variable configuration to a second control variable configuration based on the control and / or monitoring of equipment during the production of a first type of paper, particularly for automatically adjusting the transition plan from the first control variable configuration to the second control variable configuration based on the control and / or monitoring of equipment during the production of a first type of paper; and / or

[0115] Devices for automatically planning the switch from a first paper type to a third paper type produced in an intermediate process segment, having devices for automatically planning the transition from a first control variable configuration to a third control variable configuration based on the production status of the first paper type.

[0116] In one embodiment, the system or its device for performing a production process to manufacture different types of paper includes, in an improved version:

[0117] Based on the first control variable, the device is configured to manufacture a first type of paper in the first process segment of the production process; and / or

[0118] Devices used to perform planned conversions; and / or

[0119] Devices for configuring the production of a second type of paper based on a second control variable in the second stage of the production process; and / or

[0120] A device used to configure the production of a third type of paper based on a third control variable in an intermediate stage of the production process.

[0121] The systems and / or devices described in this invention can be implemented using hardware and / or software technologies, and in particular include at least one digital processing unit, especially a microprocessor unit (CPU), graphics processor (GPU), or similar component preferably connected to a memory and / or bus system for data or signals, and / or one or more programs or program modules, especially at least one or more, preferably correspondingly programmed, computers. The processing unit may be designed to execute instructions implemented as a program stored in the storage system, acquire input signals from the data bus, and / or output signals to the data bus. The storage system may include one or more, especially different, storage media, particularly optical, magnetic, solid-state, and / or other non-volatile media. The program may be designed to embody or be able to perform the aforementioned methods, thereby enabling the processing unit to perform the steps of the methods, thereby enabling, in particular, the planning of paper type switching and / or the execution of (multiple) production processes. In one embodiment, the computer program product may include a storage medium for storing programs or instructions, especially a computer-readable and / or non-volatile storage medium, or may itself be a storage medium storing programs or instructions. In one implementation, a program or its instructions are executed by a system or controller, particularly a computer or a combination of computers, to cause the system or controller, particularly the computer, to perform the aforementioned methods or one or more of the steps, or the program or instructions are configured for this purpose.

[0122] In one implementation, one or more steps of the method, especially all of the steps, are implemented entirely or partially by a computer, or one or more steps of the method, especially all of the steps, are performed entirely or partially by an automated means, especially by a system or device thereof.

[0123] In one embodiment, the system has a portion of the device or the device itself. Attached Figure Description

[0124] Other advantages, features, and advantageous improvements of the invention can be seen from the embodiments. Therefore, they are shown in part schematically in the accompanying drawings:

[0125] Figure 1 A system according to an embodiment of the present invention is shown, the system being used to execute a production process to manufacture different types of paper and to plan a switch in the production process from a first type of paper to a second type of paper.

[0126] Figure 2 This illustrates a production process with switching capabilities; and

[0127] Figure 3 A method for planning a switchover and executing a production process according to an embodiment of the present invention is shown. Detailed Implementation

[0128] Figure 1The diagram shows equipment for producing different types of paper, which (for illustrative purposes only) includes two stacking towers 11 and 12, a mixing tank 20, a machine feed trough 21, a stabilizing section 30, a headbox 31, a screen section 32, a press section 40 including (for illustrative purposes only) two press zones 41, a drying section 50 including (for illustrative purposes only) two pairs of drying rollers 51, a leveling machine 60, and a computer system 70, which has or is used for a production planner 71 and a machine and equipment control and monitoring device 72.

[0129] Figure 2 The following are shown (respectively) at time t:

[0130] - The top chart shows the production volume V1 for the first paper type, where V... 1s Indicates the preset rated paper output;

[0131] - The amount of slurry Q from the first fiber component of the stacking tower 11 is shown in the chart below. 11 ;

[0132] - The slurry quantity Q of the second fiber component from stacking tower 12 is shown in the chart below. 12 ;

[0133] - The middle diagram below shows type B of the fiber suspension present in headbox 31. 31 ;

[0134] - The linear load P of at least one pressing zone 41 in the pressing section 40 is shown in the diagram below. 41 ;

[0135] - The heating steam flow rate D of at least one pair of drying rollers 51 in the drying section 50 is shown in the chart below. 51 ;as well as

[0136] - The temperature T of at least one pair of drying rollers 51 is shown in the charts below and at the very bottom. 51 .

