A Multi-Scale Contracted Electricity Decomposition Method under Regional Water, Wind and Solar Joint Constraints

By combining ten-day water inflow forecasting and water level status simulation, and considering the water level constraints at the end of the scheduling period and the unit availability, the feasibility of power allocation in hydropower joint scheduling and the adaptability of scheduling were realized. This solved the problem of power allocation mismatch in hydropower scheduling and provided a ten-day granularity benchmark for power generation planning.

CN123116005APending Publication Date: 2026-11-17STATE GRID GANSU ELECTRIC POWER RESEARCH INSTITUTE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611278161.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In scenarios where hydropower participates in regional joint dispatch, the existing contract power allocation process lacks continuous analysis of changes in inflow, reservoir water level evolution, and water level constraints at the end of the dispatch period. This leads to a mismatch between the power allocation results and the actual water level adjustment space and the available power generation capacity of the units, resulting in problems such as the plan being unable to be executed or insufficient adjustment during the dispatch cycle.

Method used

By combining ten-day water inflow forecasting with water level status simulation, analyzing deviations from water level constraints at the end of the scheduling period, identifying unit availability, and using a ten-day granular power dynamic allocation method, a hydropower ten-day power generation plan curve is generated, achieving coordinated matching between reservoir operation constraints and unit power generation capacity.

Benefits of technology

It improves the executability and scheduling adaptability of the power allocation results, ensures the matching of power allocation with reservoir operation and unit power generation capacity, and provides a ten-day granularity reference benchmark for day-ahead power generation plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116005A_ABST
    Figure CN123116005A_ABST
Patent Text Reader

Abstract

This invention discloses a multi-scale contracted power decomposition method under the joint constraints of regional hydropower, wind power, and solar power, relating to the field of power decomposition technology. It addresses the problem of planned power generation failing to be executed. The method involves collecting the cumulative forecast of inflow over a ten-day period, reading the current measured water level of the reservoir, generating a ten-day end-of-ten-day water level projection sequence based on the cumulative forecast, retrieving the water level constraint at the end of the ten-day scheduling period, calculating the bidirectional deviation for each ten-day period, generating a ten-day water level deviation label, analyzing the physical acceptance status of each ten-day period by combining the ten-day water level deviation label with the available output time of the generating units, dividing the ten-day periods into acceptable and obstructed sets, calculating the remaining space for each acceptable ten-day period, reading the monthly planned hydropower generation, and performing ten-day granular allocation with the remaining space as weight. This generates a hydropower ten-day power generation plan curve. Under the joint constraints of the upper boundary of the flood control limit water level, the lower boundary of the dead water level, and the available output time of the generating units for a ten-day period, an executable ten-day power decomposition is achieved, providing a ten-day granular reference benchmark for the preparation of day-ahead power generation plans.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power decomposition technology, and more specifically, to a multi-scale contract power decomposition method under regional water, wind and solar joint constraints. Background Technology

[0002] As the proportion of renewable energy consumption continues to increase, regional power systems are gradually forming a multi-power coordinated operation mode, including hydropower, wind power, and photovoltaic power. Due to the significant differences in time scale, output characteristics, and operational constraints among different types of energy, regional power dispatching typically requires further decomposition of the monthly contracted electricity volume plan into power generation execution plans at different periodic scales to meet grid dispatching requirements and ensure the rational utilization of energy resources.

[0003] The existing technology has the following shortcomings: Currently, in scenarios where hydropower participates in regional joint dispatch, the existing contract power allocation process is usually divided into cycles based on monthly planned power and historical power generation capacity. It lacks continuous analysis of the correlation between changes in inflow, reservoir water level evolution, and water level constraints at the end of the dispatch period. This leads to a mismatch between the power allocation results of some cycles and the actual water level adjustment space and the available power generation capacity of the units, which can easily result in the planned power not being executed or insufficient adjustment space in subsequent dispatch cycles. Therefore, a multi-scale contract power allocation method under regional hydropower, wind power, and solar power joint constraints is proposed.

[0004] The information disclosed in the background section is only intended to enhance the understanding of the background of this disclosure, and therefore may include information that does not constitute prior art known to those skilled in the art. Summary of the Invention

[0005] To overcome the aforementioned deficiencies of the prior art, embodiments of the present invention provide a multi-scale contracted electricity decomposition method under the joint constraints of regional water, wind, and solar power. This method addresses the problems mentioned in the background art by employing joint extrapolation of ten-day water inflow forecasts and water level status, deviation analysis of water level constraints at the end of the scheduling period, identification of physical acceptance status based on water level status and unit availability, and a ten-day granularity dynamic electricity allocation method oriented towards the executable space.

