A Collaborative Management and Control Method and System for Home Appliance Dismantling Based on Material Flow Tracking
By collecting and analyzing material flow data during the home appliance dismantling process in real time, identifying and assessing the extractability status of key recycled components, and generating adaptive strategies, the problem of locating and extracting key recycled components during temporary storage is solved, thereby improving dismantling efficiency and transfer efficiency.
Patent Information
- Application Number
- CN202611266093.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-17
AI Technical Summary
During the dismantling of waste home appliances, key recyclable components are difficult to locate and extract from temporary storage piles, resulting in material turnover delays and transfer delays. Existing systems cannot identify changes in the extractable status of key recyclable components during the accumulation process and cannot provide early warnings to cover the risk of retention.
By collecting material flow data of disassembled components in real time, a component flow record and material entry sequence in the storage location are established. Key recycled components are identified, it is determined whether they should be transferred out of the warehouse, the degree of subsequent material interference is analyzed, the degree of extraction is assessed, and an extraction status mark is generated. Priority intervention component records are determined, and corresponding storage location cleaning and transfer strategies are generated for collaborative management.
It enables continuous tracking of key recycled components, reduces inaccurate positioning, reflects the status of stagnation, distinguishes extraction priorities, improves turnover efficiency and disposal coordination efficiency, avoids material interference, and generates adaptive strategies.
Smart Images

Figure CN123118083A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of home appliance dismantling and tracking technology, specifically to a collaborative management and control method and system for home appliance dismantling based on material flow tracking. Background Technology
[0002] Dismantling and recycling of waste household appliances is a crucial link in resource recycling and renewable resource management, involving multiple processes such as whole-machine warehousing, classified dismantling, component temporary storage, material transfer, and end-of-life disposal. With the increasing volume of recycled waste air conditioners, refrigerators, washing machines, and other household appliances, dismantling sites need to utilize warehouses and cargo identification systems to identify, temporarily store, and continuously manage the flow of various dismantled components, including compressors, motors, copper pipes, plastic parts, and metal parts. This, combined with automated storage and retrieval systems (AS / RS) and unmanned storage yard intelligent control systems, allows for collaborative management of the storage locations of different dismantled components and the material transfer process. This ensures traceable material destinations, manageable temporary storage, identifiable storage location status, and orderly transfer connections.
[0003] For example, Chinese patent CN114239773B discloses a material tracking method and device, including: a laser engraving device forming a second pattern in a designated area using second laser parameters, and using the second pattern as a second identification code. A first pattern is present in the designated area. The second pattern at least partially overlaps with the first pattern. An image recognition device identifies the second identification code within the designated area using second recognition parameters. This material tracking method reduces the area occupied by the identification code on the material by covering the designated area containing the first pattern with the second identification code.
[0004] For example, Chinese patent CN115660013A discloses a material tracking and management system using electronic tags and its applications. The system includes: a plurality of electronic tags connected to a plurality of containers, at least one first electronic device, and at least one second electronic device. Each container contains a material, and the memory of each electronic tag stores basic material information corresponding to that material. During the transportation / storage of the containers, the first electronic device receives the ambient temperature of the storage environment of the container via a temperature sensing device. Then, it determines the shelf life adjustment based on the cold storage conditions and the ambient temperature. If a shelf life adjustment is necessary, an adjustment parameter is written into the memory of each electronic tag. Thus, after a client uses the second electronic device to read the electronic tag on the container, the display screen of the second electronic device shows the real-time shelf life of the material contained in the container.
[0005] However, during the dismantling of used air conditioners, refrigerators, and washing machines, key recyclable components such as compressors, motors, and copper pipe assemblies are often produced simultaneously with low-value materials such as plastic casings, foam insulation layers, and sheet metal frames. When the dismantling volume is large, a large amount of low-value materials will preferentially enter the temporary storage area and accumulate, while key recyclable components, due to their small size or earlier production time, are easily covered by materials that enter later. In actual production, it often happens that the system records show that key recyclable components have been put into storage and are in sufficient stock, but it is difficult to locate and retrieve them in a timely manner during on-site transfer or sale, resulting in long-term retention of key recyclable components, reduced turnover efficiency, and delays in subsequent disposal plans. Existing systems usually only record the quantity of materials and storage area, and cannot identify changes in the retrievable status of key recyclable components during the accumulation process, nor can they provide early warnings of potential risks of being covered and retained.
[0006] Therefore, in order to address the above issues, there is an urgent need for a collaborative management and control method and system for home appliance dismantling based on material flow tracking. Summary of the Invention
[0007] Technical problems to be solved
[0008] To address the shortcomings of existing technologies, this invention provides a collaborative management and control method and system for home appliance dismantling based on material flow tracking. This solves the problem that key recyclable components are difficult to locate and extract during the temporary storage and accumulation of waste home appliances, leading to material turnover delays and transfer connection delays.
[0009] Technical solution
[0010] To achieve the above objectives, the present invention provides the following technical solution: a collaborative management and control method for home appliance dismantling based on material flow tracking, comprising the following steps: S1, real-time collection of material flow data of dismantled components, preprocessing of the material flow data, establishing component flow records and material entry sequences in storage locations, and identifying key recycled components; S2, determining whether key recycled components have been transferred out of storage based on the material flow data, and for key recycled components that have not been transferred out of storage, analyzing the degree of subsequent material interference in the storage location based on the component flow records and material entry sequences in storage locations to obtain the coverage characteristics of key recycled components; S3, evaluating the extractability of key recycled components by combining the coverage characteristics of key recycled components and the material flow data, identifying the corresponding extractable status based on the evaluation results, and generating an extractable status marker; S4, determining priority intervention component records based on the extractable status markers, generating normal flow strategies for key recycled components that do not belong to priority intervention component records, generating corresponding storage location clearing strategies and restricted entry strategies for priority intervention component records, and generating priority transfer strategies to perform collaborative management and control of key recycled component extraction, material temporary storage, and transfer scheduling.
[0011] Furthermore, the process involves real-time collection of material flow data for disassembled components, preprocessing the data, establishing component flow records and material entry sequences within storage locations, and identifying key components for recycling. This process includes: real-time collection of material flow data for each disassembled component, including: disassembly batch number, appliance serial number, component number, component category number, component weight, warehousing timestamp, temporary storage area number, storage location number, and transfer timestamp; standardizing the format of each number in the material flow data and deleting invalid records with empty component numbers, empty storage location numbers, or empty warehousing timestamps; for duplicate material flow data with the same component number, same warehousing timestamp, and same storage location number, only the record with the latest data reception time is retained. The inbound and transfer timestamps are uniformly converted to the same system clock, and abnormal records with transfer timestamps earlier than inbound timestamps are removed. For component weight, abnormal records with weights exceeding the corresponding rated weighing range are removed. Component flow records are established based on component number, inbound timestamp, storage location number, and transfer timestamp. These records are then grouped according to storage location number, and within each group corresponding to a storage location number, they are sorted from earliest to latest by inbound timestamp, forming a material entry sequence within the storage location. Component category numbers are matched with a preset list of key recycled component categories; when a component category number belongs to the preset list of key recycled component categories, the corresponding component number is marked as a key recycled component. A home appliance dismantling management database is constructed to store raw and pre-processed material flow data.
[0012] Furthermore, the specific process for determining whether key recycled components have been transferred out of the warehouse based on material flow data is as follows: read the component flow record, the material entry sequence in the storage location, and the key recycled component mark; take the component flow record corresponding to the key recycled component as the key recycled component record to be analyzed, and read the corresponding material flow data; for each key recycled component record to be analyzed, determine whether the transfer timestamp is empty; if the transfer timestamp is not empty, it means that the corresponding component has been transferred out of the warehouse, and no overwrite status analysis is performed.
[0013] Furthermore, for key recycled components that have not been transferred out of the warehouse, based on the component flow records and the material entry sequence within the storage location, the specific process for analyzing the degree of interference from subsequent materials in the storage location and obtaining the coverage characteristics of key recycled components is as follows: If the transfer timestamp of the key recycled component record to be analyzed is empty, then the corresponding key recycled component record to be analyzed is determined as the key recycled component record to be evaluated, and coverage status analysis is performed: According to the storage location number in the key recycled component record to be evaluated, all component flow records corresponding to the same storage location number are read in the material entry sequence within the storage location, and the entry timestamps later than the current timestamps are selected. The entry timestamp of the key recycled components to be evaluated is recorded, and the transfer timestamp of the components is empty. The component flow records are identified as subsequent entry component records. The component weights in the subsequent entry component records are summed to obtain the cumulative weight of subsequent coverage. The number of subsequent entry component records is counted to obtain the cumulative number of subsequent coverages. The difference between the current time and the entry timestamp of the corresponding key recycled component record to be evaluated is calculated to obtain the temporary storage duration. The cumulative weight of subsequent coverage, the cumulative number of subsequent coverages, and the temporary storage duration corresponding to the key recycled component record to be evaluated are associated and stored to form the coverage characteristics of key recycled components.
[0014] Furthermore, the specific process for assessing the extractability of key recycled components by combining the coverage characteristics and material flow data of key recycled components is as follows: Read the material flow data and coverage characteristics of the key recycled components to be assessed. For each key recycled component record, divide the cumulative weight of subsequent coverage by the corresponding component weight to obtain the weight overlay ratio, and use the corresponding cumulative number of subsequent coverages as the number of components to be removed. Calculate the ratio of the temporary storage duration to the preset storage duration benchmark value to obtain the storage impact value. When the storage impact value is greater than one, limit the storage impact value to one. Normalize the weight overlay ratio and the number of components to be removed to obtain the weight interference level value and the removal interference level value. Perform weighted fusion of the weight interference level value, the removal interference level value, and the storage impact value to obtain the extraction obstacle value. Apply an exponential decay mapping to the extraction obstacle value to obtain the extractability index.
