Intelligent warehousing and logistics scheduling methods and systems
By constructing a multi-dimensional constraint factor set and fusing multi-source data, the problem of low efficiency in traditional warehouse scheduling is solved, realizing efficient and flexible scheduling and automatic handling of anomalies in the intelligent warehousing and logistics system, thereby improving resource utilization efficiency and decision-making accuracy.
Patent Information
- Application Number
- CN202611555643.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-09
- Publication Date
- 2026-11-17
AI Technical Summary
In traditional warehouse scheduling methods, path planning and job scheduling use fixed algorithms and static storage location layouts, resulting in low scheduling efficiency, insufficient flexibility and adaptability, lack of end-to-end data fusion, inability to simulate and predict in advance and global coordination, and passive handling of anomalies that relies on manual intervention, leading to resource waste and low efficiency.
Construct a multi-dimensional constraint factor set that includes storage location, equipment, environment, orders, and personnel. Through detailed material breakdown and multi-source data fusion, realize intelligent storage location recommendation, personnel allocation, and equipment scheduling, forming a globally unified decision-making basis. Combine multi-dimensional constraint factors for task allocation and anomaly self-healing, and establish a closed-loop mechanism of "detection, hierarchical handling, root cause analysis, constraint update, and scheduling optimization".
It improves the efficiency and flexibility of the entire process scheduling, realizes dynamic and precise control of inventory, automatic hierarchical handling of anomalies, and coordinated optimization of energy consumption and efficiency, ensures the real-time and accuracy of decision-making, and reduces manual intervention and resource waste.
Smart Images

Figure CN123117716A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of warehousing and logistics technology, and in particular to intelligent warehousing and logistics scheduling methods and systems. Background Technology
[0002] In the modern warehousing and logistics industry, with the rapid development of e-commerce, manufacturing, and other fields, the scale of warehousing is constantly expanding, and the types of goods and the frequency of inbound and outbound operations are increasing significantly, posing numerous challenges to traditional warehousing scheduling methods. Currently, traditional warehousing scheduling methods use fixed algorithms and static storage location layouts for path planning and operation scheduling. To fully consider the multi-dimensional coupled effects of equipment real-time status and aisle congestion, scheduling efficiency is low. Furthermore, traditional warehousing scheduling can only achieve single-stage data collection, lacking full-link data fusion, and cannot perform advance simulation and prediction or global collaboration, resulting in a disconnect between energy consumption optimization and business fulfillment. Moreover, when facing complex operating conditions such as mixed storage of multiple product categories and sudden order surges, the adaptation cycle is long, and the lack of material weighting and splitting strategies leads to insufficient flexible adaptation capabilities. Summary of the Invention
[0003] This invention provides an intelligent warehousing and logistics scheduling method and system to at least solve the problems of low scheduling efficiency and insufficient flexibility caused by the static management of traditional warehousing scheduling, which results in rigid algorithms and independent constraints during the scheduling process. The technical solution of this invention is as follows: According to a first aspect of the present invention, an intelligent warehousing and logistics scheduling method is provided. The method includes: determining initial multidimensional constraint factors based on the physical layout information and basic warehousing information of the warehouse; the initial multidimensional constraint factors include location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints; performing material detail breakdown on the put-away documents to obtain material detail information; the put-away documents represent material documents whose execution status is pending put-away but have not yet been put-away; recommending storage locations based on the material detail information and location constraints to determine the recommended storage location for the target material; determining recommended operators based on the recommended storage location of the target material, the material put-away time, and personnel constraints; generating a put-away task allocation result for the target material based on the initial multidimensional constraint factors, recommended storage locations, and recommended operators; the target put-away task represents the put-away task allocation result for handling equipment and recommended operators; and updating the basic warehousing information after detecting that the material has been put away, thereby updating the initial multidimensional constraint factors.
[0004] As one implementation method, the material details information includes material code, material name, material type, material serial number management status, quantity to be put on the shelf, and material unit. The material details of the documents to be put on the shelf are broken down to obtain the material details information, including: filtering documents to be put on the shelf based on document type; document types include inbound execution documents, outsourced material receiving documents, outsourced goods receiving documents, and transfer inbound documents; the documents to be put on the shelf are summarized to obtain the document summary result; the document summary result includes document number, document type, delivery party, receiving warehouse, number of material detail rows, and creation time; based on the document summary result, each document to be put on the shelf is broken down into its material details to obtain the material details information.
[0005] In this implementation, the total amount, source composition, and distribution of tasks currently pending processing are quickly obtained through the first-level query of the pending documents. This compresses a massive number of scattered inbound tasks into a structured task queue, providing the system with a decision-making framework of "grasping the overall picture first, then processing each order individually," avoiding excessive data volume and chaotic processing order caused by directly entering the detail layer. Furthermore, the second-level query of document material details further deconstructs document-level tasks into the smallest executable work units, enabling subsequent location recommendations and personnel allocation to be accurately calculated based on specific material attributes.
[0006] As one implementation method, storage location constraints include the remaining load capacity of the storage location, allowable storage temperature and humidity, remaining space capacity, and historical congestion frequency. Based on material details and storage location constraints, storage location recommendations are made to determine the recommended storage location for the target material. This includes: performing a three-tiered storage location recommendation based on material details and storage location constraints to determine the recommended storage location for the target material; wherein, based on the material details and storage location constraints of the target material, the designated storage location corresponding to the target material is determined as the first priority storage location; when the remaining load capacity of the storage location is less than the quantity of the target material to be shelved, the excess portion is split into multiple candidate storage locations using a weighted average; candidate storage locations that meet the storage location constraints and whose shelved materials are of the same material type as the target material are determined as second priority storage locations; and candidate storage locations that meet the storage location constraints are determined as third priority storage locations.
[0007] In this implementation, the three-tiered rules are executed sequentially according to priority, ensuring that each batch of materials receives a reasonable storage location recommendation. Simultaneously, the three-tiered rules use storage location constraints (remaining load-bearing capacity, space capacity, and permissible storage temperature and humidity) as prerequisites for all recommendations. Candidate storage locations at any level must pass basic availability screening to ensure the feasibility of the recommendations. This avoids the computational overhead and manual intervention caused by repeated trial and error in traditional solutions, improving the accuracy and success rate of storage location recommendations.
[0008] As one implementation method, personnel constraints include personnel on-duty status, work status information, default person in charge of the storage location, warehouse area location, and estimated working hours of assigned tasks. Based on the recommended storage location of the target material, the material shelving time, and personnel constraints, recommended operators are determined, including: determining the material shelving time of the target material based on the document summary results and material details of the documents to be shelved corresponding to the target material; determining candidate operators who meet the personnel constraints based on the material shelving time of the target material and the recommended storage location; the warehouse area location of the candidate operators is consistent with the warehouse area location of the recommended storage location; and determining recommended operators from the candidate operators based on a preset allocation priority. This method represents the priority order for assigning the shelving task of the target material among multiple candidate operators. Specifically, the first priority is given to candidate operators whose on-duty status is currently active; the second priority is given to the default person in charge of the recommended storage location among the multiple candidate operators; and the third priority is given to the warehouse person in charge of the warehouse area corresponding to the recommended storage location among the multiple candidate operators. When the shelving time for the target material exceeds the operation time threshold, the document to be shelved is identified as a large order, and the target material is split and assigned to multiple recommended operators. When the shelving time for the target material is less than or equal to the operation time threshold, the document to be shelved is identified as a small order, and no splitting is performed.
[0009] In this implementation, personnel allocation priorities are progressively prioritized from "on-duty availability, optimal responsibility, and nearest backup" to ensure that tasks always have an executable entity. The rules for splitting large and small orders are progressively established from "time estimation, threshold determination, and task grouping" to ensure that task granularity matches personnel workload. These two aspects are linked through material shelving time calculations, where the calculation results are used both to determine the current workload of personnel and to estimate the total time for each document to determine whether an order is large or small. Thus, personnel allocation achieves a balance between prioritizing responsibility and balancing workload. This allows tasks to be preferentially assigned to on-duty personnel most familiar with the storage location to leverage their efficiency advantage. Simultaneously, internal load optimization is performed through time estimation, and the splitting of large and small orders avoids overloading any single personnel. Ultimately, while ensuring operational efficiency and accuracy, this approach achieves a reasonable distribution of personnel workload and rapid completion of warehousing tasks.
[0010] As one implementation method, if a target shelving document that has not been shelved on the current day is detected, and the recommended operator corresponding to the target shelving document is on duty the next day, the original personnel assignment remains unchanged; if the recommended operator corresponding to the target shelving document is off duty the next day, the recommended operator for the target shelving document is re-determined according to the preset assignment priority.
[0011] In this implementation, all judgments and reassignments are automatically completed before the start of the next day's work. Based on "whether the document has been completed" and "whether the original assigner is on duty the next day", it is possible to quickly determine whether a reassignment needs to be triggered. There is no need to check the completion status of each material detail, which ensures the integrity of the processing while maintaining good computational efficiency.