[0006] To achieve the above objectives, the present invention provides the following technical solution: a multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints, comprising the following steps: Step S1: Set the decomposition initiation time, collect the cumulative amount of water inflow forecast for the ten-day period, read the current measured water level of the reservoir, and generate the end-of-ten-day water level prediction sequence by performing rolling extrapolation on the cumulative amount of water inflow forecast for the ten-day period based on the current measured water level of the reservoir. Step S2: Access the water level constraint database to retrieve the water level constraints at the end of the ten-day scheduling period, evaluate the water level deviation characteristics of each ten-day period in the current month in conjunction with the water level prediction sequence at the end of the ten-day period, and generate the water level deviation labels of each ten-day period in the current month based on the water level deviation characteristics. Step S3: Detect the available output time of the unit for each ten-day period, analyze the physical connection status of each ten-day period based on the combined ten-day water level deviation label and the available output time of the unit for each ten-day period, and classify each ten-day period of the month; Step S4: Read the monthly planned hydropower generation, and perform ten-day granularity allocation on the monthly planned hydropower generation based on the classification of each ten-day period of the month. After performing the ten-day granularity allocation, generate the hydropower ten-day power generation plan curve.

[0007] In a preferred embodiment, in step S1, the cumulative amount of the ten-day water inflow forecast issued on a ten-day basis is collected at the time of decomposition initiation, and the current measured water level of the reservoir is read at the same time. Let the current measured water level of the reservoir be the initial value for recursion. Divide the difference between the cumulative water inflow forecast for the first ten days and the estimated water consumption for power generation in the first ten days by the water surface area corresponding to the current water level, and then add it to the initial value to obtain the predicted water level at the end of the first ten days. Based on the predicted water level at the end of the first ten-day period, the predicted water level at the end of subsequent ten-day periods are derived sequentially. The predicted water levels at the end of each ten-day period are arranged in ten-day order to obtain the predicted water level sequence at the end of each ten-day period.

[0008] In a preferred embodiment, in step S2, the water level constraint at the end of the ten-day scheduling period is the reservoir water level control boundary issued for each ten-day period of the month, which includes the upper boundary of the flood limit water level and the lower boundary of the dead water level. When the predicted water level at the end of the ten-day period is greater than the upper boundary of the flood limit water level, the water level deviation characteristic of the corresponding ten-day period is calculated by dividing the difference between the predicted water level at the end of the ten-day period and the upper boundary of the flood limit water level by the difference between the upper boundary of the flood limit water level and the lower boundary of the dead water level. When the predicted water level at the end of the ten-day period is less than the lower boundary of the dead water level, the water level deviation characteristic of the corresponding ten-day period is calculated by dividing the difference between the lower boundary of the dead water level and the predicted water level at the end of the ten-day period by the difference between the upper boundary of the flood control water level and the lower boundary of the dead water level. When the projected water level at the end of the ten-day period is between the upper boundary of the flood control limit water level and the lower boundary of the dead water level, the water level deviation characteristic of the corresponding ten-day period is zero.

[0009] In a preferred embodiment, in step S2, the ten-day water level deviation characteristics are compared with a preset label classification threshold: When the water level deviation of a ten-day period is greater than or equal to the threshold for exceeding the limit, the ten-day period will be marked as exceeding the limit. When the water level deviation characteristic of a ten-day period is between the threshold of imminent limit and the threshold of exceeding the limit, the ten-day period is marked as the imminent limit ten-day period; When the water level deviation of a ten-day period is less than the threshold, the ten-day period is marked as a safe ten-day period. The water level deviation label for each ten-day period of the month is formed by combining the over-limit, near-limit, and safety markers in the ten-day sequence.

[0010] In a preferred embodiment, in step S3, the available output time of a unit within a ten-day period refers to the cumulative number of hours during which the unit has the ability to generate electricity on the grid within a ten-day period, after deducting the planned maintenance shutdown period; The determination of physical acceptance status shall be carried out according to the following rules: When a ten-day period is an over-limit ten-day period, the physical acceptance status of the corresponding ten-day period is determined to be obstructed; When a ten-day period is a critical period or a safe period, and the available output time of the unit in the ten-day period is less than the available time threshold, the physical connection status of the corresponding ten-day period is determined to be obstructed. When a ten-day period is a critical period or a safe period, and the available output time of the unit in the ten-day period is greater than or equal to the available time threshold, the physical acceptance status of the corresponding ten-day period is determined to be permissible.