[0015] Further, the specific process of identifying the corresponding extractable state based on the assessment results and generating extractable state markers is as follows: The extractable index is compared with a first extractable threshold and a second extractable threshold. When the extractable index is less than or equal to the first extractable threshold, the corresponding key recyclable component to be assessed is marked as difficult to extract. When the extractable index is greater than the first extractable threshold and less than or equal to the second extractable threshold, the corresponding key recyclable component to be assessed is marked as requiring intervention. When the extractable index is greater than the second extractable threshold, the corresponding key recyclable component to be assessed is marked as easily extractable. The retention impact value, weight interference degree value, removal interference degree value, extraction obstacle value, extractable index, and extractable state marker corresponding to the key recyclable component to be assessed are associated and stored to form a key recyclable component extractability assessment record.
[0016] Furthermore, based on the extractable status markers, priority intervention component records are determined. The specific process for generating normal circulation strategies for key recycling components not included in priority intervention component records is as follows: Extractability assessment records for key recycling components are read. When the extractable status marker is marked as difficult to extract, the corresponding key recycling component record to be assessed is identified as a priority intervention component record. When the extractable status marker is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding key recycling component record to be assessed is identified as a priority intervention component record. All others are not recorded as priority intervention component records. For key recycling component records not recorded as priority intervention component records, a normal circulation strategy is generated. The normal circulation strategy includes: maintaining the current storage location number unchanged, allowing new disassembled components to continue to be allocated to the corresponding storage location number, and executing component transfer according to the established transfer plan, while continuously monitoring the subsequent cumulative weight of the corresponding key recycling component, the subsequent cumulative number of coverages, and the temporary storage duration.
[0017] Furthermore, the specific process for generating corresponding location clearing strategies and restricted entry strategies for priority intervention component records is as follows: For priority intervention component records in a difficult-to-retrieve state, based on the corresponding storage location number, read the component flow records under the same storage location number in the material entry sequence within the storage location, where the entry timestamp is later than the entry timestamp of the corresponding priority intervention component record and the transfer timestamp is empty, and generate a list of components to be cleared; when the retrieval status of a priority intervention component record is marked as difficult to retrieve, or the retrieval status is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, mark the corresponding storage location number as restricted entry and generate a restricted entry strategy; when the retrieval status of a priority intervention component record is marked as... When the component is difficult to retrieve, a storage location clearing strategy is generated based on the list of components to be cleared. This strategy includes the corresponding key recycling component number, the list of components to be cleared, and the corresponding storage location number. The restricted entry strategy includes the restricted storage location number and the restricted entry start time, preventing new disassembled components from being assigned to the corresponding storage location number before the corresponding key recycling component has been transferred. Once the restricted entry strategy takes effect, if a new disassembled component needs to be assigned to a storage location number under restricted entry, the new component will be assigned to a storage location within the same temporary storage area that is not under restricted entry. If there are no storage locations within the same temporary storage area that are not under restricted entry, a temporary storage area allocation prompt will be output.
[0018] Furthermore, the specific process for generating a priority transfer strategy and coordinating the extraction, temporary storage, and transfer scheduling of key recycled components is as follows: When the extractable status of a priority intervention component is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding key recycled component is added to the next batch of transfer tasks, and a priority transfer strategy is generated. The priority transfer strategy includes the corresponding key recycled component number, component category number, temporary storage area number, storage location number, and transfer trigger time; after the transfer timestamp corresponding to the priority intervention component record is written into the component flow record, the corresponding... Priority intervention components have been transferred, and component flow records and material entry sequences within storage locations have been updated. The restriction on warehousing for the corresponding storage location number is lifted only when there are no difficult-to-retrieve or retrieval-available components under the storage location number, or when a component is marked as pending intervention and its retention impact value exceeds the retention intervention threshold. The pre-cleaning component list, storage location cleaning strategy, restricted warehousing strategy, priority transfer strategy, temporary storage area allocation prompts, and normal flow strategy are associated and stored in the home appliance dismantling control database, and output to the dismantling site management terminal, temporary storage area management terminal, and transfer scheduling terminal.
[0019] The second aspect of this invention provides a collaborative management and control system for home appliance dismantling based on material flow tracking, comprising: a material data acquisition and processing module, used to acquire material flow data of dismantled components in real time, preprocess the material flow data, establish component flow records and material entry sequences in storage locations, and identify key recycled components; and a key recycled component analysis module, used to determine whether key recycled components have been transferred out of the warehouse based on material flow data, and for key recycled components that have not been transferred out of the warehouse, analyze the degree of subsequent material interference in the storage location based on the component flow records and material entry sequences in storage locations to obtain the coverage characteristics of key recycled components; The recycling component extraction assessment module is used to assess the extractability of key recycling components by combining the coverage characteristics of key recycling components and material flow data. Based on the assessment results, it identifies the corresponding extractability status and generates an extractability status marker. The material flow collaborative management and control module is used to determine the priority intervention component records based on the extractability status markers. For key recycling components that do not belong to the priority intervention component records, it generates normal flow strategies. For priority intervention component records, it generates corresponding location clearing strategies and restricted entry strategies, and generates priority transfer strategies to carry out collaborative management and control of key recycling component extraction, material temporary storage, and transfer scheduling.
[0020] Beneficial effects The present invention has the following beneficial effects: (1) By disassembling batch number, whole machine number, component number, storage location number and transfer timestamp, a component-level material flow record is established, so that the status of key recycled components such as compressors, motors and copper pipe assemblies from warehousing and temporary storage to transfer can be continuously tracked, reducing the problem of inaccurate positioning caused by relying solely on inventory quantity.
[0021] (2) By recording the subsequent entry of components in the same storage location that have not yet been transferred, the cumulative weight of subsequent coverage, the cumulative number of subsequent coverages and the duration of temporary storage can be formed, which can reflect the status of key recycled components being disturbed by subsequent materials and being stored for a long time in the temporary storage area.
[0022] (3) The extractability of key recycling components is assessed by combining weight interference, removal interference and retention effects, and status markers of difficult extraction, need for intervention and easy extraction are generated so that the extraction priority of different key recycling components can be distinguished on site.
[0023] (4) Automatically generate storage location clearing strategy, restricted entry strategy, priority transfer strategy or normal circulation strategy according to the retrieval status, so as to avoid the new dismantled parts from continuing to aggravate the material interference of difficult-to-retrieve storage locations, and improve the turnover efficiency of key recycled parts and the efficiency of subsequent disposal.
[0024] Of course, any product implementing this invention does not necessarily need to achieve all of the advantages described above at the same time. Attached Figure Description
[0025] Figure 1 Flowchart of a collaborative management and control method for home appliance dismantling based on material flow tracking;
[0026] Figure 2 This is a structural diagram of a collaborative management and control system for home appliance dismantling based on material flow tracking.
[0027] Figure 3 A schematic diagram for determining the extractable status of key recyclable components;
[0028] Figure 4 This is a flowchart of the collaborative management process for home appliance dismantling based on material flow tracking. Detailed Implementation
[0029] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. As those skilled in the art will understand, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0030] Please see Figures 1-4 This invention provides a technical solution: a collaborative management and control method for home appliance dismantling based on material flow tracking, such as... Figure 1 As shown, the process includes the following steps: S1, real-time collection of material flow data for disassembled components, preprocessing of the material flow data, establishment of component flow records and material entry sequences within storage locations, and identification of key recycled components; S2, determination of whether key recycled components have been transferred out of storage based on material flow data, and for key recycled components that have not been transferred out of storage, analysis of the degree of subsequent material interference in the storage location based on component flow records and material entry sequences within storage locations to obtain the coverage characteristics of key recycled components; S3, evaluation of the extractability of key recycled components based on the coverage characteristics of key recycled components and material flow data, identification of corresponding extractable states based on the evaluation results, and generation of extractable state markers; S4, determination of priority intervention component records based on extractable state markers, generation of normal flow strategies for key recycled components that do not belong to priority intervention component records, generation of corresponding storage location clearing strategies and restricted entry strategies for priority intervention component records, and generation of priority transfer strategies to achieve coordinated management and control of key recycled component extraction, material temporary storage, and transfer scheduling.