[0012] As one implementation method, after detecting that materials have been put on the shelf and updating the basic warehousing information, the method further includes: taking inventory of the basic warehousing information, specifically including: collecting multi-source sensing data within the same storage location and the same time window; multi-source sensing data includes visual recognition data, positioning data, storage location pressure sensing data, and material label collection information; aligning the timestamps and unifying the spatial coordinates of the multi-source sensing data to generate spatiotemporally aligned data; performing joint discrimination based on the spatiotemporally aligned data to distinguish between real goods anomalies, sensor drift, and occlusion interference to obtain inventory results; performing differentiated processing based on the inventory results; among which, for real goods anomalies, automatically correcting the inventory data; for sensor drift, outputting equipment operation and maintenance alarms; and updating the initial multidimensional constraint factor based on the inventory results to obtain the updated first multidimensional constraint factor.
[0013] In this implementation, by aligning and jointly judging the data from four sources in time and space, the inventory count is transformed from a "rough" method that relies on a single sensor to a "refined" method that uses multi-source cross-validation. This significantly reduces the false alarm rate and the workload of manual review. At the same time, the differentiated classification and handling strategy enables accurate response to different abnormal scenarios, and the inventory count results are seamlessly integrated into subsequent scheduling decisions through constraint factor updates.
[0014] As one implementation method, equipment constraints include the location of the handling equipment, battery health and state of charge, remaining power, historical failure rate, and maximum allowable task distance; environmental constraints include warehouse temperature and humidity, aisle access status, and congestion probability; order constraints include order urgency level, deadline, and goods storage attributes; the method further includes: responding to outbound orders, merging outbound orders within the same preset time range based on the order urgency, warehouse location of the outbound materials, and material type of the outbound materials to obtain a target task group; generating a target picking path and operation sequence for the handling equipment to the target task group based on the operating status of the handling equipment, preset energy consumption and fulfillment dynamic weights, and a first multi-dimensional constraint factor; the operating status includes real-time location, aisle congestion status, and task queuing status; controlling the handling equipment to pick and verify outbound items based on the target picking path and operation sequence to obtain outbound information; and updating the first multi-dimensional constraint factor based on the outbound information to obtain a second multi-dimensional constraint factor.
[0015] As one implementation method, the system monitors the operating data, environmental data, and operational data of the handling equipment in real time to identify abnormal events. In response to the identified abnormal events, a first-level self-healing action is executed, in which the handling equipment autonomously performs obstacle avoidance, speed reduction, or restart operations. If the first-level self-healing action fails to eliminate the abnormal event, a second-level self-healing action is executed to redetermine the target picking route and operation sequence. If the second-level self-healing action fails to eliminate the abnormal event, a third-level self-healing action is executed to activate backup equipment, backup storage locations, or backup personnel. After the abnormality handling is completed, the root cause of the abnormality is analyzed, and the second multi-dimensional constraint factor is updated based on the root cause of the abnormality.
[0016] In this implementation, the system performs three stages: Level 1 autonomous equipment handling, Level 2 recalculation of the scheduling plan, and Level 3 switching to backup resources. After handling, the root cause of the anomaly is analyzed, and the multi-dimensional constraint factor set is automatically updated to accumulate anomaly experience. Subsequent scheduling proactively avoids similar fault conditions, forming a complete closed loop of "detection, graded handling, root cause analysis, constraint update, and scheduling optimization." This achieves the dual goals of improving outbound efficiency and reducing energy consumption, and ensures that the decision-making basis remains synchronized with the on-site operating conditions during continuous operation.
[0017] As one approach, real-time statistics are collected on the operational efficiency and energy consumption data of the handling equipment; based on the operational efficiency and energy consumption data, performance weights and energy consumption weights are determined; and based on the performance weights and energy consumption weights, the operational data of the handling equipment are dynamically adjusted.
[0018] According to a second aspect of the present invention, an intelligent warehousing and logistics scheduling system is provided, the intelligent warehousing and logistics scheduling system comprising: The intelligent inbound module is configured to determine initial multi-dimensional constraint factors based on the physical layout and basic warehousing information of the warehouse. These initial multi-dimensional constraint factors include location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints. It then performs a detailed breakdown of the materials to be put away, obtaining detailed material information. The materials to be put away represent those documents whose execution status is pending put-away but have not yet been put-away. Based on the detailed material information and location constraints, it recommends storage locations to determine the recommended storage locations for the target materials. Based on the recommended storage locations for the target materials, the material put-away time, and personnel constraints, it determines the recommended operators. Based on the initial multi-dimensional constraint factors, recommended storage locations, and recommended operators, it generates the put-away task allocation results for the target materials. The target put-away task represents the put-away task allocation results for handling equipment and recommended operators. Upon detection that the material put-away is complete, it updates the basic warehousing information to update the initial multi-dimensional constraint factors.
[0019] The inventory counting module is configured to count basic warehouse information.
[0020] The intelligent outbound module is configured to respond to outbound orders by merging outbound orders within the same preset time range based on the order urgency, the warehouse location of the outbound materials, and the material type of the outbound materials, thereby generating the target picking path and operation sequence for the handling equipment.
[0021] The anomaly management module is configured to monitor the operation data, environmental data, and work data of the handling equipment in real time, identify abnormal events, perform a three-level progressive self-healing treatment for abnormal events, and analyze the root cause of the anomaly.
[0022] The energy consumption optimization module is configured to collect real-time statistics on the operating efficiency data and energy consumption data of the handling equipment; determine the performance weight and energy consumption weight based on the performance weight and energy consumption weight; and dynamically adjust the operating data of the handling equipment based on the performance weight and energy consumption weight.
[0023] The intelligent warehousing and logistics scheduling system is configured to execute intelligent warehousing and logistics scheduling methods as described in the first aspect and any of its possible implementations.
[0024] According to a third aspect of the present invention, an intelligent warehousing and logistics scheduling device is provided, the device being configured to perform an intelligent warehousing and logistics scheduling method as described in the first aspect and any possible implementation thereof.
[0025] According to a fourth aspect of the present invention, a computer-readable storage medium is provided, on which instructions are stored, such that when the instructions in the computer-readable storage medium are executed by a processor of an intelligent warehousing and logistics scheduling device, the intelligent warehousing and logistics scheduling device is able to perform an intelligent warehousing and logistics scheduling method as described in the first aspect and any possible implementation thereof.
[0026] According to a fifth aspect of the present invention, a computer program product is provided, the computer program product including computer instructions, which, when executed on an intelligent warehousing and logistics scheduling device, cause the intelligent warehousing and logistics scheduling device to execute the intelligent warehousing and logistics scheduling method of the first aspect and any possible implementation thereof.
[0027] The technical solutions provided by the embodiments of the present invention bring at least the following beneficial effects: The present invention establishes a globally unified decision-making basis for warehouse scheduling by constructing a multi-dimensional constraint factor set including storage location, equipment, environment, orders, and personnel. This ensures that storage location recommendations meet physical capacity and storage environment constraints during the generation stage, avoiding post-event interception and trial-and-error rework. On this basis, the invention achieves automated deconstruction of multi-source inbound documents through material detail breakdown, and allocates personnel by combining material shelving time and personnel constraints. This ensures that tasks are optimally matched with operators who have the conditions to execute and whose responsibilities are matched, avoiding uneven load and low efficiency caused by traditional static assignment. Furthermore, the invention determines the shelving task allocation result based on the combination of multi-dimensional constraint factors and recommendation results, ensuring that the task allocation result meets all constraints such as equipment endurance, aisle access, and personnel load, avoiding conflicts and rework caused by separate planning and then integration. After shelving is completed, the invention immediately writes back and updates storage location occupancy and personnel load, ensuring that constraint factors always reflect the current real working conditions and that subsequent decisions are based on the latest data, forming a complete closed loop of "constraint-driven, decision generation, execution feedback to constraint factor update". In this way, all links are connected and integrated through the unified central concept of multi-dimensional constraint factors, ensuring the real-time nature and accuracy of decision-making basis during continuous operation, thereby effectively improving the scheduling efficiency and flexibility of the entire process.
[0028] It should be understood that the above general description and the following detailed description are exemplary and explanatory only, and are not intended to limit this disclosure. Attached Figure Description
[0029] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this disclosure and, together with the description, serve to explain the principles of this disclosure, and are not intended to unduly limit this disclosure.
[0030] Figure 1 This is a schematic diagram illustrating an intelligent warehousing and logistics scheduling system according to an exemplary embodiment; Figure 2 This is a flowchart illustrating an intelligent warehousing and logistics scheduling method according to an exemplary embodiment; Figure 3 This is a schematic diagram illustrating an intelligent warehousing and logistics scheduling device according to an exemplary embodiment. Detailed Implementation
[0031] To enable those skilled in the art to better understand the technical solutions of this disclosure, the technical solutions in the embodiments of this disclosure will be clearly and completely described below with reference to the accompanying drawings.
[0032] It should be noted that the terms "first," "second," etc., used in the specification, claims, and accompanying drawings of this disclosure are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this disclosure described herein can be implemented in orders other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this disclosure. Rather, they are merely examples of apparatuses and methods consistent with some aspects of this disclosure as detailed in the appended claims.
[0033] Before providing a detailed introduction to the intelligent warehousing and logistics scheduling method provided in the embodiments of this application, let's first briefly introduce the application scenarios and implementation environment involved in the embodiments of this application.