[0011] In a preferred embodiment, in step S3, the ten-day periods of the month are classified according to their physical acceptance status. Ten-day periods whose physical acceptance status is determined to be permissible are included in the set of permissible ten-day periods, and ten-day periods whose physical acceptance status is determined to be obstructed are included in the set of obstructed ten-day periods.

[0012] In a preferred embodiment, in step S3, for each ten-day period in the set of ten-day periods that can be accommodated, the margin space is calculated based on the distance between the landing point of the ten-day end water level projection sequence in the corresponding ten-day period and the double boundary distance between the water level constraint at the end of the ten-day scheduling period: ,in, This represents the remaining space in the k-th tenth period. This is the projected water level at the end of the k-th ten-day period; and These represent the upper boundary of the flood control water level and the lower boundary of the dead water level corresponding to the k-th ten-day period, respectively. Let be the average reservoir area for the k-th ten-day period.

[0013] In a preferred embodiment, in step S4, when the available ten-day set is not empty, the monthly planned hydropower generation is allocated according to the proportion of the remaining space of each ten-day set within the available ten-day set, so as to obtain the planned hydropower generation for each ten-day period. The planned hydropower generation for each ten-day period of the month is arranged in chronological order to form a hydropower ten-day generation plan curve, which is then issued for scheduling and execution.

[0014] The technical effects and advantages of this invention are as follows: This invention collects the cumulative forecast of inflow over ten days, reads the current measured water level of the reservoir, and generates a ten-day end-of-day water level projection sequence by combining the cumulative forecast of inflow over ten days. It retrieves the water level constraints at the end of the ten-day scheduling period, calculates the bidirectional deviation of each ten-day period, generates ten-day water level deviation labels, analyzes the physical acceptance status of each ten-day period by combining the ten-day water level deviation labels with the available output time of the generating units, divides the ten-day period into a set of ten-day periods that can accept water and a set of ten-day periods that are blocked, calculates the remaining space of each ten-day period that can accept water, reads the monthly planned power generation of hydropower, performs ten-day granular allocation with the remaining space as the weight, and generates a hydropower ten-day power generation plan curve. Under the joint constraints of the upper boundary of the flood limit water level, the lower boundary of the dead water level, and the available output time of the generating units for ten days, it achieves an executable ten-day power decomposition, provides a ten-day granular reference benchmark for the preparation of day-ahead power generation plans, realizes the coordinated matching between reservoir operation constraints, generating capacity of generating units, and contracted power targets, and improves the executability and scheduling adaptability of power decomposition results at different time scales. Attached Figure Description

[0015] Figure 1 This is a flowchart illustrating the implementation of a multi-scale contract power decomposition method under the joint constraints of regional water, wind, and solar power, according to the present invention.

[0016] Figure 2 This is a schematic diagram illustrating the steps of a multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints according to the present invention. Detailed Implementation

[0017] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0018] This invention collects the cumulative forecast of inflow over ten days, reads the current measured water level of the reservoir, and generates a ten-day end-of-ten-day water level projection sequence by combining the cumulative forecast of inflow over ten days. It retrieves the water level constraints at the end of the ten-day scheduling period, calculates the bidirectional deviation of each ten-day period, generates a ten-day water level deviation label, analyzes the physical acceptance status of each ten-day period by combining the ten-day water level deviation label with the available output time of the generating units, divides the ten-day period into a set of ten-day periods that can accept water and a set of ten-day periods that are blocked, calculates the remaining space of each ten-day period that can accept water, reads the monthly planned power generation of hydropower, performs ten-day granular allocation with the remaining space as the weight, and generates a hydropower ten-day power generation plan curve. Under the joint constraints of the upper boundary of the flood limit water level, the lower boundary of the dead water level, and the available output time of the generating units for each ten-day period, it achieves an executable ten-day power generation decomposition, providing a ten-day granular reference benchmark for the preparation of day-ahead power generation plans.