[0031] Specifically, the process involves real-time collection of material flow data for dismantled components, preprocessing of this data, establishing component flow records and material entry sequences within storage locations, and identifying key components for recycling. This process includes: real-time collection of material flow data for each dismantled component, including: dismantling batch number, appliance serial number, component number, component category number, component weight, warehousing timestamp, temporary storage area number, storage location number, and transfer timestamp. This material flow data is generated during the dismantling component warehousing registration, temporary storage location allocation, and transfer confirmation. The dismantling batch number and appliance serial number are generated by the dismantling work order system. The following information is generated and written when discarded household appliances enter the dismantling task: Component number is obtained by scanning the corresponding component label by the barcode scanning terminal during component registration; Component category number is written by the dismantling work order system according to the preset component category mapping relationship corresponding to the component number; Component weight is collected and uploaded by electronic weighing equipment when the component is weighed upon entering the warehouse; Warehouse entry timestamp is automatically written by the system server when component registration is completed; Temporary storage area number and storage location number are written by the temporary storage area management terminal when component location allocation is completed; Transfer timestamp is automatically written by the system server when component transfer out of the warehouse is confirmed; When the dismantled component has not yet been transferred out of the warehouse, the transfer timestamp is empty. The format of all serial numbers in the material flow data is standardized, and invalid records with empty component numbers, empty storage location numbers, or empty entry timestamps are deleted. The standardization process includes converting dismantling batch numbers, appliance serial numbers, component numbers, component category numbers, temporary storage area numbers, and storage location numbers into preset code lengths, character types, and separator formats. For example, dismantling batch numbers are uniformly converted to the format "BT-20260101-0001", and appliance serial numbers are uniformly converted to "AP-000". The format is standardized as "001". Component numbers are uniformly converted to "PT-000001", component category numbers to "CT-001", temporary storage area numbers to "AR-01", and storage location numbers to "AR-01-P05". Each field uses a fixed-length code, padded with leading zeros to ensure consistency and unique identifiability of data uploaded from different acquisition terminals. This guarantees that data for the same component uploaded to different terminals can be uniquely identified and associated. For duplicate material flow data with the same component number, same entry timestamp, and same storage location number, only the record with the latest data reception time is retained. The data reception time is the time when the material flow data is uploaded to the home appliance dismantling management database and received by the system. Retaining the record with the latest data reception time reflects the latest confirmed status of the entry flow event and avoids duplicate records interfering with subsequent analysis of material entry sequences and coverage status within storage locations.The inbound and transfer timestamps are uniformly converted to the same system clock, and abnormal records with transfer timestamps earlier than inbound timestamps are removed. The same system clock refers to the standard time of the current system server. The inbound timestamp represents the time when disassembled components enter the temporary storage area and complete location registration, while the transfer timestamp represents the time when disassembled components leave their corresponding storage location and complete transfer confirmation. For material flow data with empty transfer timestamps, the abnormal judgment of transfer timestamps earlier than inbound timestamps is not performed. Regarding component weight, abnormal records where component weight exceeds the corresponding rated weighing range are removed. The corresponding rated weighing range is established based on the historical weighing data statistics corresponding to the component category number, and is pre-stored in the component category parameter table after being corrected according to the component weight range specified in the disassembly process standard. The component category parameter table records a one-to-one correspondence between component category numbers and corresponding rated weighing ranges. Component weight exceeding the corresponding rated weighing range includes components with a weight less than or equal to zero or greater than the corresponding weight limit. For example, for the compressor corresponding to component category number CT-001, based on historical dismantling records, its weight is mainly distributed between 15kg and 30kg. Combined with the company's dismantling process standards, the corresponding rated weighing range is set to 10kg to 35kg. Component flow records are established based on component number, warehousing timestamp, storage location number, and transfer timestamp. These records are grouped according to storage location number, and within each group corresponding to storage location number, they are sorted from earliest to latest by warehousing timestamp, forming a material entry sequence within the storage location. The component flow record is used to record the warehousing, storage, and transfer status of individual dismantled components in the temporary storage area. The material entry sequence within the storage location is used to characterize the order of entry of dismantled components under the same storage location number, providing a data basis for subsequently identifying components within the same storage location that entered after the target key recovery components and have not yet been transferred. The component category number is matched with a pre-set list of key recycling component categories. When a component category number belongs to the list, the corresponding component number is marked as a key recycling component. The pre-set list of key recycling component categories is established in advance based on the historical dismantling records of home appliance dismantling companies, the statistical results of component recycling value, and the classification standards for recycled resources. The pre-set list of key recycling component categories records the key recycling component category number and the corresponding component name. Key recycling components include at least one or more of the following: compressor, motor, copper pipe assembly, radiator, and control board. The pre-set list of key recycling component categories can be updated and maintained when dismantling companies adjust their recycling strategies or when market recycling prices change. The key recycling component mark is written into the corresponding component circulation record, which is used to subsequently select key recycling component records to be analyzed from the component circulation record.Construct a home appliance dismantling and management database to store raw and pre-processed material flow data. The home appliance dismantling and management database should include at least a raw material flow data table, a component flow record table, a material entry sequence table in the storage location, and a key recycling component marking table to support subsequent key recycling component coverage status analysis, extractability assessment, and collaborative management of material flow.
[0032] This implementation plan improves the accuracy, consistency, and traceability of dismantled component flow data by clarifying the data collection sources, standardizing the numbering format, removing invalid and abnormal records, and establishing component flow records and material entry sequences within storage locations. Simultaneously, by pre-setting a list of key recycled component categories, it identifies key recycled components, providing a reliable data foundation for subsequent coverage status analysis, extractability assessment, and collaborative material flow management, thereby reducing tracking errors caused by data confusion, duplicate records, or unclear component markings.
[0033] Specifically, the process of determining whether key recycled components have been transferred out of the warehouse based on material flow data is as follows: The component flow record, the material entry sequence within the storage location, and the key recycled component marker are read. The component flow record is used to determine the warehousing, storage, and transfer status of each disassembled component. The material entry sequence within the storage location is used to determine the order of entry of disassembled components under the same storage location number. The key recycled component marker is used to filter component objects requiring coverage status analysis from the component flow record. The component flow record corresponding to the key recycled component is used as the key recycled component record to be analyzed, and the corresponding material flow data is read. The key recycled component record to be analyzed includes at least the component number, component category number, component weight, warehousing timestamp, temporary storage area number, storage location number, and transfer timestamp, used to determine whether the corresponding key recycled component is still in the temporary storage area. For each key recycled component record to be analyzed, it is determined whether the transfer timestamp is empty. If the transfer timestamp is not empty, it indicates that the corresponding component has been transferred out of the warehouse, and no coverage status analysis is performed. In this context, a non-empty transfer timestamp indicates that the corresponding key recycling component has completed transfer and outbound confirmation, and the system server has written the transfer confirmation time into the corresponding component's circulation record. Transfer and outbound confirmation includes confirmation of transfer task completion, transfer and outbound barcode scanning confirmation, and confirmation from the transfer scheduling terminal. The server only writes the transfer confirmation time into the corresponding component's circulation record to form a transfer timestamp after the corresponding key recycling component has completed transfer and outbound confirmation. If a transfer task has been created but not yet completed, an abnormal termination occurs during the transfer process, on-site barcode scanning is not confirmed, the transfer and outbound record is revoked, or the transfer scheduling terminal does not return a success receipt, the transfer timestamp in the corresponding component's circulation record remains empty and continues to be considered as not having been transferred and outbound. Therefore, the transfer timestamp is not simply a record of time information, but rather a status record result after transfer and outbound confirmation is completed. Its generation is based on the completion of the transfer task and successful outbound confirmation, thus ensuring that an empty transfer timestamp corresponds to incomplete transfer and outbound, and a non-empty transfer timestamp corresponds to completed transfer and outbound, avoiding errors in the judgment of the overlay status analysis object due to incomplete transfer processes or missing confirmation information. For key recycled components that have already been transferred out of the warehouse, their corresponding component transfer records are still stored in the home appliance dismantling and management database as historical transfer records for subsequent traceability and statistical analysis. However, they are no longer in the temporary storage state corresponding to the current storage location number, so they will no longer participate in the subsequent coverage status analysis. Only the component transfer records with empty transfer timestamps will be used as current valid component records to participate in the material entry sequence analysis within the storage location, so as to avoid the transferred components being repeatedly included in the coverage risk assessment.
[0034] In this implementation plan, the transfer timestamp is used to determine whether key recycled components have been transferred out of the warehouse. Coverage status analysis is only performed on key recycled components that are still in temporary storage. This avoids repeatedly including transferred components in the judgment scope, improves the accuracy of coverage status analysis, reduces invalid analysis, and provides a reliable data screening basis for subsequent extractability assessment.