[0137] For example, at the current planned time point t a The plan is to switch from the first paper type to the second paper type.

[0138] Therefore, based on the preset rated paper production V in the production planner 71 1s And expected at time point t E1 Paper production output V1(t) E1 The paper production output is based on the output V1(t) of the first paper type. p The predicted output is then determined by the machine or equipment control and monitoring device 72, which automatically plans the paper type switching time point t.E1 .

[0139] Based on this and the corresponding downtime, the system will automatically plan the first transition from one value of the first parameter to another. The following example illustrates this using the provision of the required fiber suspension: Specifically, the first starting time point t is planned. Q Starting from this first initial time point, the amount of slurry Q from the first fiber component of the stacking tower 11 will be... 11 The amount of slurry Q from the second fiber component of the stacking tower 12 is reduced from one value x1 to another value x2. 12 The value y1 is increased to another value y2. Figure 2 As can be seen from the middle graph and the two graphs above it, the corresponding slurry volume first decreases or increases during the corresponding downtime, and then the fiber suspension type B exists in the headbox 31. 31 The final transition is from the fiber suspension (type) b1 used for the first paper type to the fiber suspension (type) b2 required for the second paper type. This is based on the downtime already considered in the plan and the first start time t for the first transition. Q This first starting time point is earlier than the paper type switching time t. E1 And it is still within the first process segment Δ1 of producing the first type of paper, with the rated paper output V of the first type of paper. 1s It will be produced from fiber suspension (type) b1 in headbox 31. After fiber suspension (type) b2 for a second paper type is present in headbox 31 ( Figure 2 :t A2 Then, the second type of paper is produced in the second process segment Δ2 of the production process.

[0140] In addition to the first transition of the control variable parameter values ​​described above for preparing the fiber suspension, two additional transitions of the control variable parameter values ​​will be further illustrated below with examples:

[0141] exist Figure 2 The chart at the bottom illustrates, for example, the temperature T of at least one pair of drying rollers 51 in the drying section 50. 51 The required change, i.e., the value from the first paper type 1. Adjust to the value for the second paper type. 2. Considering the corresponding downtime, the planning is based on the first starting time point t. Q Different and later start time t D Starting from that later start time, instructions will be issued to increase the heating steam flow rate D of at least one pair of drying rollers 51 in drying section 50. 51 .

[0142] Given another starting time point t for the additional transitionD In the second process segment of the production of the second type of paper, when the corresponding fiber suspension reaches the drying section 50, the drying section has reached the required temperature. 2.

[0143] Similarly, other additional transitions are planned for the linear loads in the pressing section 40. For this purpose, Figure 2 The third to last chart shows the control variable parameter P. 41 The value increases from p1 for the first paper type to p2 for the second paper type, which can be done very quickly, at time point t. P Issue the command.

[0144] This is also a simplification for illustrative purposes only. Figure 2 A variant is indicated by a dashed line, in which a third paper type is planned to be produced between the first and second paper types in the intermediate process segment Δ3. This third paper type differs only slightly from the first paper type, for example, at time point t'. P Control or increase the linear load (for simplicity, assume a rated paper output V). 1s This is reduced accordingly, so that a third paper type is produced instead of the first at the end of the fiber suspension (type) b1. This is particularly evident in the case of planning a third paper type in an intermediate process segment, where a switch from the first paper type to the second paper type is planned and executed simultaneously.

[0145] Figure 3 The steps of the method of the present invention are described below:

[0146] In step S10, in the first process segment of the production process, the equipment is configured to produce the first type of paper based on a first control variable containing parameter values ​​x1, y1, p1 and d1.