[0019] Example 1, as Figures 1 to 2 As shown, a multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints includes the following steps: Step S1: Set the decomposition initiation time, collect the cumulative amount of water inflow forecast for the ten-day period, read the current measured water level of the reservoir, and generate the end-of-ten-day water level prediction sequence by performing rolling extrapolation on the cumulative amount of water inflow forecast for the ten-day period based on the current measured water level of the reservoir. Step S2: Access the water level constraint database to retrieve the water level constraints at the end of the ten-day scheduling period, evaluate the water level deviation characteristics of each ten-day period in the current month in conjunction with the water level prediction sequence at the end of the ten-day period, and generate the water level deviation labels of each ten-day period in the current month based on the water level deviation characteristics. Step S3: Detect the available output time of the unit for each ten-day period, analyze the physical connection status of each ten-day period based on the combined ten-day water level deviation label and the available output time of the unit for each ten-day period, and classify each ten-day period of the month; Step S4: Read the monthly planned hydropower generation, and perform ten-day granularity allocation on the monthly planned hydropower generation based on the classification of each ten-day period of the month. After performing the ten-day granularity allocation, generate the hydropower ten-day power generation plan curve.

[0020] The specific implementation is as follows: In step S1, the decomposition initiation time is set. At the decomposition initiation time, the cumulative amount of water inflow forecast issued by the watershed hydrological forecast system on a ten-day basis is collected, and the current measured water level of the reservoir is read by the water level sensor. The end-of-day water level projection uses a water balance recursive method, taking the current measured water level of the reservoir as the initial value. Let the current measured water level of the reservoir be the starting point. Iterating through the ten-day sequence starting from k=1, the formula for calculating the projected water level at the end of the k-th ten-day period is:

[0021] in, This is the projected water level at the end of the k-th ten-day period. For the first The projected water level at the end of the ten-day period. This represents the cumulative forecast of water inflow for the k-th ten-day period. This represents the estimated water consumption for power generation in the k-th ten-day period. Therefore The index is used to query the water surface area obtained from the reservoir capacity curve, where k is the index for the current month's ten-day period.

[0022] It needs to be explained that when k=1, for That is, the current measured water level of the reservoir, when k is greater than 1. Substitute the predicted water level value at the end of the previous ten-day period into the value, and roll forward ten days by ten until a complete predicted water level sequence at the end of the ten-day period is obtained. The estimated water consumption for power generation refers to the amount of water required to complete the hydropower generation plan for each ten-day period. It is obtained by multiplying the estimated hydropower generation for each ten-day period by the corresponding water consumption coefficient per unit of electricity. The water consumption coefficient per unit of electricity is determined by the comprehensive efficiency of the unit under the corresponding operating head. The higher the head, the smaller the water consumption coefficient per unit of electricity, the less water is consumed under the same power generation plan, and the smaller the drop in water level at the end of the ten-day period.

[0023] The ten-day end-of-day water level projection sequence reflects an ordered set of values ​​for the water level landing points of reservoirs at the end of each ten-day period. It is obtained by arranging the ten-day end-of-day water level projection values ​​in chronological order and is used to characterize the cumulative impact of inflow and outflow on the water level path at the ten-day scale.

[0024] The higher the average expected water consumption for power generation over a ten-day period, the lower the projected water level at the end of the period. The projected water level sequence at the end of the period reflects the upward or downward trend of the net inflow and outflow of water on the water level path at the ten-day scale.

[0025] The reservoir capacity curve is a curve obtained from topographic surveys during the reservoir design phase, describing the relationship between water level and corresponding reservoir capacity and area. In this example, it is used to convert the net inflow of water into water level change over a ten-day period.

[0026] It should be noted that the watershed hydrological forecasting system refers to an operational software platform that uses the watershed as a unit and performs rolling forecasts of runoff processes at each hydrological station based on numerical weather prediction and runoff generation and confluence models. In this embodiment, it is used to provide inflow runoff forecast data at the ten-day granularity. The water level sensor refers to an online monitoring device installed at the designed cross-section in front of the reservoir dam, which collects and reports the reservoir surface elevation in real time based on pressure or radar measurement principles. In this embodiment, it is used to provide the initial water level of the reservoir at the time of decomposition initiation.

[0027] In step S2, the water level constraint database is accessed to retrieve the water level constraints at the end of the ten-day scheduling period. The water level constraints at the end of the ten-day scheduling period are the reservoir water level control boundaries issued by the power grid dispatch center for each ten-day period of the month, including the upper boundary of the flood limit water level and the lower boundary of the dead water level.