[0035] Specifically, for key recycled components that have not been transferred out of the warehouse, the process of analyzing the degree of interference from subsequent materials in the warehouse location based on the component flow record and the material entry sequence in the storage location to obtain the coverage characteristics of key recycled components is as follows: If the transfer timestamp of the key recycled component record to be analyzed is empty, the corresponding key recycled component record to be analyzed is determined as the key recycled component record to be evaluated, and coverage status analysis is performed: Wherein, an empty transfer timestamp indicates that the corresponding key recycled component is still in the temporary storage area and has not yet completed the transfer out of the warehouse confirmation; the key recycled component record to be evaluated includes at least the component number, component category number, component weight, warehouse entry timestamp, temporary storage area number, and storage location number, which are used to determine the temporary storage location and entry time of the key recycled component. Based on the storage location numbers in the records of key components to be evaluated, all component flow records corresponding to the same storage location number are read from the material entry sequence within the location. These records characterize the order of entry and current transfer status of all disassembled components within the corresponding location. The material entry sequence is sorted from earliest to latest by entry timestamp to determine which components entered the same location after the key components to be evaluated. Component flow records with entry timestamps later than the current key component record and empty transfer timestamps are identified as subsequent entry records. The later entry timestamp is used to filter disassembled components that entered the same location after the current key component, and the empty transfer timestamp excludes disassembled components that have already left the corresponding location. This ensures that subsequent entry records only include components currently remaining in the same location that may interfere with the location and retrieval of the key components. The weights of components in subsequent entry component records are summed to obtain the cumulative weight of subsequent coverage. This cumulative weight represents the total weight of disassembled components that entered the same storage location after the key recovery component to be evaluated and have not yet been transferred, reflecting the potential weight interference that subsequent materials in the current storage location may cause to the corresponding key recovery component. The number of subsequent entry component records is counted to obtain the cumulative number of subsequent coverages. This cumulative number of subsequent coverages represents the number of disassembled components that entered the same storage location after the key recovery component to be evaluated and have not yet been transferred, reflecting the number of subsequent components that may need to be checked or removed before retrieving the key recovery component. The difference between the current time and the entry timestamp of the corresponding key recovery component record is calculated to obtain the temporary storage duration. The current time is the current time of the system server when performing coverage status analysis and is consistent with the unified system clock. The temporary storage duration represents the length of time the key recovery component has remained in the temporary storage area since entering its corresponding storage location number. The cumulative weight of subsequent coverage, the cumulative number of subsequent coverages, and the temporary storage duration corresponding to the key recovery component record are stored together to form the key recovery component coverage feature.The coverage characteristics of key recycled components are associated with their corresponding component numbers, temporary storage area numbers, and storage location numbers and written into the home appliance dismantling management database. This information is used to assess the ease of retrieval of the key recycled component. To further clarify, the coverage status analysis is not used to determine whether a physical obstruction exists between the key recycled component and subsequent incoming components, nor is it used to establish a geometric stacking model of materials within the storage location. Instead, it is used to assess the degree of comprehensive retrieval interference from subsequent materials to the key recycled component under the current storage location number. In home appliance dismantling temporary storage scenarios, the same storage location is typically used to temporarily store components from the same or consecutive batches of dismantling. Subsequent incoming components that have not yet been transferred occupy storage space and increase the workload of on-site searching, investigation, sorting, moving, and retrieval. Therefore, even if subsequent incoming components do not directly obstruct the target key recycled component, they will still interfere with the location and retrieval of the target key recycled component. The material entry sequence within the storage location is grouped according to the storage location number. Coverage status analysis is only performed on the flow records of components with the same storage location number as the key recovery component to be evaluated. Component flow records with an entry timestamp later than the entry timestamp of the key recovery component to be evaluated and an empty transfer timestamp are identified as subsequent entry component records. Coverage characteristics of the key recovery component are formed based on these subsequent entry component records, including cumulative weight of subsequent coverage, cumulative number of subsequent coverages, and temporary storage duration. The cumulative weight of subsequent coverage characterizes the relative weight interference caused by subsequently entering components that have not yet been transferred; the cumulative number of subsequent coverages characterizes the number of subsequent entering components that may need to be checked, moved, or reorganized before the extraction of the target key recovery component; and the temporary storage duration characterizes the degree to which the target key recovery component deviates from its normal turnover cycle. These three characteristics are used together to characterize the comprehensive extraction interference degree of the target key recovery component under the current storage location number, rather than to establish a geometric stacking model of the materials within the storage location.
[0036] In this implementation plan, by screening components that subsequently enter but have not yet been transferred within the same storage location, the cumulative weight of subsequent coverage, the cumulative number of subsequent coverages, and the temporary storage duration are generated. This can accurately reflect the current material interference and storage status of key recycled components, providing a reliable basis for subsequent extractability assessment.
[0037] Specifically, the process of assessing the extractability of key recycled components by combining the coverage characteristics of key recycled components and material flow data is as follows: read the material flow data and coverage characteristics of the key recycled components to be assessed. The material flow data includes at least the component number, component category number, component weight, warehousing timestamp, temporary storage area number, and storage location number. The coverage characteristics of key recycled components include at least the cumulative weight of subsequent coverage, the cumulative number of subsequent coverages, and the temporary storage duration, which are used to jointly characterize the weight interference, quantity interference, and retention impact of the key recycled components to be assessed under the current storage location number. For records of key recycled components to be evaluated, the weight overlay ratio is obtained by dividing the cumulative weight of subsequent overlays by the corresponding component weight in the record. Here, the component weight is the weight of the key recycled component itself. The weight overlay ratio characterizes the proportional relationship between the weight of subsequently entering but not yet transferred components under the same storage location number and the weight of the current key recycled component. When the total weight of subsequently entering components continuously increases, it indicates that there is more material to be processed around the current key recycled component, occupying more storage space. In actual retrieval, more subsequent material usually needs to be moved, sorted, or checked, thus increasing the degree of retrieval interference to the key recycled component. Using the ratio of the cumulative weight of subsequent overlays to the weight of the key recycled component itself eliminates the impact of weight differences between different categories of key recycled components, allowing key recycled components of different weight levels, such as compressors, motors, and control boards, to be evaluated for their relative overlay degree on a uniform scale. A higher weight overlap ratio indicates a greater total weight of subsequent materials relative to the weight of the current key recovery component, typically resulting in greater interference with its location, identification, and extraction. Conversely, a lower weight overlap ratio indicates less interference from subsequent materials, making it easier to quickly locate and extract the key recovery component. To avoid division by zero, if the weight of the key recovery component being evaluated is less than or equal to zero, the extraction difficulty assessment is not performed on that record, and the record is marked as a weight anomaly. The corresponding cumulative number of subsequent covers is used as the number of components to be removed. This number represents the number of subsequent components that may need to be checked, moved, or organized before extracting the key recovery component being evaluated. A higher cumulative number of subsequent covers indicates a greater estimated amount of cleanup work before on-site extraction. The ratio of the temporary storage duration to the preset storage duration benchmark value is calculated to obtain the storage impact value. When the storage impact value is greater than one, the storage impact value is limited to one. The preset storage duration benchmark value is set in advance based on the normal turnover cycle of the key recycled parts by the dismantling company, and the preset storage duration benchmark value is greater than zero, preferably 48 hours to 120 hours. The storage impact value is used to characterize the degree to which the key recycled parts to be evaluated stay in the temporary storage area relative to the normal turnover cycle.The weight overlap ratio and the number of parts to be removed are normalized to obtain the weight interference level and removal interference level values, respectively. The normalization process preferably uses the minimum-maximum normalization method to map the weight overlap ratio and the number of parts to be removed to a range of 0 to 1. The minimum and maximum values can be obtained statistically from the normal retrieval records of key recovered parts in historical temporary storage locations. Optionally, when the weight interference level and removal interference level values are greater than one, they can be limited to one. The weight interference level, removal interference level, and retention impact value are weighted and fused to obtain the extraction obstacle value. This extraction obstacle value characterizes the overall extraction obstacle level of the key recovery component under the current storage location number after being affected by weight interference, removal interference, and retention. The weight coefficients for the weight interference level, removal interference level, and retention impact value in the weighted fusion are pre-set based on the impact of weight interference, removal interference, and retention on extraction time in the dismantling company's historical extraction operation records. The preferred weight coefficient for the weight interference level is 0.30–0.50; the preferred weight coefficient for the removal interference level is 0.25–0.45; and the preferred weight coefficient for the retention impact value is 0.15–0.35. All three weight coefficients are non-negative, and their sum is 1. An exponential decay mapping is applied to the extraction obstacle value to obtain the extractability index. The extractability index characterizes the feasibility of quickly locating and retrieving the key components to be evaluated under the current storage location number. The preferred index decay mapping is extractability index = exp(-retrievable barrier value), where the larger the retrievable barrier value, the smaller the extractability index. The specific formula for the extractability index is: In the formula, Indicates the extractable index; Indicates the degree of weight interference; This indicates the degree of interference removal. Indicates the impact value of the retention; Weighting coefficients representing the degree of weight interference; The weighting coefficient represents the degree of interference removal. The weighting coefficients represent the impact of retention. The extractability index is a comprehensive representation of the weight interference level, removal interference level, and retention impact level. This is because the ease of extraction of key recovery components during actual temporary storage and retrieval is primarily influenced by the degree of subsequent material coverage, the amount of on-site cleanup, and the degree of temporary retention. The weight interference level reflects the burden of subsequent accumulated materials on key recovery components; as the cumulative weight of subsequent coverage increases, the obstruction and difficulty in locating key recovery components increase simultaneously. The removal interference level reflects the number of subsequent components that need to be checked, moved, or sorted before extraction; the more times subsequent coverage occurs, the more complex the on-site extraction path becomes, and the longer the extraction operation time. The retention impact level reflects the degree to which key recovery components deviate from their normal turnover cycle; long-term retention of key recovery components usually indicates continuous coverage by subsequent materials, increased difficulty in locating, or failure to enter the transfer process in a timely manner. Since the three influencing factors mentioned above characterize the degree of extraction obstruction of key recovery components from three dimensions—overburden, operational complexity, and time delay—a weighted fusion method is adopted to form an extraction obstruction value, comprehensively reflecting the overall extraction obstruction level currently experienced by key recovery components. Furthermore, an exponential decay mapping is used to generate an extraction index because the extractability of key recovery components and the degree of extraction obstruction typically exhibit a non-linear negative correlation. When the extraction obstruction value is small, a small amount of interference will not significantly affect the extraction efficiency; however, as the extraction obstruction value continues to increase, the probability of quickly locating and extracting key recovery components decreases rapidly. The exponential decay mapping ensures that the extraction index remains between zero and one, and that the greater the extraction obstruction value, the more significant the decrease in the extraction index, thus better reflecting the actual pattern in dismantling sites where the extraction efficiency of key recovery components rapidly decreases with increasing accumulation interference.