[0034] In the modern warehousing and logistics industry, with the rapid development of e-commerce, manufacturing, and other fields, the scale of warehousing is constantly expanding, and the types of goods and the frequency of inbound and outbound operations are increasing significantly. Traditional warehousing scheduling methods face many challenges, specifically: First, inventory management is extensive. Traditional warehousing scheduling methods rely on static data collection using barcodes or RFID, without real-time monitoring of the warehousing environment, storage space capacity, and goods stacking. Manual or scheduled inventory checks are lagging, leading to discrepancies between records and actual inventory, goods damage, and frequent storage space overload. Second, scheduling efficiency is low. Path planning and operation scheduling use fixed algorithms and static storage space layouts, failing to consider real-time equipment status, aisle congestion, and task concurrency conflicts, resulting in high AGV empty running rates, long waiting times, and weak multi-task scheduling capabilities. Third, data collaboration is fragmented. Only single-link data collection is achieved, forming data silos with ERP and TMS systems, lacking full-link data fusion, and unable to perform advance simulation and prediction or global collaboration. Fourth, flexibility and adaptability are insufficient. When complex situations arise, such as mixed storage of multiple product categories, sudden order surges, and layout adjustments, manual configuration is still relied upon, resulting in long adaptation cycles and a failure to incorporate energy consumption and equipment wear and tear into optimization, leading to significant resource waste. Furthermore, the logic for recommending storage locations in the inbound and shelving process is simplistic, lacking a weighted material splitting strategy when designated storage locations exceed capacity. Workers are mostly statically assigned, lacking the ability to dynamically calculate material and labor hours based on historical work sequences; incomplete shelving orders across days require manual reassignment. Fifth, anomaly handling is passive. Anomaly identification is delayed, relying on manual intervention, lacking a tiered automatic handling mechanism, resulting in long unplanned downtime and poor operational continuity. Moreover, anomaly handling only involves emergency alarms and task reassignment, failing to translate anomaly handling experience into scheduling rules, leading to recurring similar failures.
[0035] It is evident that current warehouse scheduling largely employs fixed-weight multi-objective algorithms, simply weighting distance, time, and priority in calculations. Current methods only perform independent threshold checks, neglecting the interdependent constraints of factors such as storage location load limits, equipment battery degradation, real-time aisle congestion, personnel load, cargo temperature and humidity, and storage conditions. The mutual influence of these constraints is not incorporated into the scheduling solution. Furthermore, inventory counting relies heavily on single sensors, lacking spatiotemporal alignment verification logic for multi-source data, resulting in a high false alarm rate. Moreover, energy consumption optimization and business fulfillment are disconnected, with weights statically fixed. Cloud-edge collaboration is simplistic and crude, lacking a mechanism for bidirectional synchronous updates of constraint factors between the cloud and edge. Inbound and shelving processes lack a unified handling process for multi-source pending shelving documents, there is no weighted splitting of overflowing storage locations, a time-based calculation model for work hours based on operational sequence, and an automatic personnel update mechanism for cross-day documents.
[0036] To address the aforementioned issues, this application proposes an intelligent warehousing and logistics scheduling method. By constructing a multi-dimensional constraint factor set encompassing storage locations, equipment, environment, orders, and personnel, a globally unified decision-making foundation is established for warehousing scheduling. This unified central hub of multi-dimensional constraint factors connects and integrates various stages, ensuring the real-time nature and accuracy of decision-making throughout continuous operation. This effectively improves the overall scheduling efficiency and flexibility. The method achieves intelligent scheduling throughout the entire process, dynamic and precise inventory control, automatic hierarchical handling of anomalies, energy consumption and efficiency synergistic optimization, and integrated data across the entire chain.
[0037] Secondly, the implementation architecture involved in this application will be briefly introduced below.
[0038] Figure 1 This is a schematic diagram of an intelligent warehousing and logistics scheduling system provided in this application. Figure 1 As shown, the intelligent warehousing and logistics scheduling system includes an intelligent inbound module 11, an inventory counting module 12, an intelligent outbound module 13, an anomaly management module 14, and an energy consumption optimization module 15.
[0039] The aforementioned intelligent warehousing module 11, inventory counting module 12, intelligent outbound module 13, anomaly management module 14, and energy consumption optimization module 15 are connected via communication.
[0040] The intelligent inbound module 11 is configured to determine initial multi-dimensional constraint factors based on the physical layout information and basic warehousing information of the warehouse. These initial multi-dimensional constraint factors include location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints. The module further performs material detail breakdown on the documents to be put away, obtaining detailed material information. Documents to be put away represent material documents whose execution status is pending put-away but have not yet undergone put-away operation. Based on the detailed material information and location constraints, the module recommends storage locations to determine the recommended storage locations for the target materials. Based on the recommended storage locations for the target materials, the material put-away time, and personnel constraints, the module determines the recommended operators. Based on the initial multi-dimensional constraint factors, recommended storage locations, and recommended operators, the module generates the put-away task allocation result for the target materials. The target put-away task represents the put-away task allocation result for handling equipment and recommended operators. Upon detection that the material put-away is completed, the module updates the basic warehousing information to update the initial multi-dimensional constraint factors.
[0041] Inventory counting module 12 is configured to count basic warehouse information.
[0042] The intelligent outbound module 13 is configured to respond to outbound orders by merging outbound orders within the same preset time range based on the order urgency, the warehouse location of the outbound materials, and the material type of the outbound materials, thereby generating the target picking path and operation sequence for the handling equipment.
[0043] The anomaly management module 14 is configured to monitor the operation data, environmental data, and work data of the handling equipment in real time, identify abnormal events, perform three-level progressive self-healing handling of abnormal events, and analyze the root causes of the anomalies.
[0044] The energy consumption optimization module 15 is configured to collect real-time statistics on the operating efficiency data and energy consumption data of the handling equipment; determine the performance weight and energy consumption weight based on the performance weight and energy consumption weight; and dynamically adjust the operating data of the handling equipment based on the performance weight and energy consumption weight.
[0045] In some embodiments, this intelligent warehousing and logistics scheduling system is applied in a three-tier architecture that collaborates with the edge and cloud. This ensures intelligent control of the entire process without relying on digital twins, based entirely on multimodal perception, intelligent scheduling, data collaboration, and autonomous optimization.
[0046] The system is divided into an intelligent sensing layer, an intelligent scheduling and data processing layer, a business application layer, and supporting edge computing nodes and cloud management servers.
[0047] The aforementioned intelligent sensing layer, intelligent scheduling and data processing layer, business application layer, supporting edge computing nodes, and cloud management server are connected via communication.
[0048] Among them, the multidimensional constraint factor engine initializes and updates the multidimensional constraint factor, which serves as the common core hub for scheduling, inventory, exception handling, and warehouse dispatch. All business modules read and write back to the multidimensional constraint factor engine. The multidimensional constraint factor supports bidirectional synchronization between real-time updates at the edge and global model iteration in the cloud.
[0049] The intelligent sensing layer is responsible for real-time collection of physical information across the entire warehouse scenario, providing a data foundation for system decision-making; all raw sensing data is appended with a unified timestamp and spatial identifier.
[0050] The intelligent perception layer includes an environment and state perception unit, a positioning and vision unit, a device and energy consumption perception unit, and a data acquisition rule control unit.
[0051] The environment and status sensing unit is configured to use temperature and humidity sensors and pressure sensors deployed at the storage location to monitor the storage environment and the weight that the storage location can bear in real time.
[0052] The positioning and vision unit is configured to deploy high-definition vision cameras in aisles and picking areas, and to equip AGVs (Automated Guided Vehicles), pallets, and operators with UWB positioning modules to achieve cargo identification, operation motion capture, and precise positioning.
[0053] The equipment and energy consumption sensing unit are configured to carry operating status acquisition modules and energy consumption monitoring modules on operating equipment such as AGVs, conveyor lines, and robotic arms to collect equipment power, fault signals, and operating power in real time.
[0054] The data acquisition rule control unit is configured to upload all sensed data at a fixed frequency, support proactive reporting of anomalies, and ensure data real-time performance and integrity.
[0055] The intelligent scheduling and data processing layer is the core of the system, which completes data fusion, algorithm calculation, scheduling decision-making, joint recommendation of warehouse locations and personnel, and anomaly handling.
[0056] The intelligent scheduling and data processing layer includes a unified spatiotemporal data engine, a full-link data platform, a multi-dimensional constraint factor engine, a multi-objective intelligent scheduling engine, an anomaly diagnosis and self-healing engine, an energy consumption-efficiency collaborative optimization engine, and a joint recommendation engine for personnel at inbound storage locations.
[0057] The spatiotemporal data unification engine is configured to perform time alignment and spatial coordinate unification of multi-source sensing data, eliminating data misalignment issues between different devices and sensors; it can also identify conflicts in multi-source data at the same time in the same storage location, distinguishing between real cargo anomalies, sensor drift, and occlusion interference, and output reliable business data.
[0058] The end-to-end data platform is configured to uniformly access sensor data, order data, equipment data, and ERP and TMS system data, and complete data cleaning, standardization, storage and sharing to eliminate data silos.
[0059] The multidimensional constraint factor engine is configured to maintain a quantifiable set of dynamic multidimensional constraint factors, including: Location constraints: remaining load capacity of the storage location, allowable storage temperature and humidity, remaining space capacity, and historical congestion frequency. Equipment constraints: equipment location, battery health (SOH), remaining power, historical failure rate, and maximum allowable task distance. Environmental constraints: storage area temperature and humidity, aisle access status, and congestion probability. Order constraints: order urgency level, deadline, and cargo storage attributes. Personnel constraints: personnel on-duty status, operational status (normal—busy—overloaded), default person in charge of the storage location, storage area / warehouse ownership, and estimated workload for assigned tasks.