[0028] It should be added that the water level constraint database refers to a structured data set maintained by the power grid dispatch center, which stores the upper and lower boundaries of the water level control at the end of each ten-day period of the dispatch period of each reservoir using the reservoir number as an index. In this example, it is used to retrieve the upper boundary of the flood limit water level and the lower boundary of the dead water level for each ten-day period of the month.

[0029] The ten-day water level deviation characteristic refers to the quantitative representation of the direction and magnitude of the deviation of the predicted water level at the end of the ten-day period relative to the upper and lower boundaries of the water level constraint at the end of the ten-day scheduling period; its calculation method is as follows: When the projected water level at the end of the k-th ten-day period is greater than the upper boundary of the flood control limit water level... ; When the projected water level at the end of the k-th ten-day period is less than the lower boundary of the dead water level... ; When the projected water level at the end of the k-th ten-day period is between the upper boundary of the flood control limit and the lower boundary of the dead water level... .

[0030] in, This describes the water level deviation characteristics for the k-th ten-day period; This is the projected water level at the end of the k-th ten-day period; , These represent the upper boundary of the flood control water level and the lower boundary of the dead water level corresponding to the k-th ten-day period.

[0031] The greater the deviation of the ten-day water level characteristic, the greater the deviation of the water level at the end of the ten-day period from the double boundary; a zero deviation of the ten-day water level characteristic indicates that the water level at the end of the ten-day period is within the safe range.

[0032] Based on this, the ten-day water level deviation characteristics are compared with the preset label classification threshold: When the water level deviation characteristic of a ten-day period is greater than or equal to the threshold for exceeding the limit, the ten-day period is marked as an over-limit ten-day period. When the water level deviation characteristic of a ten-day period is between the threshold of imminent limit and the threshold of exceeding the limit, the ten-day period is marked as the imminent limit ten-day period; When the water level deviation of a ten-day period is less than the threshold, that ten-day period is marked as a safe ten-day period.

[0033] The water level deviation label for each ten-day period of the month is formed by combining the over-limit, near-limit, and safety markers in the ten-day sequence.

[0034] It should be noted that the thresholds for the critical limit and the exceeding limit are set using a quantitative method based on the statistical distribution of the characteristic values ​​of water level deviation in each ten-day period of the current month over the past three years: the characteristic values ​​of water level deviation in each ten-day period of the current month over the past three years are statistically analyzed, the critical limit threshold is taken from the upper quartile of the distribution, and the exceeding limit threshold is taken from the upper 5% quartile of the distribution. This threshold determination method ensures that the labeling matches the reservoir's own historical water situation distribution, avoiding mismatch between wet and dry years when using fixed thresholds.

[0035] By comparing the above-mentioned ten-day end-of-ten-day water level projection sequence with the ten-day end-of-ten-day scheduling water level constraints, the ten-day water level deviation labels for each ten-day period of the month are obtained, providing a criterion for the water level boundary dimension for determining the physical acceptance status of each ten-day period in step S3.

[0036] In step S3, the available output time of the units for each ten-day period is detected by summarizing the power plant unit maintenance plan. The physical connection status of each ten-day period is analyzed by combining the distribution of the number of overdue ten-day periods and the available output time of the units for each ten-day period. The ten-day periods of the month are then classified according to the physical connection status.

[0037] The available output time of a unit in a ten-day period refers to the cumulative number of hours within the k-th ten-day period when all units of the hydropower station are not under maintenance and can participate in dispatch output. It reflects the physical output time window of the hydropower station in that ten-day period, in hours.

[0038] It should be added that the power plant unit maintenance plan is a dispatch management document compiled monthly by the power plant operation and maintenance department, which records the planned shutdown maintenance period and grid connection time of each unit. It summarizes the cumulative number of hours that the units have grid connection power generation capacity within each ten-day period, so that the dispatching side can check the available output time of the units in each ten-day period.

[0039] The determination of physical acceptance status shall be carried out according to the following rules: When the k-th ten-day period is an over-limit ten-day period, the physical acceptance status of that ten-day period is determined to be obstructed; When the kth ten-day period is a critical ten-day period or a safe ten-day period, and the available output time of the unit in the ten-day period is less than the available time threshold, the physical acceptance status of that ten-day period is determined to be obstructed. When the k-th ten-day period is a critical ten-day period or a safe ten-day period, and the available output time of the unit in that ten-day period is greater than or equal to the available time threshold, the physical acceptance status of that ten-day period is determined to be permissible.