[0038] In this embodiment, Table 1 is a data table of extractable indexes for key recycled components. The preset retention time baseline value is 72, and the weights corresponding to the weight interference level value, removal interference level value, and retention impact value are 0.40, 0.35, and 0.25, respectively. The table details the component category number, component category, storage location number, component weight, cumulative weight of subsequent coverage, cumulative number of subsequent coverages, temporary storage retention time, and extractable index for each of the five key recycled component numbers. Among them, the key recycled component number PT-000001 corresponds to component category number CT-001, component category is compressor, storage location number is AR-01-P01, component weight is 18.6, cumulative weight after subsequent coverage is 95.4, cumulative number of subsequent coverages is 7, temporary storage duration is 96, and extractability index is 0.4047; the key recycled component number PT-000002 corresponds to component category number CT-002, component category is copper pipe assembly, storage location number is AR-01-P02, component weight is 6.3, cumulative weight after subsequent coverage is 25.7, cumulative number of subsequent coverages is 3, temporary storage duration is 30, and extractability index is 0.6374; the key recycled component number PT-000003 corresponds to component category number CT-003, component category is motor, storage location number is AR-01-P0 3. The component weight is 12.4, the cumulative weight of subsequent coverage is 10.8, the cumulative number of subsequent coverages is 1, the temporary storage duration is 12, and the extractable index is 0.9592; The component category number corresponding to the key recovery component number PT-000004 is CT-001, the component category is compressor, the storage location number is AR-01-P04, the component weight is 20.2, the cumulative weight of subsequent coverage is 45.6, the cumulative number of subsequent coverages is 4, the temporary storage duration is 70, and the extractable index is 0.5962; The component category number corresponding to the key recovery component number PT-000005 is CT-004, the component category is control motherboard, the storage location number is AR-01-P05, the component weight is 1.3, the cumulative weight of subsequent coverage is 8.4, the cumulative number of subsequent coverages is 5, the temporary storage duration is 100, and the extractable index is 0.4134.
[0039] Taking the key recycled component number PT-000001, component category number CT-001, component category is compressor, and storage location number AR-01-P01 as an example, the weight coverage ratio is obtained by dividing the cumulative weight of subsequent coverage (95.4) by the component weight (18.6). After performing minimum-maximum normalization on 5.129032, the minimum and maximum values are 0.870968 and 6.461538 respectively, resulting in a weight interference level of 0.761651. The cumulative number of subsequent coverages (7) is used as the number of components to be removed, and after minimum-maximum normalization, the minimum and maximum values are 1 and 7 respectively. The interference removal level value is 1. The ratio of the temporary storage duration of 96 to the preset storage duration baseline value of 72 is calculated to be 1.333333. When the storage impact value is greater than 1, it is limited to 1, resulting in a storage impact value of 1. The weight interference level value of 0.761651, the interference removal level value of 1, the storage impact value of 1, and the corresponding weights of 0.40, 0.35, and 0.25 are further calculated, which equals 0.304660, 0.35, and 0.25, respectively. These are then summed to obtain an extraction obstacle value of 0.904660. The extraction obstacle value of 0.904660 is substituted into the exponential decay formula, calculated, and rounded to four decimal places to obtain 0.4047.
[0040] Table 1. Extractable Index Data for Key Recyclable Components
[0041]
[0042] like Figure 3 The diagram illustrates the determination of the extractability status of key recycled components. It shows the extractability index results of five key recycled components in different storage locations, sorted in ascending order of extractability index. The horizontal axis represents the extractability index, and the vertical axis represents the key recycled component number, component category, and storage location number. The two dashed lines represent the first extractability threshold (0.45) and the second extractability threshold (0.70), used to classify key recycled components into difficult-to-extract, requiring intervention, and easy-to-extract states. (See Table 1 and...) Figure 3It can be seen that the extractability index of compressor PT-000001 and control motherboard PT-000005 are both below the first extractability threshold, indicating a difficult-to-extract state. This suggests that the subsequent material interference in their respective storage locations is strong, requiring extensive cleaning operations before extraction, and is prone to positioning difficulties and extraction delays. The extractability index of copper pipe assembly PT-000002 and compressor PT-000004 is between the first and second extractability thresholds, indicating a state requiring intervention. This means that extraction is still possible, but there is already some weight interference, removal interference, or retention impact. Continuous monitoring is needed, and they should be prioritized for transfer if the retention impact further increases. The extractability index of motor PT-000003 is above the second extractability threshold, indicating an easy-to-extract state. This suggests that the storage location interference for this component is relatively small, and it can be processed according to the normal flow strategy. Overall, it can intuitively reflect the differences in the extractability status of key recycled components, and show that the larger the cumulative weight of subsequent coverage, the cumulative number of subsequent coverage, and the temporary storage duration, the lower the extractability index is usually, thus providing a visual basis for the generation of strategies for warehouse clearing, restricted warehousing, priority transfer, and normal circulation.
[0043] In this implementation plan, the cumulative weight of subsequent covering, the cumulative number of subsequent coverings, and the duration of temporary storage in the storage location of key recycled components are converted into the degree of weight interference, the degree of removal interference, and the impact of storage. This is further mapped to obtain an extractability index, which can quantitatively reflect the ease or difficulty of extracting key recycled components in the current storage location. This makes the determination of the status of subsequent difficult extraction, requiring intervention, and easy extraction more accurate, and provides a reliable basis for storage location clearing, restricting warehousing, and prioritizing transfer.
[0044] Specifically, the process of identifying the corresponding extractable status based on the assessment results and generating an extractable status marker is as follows: The extractable index is compared with a first extractable threshold and a second extractable threshold. The first extractable threshold is less than the second extractable threshold. Both thresholds can be pre-set based on historical key recycled component extraction records, average on-site extraction time, and the dismantling company's requirements for the turnover management of key recycled components. The smaller the extractable index, the more difficult it is to quickly locate and extract the corresponding key recycled component under the current storage location number. When the extractable index is less than or equal to the first extractable threshold, the corresponding key recycled component to be assessed is marked as difficult to extract. This difficult-to-extract status indicates that the corresponding key recycled component is significantly affected by subsequent material interference and retention, requiring triggering location clearing and restricted warehousing in subsequent collaborative management. When the extractable index is greater than the first extractable threshold and less than or equal to the second extractable threshold, the corresponding key recycled component to be assessed is marked as pending intervention. This pending intervention status indicates that the corresponding key recycled component meets the extraction conditions but is subject to certain interference, requiring a determination of whether to enter priority transfer processing based on the retention impact value. When the extractability index exceeds the second extractability threshold, the corresponding key recycled component record to be evaluated is marked as easily extractable. This easily extractable status indicates that the corresponding key recycled component experiences minimal extraction interference under its current storage location number and can continue to be managed according to the normal flow strategy. The retention impact value, weight interference level value, removal interference level value, extraction obstacle value, extractability index, and extractability status mark corresponding to the key recycled component record are associated and stored to form a key recycled component extractability assessment record. This key recycled component extractability assessment record is also associated with the corresponding component number, component category number, temporary storage area number, and storage location number and written into the home appliance dismantling control database for subsequent determination of priority intervention component records and generation of material flow collaborative control strategies.
[0045] In this implementation plan, by dividing the extractability index into three categories—difficult to extract, requiring intervention, and easy to extract—it is possible to clearly distinguish the on-site extraction difficulty of different key recycled components. The assessment results are then linked and stored with the component location and status information, providing a clear basis for subsequent cargo space clearing, priority transfer, and normal circulation strategies.
[0046] Specifically, the process of determining priority intervention component records based on retrieval status markers and generating normal flow strategies for key recycling components that do not belong to priority intervention component records is as follows: The retrieval feasibility assessment record for key recycling components is read. This record includes at least the component number, component category number, temporary storage area number, storage location number, retention impact value, weight interference level value, removal interference level value, retrieval obstacle value, retrieval index, and retrieval status marker corresponding to the key recycling component record to be assessed. This is used to determine whether the corresponding key recycling component needs to enter the collaborative control intervention process. When the retrieval status marker is "difficult to retrieve," the corresponding key recycling component record to be assessed is determined as a priority intervention component record. The "difficult to retrieve" status indicates that the corresponding key recycling component is currently experiencing significant weight interference, removal interference, and retention impacts, requiring priority for location clearing, warehousing restrictions, and transfer processing. When the extractable status is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding key recycling component record to be evaluated is identified as a priority intervention component record. The retention intervention threshold is pre-set based on the normal turnover requirements of key recycling components, and the retention intervention threshold is less than or equal to one. When the retention impact value is greater than the retention intervention threshold, it indicates that although the corresponding key recycling component is in a pending intervention state, its temporary storage time has approached or exceeded the intervention range set by the enterprise, and it needs to be included in priority transfer management in advance. All others are not recorded as priority intervention component records. These include key recycling component records to be evaluated that are marked as easily extractable, and key recycling component records to be evaluated that are marked as pending intervention but whose retention impact value is less than or equal to the retention intervention threshold. Key recycling component records to be evaluated that are easily extractable are excluded from the priority intervention component record because these components are currently subject to less weight interference, removal interference, and retention impact, and can be executed according to the normal flow strategy without occupying storage space for cleaning and priority transfer resources. Records of key recyclable components awaiting intervention but with a retention impact value less than or equal to the retention intervention threshold are excluded from the priority intervention component record. This is because while these components present some extraction interference, their temporary storage time has not yet reached the level requiring early intervention. Monitoring can continue according to the established transfer plan, combined with periodic reviews. This exclusion rule avoids indiscriminate intervention on all key recyclable components, reduces unnecessary location adjustments and transfer scheduling, and improves the efficiency of collaborative management resources. For key recyclable component records not recorded as priority intervention components, a normal flow strategy is generated. This strategy includes: maintaining the current storage location number, allowing new dismantled components to continue to be allocated to the corresponding storage location number, and executing component transfer according to the established transfer plan. Continuous monitoring of the subsequent cumulative weight, subsequent cumulative number of coverages, and temporary storage duration of the corresponding key recyclable components is also conducted.The predetermined transfer plan refers to the batch transfer plans generated in the transfer scheduling terminal that have not yet been completed. These plans are pre-generated based on the dismantling company's daily transfer shifts, internal logistics vehicle arrangements, the disposal company's receiving plan, and the outbound sequence from the temporary storage area. Each predetermined transfer plan includes at least a plan number, plan execution time, temporary storage area number, component category, and plan status. The normal circulation strategy does not change the transfer sequence and execution time in the predetermined transfer plan; it only maintains the transfer of the corresponding key recycled components according to the predetermined plan. When a priority transfer strategy is subsequently generated, it is used to insert the transfer task of the corresponding key recycled component into the queue of unexecuted transfer tasks, with a higher execution priority than the predetermined transfer plan corresponding to the normal circulation strategy. Continuous monitoring refers to rereading the subsequent cumulative weight, subsequent cumulative number of times, and temporary storage duration of the corresponding key recycled component when new components are received or transferred out under the same storage location number, and updating the extractability assessment record of the corresponding key recycled component.