[0147] During this period, in step S20, the control system 70 automatically plans the switch from the first paper type to the second paper type, and in an optional embodiment, additionally plans the switch from the first paper type to a third paper type produced in the intermediate process segment. In one embodiment, dynamic adjustments are made based on data provided by the machine or equipment controller and monitor 72. For example, if a malfunction causes the production growth rate of the first paper type to be lower than initially or previously predicted, the type switch timing point t can be automatically replanned. E1 In particular, it was postponed.

[0148] In step S30, (if necessary) an optional switch to a third paper type is performed, and the third paper type is produced in an intermediate process segment (step S40).

[0149] Prior to and during this period, the switch to the second paper type was performed in step S50, and the second paper type was produced in the second process segment (step S60).

[0150] The planning can be carried out on a computer system 70, which preferably has a production planner 71 and / or a machine or equipment controller and monitor 72, or is capable of communicating with it. Accordingly, the computer system 70 can also be constructed independently of the equipment (and its controller and / or monitor 72) used to produce various types of paper.

[0151] As previously stated, this simplified implementation is illustrated, in particular, by way of example, with the first parameter (e.g., Q) 11 Transform one value (e.g., x1) of the first parameter to another value (e.g., x2), and transform the other parameter (e.g., D) to another value (e.g., x2). 51 The transition from one value (e.g., d1) of the other parameter to another value (e.g., d2) of the other parameter, and the transition from a first control variable configuration having these parameters (values) to a second control variable configuration having these other parameter values.

[0152] In this disclosure, "having X" is not intended to be an exhaustive list, but rather a shorthand for "having at least one X," and also encompasses "having two or more X" and "having Y in addition to X." Although exemplary descriptions have been set forth above, it should be noted that various possible variations exist. Furthermore, it should be noted that the exemplary embodiments are merely examples and are by no means intended to limit the scope, application, or structure of the invention. Rather, the foregoing description provides guidance to those skilled in the art for implementing at least one exemplary embodiment, wherein various modifications can be made, particularly regarding the function and arrangement of the components, without departing from the scope of protection defined by the specification.

[0153] List of reference numerals

[0154] 11 Stacking Towers

[0155] 12 stacking towers

[0156] 20 mixing tanks

[0157] 21 Machine Feed Tank

[0158] 30 Stability Department

[0159] 31 headbox

[0160] 32 Screen Section

[0161] 40 Pressing Section

[0162] 41 Press Rollers

[0163] 50 Drying Section

[0164] 51 drying roller pairs

[0165] 60 leveling machine

[0166] 70 control system

[0167] 71 Production Planner

[0168] 72 Machine or equipment control and monitoring devices

[0169] V1 First Paper Type Production

[0170] V 1s Preset rated paper output

[0171] Q 11 Slurry amount of the first fiber component

[0172] x1, x2Q 11 numerical value

[0173] Q 12 Slurry amount of the second fiber component

[0174] y1、y2Q 12 numerical value

[0175] B 31 Fiber suspension type in headbox 31

[0176] b1、b2B 31 numerical value

[0177] P 41 Linear load

[0178] p1, p2P 41 numerical value

[0179] D 51 Heating steam flow rate

[0180] d1, d2D 51 numerical value

[0181] T 51 Temperature of drying rollers

[0182] 1. 2T 51 numerical value

[0183] Δ1 First process segment

[0184] Δ2 Second process segment

[0185] Δ3 intermediate process section

[0186] t A2 Start of the second process segment

[0187] t D Other start times

[0188] t E1 Type switching time

[0189] t a Current planning timeline

[0190] t P ;t' P Time point of linear load increase

[0191] t Q First starting time point

Claims

1. A method for planning a switch from a first paper type to a second paper type in a production process. - In the first process segment (Δ1) of the production process, the first type of paper is produced by equipment (11-72) based on a first control variable. - Subsequently, in the second process segment (Δ2) of the production process, the second paper type is produced by the equipment based on the second control variable. in, The first control variable configuration has - A value for the first parameter and - At least one value of another parameter, The second control variable configuration has - Another value of the first parameter and - Another value for the other parameter, And the transition from the first control variable configuration to the second control variable configuration includes - A first transition from the value of the first parameter to another value of the first parameter, and - Another transition from the value of the other parameter to another value of the other parameter; The automatic planning of production based on the first paper type (S20) involves the transition from the configuration of the first control variable to the configuration of the second control variable.