[0060] In this way, the entire set of constraint factors is directly used as optimization conditions in the calculation during the inventory allocation and task scheduling solution stages; the results of inventory, anomaly handling, and inventory dispatch are written back to update the constraint factors; the constraint factor library is stored locally at the edge node, and the copy is updated in real time when the edge field working conditions change. The cloud summarizes the historical working conditions, iterates the constraint model, and then distributes it synchronously to achieve cloud-edge bidirectional synchronization. If the network is disconnected for a short time, the edge can continue to schedule based on the latest local constraints.
[0061] The multi-objective intelligent scheduling engine is configured to integrate an improved intelligent optimization algorithm. It receives dynamic weights from the energy consumption-performance coupling optimization engine and aims to minimize operation time, reduce equipment idle time, minimize energy consumption, and maximize task completion rate. It dynamically plans AGV paths, personnel tasks, and equipment start-up and shutdown strategies by combining multi-dimensional constraint factors.
[0062] The anomaly diagnosis and self-healing engine is configured to identify equipment failures, path congestion, cargo anomalies, and order errors in real time based on multi-dimensional data fusion judgment, and execute first-level, second-level, and third-level progressive self-healing actions. After the actions are completed, the root cause is analyzed, and the root cause characteristics are written into the multi-dimensional constraint factor engine to automatically adjust subsequent scheduling parameters, forming a closed loop of "detection - hierarchical handling - root cause analysis - constraint update - scheduling optimization".
[0063] The energy consumption-efficiency collaborative optimization engine is configured to establish a coupled model between operational efficiency and equipment energy consumption. It dynamically and adaptively outputs fulfillment and energy consumption weight coefficients to the scheduling engine based on real-time order queuing load. It increases the fulfillment weight during peak periods and increases the energy consumption weight during off-peak periods. The equipment energy consumption statistics are written back to the multi-dimensional constraint factor engine.
[0064] The warehouse location personnel joint recommendation sub-engine is configured to receive pending putaway documents and material details, perform multi-source document filtering and parsing, three-level warehouse location recommendation (supports weighted average splitting of overflow materials for specified warehouse locations), material working hours calculation, multi-priority personnel allocation, and cross-day document personnel update logic; output recommended warehouse locations and recommended operators, and write back the results to the multi-dimensional constraint factor engine to update warehouse location and personnel load constraints.
[0065] The business application layer includes the aforementioned intelligent inbound module 11, inventory counting module 12, intelligent outbound module 13, exception management module 14, and energy consumption optimization module 15.
[0066] The business application layer also includes a system collaboration module.
[0067] The system collaboration module is configured to seamlessly integrate with ERP, TMS, and WCS, enabling bidirectional synchronization of orders, inventory, logistics, and equipment status.
[0068] The supporting edge computing nodes and cloud management servers include edge nodes and cloud servers.
[0069] Edge nodes are configured to be deployed on-site in the warehouse and are responsible for visual recognition, location parsing, local scheduling, local calculation by personnel at the receiving location, and rapid response to anomalies; they maintain a local copy of the multi-dimensional constraint factor engine to ensure low-latency issuance of work instructions and independent completion of business operations even during network interruptions; and they upload preprocessed raw perception data to the cloud.
[0070] The cloud server is configured to be responsible for global data aggregation, historical data mining, algorithm model iteration, global model optimization of constraint factors, report generation, remote monitoring and policy distribution, so as to achieve global optimization.
[0071] This intelligent warehousing and logistics scheduling system is configured to determine initial multi-dimensional constraint factors based on the physical layout and basic warehousing information of the warehouse. These initial multi-dimensional constraint factors include location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints. The system then performs detailed material breakdown on the documents to be put away, obtaining detailed material information. Documents to be put away represent material documents whose execution status is pending put-away but have not yet been put-away. Based on the detailed material information and location constraints, the system recommends storage locations to determine the recommended storage locations for the target materials. Based on the recommended storage locations for the target materials, the material put-away time, and personnel constraints, the system determines the recommended operators. Based on the initial multi-dimensional constraint factors, recommended storage locations, and recommended operators, the system generates the put-away task allocation results for the target materials. The target put-away task represents the put-away task allocation results for handling equipment and recommended operators. Upon detection that the material put-away is completed, the system updates the basic warehousing information to update the initial multi-dimensional constraint factors.
[0072] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured as follows: Material details include material code, material name, material type, material serial number management status, quantity to be put on shelves, and material unit; the material details of the documents to be put on shelves are broken down to obtain material details, including: filtering documents to be put on shelves according to document type; document types include inbound execution documents, outsourced receiving documents, outsourced goods receiving documents, and transfer inbound documents; the documents to be put on shelves are summarized to obtain document summary results; the document summary results include document number, document type, delivery party, receiving warehouse, number of material detail rows, and creation time; based on the document summary results, each document to be put on shelves is broken down into material details to obtain material details information.
[0073] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured with the following: storage location constraints include the remaining load capacity of the storage location, allowable storage temperature and humidity, remaining space capacity, and historical congestion frequency; storage location recommendations are made based on material details and storage location constraints to determine the recommended storage location for the target material, including: performing a three-level storage location recommendation based on material details and storage location constraints to determine the recommended storage location for the target material; wherein, based on the material details and storage location constraints of the target material, the designated storage location corresponding to the target material is determined as the first priority storage location; when the remaining load capacity of the storage location is less than the quantity of the target material to be put on the shelf, the excess portion is split into multiple candidate storage locations according to a weighted average; candidate storage locations that meet the storage location constraints and whose material type is the same as the target material are determined as the second priority storage locations; and candidate storage locations that meet the storage location constraints are determined as the third priority storage locations.
[0074] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured with personnel constraints including personnel on-duty status, work status information, default person in charge of the storage location, warehouse area location, and estimated working hours of the assigned tasks. Based on the recommended storage location of the target material, the material shelving time, and personnel constraints, recommended operators are determined, including: determining the material shelving time of the target material based on the document summary results and material details of the documents to be shelved corresponding to the target material; determining candidate operators who meet the personnel constraints based on the material shelving time of the target material and the recommended storage location; the warehouse area location of the candidate operators is consistent with the warehouse area location of the recommended storage location; and determining the recommended operators from the candidate operators according to the preset allocation priority. Personnel; Allocation priority represents the optimal order for assigning the task of putting the target material on the shelves among multiple candidate operators; among them, the candidate operators whose on-duty status is on duty are determined as the first allocation priority; the default person in charge of the recommended storage location among multiple candidate operators is determined as the second allocation priority; the warehouse person in charge of the warehouse area belonging to the recommended storage location among multiple candidate operators is determined as the third allocation priority; when the material putting time of the target material is greater than the operation time threshold, the document to be put on the shelves is determined as a large order, and the target material is split and assigned to multiple recommended operators; when the material putting time of the target material is less than or equal to the operation time threshold, the document to be put on the shelves is determined as a small order, and no splitting is performed.
[0075] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured to detect target shelving documents that have not been shelved on the same day; if the recommended operator corresponding to the target shelving document is on duty the next day, the original personnel allocation remains unchanged; if the recommended operator corresponding to the target shelving document is off duty the next day, the recommended operator for the target shelving document is re-determined according to the preset allocation priority.
[0076] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured as follows: after detecting that materials have been put on the shelf and updating the basic warehousing information, the method further includes: taking inventory of the basic warehousing information, specifically including: collecting multi-source sensing data within the same storage location and the same time window; the multi-source sensing data includes visual recognition data, positioning data, storage location pressure sensing data, and material label collection information; aligning the timestamps and unifying the spatial coordinates of the multi-source sensing data to generate spatiotemporally aligned data; performing joint discrimination based on the spatiotemporally aligned data to distinguish between real goods anomalies, sensor drift, and occlusion interference to obtain inventory results; performing differentiated processing based on the inventory results; among which, for real goods anomalies, automatically correcting the inventory data; for sensor drift, outputting equipment operation and maintenance alarms; and updating the initial multidimensional constraint factors based on the inventory results to obtain the updated first multidimensional constraint factors.
[0077] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured with the following constraints: equipment constraints include the location of handling equipment, battery health and state of charge, remaining power, historical failure rate, and maximum allowable task distance; environmental constraints include warehouse temperature and humidity, aisle access status, and congestion probability; order constraints include order urgency level, deadline, and cargo storage attributes; the method also includes: responding to outbound orders, merging outbound orders within the same preset time range according to the order urgency, warehouse location of the outbound materials, and material type of the outbound materials to obtain a target task group; generating a target picking path and operation sequence for the handling equipment to the target task group based on the operating status of the handling equipment, preset energy consumption and fulfillment dynamic weights, and a first multi-dimensional constraint factor; the operating status includes real-time location, aisle congestion status, and task queuing status; controlling the handling equipment to pick and verify outbound items according to the target picking path and operation sequence to obtain outbound information; and updating the first multi-dimensional constraint factor according to the outbound information to obtain a second multi-dimensional constraint factor.
[0078] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured to monitor the operating data, environmental data, and operational data of handling equipment in real time, and identify abnormal events; in response to the identified abnormal events, it executes a first-level self-healing action, in which the handling equipment autonomously performs obstacle avoidance, speed reduction, or restart operations; if the first-level self-healing action fails to eliminate the abnormal event, it executes a second-level self-healing action, re-determining the target picking route and operation sequence; if the second-level self-healing action fails to eliminate the abnormal event, it executes a third-level self-healing action, activating backup equipment, backup storage locations, or backup personnel; after the abnormality handling is completed, the root cause of the abnormality is analyzed; and based on the root cause of the abnormality, the second multi-dimensional constraint factor is updated.