[0040] The method for determining the available time threshold is as follows: statistically analyze the sample distribution of the available output time of the units in each ten-day period over the past three years, and take the median value of the distribution as the available time threshold, reflecting the central level of the available output time of the units in each ten-day period under normal operation of the power plant. The distribution of the number of overdue ten-day periods is used to trigger the monthly plan re-verification application when overdue ten-day periods occur in a concentrated manner within a month (for example, when the number of overdue ten-day periods accounts for more than 50% of the total number of ten-day periods in the month), and is not used as the primary acceptance criterion.

[0041] When the number of times the limit is exceeded reaches the trigger condition, the system automatically sends a re-verification request to the corresponding module of the monthly plan table of the power dispatching system. The dispatching side then corrects the monthly planned hydropower generation based on the latest hydrological forecast and restarts the decomposition process.

[0042] The ten-day periods of the month are classified according to their physical acceptance status. Ten-day periods with a physical acceptance status that is deemed permissible are included in the set of ten-day periods that can accept the acceptance status, while ten-day periods with a physical acceptance status that is deemed obstructed are included in the set of ten-day periods that are obstructed.

[0043] Furthermore, for each ten-day period in the set of ten-day periods that can be accommodated, the margin space is calculated based on the distance between the landing point of the ten-day end-of-ten-day water level projection sequence and the double boundary distance between the water level constraint at the end of the ten-day scheduling period: ,in, The remaining capacity for the k-th ten-day period reflects the additional net inflow of water that can be received in that ten-day period without exceeding the limit, in cubic meters. This is the projected water level at the end of the k-th ten-day period; and These represent the upper boundary of the flood control water level and the lower boundary of the dead water level corresponding to the kth ten-day period; The average reservoir area for the k-th ten-day period is given by the water level-reservoir capacity characteristic curve. and The area of ​​the warehouse is obtained by taking the arithmetic mean, in square meters.

[0044] The greater the distance between the projected water level at the end of the ten-day period and the side closer to the upper boundary of the flood control limit water level and the lower boundary of the dead water level, the greater the remaining space for that ten-day period, reflecting the greater amount of additional water consumption for power generation that can be accommodated without touching the water level boundary.

[0045] The margin of water level is taken as the smaller of the distance between the upper boundary of the flood limit water level and the lower boundary of the dead water level, so as to ensure that the water level that can be received at the end of each ten-day period after receiving additional electricity does not exceed the constraint boundary on either side, thus eliminating the risk of exceeding the limit from the source of allocation.

[0046] By classifying the physical acceptance status and quantifying the margin space as described above, a capacity characteristic basis with ten-day granularity is provided for the differentiated allocation of the monthly planned hydropower generation among the ten-day periods in step S4.

[0047] In step S4, the monthly planned hydropower generation issued by the power dispatch system is read, and the monthly planned hydropower generation is allocated at the ten-day granularity level based on the classification of each ten-day period of the month. After the ten-day granularity allocation is performed, the hydropower ten-day power generation plan curve is generated.

[0048] It should be added that the monthly power dispatching system plan refers to the dispatching instruction document issued monthly by the power grid dispatching agency, which specifies the planned power generation targets for various power sources in the current month. In this embodiment, it is used to provide the power allocation module with the planned monthly hydropower generation that the hydropower station should complete in the current month. The planned monthly hydropower generation is determined by the dispatching agency after joint allocation of hydropower, wind power, and photovoltaic power sources within the region. Therefore, the planned monthly hydropower generation read in this embodiment already includes the constraint of the transmission of wind and solar power output characteristics to the hydropower side. The ten-day granularity allocation of this method is performed under the boundary of this joint constraint.

[0049] Specifically, the ten-day granularity allocation is performed according to the following rules: When the available ten-day period is not empty, the monthly planned hydropower generation is allocated according to the proportion of the remaining space in each ten-day period within the available ten-day period: ; when hour, ; in, The planned hydropower generation for the k-th ten-day period is expressed in kilowatt-hours. This represents the planned monthly power generation of hydropower, expressed in kilowatt-hours. This represents the remaining space in the k-th tenth period; To accommodate ten-day periods; The sum of the remaining space of all ten-day periods within the set of ten-day periods that can be accepted is denoted by j, where j is the index number of the ten-day periods that can be accepted within the set of ten-day periods that can be accepted.