2. The method according to claim 1, characterized in that, Based on the amount of paper (V1) of the first paper type produced in the first process segment and / or the preset rated amount of paper (V) of the first paper type. 1s It automatically plans the time for switching between categories.

3. The method according to any one of the preceding claims, characterized in that, Based on at least one previously executed switch from a first paper type produced by the equipment and / or to a second paper type produced by the equipment, the transition from the first control variable configuration to the second control variable configuration is automatically planned.

4. The method according to any one of the preceding claims, characterized in that, The first transition planning start time point (t) Q ), and plan another later start time point (t) for the additional transition. D ).

5. The method according to any one of the preceding claims, characterized in that, The first starting time point is located within the first process segment, and / or at least one is another starting time point (t') for another transition plan. P Located within the first process segment, and / or at least one of them being another starting point (t) for another transition plan. P ;t D Located outside the first process segment, and / or dynamically planning a variable time interval between the first start time point and another start time point.

6. The method according to any one of the preceding claims, characterized in that, Based on the control and / or monitoring of the equipment during the production of the first type of paper, the transition from the first control variable configuration to the second control variable configuration is automatically planned.

7. The method according to any one of the preceding claims, characterized in that, Based on the control and / or monitoring of the equipment during the production of the first type of paper, the planned transition from the first control variable configuration to the second control variable configuration is automatically changed.

8. The method according to any one of the preceding claims, characterized in that, Additionally, the system automatically plans to switch from manufacturing a first paper type in the first process segment using the equipment based on a first control variable configuration to manufacturing a third paper type in the intermediate process segment (Δ3) between the first and second process segments of the production process using the equipment based on a third control variable configuration; wherein the production based on the first paper type is automatically planned to transition from the first control variable configuration to the third control variable configuration, and includes a transition from the first control variable configuration to the third control variable configuration during the transition from the first control variable configuration to the second control variable configuration.

9. The method according to any one of the preceding claims, characterized in that: - The parameters configured for the first and second control variables are control variables for the equipment sections (11, 12, 20, 21) used to provide the fiber suspension, and / or - The parameters configured for the first and second control variables are control variables of the stabilizing unit (30), and / or - The parameters configured for the first and second control variables are control variables of the headbox (31), and / or - The parameters configured for the first and second control variables are control variables of the screen section (32), and / or - The parameters configured for the first and second control variables are control variables of the pressing section (40), and / or - The parameters configured for the first and second control variables are control variables for the drying section (50), and / or - The parameters configured for the first and second control variables are control variables of the leveling machine (60).

10. A method for implementing a production process to manufacture different types of paper using equipment, wherein, - In the first process segment of the production process, the first type of paper is manufactured by the equipment based on a first control variable (S10); - The process planning (S20) according to any one of the preceding claims switches from producing a first type of paper to producing another second type of paper; - Execute the plan switch (S50); and - In the second process segment of the production process, the second paper type is produced by the equipment based on the second control variable (S60).

11. A system for planning a switch from a first paper type to a second paper type in a production process. - In the first process segment of the production process, the first type of paper is produced by equipment configured based on a first control variable. - Subsequently, in the second process segment of the production process, the equipment is configured to produce a second type of paper based on a second control variable. in, The first control variable configuration has - A value for the first parameter and - At least one value of another parameter, The second control variable configuration has - Another value of the first parameter and - Another value for the other parameter, And the transition from the first control variable configuration to the second control variable configuration includes - A first transition from the value of the first parameter to another value of the first parameter, and - Another transition from the value of the other parameter to another value of the other parameter; The system is configured to perform the method according to any one of the preceding claims, and / or the system has devices for automatically planning the transition from the first control variable configuration to the second control variable configuration based on the production of a first paper type.

12. A computer program or computer program product, wherein, The computer program or computer program product includes, in particular, instructions stored on a computer-readable and / or non-volatile storage medium, which, when executed by one or more computers or a system according to claim 11, cause the computer or system to perform the method according to any one of claims 1 to 10.