[0079] As one implementation method, the intelligent warehousing and logistics scheduling system is specifically configured to collect real-time statistics on the operating efficiency data and energy consumption data of the handling equipment; determine the fulfillment weight and energy consumption weight based on the operating efficiency data and energy consumption data; and dynamically adjust the operating data of the handling equipment based on the fulfillment weight and energy consumption weight.
[0080] For ease of understanding, the intelligent warehousing and logistics scheduling method provided in this application will be described in detail below with reference to the accompanying drawings.
[0081] Figure 2 This is a flowchart illustrating an intelligent warehousing and logistics scheduling method according to an exemplary embodiment, such as... Figure 2 As shown, the intelligent warehousing and logistics scheduling method includes the following steps.
[0082] S21. Determine the initial multidimensional constraint factors based on the physical layout information and basic storage information of the warehouse.
[0083] The initial multidimensional constraint factors include storage location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints.
[0084] Specifically, a static basic model of the warehouse is established by collecting physical layout information such as storage areas, storage locations, aisles, and equipment locations. This model is then integrated with all sensing devices, operational equipment, ERP, and TMS system interfaces to complete communication protocol adaptation and data integration.
[0085] Based on this, configure basic information such as goods category, storage location attributes, equipment parameters, operation rules, recommended storage location parameters, operation interruption failure time in working hour calculation parameters, historical document filtering days, default working hours for new materials, and thresholds for judging large and small orders. Edge nodes synchronize complete constraint copies to complete system initialization.
[0086] Thus, by using physical layout information and basic warehousing information, a set of multidimensional constraint factors is initialized to obtain the initial multidimensional constraint factors.
[0087] S22, break down the material details of the put-away document to obtain the material details information.
[0088] Among them, the pending shelving document represents a material document whose execution status is pending shelving but has not yet been shelved.
[0089] Material details include material code, material name, material type, material serial number management status, quantity to be put on the shelf, and material unit.
[0090] The material code and material name are used to match the location of existing materials or to determine the material storage environment requirements.
[0091] The quantity to be put on the shelf is the basic data for calculating the total working hours for putting materials on the shelf and the time consumed per unit.
[0092] The material serial number management status, also known as the SN management status, directly affects the processing time coefficient of a single material. SN-managed materials require individual barcode scanning and verification, resulting in significantly longer processing time per unit compared to non-SN-managed materials.
[0093] In one implementation, documents to be put on the shelf are selected according to document type; the documents to be put on the shelf are summarized to obtain document summary results; and according to the document summary results, the material details of each document to be put on the shelf are broken down to obtain material detail information.
[0094] The document types include inbound execution documents, outsourced material receiving documents, outsourced goods receiving documents, and transfer inbound documents.
[0095] The document summary results include document number, document type, delivery party, receiving warehouse, number of material detail rows, and creation time.
[0096] The number of material detail rows is the basic input unit for location recommendation and time calculation.
[0097] In simple terms, it performs two-level queries on massive amounts of documents to accurately filter out documents that are ready to be put on the shelves. The first level of query is for documents ready to be put on the shelves, and the second level of query is for document material details.
[0098] Understandably, the first-level query for documents awaiting shelving involves filtering documents that are in a pending shelving state but have not yet been shelved, and outputting a summary of these documents. This allows for a quick understanding of the total number, source composition, and distribution of tasks currently pending, compressing a massive number of scattered inbound tasks into a structured task queue. This provides the system with a "first grasp the overall picture, then process each document individually" decision-making framework, avoiding excessive data volume and chaotic processing order caused by directly entering the detailed layer.
[0099] The second level of document material detail query allows you to retrieve the specific material details for each document awaiting putaway. This further breaks down document-level tasks into the smallest executable work units. The macroscopic "documents awaiting putaway" are transformed into a "material-level work list" that the system can process item by item, enabling subsequent location recommendations and personnel allocation to be accurately calculated based on specific material attributes.
[0100] S23, based on the material details and storage location constraints, recommend storage locations and determine the recommended storage location for the target material.
[0101] Storage location constraints include the remaining load-bearing capacity of the storage location, the allowable storage temperature and humidity, the remaining space capacity, and the historical frequency of congestion.
[0102] In one implementation, a three-tiered storage location recommendation process is performed based on material details and storage location constraints to determine recommended storage locations for the target material. Specifically, a designated storage location corresponding to the target material is designated as the first priority storage location based on the material details and storage location constraints. When the remaining capacity of a storage location is less than the quantity of the target material to be shelved, the excess is distributed among multiple candidate storage locations using a weighted average. Candidate storage locations that meet the storage location constraints and whose already shelved materials are of the same material type as the target material are designated as second priority storage locations; and candidate storage locations that meet the storage location constraints are designated as third priority storage locations.
[0103] In this implementation, a progressive, guaranteed recommendation mechanism is formed through three levels of rules: the first level meets specified business requirements and provides intelligent overflow splitting; the second level achieves spatial aggregation of similar materials to optimize subsequent picking efficiency; and the third level achieves long-term balance of storage location load through random dispersion. The three levels of rules are executed sequentially according to priority, ensuring that each batch of materials receives a reasonable storage location recommendation. Simultaneously, the three levels of rules use storage location constraints (remaining load-bearing capacity, space capacity, and allowable storage temperature and humidity) as prerequisites for all recommendations. Candidate storage locations at any level must pass basic availability screening to ensure the feasibility of the recommendation results. This avoids the computational overhead and manual intervention caused by repeated trial and error in traditional solutions, improving the accuracy and success rate of storage location recommendations.
[0104] S24. Based on the recommended storage location of the target material, the material shelving time, and personnel constraints, determine the recommended operators.
[0105] Personnel constraints include personnel on-duty status, work status information, default person in charge of storage location, warehouse area location, and estimated working hours of assigned tasks.
[0106] To ensure that the recommended personnel meet the personnel constraints, the determination of recommended personnel involves the following two steps.
[0107] First, determine the material shelving time for the target materials to be shelved.
[0108] In one implementation, the material shelving time for the target material is determined based on the document summary results and material details of the documents to be shelved corresponding to the target material.
[0109] Specifically, the time consumption of the first material is taken as the unit material consumption benchmark based on the system default time; for materials that appear for the second time or later, the working time is calculated based on the document entry time sequence.
[0110] For example, calculate the material consumption time within a single document. For instance, if the document contains three materials: A, B, and C; the total consumption time for the first material = the start time of data entry for the second material - the start time of data entry for the first material; the total consumption time for the second material = the start time of data entry for the third material - the start time of data entry for the second material; the total consumption time for the third material = the document click end time - the start time of data entry for the third material; the consumption time per unit quantity of a single material = the total consumption time for that material / the total quantity of that material; Optionally, if no operation is performed within a preset number of minutes of interruption, the time consumed during that period is invalidated and not included in the statistics. Based on this, the standard operating rate for the target material is determined.
[0111] For example, the statistics of multiple documents for the same material are as follows: If document A has 400 documents, the time taken is calculated as T1; document B has 1000 documents, the time taken is calculated as T2; document C has 10000 documents, the time taken is calculated as T3; the standard operating rate of the material is (T1+T2+T3) / (400+1000+10000); historical document samples older than W days are not included in the calculation.
[0112] Secondly, based on the material shelving time, the recommended location of the target material, and personnel constraints, the recommended operators are determined.
[0113] In a real-time approach, candidate workers who meet the personnel constraints are identified based on the material racking time of the target material and the recommended storage location; recommended workers are then selected from the candidate workers based on a preset allocation priority.
[0114] The allocation priority is determined as follows: Candidate workers whose on-duty status is confirmed as on-duty are assigned first; the default person in charge of the recommended storage location among multiple candidate workers is assigned second; the warehouse manager of the recommended storage location among multiple candidate workers is assigned third; when the material shelving time for the target material exceeds the operation time threshold, the document to be shelved is identified as a large order, and the target material is split and allocated to multiple recommended workers; when the material shelving time for the target material is less than or equal to the operation time threshold, the document to be shelved is identified as a small order and is not split.
[0115] The warehouse location of the candidate workers is consistent with the warehouse location of the recommended storage location.
[0116] Priority assignment characterizes the optimal order for assigning the task of placing the target material among multiple candidate operators.
[0117] Understandably, candidate recommended workers are first determined based on the recommended storage location of the target material to ensure that the recommended workers meet the hard constraint that cross-warehouse assignment is not allowed. Secondly, qualified workers are determined based on the assignment priority.
[0118] In this implementation, personnel allocation priorities are progressively prioritized from "on-duty availability, optimal responsibility, and nearest backup" to ensure that tasks always have an executable entity. The rules for splitting large and small orders are progressively established from "time estimation, threshold determination, and task grouping" to ensure that task granularity matches personnel workload. These two aspects are linked through material shelving time calculations, where the calculation results are used both to determine the current workload of personnel and to estimate the total time for each document to determine whether an order is large or small. Thus, personnel allocation achieves a balance between prioritizing responsibility and balancing workload. This allows tasks to be preferentially assigned to on-duty personnel most familiar with the storage location to leverage their efficiency advantage. Simultaneously, internal load optimization is performed through time estimation, and the splitting of large and small orders avoids overloading any single personnel. Ultimately, while ensuring operational efficiency and accuracy, this approach achieves a reasonable distribution of personnel workload and rapid completion of warehousing tasks.