[0047] This implementation plan can screen key recycling components that require priority intervention based on their extractability and retention impact, and perform normal circulation management on components that do not require intervention, thereby avoiding indiscriminate scheduling, improving the accuracy of intervention target identification, and ensuring a more orderly process for the temporary storage, transfer, and continuous monitoring of key recycling components.
[0048] Specifically, the process of generating corresponding location clearing strategies and restricted entry strategies for priority intervention component records is as follows: For priority intervention component records in a difficult-to-retrieve state, based on the corresponding storage location number, the process reads the component flow records under the same storage location number whose entry timestamp is later than the entry timestamp of the corresponding priority intervention component record and whose transfer timestamp is empty, generating a preliminary clearing component list. This preliminary clearing component list records subsequent entering components that may require priority screening, movement, or sorting before the retrieval of the corresponding key recovery component. The preliminary clearing component list includes at least the component number, component category number, component weight, entry timestamp, and storage location number of the subsequent entering component, so that on-site personnel can clear the location according to the list. The subsequent entering components in the preliminary clearing component list are sorted from latest to earliest entry timestamp to generate a clearing order, allowing on-site personnel to prioritize the processing of the latest-entering components that are more likely to be located on the outer or upper levels, gradually restoring the retrieval channel for the corresponding key recovery component. After the preliminary cleaning component list is generated, it is simultaneously output to the dismantling site management terminal. The dismantling site management terminal displays the component number, component category number, component weight, warehousing timestamp, and storage location number of the corresponding subsequent incoming components in the cleaning order. When on-site personnel complete the movement, sorting, or transfer of the corresponding subsequent incoming components, they submit a cleaning completion confirmation message through the dismantling site management terminal. The cleaning completion confirmation message includes at least the component number that has been cleaned, the confirmation time, and the operator's identifier. Upon receiving the cleaning completion confirmation message, the status of the corresponding component in the preliminary cleaning component list is updated to "cleaned". When all components in the corresponding preliminary cleaning component list are updated to "cleaned", the corresponding storage location cleaning strategy is marked as "completed". During the execution of the storage location cleaning strategy, if the corresponding component has been transferred out of the warehouse and a transfer timestamp has been written, the component is automatically removed from the preliminary cleaning component list or updated to "transferred". The dismantling site management terminal synchronizes the status changes of the preliminary cleaning component list in real time to ensure that the on-site cleaning order is consistent with the actual status of the current storage location. When the retrieval status of a priority intervention component is marked as "difficult to retrieve," or when the retrieval status is marked as "pending intervention" and the retention impact value exceeds the retention intervention threshold, the corresponding storage location number is marked as "restricted entry," and a restricted entry strategy is generated. The "difficult to retrieve" status indicates that the corresponding key recovery component is currently experiencing a high degree of interference from subsequent entering components. Continuing to allocate new dismantling components to the same storage location number will further increase the difficulty of retrieving the key recovery component. The "pending intervention" status, with the retention impact value exceeding the retention intervention threshold, indicates that although the corresponding key recovery component still meets the retrieval conditions, the temporary storage time has reached the priority intervention condition. Continuing to allocate new dismantling components to the same storage location number before completing priority transfer may further increase the cumulative weight and cumulative number of subsequent coverages.Therefore, warehousing control is applied to the storage location numbers corresponding to the two types of priority intervention component records. When the retrieval status of a priority intervention component record is marked as difficult to retrieve, a storage location retrieval strategy is generated based on the list of components to be cleared. This strategy includes the corresponding key recovery component number, the list of components to be cleared, and the corresponding storage location number. The strategy instructs the dismantling site management terminal or temporary storage area management terminal to output the storage locations to be cleared, the key recovery components to be retrieved, and the components to be cleared that require prior processing. After on-site personnel complete the retrieval or transfer of the corresponding key recovery components according to the list of components to be cleared, the retrieval or transfer operation is then performed. The restricted storage policy includes the restricted storage location number and the restricted storage start time. This prevents new disassembled parts from being assigned to the corresponding storage location number before the transfer of the corresponding key recycled parts is completed. The restricted storage start time is the time when the corresponding storage location number is marked as restricted. After the restricted storage policy is written into the temporary storage area management terminal, when new disassembled parts are assigned to storage locations, the temporary storage area management terminal will exclude storage location numbers in the restricted storage status from the set of allocable locations. When the restricted storage policy takes effect, if a new disassembled part needs to be assigned to a storage location number in the restricted storage status, the new disassembled part will be assigned to a storage location within the same temporary storage area that is not in the restricted storage status. A storage location within the same temporary storage area that is not currently marked as restricted and is allowed to receive new disassembled parts. When multiple storage location numbers within the same temporary storage area are not under restricted entry status, the temporary storage area management terminal prioritizes the storage location number whose remaining available capacity meets the storage requirements of the currently disassembled parts. Among the multiple storage location numbers that meet the remaining available capacity requirements, priority is given to the storage location number that has already stored disassembled parts of the same type or the same disassembly batch number. If multiple storage location numbers still meet the conditions, priority is given to the storage location number that is in the same temporary storage area as the originally planned storage location number and is the closest in distance, in order to reduce the impact of storage location adjustments on subsequent transfer operations and on-site logistics routes. The remaining available capacity is determined based on the design capacity of the storage location corresponding to the storage location number and the cumulative weight of the currently stored parts; the storage location distance is determined based on the pre-established storage location layout information within the same temporary storage area. By prioritizing storage location numbers that meet the capacity requirements, have similar part types, and are close in distance, it is possible to avoid newly disassembled parts re-entering storage locations with the risk of retrieval of key recycled parts, while also reducing the impact of storage location adjustments on subsequent transfer plans. If there are no storage location numbers in the same temporary storage area that are not under restricted entry status, a temporary storage area allocation prompt will be output.The temporary storage area allocation prompt includes at least the part number to be allocated, the current temporary storage area number, the original intended storage location number, and the reason for allocation. This prompts management personnel to allocate newly added disassembled parts to other temporary storage areas, or to first complete the clearing of corresponding restricted storage locations and the transfer of key recycled parts. The temporary storage area allocation prompt is output to both the temporary storage area management terminal and the disassembly site management terminal. In addition to the part number to be allocated, the current temporary storage area number, the original intended storage location number, and the reason for allocation, the prompt may also include the suggested temporary storage area number, the suggested storage location number, and the prompt generation time. When a temporary storage area allocation prompt is generated, the temporary storage area management terminal triggers a cross-temporary storage area allocation confirmation process. Management personnel confirm the target temporary storage area and target storage location number on the temporary storage area management terminal. After confirmation, the temporary storage area number and storage location number of the corresponding disassembled part are updated according to the confirmation result and written to the home appliance disassembly control database. If the management personnel do not complete the confirmation, the corresponding disassembled part remains in a pending allocation state, and automatic storage location allocation is not performed.
[0049] In this implementation plan, by generating a list of components to be cleaned, a storage location cleaning strategy, and a restricted entry strategy, it is possible to clearly identify the cleaning targets and processing order of key recyclable components that are difficult to extract, and to prevent new disassembled components from entering restricted storage locations. This reduces the difficulty of extracting key recyclable components and improves the efficiency of temporary storage location management and on-site transfer and processing.