[0050] The larger the proportion of the remaining space of the k-th ten-day period to the total remaining space of the set of ten-day periods that can be received, the larger the planned hydropower generation volume of the k-th ten-day period will be; the planned hydropower generation volume of the ten-day period corresponding to the obstructed ten-day period is zero, and its allocated power volume will naturally be transferred to the ten-day period that can be received through the above proportional allocation.

[0051] When the available ten-day set is empty, return to the water level constraint database to trigger a monthly plan re-verification application and suspend the current decomposition process.

[0052] When the available ten-day period only contains one ten-day period, the planned monthly power generation of hydropower is fully allocated to that ten-day period, and the planned power generation of the obstructed ten-day period is set to zero. The execution side needs to simultaneously check the upper limit of the power generation capacity of that ten-day period to confirm that the planned monthly power generation of hydropower does not exceed the product of the available output time of the unit and the rated output of the unit. If it exceeds this limit, a monthly plan re-check application will be triggered.

[0053] The planned hydropower generation for each ten-day period of the month is arranged in chronological order to form a hydropower ten-day generation plan curve, which is then issued for scheduling and execution.

[0054] It should be noted that the hydropower ten-day power generation plan curve uses ten days as the smallest granularity. It is used to carry out the downward transfer of hydropower monthly planned power generation between medium and long-term plans and day-ahead scheduling, and to provide a ten-day granularity benchmark curve for the multi-scale power allocation of hydropower, wind and solar power in the region.

[0055] Before the decomposition is initiated, a water level feasibility prediction is completed to avoid including infeasible ten-day periods in the allocation scope from the source; the margin space is used as the allocation weight to tilt the power generation towards ten-day periods with large water level margins and sufficient unit availability time; the generated hydropower ten-day power generation plan curve is feasible under the joint constraints of the upper boundary of the flood limit water level, the lower boundary of the dead water level, and the available output time of the unit in the ten-day period, and can be used as a ten-day granular reference benchmark for the preparation of the day-ahead power generation plan.

[0056] Finally, it should be noted that in this paper, relational terms such as first and second are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations.

[0057] Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0058] In this document, the singular forms “a,” “an,” and “the” may also include the plural forms unless the context clearly indicates otherwise. It should also be understood that terms such as “comprising / including” or “having” specify the presence of the stated features, integrals, steps, operations, components, parts, or combinations thereof, but do not preclude the possibility of the presence or addition of one or more other features, integrals, steps, operations, components, parts, or combinations thereof. Meanwhile, the term “and / or” as used in this specification includes any and all combinations of the associated listed items.

[0059] The various embodiments in this specification are described in a progressive manner. Each embodiment focuses on the differences from other embodiments. The various embodiments can be combined as needed, and the same or similar parts can be referred to each other.

[0060] The above description of the disclosed embodiments will enable those skilled in the art to make or use various modifications to these embodiments. It will be readily apparent to those skilled in the art that the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints, characterized in that: Includes the following steps: Step S1: Set the decomposition initiation time, collect the cumulative amount of water inflow forecast for the ten-day period, read the current measured water level of the reservoir, and generate the end-of-ten-day water level prediction sequence by performing rolling extrapolation on the cumulative amount of water inflow forecast for the ten-day period based on the current measured water level of the reservoir. Step S2: Access the water level constraint database to retrieve the water level constraints at the end of the ten-day scheduling period, evaluate the water level deviation characteristics of each ten-day period in the current month in conjunction with the water level prediction sequence at the end of the ten-day period, and generate the water level deviation labels of each ten-day period in the current month based on the water level deviation characteristics. Step S3: Detect the available output time of the unit for each ten-day period, analyze the physical connection status of each ten-day period based on the combined ten-day water level deviation label and the available output time of the unit for each ten-day period, and classify each ten-day period of the month; Step S4: Read the monthly planned hydropower generation, and perform ten-day granularity allocation on the monthly planned hydropower generation based on the classification of each ten-day period of the month. After performing the ten-day granularity allocation, generate the hydropower ten-day power generation plan curve.

2. The method for decomposing multi-scale contracted electricity under regional water, wind, and solar joint constraints as described in claim 1, characterized in that: In step S1, at the time of decomposition initiation, the cumulative amount of water inflow forecast issued on a ten-day basis is collected, and the current measured water level of the reservoir is read. Let the current measured water level of the reservoir be the initial value for recursion. Divide the difference between the cumulative water inflow forecast for the first ten days and the estimated water consumption for power generation in the first ten days by the water surface area corresponding to the current water level, and then add it to the initial value to obtain the predicted water level at the end of the first ten days. Based on the predicted water level at the end of the first ten-day period, the predicted water level at the end of subsequent ten-day periods are derived sequentially. The predicted water levels at the end of each ten-day period are arranged in ten-day order to obtain the predicted water level sequence at the end of each ten-day period.