[0119] In one implementation, a target shelving document that has not been shelved on the current day is detected; if the recommended operator corresponding to the target shelving document is on duty the next day, the original personnel allocation remains unchanged; if the recommended operator corresponding to the target shelving document is off duty the next day, the recommended operator for the target shelving document is re-determined according to the preset allocation priority.
[0120] In this implementation, all judgments and reassignments are automatically completed before the start of the next day's work. Based on "whether the document has been completed" and "whether the original assigner is on duty the next day", it is possible to quickly determine whether a reassignment needs to be triggered. There is no need to check the completion status of each material detail, which ensures the integrity of the processing while maintaining good computational efficiency.
[0121] S25: Based on the initial multidimensional constraint factors, recommended storage locations, and recommended operators, generate the task allocation results for the placement of the target materials.
[0122] The target shelving task represents the shelving task allocation results for handling equipment and recommended operators.
[0123] Based on the above steps, we obtain the document number, document type, receiving warehouse, material code, material name, quantity to be put away, unit, recommended storage location, and recommended personnel for all documents to be put away. Combining this with multi-dimensional constraint factors, we generate the optimal put-away task. Based on the optimal put-away task, we assign AGVs or operators to perform the put-away operation.
[0124] S26, After the material has been put on the shelf, update the warehouse basic information to update the initial multidimensional constraint factor.
[0125] Once the device is put into storage, it automatically sends back completion information, the system updates the inventory in real time, and simultaneously writes back and updates the multi-dimensional constraint factor engine storage location, personnel load constraints, and edge copies are synchronized instantly.
[0126] After detecting that the materials have been put on the shelf and updating the basic warehouse information, an inventory check of the basic warehouse information is performed.
[0127] In one implementation, multi-source sensing data is collected within the same storage location and time window; the multi-source sensing data is timestamped and spatial coordinates are unified to generate spatiotemporally aligned data; joint discrimination is performed based on the spatiotemporally aligned data to distinguish between real cargo anomalies, sensor drift, and occlusion interference to obtain inventory results; differentiated processing is performed based on the inventory results; for real cargo anomalies, inventory data is automatically corrected; for sensor drift, equipment maintenance alarms are output; and the initial multidimensional constraint factor is updated based on the inventory results to obtain the updated first multidimensional constraint factor.
[0128] The multi-source sensing data includes visual recognition data, positioning data, warehouse pressure sensing data, and material label collection information.
[0129] Understandably, the system continuously collects environmental, storage location, and cargo status data, providing real-time alerts for excessive temperature and humidity, overloaded storage locations, and cargo backlog. Based on set cycles or trigger conditions, it initiates unmanned automatic inventory checks: It utilizes a unified spatiotemporal data engine, combining visual recognition, UWB positioning, pressure sensing, and multi-source spatiotemporal alignment comparison of barcodes to distinguish between actual cargo anomalies, sensor drift, and occlusion interference, quickly verifying physical inventory against system inventory. The system automatically compares the inventory results, marking discrepancies and prompting for review. For scenarios determined to be actual inventory discrepancies, it supports automatic correction of discrepancies between records and actual inventory. Sensor drift triggers equipment maintenance reminders. Based on historical data, it predicts inventory turnover speed and automatically generates relocation or disposal suggestions for low-turnover and near-expiry goods. Inventory results are written back to the multi-dimensional constraint factor engine.
[0130] In this implementation, by aligning and jointly judging the data from four sources in time and space, the inventory count is transformed from a "rough" method that relies on a single sensor to a "refined" method that uses multi-source cross-validation. This significantly reduces the false alarm rate and the workload of manual review. At the same time, the differentiated classification and handling strategy enables accurate response to different abnormal scenarios, and the inventory count results are seamlessly integrated into subsequent scheduling decisions through constraint factor updates.
[0131] When an outbound order is received, intelligent picking and outbound execution are performed.
[0132] In one implementation, in response to an outbound order, outbound orders within the same preset time range are merged based on the order urgency, the warehouse location of the outbound materials, and the material type of the outbound materials to obtain a target task group; based on the operating status of the handling equipment, preset energy consumption and fulfillment dynamic weights, and a first multidimensional constraint factor, a target picking path and operation sequence for the handling equipment to the target task group are generated; based on the target picking path and operation sequence, the handling equipment is controlled to pick and verify outbound items to obtain outbound information; based on the outbound information, the first multidimensional constraint factor is updated to obtain a second multidimensional constraint factor.
[0133] The operational status includes real-time location, lane congestion status, and task queuing status.
[0134] Equipment constraints include the location of the handling equipment, battery health status, remaining power, historical failure rate, and maximum permissible mission distance.
[0135] Environmental constraints include temperature and humidity in the reservoir area, roadway accessibility, and probability of congestion.
[0136] Order constraints include order urgency level, deadline, and cargo storage attributes.
[0137] Understandably, when receiving outbound orders, the system optimizes and merges them by order urgency, warehouse area, and product category; combining real-time equipment location, aisle congestion status, and task queuing, it reads the dynamic weights of energy consumption and fulfillment, as well as multi-dimensional constraint factors, to generate the optimal picking path and operation sequence; and issues picking instructions to AGVs, robotic arms, or operation terminals to execute "goods-to-person" or "person-to-goods" picking; after picking is completed, the system automatically verifies the category, quantity, and batch, and allows outbound delivery if the verification passes; after outbound delivery is completed, the system deducts inventory in real time and synchronizes outbound information to the TMS system to start logistics distribution; the operation results are written back to the multi-dimensional constraint factor engine to update the multi-dimensional constraint factors.
[0138] The system continuously monitors equipment, environment, and operational data, identifying anomalies such as faults, congestion, damage, and errors in real time. When an anomaly is detected, it performs a three-level self-healing process. It also analyzes the root cause of the anomaly, writes the root cause characteristics into the multi-dimensional constraint factor engine, and automatically updates scheduling constraint parameters; it records the anomaly time, phenomenon, handling process, and results to form optimization rules.
[0139] In one implementation, real-time monitoring of the operating data, environmental data, and work data of the handling equipment is performed to identify abnormal events. In response to the identified abnormal events, a first-level self-healing action is executed, in which the handling equipment autonomously performs obstacle avoidance, speed reduction, or restart operations. If the first-level self-healing action fails to eliminate the abnormal event, a second-level self-healing action is executed to redetermine the target picking route and work sequence. If the second-level self-healing action fails to eliminate the abnormal event, a third-level self-healing action is executed to activate backup equipment, backup storage locations, or backup personnel. After the abnormality handling is completed, the root cause of the abnormality is analyzed, and the second multidimensional constraint factor is updated based on the root cause of the abnormality.
[0140] In this implementation, the system performs three stages: Level 1 autonomous equipment handling, Level 2 recalculation of the scheduling plan, and Level 3 switching to backup resources. After handling, the root cause of the anomaly is analyzed, and the multi-dimensional constraint factor set is automatically updated to accumulate anomaly experience. Subsequent scheduling proactively avoids similar fault conditions, forming a complete closed loop of "detection, graded handling, root cause analysis, constraint update, and scheduling optimization." This achieves the dual goals of improving outbound efficiency and reducing energy consumption, and ensures that the decision-making basis remains synchronized with the on-site operating conditions during continuous operation.
[0141] Finally, real-time statistics on operational efficiency (fulfillment rate, picking speed, and turnover efficiency) and equipment energy consumption data are used to optimize energy consumption and efficiency in a coordinated manner.
[0142] In one implementation, the operating efficiency data and energy consumption data of the handling equipment are collected in real time; based on the operating efficiency data and energy consumption data, the performance weight and energy consumption weight are determined; and based on the performance weight and energy consumption weight, the operating data of the handling equipment are dynamically adjusted.
[0143] Understandably, the system provides real-time statistics on operational efficiency (fulfillment rate, picking speed, and turnover efficiency) and equipment energy consumption data; the energy consumption and efficiency collaborative optimization engine dynamically outputs weights, and the scheduling engine dynamically adjusts AGV speed, conveyor line cycle time, and equipment start-up and shutdown strategies; the edge ensures real-time performance on-site, and the cloud aggregates data to continuously iterate and optimize the global model of constraint factors, distributes synchronous edge copies, and optimizes scheduling and anomaly handling rules; and it regularly generates operational analysis reports to support continuous improvement of warehousing processes.
[0144] In this implementation, the fulfillment and energy consumption weight coefficients are dynamically and adaptively output based on the real-time order queuing load in the warehouse; this achieves the goal of increasing the fulfillment weight during peak periods to ensure timeliness, and increasing the energy consumption weight during off-peak periods to reduce equipment power consumption.
[0145] In one specific embodiment, based on the above implementation method, the technical solution of the present invention is specifically described using intelligent warehousing of manufacturing parts as an application scenario, which includes the following five scenarios.
[0146] The on-site deployment and system configuration were determined. The warehouse area has 400 storage locations, equipped with temperature and humidity sensors and storage location pressure sensors. High-definition vision cameras are deployed in the aisles and picking areas, and AGVs and pallets are equipped with UWB positioning modules. The on-site configuration includes 8 AGVs, 2 collaborative robotic arms, 2 intelligent conveyor lines, and an edge computing gateway. The system is integrated with the enterprise's ERP, TMS, and equipment control systems, configuring parts receiving rules, storage conditions, picking priorities, and anomaly handling strategies. Working time parameters and thresholds for judging large and small orders are configured, and a multi-dimensional constraint factor set is initialized.