[0050] Specifically, the process of generating a priority transfer strategy and coordinating the extraction, temporary storage, and transfer scheduling of key recycled components is as follows: When the extractable status of a priority intervention component is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding key recycled component is added to the next batch of transfer tasks, and a priority transfer strategy is generated. The priority transfer strategy includes the corresponding key recycled component number, component category number, temporary storage area number, storage location number, and transfer trigger time; where the transfer trigger time is the time when the priority transfer strategy is generated; adding the corresponding key recycled component to the next batch of transfer tasks means inserting the transfer task corresponding to the current key recycled component into the unexecuted transfer task queue of the transfer scheduling terminal, so that it will be prioritized for extraction and transfer in the next transfer operation. The next batch of transfer tasks refers to the most recent unexecuted transfer batch that has been generated but not yet started in the current transfer scheduling terminal; transfer batches are generated according to the transfer scheduling cycle pre-set by the dismantling company, and each transfer batch corresponds to a transfer task queue, which records the information of the component to be transferred, the planned execution time, and the batch status. When the conditions for generating a priority transfer strategy are met, the system reads the transfer batch whose status is currently "not executed" after the current time and inserts the corresponding key recovery component into the queue of unexecuted transfer tasks for that batch. If no unexecuted transfer batch exists, the transfer scheduling terminal generates a new transfer batch and writes the corresponding key recovery component into the transfer task queue of that batch. The batch status includes at least three states: pending execution, in execution, and completed. New priority transfer tasks are only allowed to be inserted into transfer batches corresponding to the pending execution state to avoid affecting transfer operations that have already begun. Once the transfer timestamp corresponding to the priority intervention component record is written into the component flow record, it is determined that the corresponding priority intervention component has completed transfer, and the component flow record and the material entry sequence in the storage location are updated. The transfer timestamp is written by the system server when the transfer is confirmed to be out of the warehouse. Updating the component flow record and the material entry sequence in the storage location includes updating the transfer timestamp of the corresponding priority intervention component record from a null value to the transfer confirmation time, so that it is no longer considered as a key recovery component record to be evaluated in subsequent coverage status analysis. Furthermore, the restricted entry status of the corresponding storage location number is lifted only when there are no key recycling components in a difficult-to-retrieve, retrieval, or marked as pending intervention with a retention impact value greater than the retention intervention threshold under the storage location number. Before lifting the restricted entry status, the retrieval feasibility assessment records of key recycling components with empty transfer timestamps under the same storage location number are reread. If there are neither key recycling components marked as difficult to retrieve nor key recycling components marked as pending intervention with a retention impact value greater than the retention intervention threshold, the corresponding storage location number is updated from restricted entry status to retrieval status. If any of the above key recycling components still exist, the restricted entry status of the corresponding storage location number is maintained.The condition for lifting the restriction on key recycled components under the same storage location number is that there are no key recycled components in a difficult-to-retrieve state, and there are no key recycled components in a state requiring intervention, and the retention impact value is greater than the retention intervention threshold. This is because key recycled components in a difficult-to-retrieve state already have a high degree of retrieval obstruction, while key recycled components in a state requiring intervention and with a retention impact value greater than the retention intervention threshold, although still capable of being retrieved, have already reached the priority intervention condition due to their temporary storage time. If the corresponding storage location continues to receive new dismantled components, it may further increase the cumulative weight and number of subsequent coverages, thereby exacerbating the retrieval difficulty of the corresponding key recycled components. Therefore, before both types of key recycled components under the same storage location number have been transferred or no longer meet the corresponding state conditions, the restricted warehousing state of the corresponding storage location number is maintained to avoid further interference from newly added dismantled components. The pre-cleaning component list, storage location cleaning strategy, restricted warehousing strategy, priority transfer strategy, temporary storage area allocation prompts, and normal circulation strategy are associated and stored in the home appliance dismantling management database, and output to the dismantling site management terminal, temporary storage area management terminal, and transfer scheduling terminal. The system comprises three terminals: a dismantling site management terminal for displaying the list of storage locations to be cleaned and the list of components to be cleaned; a temporary storage area management terminal for implementing restrictions on warehousing and adjusting storage location allocation; and a transfer scheduling terminal for receiving and executing priority transfer strategies. By outputting data to their respective terminals, the extraction of key recycled components, control of temporary storage locations, and scheduling of transfer tasks can be synchronously updated based on the same component flow record. Upon receiving the list of components to be cleaned and the storage location cleanup strategy, the dismantling site management terminal performs the necessary checks, moves, sorting, or transfers of the corresponding components according to the list. Once a component is cleaned, on-site personnel submit a cleanup completion confirmation message through the dismantling site management terminal. This confirmation message includes at least the component number, confirmation time, and operator identification. Upon receiving the cleanup completion confirmation message, the corresponding component to be cleaned is updated to a cleaned status. Upon receiving a restricted entry policy, the temporary storage area management terminal updates the corresponding storage location number to a restricted entry status and automatically removes the corresponding storage location number from the set of allocable locations during subsequent location allocation. When location reallocation or cross-temporary storage area transfer occurs, the temporary storage area management terminal writes the adjusted temporary storage area number and storage location number into the corresponding component flow record and simultaneously updates the appliance dismantling control database. Upon receiving a priority transfer policy, the transfer scheduling terminal generates or adjusts transfer tasks for corresponding key recycled components in the queue of unexecuted transfer tasks and updates the execution priority of the corresponding transfer tasks. Once the corresponding key recycled component completes its transfer and is confirmed to be out of storage, the transfer scheduling terminal returns a transfer completion receipt to the system, writes the corresponding transfer timestamp based on the receipt, and updates the component flow record and the material entry sequence within the storage location.After receiving execution feedback information from the dismantling site management terminal, temporary storage area management terminal, and transfer scheduling terminal, the system rereads the component flow records of the corresponding key recycled components, the extractability assessment records of high-value components, and the material entry sequence in the storage location. It also updates the execution status of the corresponding storage location cleaning strategy, restricted entry strategy, and priority transfer strategy, thereby forming a collaborative control closed loop of "strategy generation, terminal execution, status feedback, and data update".
[0051] In this implementation plan, by including key recycled components that are subject to intervention but have a high risk of being stranded in the next batch of priority transfer tasks, and by updating the component flow records and material entry sequence in the storage location simultaneously after the transfer is completed, the long-term stranding of key recycled components can be reduced. At the same time, by reviewing whether there are still difficult-to-extract components in the same storage location before lifting the restrictions on warehousing, the premature resumption of warehousing can be avoided, which would lead to increased interference. This achieves synchronous coordination of key recycled component extraction, storage location management, and transfer scheduling.
[0052] Reference Figure 2 As shown, the second aspect of the present invention provides a collaborative management and control system for home appliance dismantling based on material flow tracking, applied to the aforementioned collaborative management and control method for home appliance dismantling based on material flow tracking. The system includes: a material data acquisition and processing module, used to collect material flow data of dismantled components in real time, preprocess the material flow data, establish component flow records and material entry sequences within storage locations, and identify key recycled components; and a key recycled component analysis module, used to determine whether key recycled components have been transferred out of storage based on material flow data, and for key recycled components that have not been transferred out of storage, analyze the degree of subsequent material interference in the storage location based on the component flow records and material entry sequences within storage locations, and obtain... The system includes several modules: a key recycling component coverage feature module; a key recycling component extraction assessment module, which combines key recycling component coverage features and material flow data to assess the extractability of key recycling components, identify corresponding extractable states based on the assessment results, and generate extractable state markers; and a material flow collaborative management module, which determines priority intervention component records based on extractable state markers, generates normal flow strategies for key recycling components that do not belong to priority intervention component records, generates corresponding location clearing strategies and restricted entry strategies for priority intervention component records, and generates priority transfer strategies to achieve collaborative management of key recycling component extraction, material temporary storage, and transfer scheduling.
[0053] like Figure 4The diagram shows a workflow for collaborative management of home appliance dismantling based on material flow tracking. It illustrates the entire process from identification of key recycled components, coverage status analysis, extractability assessment to the generation of collaborative management strategies. Specifically, it first collects material flow data of dismantled components and completes data preprocessing. Based on this, component flow records and material entry sequences within storage locations are established, forming the basic data for material flow tracking required for subsequent analysis. Then, key recycled components such as compressors, motors, and copper pipe assemblies are identified according to a pre-set key recycled component category table. After identifying key recycled components, it first checks whether the corresponding component's transfer timestamp is empty. When the transfer timestamp is not empty, it indicates that the key recycled component has been transferred out of the warehouse and will no longer participate in subsequent coverage status analysis; when the transfer timestamp is empty, the corresponding component is identified as a key recycled component record to be evaluated and enters the coverage status analysis process. For key recycled components to be evaluated, the situation of subsequently entering components that have not yet been transferred in the same storage location is analyzed based on the material entry sequence within the storage location. This identifies subsequent entering component records and statistically forms the coverage characteristics of key recycled components. The key recycling component coverage characteristics include the cumulative weight of subsequent coverage, the cumulative number of subsequent coverages, and the temporary storage duration, used to characterize the degree of interference and storage status of the key recycling component from subsequent materials. Based on this, an extractability assessment is further performed, converting the coverage characteristics into extraction obstacle values, and obtaining an extractability index through exponential decay mapping to reflect the feasibility of quickly locating and extracting the key recycling component under the current storage conditions. Subsequently, the key recycling component's status is determined according to the extractability index, categorized into three types: difficult to extract, requiring intervention, and easy to extract. Key recycling components determined to be in a difficult-to-extract or requiring intervention state and exceeding the storage threshold are identified as priority intervention components. If the corresponding component is in a difficult-to-extract state, a pre-cleanup component list, a storage location cleanup strategy, and a restricted entry strategy are generated, suspending the allocation of new dismantling components to the corresponding storage location, and reallocating the temporary storage location based on the storage location status. If the corresponding component is in a requiring intervention state and exceeds the storage threshold, a restricted entry strategy and a priority transfer strategy are generated, adding the key recycling component to the next batch of transfer tasks to achieve early transfer processing. For key recycled components deemed easily extractable or requiring intervention but not meeting the conditions for retention intervention, a normal circulation strategy is generated to maintain the existing storage location status and continuously monitor changes in coverage characteristics. Finally, the storage location clearing strategy, restricted entry strategy, priority transfer strategy, normal circulation strategy, and temporary storage area allocation information are output to the dismantling site management terminal, temporary storage area management terminal, and transfer scheduling terminal. This achieves coordinated linkage between key recycled component extraction, temporary storage location management, and transfer scheduling, thereby reducing the risk of key recycled components being covered and retained, improving the turnover efficiency of key recycled components, and enhancing the material flow management level at the dismantling site.In this embodiment, when a disassembled component is registered in the warehouse, new material flow data is received, material flow data preprocessing is triggered, and the corresponding component flow record and material entry sequence in the storage location are updated. When a disassembled component is allocated to a storage location, the temporary storage area number and storage location number of the corresponding component are updated, and the material entry sequence in the corresponding storage location is updated again. When a disassembled component is transferred out of the warehouse and confirmed, the corresponding transfer timestamp is written, and the component flow record and material entry sequence in the storage location are updated. When the component flow record and material entry sequence in the storage location are added, deleted, or updated, the key recycling component coverage status analysis process is triggered; the corresponding key recycling component record is reread, and the subsequent cumulative coverage weight, subsequent cumulative coverage count, and temporary storage duration are updated. When the coverage characteristics of key recycled components change, the extractability assessment process for key recycled components is triggered. The extractability index of the corresponding key recycled component is recalculated, and the extractability status marker is updated, thereby further triggering subsequent material flow collaborative management processes. Based on the current extractability status, normal circulation strategies, location clearing strategies, restricted warehousing strategies, priority transfer strategies, or temporary storage area allocation prompts are automatically generated. Furthermore, to avoid situations where the status of key recycled components cannot be updated due to a lack of new warehousing or transfer events during prolonged periods of residence, a periodic review mechanism can be optionally set. Records of key recycled components with empty transfer timestamps are reread according to a preset review cycle, the corresponding temporary storage duration is updated, and the coverage status analysis, extractability assessment, and material flow collaborative management processes are re-executed. The preset review cycle is preferably 1 to 4 hours.