3. The multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints as described in claim 1, characterized in that: In step S2, the water level constraint at the end of the ten-day scheduling period is the reservoir water level control boundary issued for each ten-day period of the month, including the upper boundary of the flood limit water level and the lower boundary of the dead water level. When the predicted water level at the end of the ten-day period is greater than the upper boundary of the flood limit water level, the water level deviation characteristic of the corresponding ten-day period is calculated by dividing the difference between the predicted water level at the end of the ten-day period and the upper boundary of the flood limit water level by the difference between the upper boundary of the flood limit water level and the lower boundary of the dead water level. When the predicted water level at the end of the ten-day period is less than the lower boundary of the dead water level, the water level deviation characteristic of the corresponding ten-day period is calculated by dividing the difference between the lower boundary of the dead water level and the predicted water level at the end of the ten-day period by the difference between the upper boundary of the flood control water level and the lower boundary of the dead water level. When the projected water level at the end of the ten-day period is between the upper boundary of the flood control limit water level and the lower boundary of the dead water level, the water level deviation characteristic of the corresponding ten-day period is zero.

4. The multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints as described in claim 3, characterized in that: In step S2, the ten-day water level deviation characteristics are compared with the preset label classification threshold: When the water level deviation of a ten-day period is greater than or equal to the threshold for exceeding the limit, the ten-day period will be marked as exceeding the limit. When the water level deviation characteristic of a ten-day period is between the threshold of imminent limit and the threshold of exceeding the limit, the ten-day period is marked as the imminent limit ten-day period; When the water level deviation of a ten-day period is less than the threshold, the ten-day period is marked as a safe ten-day period. The water level deviation label for each ten-day period of the month is formed by combining the over-limit, near-limit, and safety markers in the ten-day sequence.

5. The multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints as described in claim 4, characterized in that: In step S3, the available output time of a unit within a ten-day period refers to the cumulative number of hours during which the unit has the ability to generate electricity on the grid within a ten-day period, after deducting the planned maintenance shutdown period; The determination of physical acceptance status shall be carried out according to the following rules: When a ten-day period is an over-limit ten-day period, the physical acceptance status of the corresponding ten-day period is determined to be obstructed; When a ten-day period is a critical period or a safe period, and the available output time of the unit in the ten-day period is less than the available time threshold, the physical connection status of the corresponding ten-day period is determined to be obstructed. When a ten-day period is a critical period or a safe period, and the available output time of the unit in the ten-day period is greater than or equal to the available time threshold, the physical acceptance status of the corresponding ten-day period is determined to be permissible.

6. The method for decomposing multi-scale contracted electricity under regional water, wind, and solar joint constraints as described in claim 5, characterized in that: In step S3, the ten-day periods of the month are classified according to their physical acceptance status. Ten-day periods with a physical acceptance status that is deemed permissible are included in the set of ten-day periods that can be accepted, while ten-day periods with a physical acceptance status that is deemed obstructed are included in the set of obstructed ten-day periods.

7. The multi-scale contracted electricity decomposition method under regional water, wind, and solar joint constraints as described in claim 6, characterized in that: In step S3, for each ten-day period in the set of ten-day periods that can be accommodated, the margin space is calculated based on the distance between the landing point of the ten-day end water level projection sequence in the corresponding ten-day period and the double boundary distance between the water level constraint at the end of the ten-day scheduling period: ,in, This represents the remaining space in the k-th tenth period. This is the projected water level at the end of the k-th ten-day period; and These represent the upper boundary of the flood control water level and the lower boundary of the dead water level corresponding to the k-th ten-day period, respectively. Let be the average reservoir area for the k-th ten-day period.

8. The method for decomposing multi-scale contracted electricity under regional water, wind, and solar joint constraints as described in claim 7, characterized in that: In step S4, when the available ten-day set is not empty, the monthly planned hydropower generation is allocated according to the proportion of the remaining space of each ten-day set within the available ten-day set, so as to obtain the planned hydropower generation for each ten-day period. The planned hydropower generation for each ten-day period of the month is arranged in chronological order to form a hydropower ten-day generation plan curve, which is then issued for scheduling and execution.