[0147] Firstly, in a batch inbound intelligent scheduling scenario, the system receives an inbound order (inbound execution document) for 50 boxes of parts from the ERP system, requiring completion of shelving within 2 hours. The first layer queries the document information to be shelved; the second layer parses the material details; a three-level storage location recommendation is executed. For some materials, the designated storage location capacity is insufficient, and the overflow materials are distributed to two alternative storage locations using a weighted average. Since this type of material is being inbound for the first time, the default time (T) is used as the working time benchmark. According to the personnel allocation rules, without crossing warehouses, the default person in charge of the storage location during the shift is prioritized as the recommended personnel. The scheduling engine reads the multi-dimensional constraint factor set. Two AGVs with low battery SOH are directly excluded during the solution phase, and three suitable AGVs are allocated to perform shelving. The path avoids congested aisles, and all inbound operations are completed within 35 minutes. Inventory is updated in real time, and storage location occupancy and personnel load are written back to the multi-dimensional constraint factor engine. If the document is not completed on the same day, the status of the originally assigned personnel is checked the next day. When personnel are resting, all materials in the document are reassigned to different personnel.
[0148] Secondly, in the scenario of automatic inventory counting and inventory correction, the system starts automatic inventory counting every day at midnight, completing the full inventory count through spatiotemporal alignment and joint verification of multi-source data; if visual recognition shows goods in a certain storage location, but the pressure sensor reading drifts, the system determines that the sensor is abnormal, outputs an operation and maintenance alarm, and does not directly modify the inventory; if multi-source data from another storage location jointly confirms that there is a quantity discrepancy, the system automatically marks it and prompts on-site verification; after the verification is completed, the inventory data is automatically corrected, and the inventory counting accuracy rate reaches 99.92%.
[0149] Thirdly, in the scenario of a sudden surge in orders for intelligent picking and outbound delivery. When an additional 30% of urgent outbound orders are added temporarily, the system automatically merges the waves and redistributes the tasks; the energy consumption and fulfillment coupling engine automatically increases the fulfillment weight, and the scheduling engine reads multi-dimensional constraint factors to dynamically adjust the AGV path, avoiding congestion and duplicate routes, thus improving picking efficiency by 42% and ensuring that all orders are fulfilled on time.
[0150] Fourth, in the event of equipment malfunction. When an AGV experiences a low battery warning, the system immediately classifies it as a level two anomaly. The scheduling engine stops the AGV's current task and dispatches a nearby standby AGV that meets the constraints to take over. The low-battery AGV automatically proceeds to the charging area. After the issue is resolved, the root cause is analyzed, and the maximum allowable task distance constraint for that AGV is reduced and written into the multi-dimensional constraint factor engine. The entire process requires no manual intervention, does not affect the work progress, and avoids subsequent similar failures.
[0151] Fifth, in scenarios where energy consumption and efficiency are optimized in tandem. During off-peak hours, the system automatically reduces the power consumption of the conveyor line and the cruising speed of the AGV. During peak order periods, it automatically increases operating efficiency, resulting in an overall energy consumption reduction of 22% without a significant decrease in operational efficiency.
[0152] In summary, this invention employs multi-dimensional constraint coupling in the scheduling solution. During the task generation phase, it incorporates mutually restrictive constraints such as storage space capacity limits, equipment battery life, aisle access capacity, and personnel workload into the optimization solution, ensuring that the allocation scheme inherently satisfies all physical constraints, achieving proactive avoidance rather than reactive interception. Furthermore, the system significantly improves the operational robustness of the warehousing system through a cloud-edge bidirectional synchronization mechanism for constraint factors. At the inventory management level, the system uses spatiotemporally aligned multimodal joint inventory counting to align and verify data from four sources—visual recognition, UWB positioning, pressure sensing, and RFID—within the same time window. This accurately distinguishes between real goods anomalies, sensor drift, and occlusion interference, significantly reducing false alarm rates and minimizing unnecessary manual verification. At the anomaly handling level, a three-level progressive self-healing mechanism, after completing autonomous equipment adjustment, rescheduling, and backup resource switching, further analyzes the root causes of anomalies and writes back a multidimensional constraint factor set. This allows fault experience to be precipitated as scheduling parameters, automatically avoiding similar operating conditions in the future, forming a dual closed loop of "emergency response and experience solidification," significantly reducing the recurrence rate of failures and manual maintenance costs. At the energy consumption management level, the energy consumption-fulfillment coupled dynamic weight model adjusts and optimizes the focus in real time based on order queuing load. During peak periods, the fulfillment weight is increased to ensure order timeliness, while during off-peak periods, the energy consumption weight is increased to reduce equipment power consumption. This effectively resolves the conflict between energy conservation and fulfillment objectives, achieving a synergistic unity between green warehousing and business delivery. At the inbound operation level, the system achieves unified parsing and automated processing of multi-source pending shelving documents. Through a three-level location recommendation system and a weighted average material splitting mechanism for designated locations exceeding capacity, it solves the pain point of manual intervention required for location overflow in traditional solutions. Based on the time difference of document entry, it dynamically calculates material working hours, upgrading task load assessment from fixed preset values to accurate calculations based on actual operational data. Combined with multi-level intelligent work assignment based on personnel on-duty status, workload, and location manager affiliation, as well as an automatic update mechanism for documents not completed across days, the manual operation workload in the inbound shelving stage is significantly reduced. Ultimately, the above-mentioned technical means form an organic whole through a multi-dimensional constraint factor engine, enabling this invention to be well-suited to complex warehousing scenarios with high-density, multi-category mixed storage and large order fluctuations, such as manufacturing, e-commerce, and third-party logistics, thereby reducing overall warehousing operating costs.
[0153] Figure 3 This is a schematic diagram of an intelligent warehousing and logistics scheduling device provided in this application. Figure 3 The intelligent warehousing and logistics scheduling device 50 includes: a first processor 501, a communication bus 502, a memory 503, a communication interface 504, an output device 505, an input device 506, and a second processor 507.
[0154] The intelligent warehousing and logistics scheduling device 50 may include at least one first processor 501 and a memory 503 for storing processor-executable instructions. The first processor 501 is configured to execute the instructions in the memory 503 to implement the intelligent warehousing and logistics scheduling method in the following embodiments.
[0155] In addition, the intelligent warehousing and logistics scheduling equipment 50 may also include a communication bus 502, at least one communication interface 504, an input device 506, and an output device 505.
[0156] The first processor 501 may be a processor (central processing unit, CPU), a microprocessor unit, an ASIC, or one or more integrated circuits for controlling the execution of programs according to the present application.
[0157] The communication bus 502 may include a path for transmitting information between the aforementioned components.
[0158] Communication interface 504 uses any transceiver-like device for communicating with other devices or communication networks, such as Ethernet, radio access network (RAN), wireless local area networks (WLAN), etc.
[0159] Input device 506 is used to receive input signals and output device 505 is used to output signals.
[0160] Memory 503 may be a read-only memory (ROM) or other type of static storage device capable of storing static information and instructions, random access memory (RAM) or other type of dynamic storage device capable of storing information and instructions, or electrically erasable programmable read-only memory (EEPROM), compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed discs, laser discs, optical discs, digital universal discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium capable of carrying or storing desired program code in the form of instructions or data structures and accessible by a computer, but not limited thereto. Memory may exist independently and be connected to the processing unit via a bus. Memory may also be integrated with the processing unit.
[0161] The memory 503 stores instructions for executing the scheme of this application, and the execution is controlled by the first processor 501. The first processor 501 executes the instructions stored in the memory 503 to realize the functions of the method of this application.
[0162] In a specific implementation, as one example, the first processor 501 may include one or more CPUs, for example... Figure 3 CPU0 and CPU1 in the CPU.
[0163] In a specific implementation, as one example, the intelligent warehousing and logistics scheduling device 50 may include multiple processors, such as... Figure 3 The first processor 501 and the second processor 507 are described. Each of these processors can be a single-core processor or a multi-core processor. A processor here can refer to one or more devices, circuits, and / or processing cores used to process data (such as computer program instructions).
[0164] This intelligent warehousing and logistics scheduling equipment, such as Figure 3 The diagram includes a first processor 501 and a memory 503 for storing executable instructions of the first processor 501. The first processor 501 is configured to execute the executable instructions to implement the intelligent warehousing and logistics scheduling method as described in any of the possible embodiments above. Since the same technical effects can be achieved, further details are omitted here to avoid repetition.
[0165] This application also provides a computer-readable storage medium. When the instructions in the computer-readable storage medium are executed by the processor of an intelligent warehousing and logistics scheduling device, the intelligent warehousing and logistics scheduling device can perform the intelligent warehousing and logistics scheduling method as described in any of the possible implementations above. And it can achieve the same technical effect; to avoid repetition, it will not be described again here.
[0166] This application also provides a computer program product, including a computer program or instructions, which are executed by a processor as an intelligent warehousing and logistics scheduling method according to any of the possible implementations described above. Furthermore, it achieves the same technical effects, and to avoid repetition, it will not be described again here.
[0167] Other embodiments of this application will readily occur to those skilled in the art upon consideration of the specification and practice of the invention disclosed herein. This application is intended to cover any variations, uses, or adaptations of this application that follow the general principles of this application and include common knowledge or customary techniques in the art not disclosed herein. The specification and examples are to be considered exemplary only, and the true scope and spirit of this application are indicated by the following claims.
[0168] It should be understood that this application is not limited to the precise structure described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of this application is limited only by the appended claims.
Claims
1. An intelligent warehousing logistics scheduling method, characterized in that, The method includes: Based on the physical layout information and basic warehousing information of the warehouse, initial multidimensional constraint factors are determined; the initial multidimensional constraint factors include location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints. The material details of the pending shelving document are broken down to obtain the material details information; the pending shelving document represents a material document whose execution status is pending shelving but has not yet been shelved. Based on the material details and the storage location constraints, a recommended storage location is determined for the target material. Based on the recommended storage location of the target material, the material shelving time, and the personnel constraints, the recommended operators are determined; Based on the initial multidimensional constraint factors, the recommended storage locations, and the recommended operators, the shelving task allocation result for the target material is generated; the target shelving task represents the shelving task allocation result for handling equipment and recommended operators. Once the material has been put on the shelf, update the warehouse basic information to update the initial multidimensional constraint factor. 2.The intelligent warehouse logistics scheduling method of claim 1, wherein, The material details include material code, material name, material type, material serial number management status, quantity to be put on the shelf, and material unit; The process of breaking down the material details of the order to be put on the shelf to obtain material detail information includes: The documents to be put on the shelf are selected according to the document type; the document types include inbound execution documents, outsourced material receiving documents, outsourced goods receiving documents, and transfer inbound documents. The documents to be put on the shelves are summarized to obtain a document summary result; the document summary result includes document number, document type, delivery party, receiving warehouse, number of material detail rows, and creation time; Based on the document summary results, each document to be put on the shelf is broken down into material details to obtain the material details information. 3.The intelligent warehouse logistics scheduling method of claim 2, wherein, The storage location constraints include the remaining load-bearing capacity of the storage location, the allowable storage temperature and humidity, the remaining space capacity, and the historical frequency of congestion. The step of recommending storage locations based on the material details and the storage location constraints to determine the recommended storage location for the target material includes: Based on the material details and the storage location constraints, a three-level storage location recommendation is performed to determine the recommended storage location for the target material; Specifically, based on the material details of the target material and the storage location constraints, the designated storage location corresponding to the target material is determined as the first priority storage location; when the remaining carrying capacity of the storage location is less than the quantity of the target material to be shelved, the excess portion is divided into multiple candidate storage locations according to a weighted average. Candidate storage locations that meet the storage location constraints and whose already stocked materials are of the same material type as the target material are identified as second priority storage locations; Candidate storage locations that meet the aforementioned storage location constraints are identified as third-priority storage locations. 4.The intelligent warehouse logistics scheduling method of claim 3, wherein, The personnel constraints include personnel on-duty status, work status information, default person in charge of the storage location, warehouse area location, and estimated working hours of the assigned tasks. The step of determining recommended operators based on the recommended storage location of the target material, the material shelving time, and the personnel constraints includes: Based on the document summary results and material details of the documents to be put on the shelves corresponding to the target material, the material shelving time for the target material is determined. Based on the material shelving time of the target material and the recommended storage location, candidate workers who meet the personnel constraints are determined; the warehouse area affiliation of the candidate workers is consistent with the warehouse area affiliation of the recommended storage location; Based on the preset allocation priority, the recommended operators are determined from the candidate operators; the allocation priority represents the optimal order for determining the task of placing the target material among multiple candidate operators. Specifically, the candidate workers whose on-duty status is determined to be on-duty are assigned the first priority; the default person in charge of the recommended storage location among the candidate workers is assigned the second priority; and the person in charge of the storage area corresponding to the storage area affiliation of the recommended storage location among the candidate workers is assigned the third priority. When the time required to put the target material on the shelf exceeds the operation time threshold, the order to be put on the shelf is determined to be a large order, and the target material is split and assigned to multiple recommended operators. When the material shelving time of the target material is less than or equal to the operation time threshold, the order to be shelved is determined to be a small order and is not split. 5.The intelligent warehouse logistics scheduling method of claim 4, wherein, The method further includes: Target putaway orders that were not completed on the same day were detected; If the recommended operator corresponding to the target shelving document is on duty the next day, then the original personnel allocation remains unchanged. If the recommended operator corresponding to the target shelving document is in a rest state on the next day, the recommended operator for the target shelving document will be re-determined according to the preset allocation priority. 6.The intelligent warehouse logistics scheduling method of claim 1, wherein, After the detection of material placement is completed and the warehouse basic information is updated, the method further includes: The inventory of the aforementioned basic warehouse information includes: Collect multi-source sensing data within the same storage location and the same time window; the multi-source sensing data includes visual recognition data, positioning data, storage location pressure sensing data, and material label collection information; The multi-source sensing data is time-stamp aligned and spatial coordinates are unified to generate spatiotemporally aligned data; Based on the spatiotemporal aligned data, joint discrimination is performed to distinguish between real cargo anomalies, sensor drift, and occlusion interference, and inventory results are obtained. Differential processing is performed based on the inventory results; specifically, for any anomalies in the actual goods, the inventory data is automatically corrected; and for any sensor drift, a device maintenance alarm is output. Based on the inventory results, the initial multidimensional constraint factor is updated to obtain the updated first multidimensional constraint factor. 7.The intelligent warehouse logistics scheduling method of claim 6, wherein, The equipment constraints include the location of the handling equipment, the battery's health and state of charge, remaining power, historical failure rate, and maximum allowable task distance; the environmental constraints include the temperature and humidity of the storage area, the accessibility of the aisles, and the probability of congestion. The order constraints include order urgency level, deadline, and goods storage attributes; the method further includes: In response to outbound orders, based on the order urgency, warehouse location of the outbound materials, and material type of the outbound materials, outbound orders within the same preset time range are merged to obtain a target task group; Based on the operating status of the handling equipment, the preset energy consumption and fulfillment dynamic weights, and the first multidimensional constraint factor, the target picking path and operation sequence of the handling equipment for the target task group are generated; the operating status includes real-time location, aisle congestion status, and task queuing status. Based on the target picking path and work sequence, the handling equipment is controlled to pick and verify outbound items to obtain outbound information. Based on the outbound information, the first multidimensional constraint factor is updated to obtain the second multidimensional constraint factor. 8.The intelligent warehouse logistics scheduling method of claim 7, wherein, The method further includes: Real-time monitoring of the operating data, environmental data, and work data of the conveying equipment to identify abnormal events; In response to the identified abnormal event, a first-level self-healing process is executed, in which the handling equipment autonomously performs obstacle avoidance, deceleration, or restart operations. If the first-level self-healing process fails to eliminate the abnormal event, the second-level self-healing process is executed to redetermine the target picking path and operation sequence; If the Level 2 self-healing procedure fails to eliminate the abnormal event, then the Level 3 self-healing procedure is executed, and backup equipment, backup storage locations, or backup personnel are activated. After the anomaly handling is completed, the root cause of the anomaly is analyzed; and the second multidimensional constraint factor is updated based on the root cause of the anomaly. 9.The intelligent warehouse logistics scheduling method of claim 8, wherein, The method further includes: Real-time statistics of the operating efficiency and energy consumption data of the material handling equipment; Based on the operational efficiency data and the equipment energy consumption data, the performance weight and energy consumption weight are determined. The operating data of the handling equipment are dynamically adjusted based on the performance weight and the energy consumption weight.
10. An intelligent warehousing logistics scheduling system, characterized in that, The system includes The intelligent inbound module is configured to determine initial multi-dimensional constraint factors based on the physical layout and basic warehousing information of the warehouse. These initial multi-dimensional constraint factors include location constraints, equipment constraints, environmental constraints, order constraints, and personnel constraints. The module then performs a detailed breakdown of the documents to be put away, obtaining detailed material information. These documents represent material documents whose execution status is pending put-away but have not yet undergone put-away operation. Based on the detailed material information and the location constraints, the module recommends storage locations for the target material. Based on the recommended storage location, put-away time, and personnel constraints, the module determines recommended operators. Finally, based on the initial multi-dimensional constraint factors, the recommended storage location, and the recommended operators, the module generates a put-away task allocation result for the target material. This target put-away task represents the put-away task allocation result for handling equipment and recommended operators. Once the material has been put on the shelf, update the warehouse basic information to update the initial multidimensional constraint factor; The inventory counting module is configured to count the inventory of the warehouse basic information; The intelligent outbound module is configured to respond to outbound orders by merging outbound orders within the same preset time range based on the order urgency, the warehouse location of the outbound materials, and the material type of the outbound materials, thereby generating the target picking path and operation sequence for the handling equipment. The anomaly management module is configured to monitor the operating data, environmental data, and work data of the conveying equipment in real time and identify abnormal events; The abnormal events are handled using a three-level progressive self-healing process, and the root causes of the abnormalities are analyzed. The energy consumption optimization module is configured to collect real-time statistics on the operating efficiency data and energy consumption data of the handling equipment; Based on the work efficiency data and the equipment energy consumption data, the performance weight and energy consumption weight are determined; based on the performance weight and the energy consumption weight, the operating data of the handling equipment are dynamically adjusted. The system is configured to perform the intelligent warehousing and logistics scheduling method as described in any one of claims 1-9.