[0054] In this implementation plan, through modular collaboration of material data collection and processing, key recycled component analysis, extractability assessment and material flow collaborative management, it is possible to achieve continuous tracking and status management of key recycled components from warehousing, temporary storage, extraction to transfer, improve the location and extraction efficiency of key recycled components, reduce the risk of retention caused by temporary storage accumulation, and enhance the synergy of on-site storage location management and transfer scheduling.
[0055] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0056] The preferred embodiments of the present invention disclosed above are merely illustrative of the invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the invention to the specific implementations described. As those skilled in the art will understand, many modifications and variations can be made based on the content of this specification. This specification selects and specifically describes these embodiments to better explain the principles and practical applications of the invention, thereby enabling those skilled in the art to better understand and utilize the invention. The invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for collaborative management and control of home appliance disassembly based on material flow tracking, characterized in that, Includes the following steps: S1 collects material flow data of disassembled parts in real time, preprocesses the material flow data, establishes part flow records and material entry sequence in storage locations, and identifies key recycled parts; S2, based on material flow data, determine whether key recycled components have been transferred out of the warehouse. For key recycled components that have not been transferred out of the warehouse, based on component flow records and material entry sequence in the storage location, analyze the degree of interference from subsequent materials in the storage location to obtain the coverage characteristics of key recycled components. S3, combining the coverage characteristics of key recycling components and material flow data, assesses the extractability of key recycling components, identifies the corresponding extractable status based on the assessment results, and generates an extractable status marker; S4. Based on the extractable status marker, determine the priority intervention component record, generate a normal flow strategy for key recycling components that do not belong to the priority intervention component record, generate the corresponding storage location clearing strategy and restricted entry strategy for the priority intervention component record, and generate a priority transfer strategy to carry out coordinated management and control of key recycling component extraction, material temporary storage and transfer scheduling.
2. The method according to claim 1, wherein, The process of collecting real-time material flow data of disassembled components, preprocessing the material flow data, establishing component flow records and material entry sequences in storage locations, and identifying key recycled components is as follows: Real-time collection of material flow data for each disassembled component. The material flow data includes: disassembly batch number, appliance serial number, component number, component category number, component weight, warehousing timestamp, temporary storage area number, storage location number, and transfer timestamp. The format of each number in the material flow data is standardized, and invalid records with empty component numbers, empty storage location numbers, or empty entry timestamps are deleted. For duplicate material flow data with the same component number, same entry timestamp, and same storage location number, only the record with the latest data reception time is retained. The entry timestamp and transfer timestamp are uniformly converted to the same system clock, and abnormal records with transfer timestamps earlier than entry timestamps are removed. For component weight, abnormal records with component weights exceeding the corresponding rated weighing range are removed. Component flow records are established based on component number, entry timestamp, storage location number, and transfer timestamp, and the component flow records are grouped according to storage location number. Within each group corresponding to storage location number, the records are sorted from earliest to latest by entry timestamp to form a material entry sequence within the storage location. Component category numbers are matched with a preset list of key recycled component categories. When a component category number belongs to the preset list of key recycled component categories, the corresponding component number is marked as a key recycled component. A home appliance dismantling management database is constructed to store the original and pre-processed material flow data.
3. The method according to claim 2, wherein, The specific process for determining whether key recycled components need to be transferred out of the warehouse based on material flow data is as follows: Read the component flow records, material entry sequence in the storage location, and key recycling component markings. Use the component flow records corresponding to the key recycling components as the key recycling component records to be analyzed, and read the corresponding material flow data. For each key component to be analyzed, check if the transfer timestamp is empty. If the transfer timestamp is not empty, it means that the corresponding component has been transferred out of the warehouse, and no overwrite status analysis is performed.
4. The method according to claim 3, wherein, The specific process for analyzing the degree of interference from subsequent materials in the storage location of key recycled components that have not been transferred out of the warehouse, based on component flow records and material entry sequences within the storage location, to obtain the coverage characteristics of key recycled components, is as follows: If the transfer timestamp of the key recycled component record to be analyzed is empty, then the corresponding key recycled component record to be analyzed is identified as the key recycled component record to be evaluated, and coverage status analysis is performed: Based on the storage location number in the key recycled component record to be evaluated, all component flow records corresponding to the same storage location number are read in the material entry sequence within the storage location. Component flow records with an entry timestamp later than the current key recycled component record to be evaluated and with an empty transfer timestamp are identified as subsequent entry component records; the component weights in the subsequent entry component records are summed to obtain the subsequent cumulative coverage weight; the number of subsequent entry component records is counted to obtain the subsequent cumulative coverage count. The temporary storage duration is obtained by calculating the difference between the current time and the warehousing timestamp of the corresponding key recycled component to be evaluated. The cumulative weight of subsequent coverage, the cumulative number of subsequent coverages, and the temporary storage duration of the key recycled components to be evaluated are recorded and stored together to form the coverage characteristics of the key recycled components.
5. The method according to claim 4, wherein, The specific process for assessing the extractability of key recycling components by combining coverage characteristics and material flow data is as follows: Read the material flow data and coverage characteristics of the key recycling components to be evaluated. For the key recycling component record, divide the cumulative weight of subsequent coverage by the component weight of the corresponding key recycling component record to obtain the weight coverage ratio, and use the corresponding cumulative number of subsequent coverages as the number of components to be removed. Calculate the ratio of the temporary storage duration to the preset storage duration benchmark value to obtain the storage impact value, and when the storage impact value is greater than one, limit the storage impact value to one. The weight pressing ratio and the number of parts to be removed were normalized to obtain the weight interference level and the removal interference level. The weighted fusion values of the interference level, the removal interference level, and the retention effect value are used to obtain the extraction obstacle value. The extraction obstacle value is then subjected to exponential decay mapping to obtain the extractable index.
6. The collaborative management and control method for home appliance dismantling based on material flow tracking according to claim 5, characterized in that, The specific process of identifying the corresponding extractable state based on the evaluation results and generating extractable state tags is as follows: The extractable index is compared with a first extractable threshold and a second extractable threshold: when the extractable index is less than or equal to the first extractable threshold, the corresponding key recycling component to be evaluated is marked as difficult to extract; when the extractable index is greater than the first extractable threshold and less than or equal to the second extractable threshold, the corresponding key recycling component to be evaluated is marked as requiring intervention; when the extractable index is greater than the second extractable threshold, the corresponding key recycling component to be evaluated is marked as easy to extract. The retention impact value, weight interference value, removal interference value, extraction obstacle value, extraction index and extraction status mark of the key recycled components to be evaluated are recorded and stored together to form an extraction capability assessment record of key recycled components.
7. The collaborative management and control method for home appliance dismantling based on material flow tracking according to claim 6, characterized in that, The specific process of determining priority intervention component records based on extractable status markers, and generating normal flow strategies for key recycling components that do not belong to priority intervention component records, is as follows: Read the extractability assessment records of key recycling components. When the extractable status is marked as difficult to extract, the corresponding key recycling component record to be assessed is identified as a priority intervention component record. When the extractable status is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding key recycling component record to be assessed is identified as a priority intervention component record. All others are not recorded as priority intervention component records. For key recycling parts that are not recorded as priority intervention parts, a normal circulation strategy is generated. The normal circulation strategy includes: maintaining the current storage location number, allowing new disassembled parts to continue to be allocated to the corresponding storage location number, and carrying out part transfer according to the established transfer plan. The subsequent cumulative weight, subsequent cumulative number of times, and temporary storage duration of the corresponding key recycling parts are continuously monitored.
8. The collaborative management and control method for home appliance dismantling based on material flow tracking according to claim 7, characterized in that, The specific process for generating corresponding location clearing strategies and inbound restriction strategies for priority intervention component records is as follows: For priority intervention component records that are difficult to extract, based on the corresponding storage location number, read the component flow records under the same storage location number in the material entry sequence of the storage location. The entry timestamp of the component is later than the entry timestamp of the corresponding priority intervention component record, and the transfer timestamp is empty. Generate a list of components to be cleaned up in advance. When the retrieval status of a priority intervention component is marked as difficult to retrieve, or when the retrieval status is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding storage location number is marked as restricted entry, and a restricted entry strategy is generated. When the retrieval status of a priority intervention component is marked as difficult to retrieve, a storage location clearance strategy is generated based on the list of components to be cleared. The storage location clearance strategy includes the corresponding key recovery component number, the list of components to be cleared, and the corresponding storage location number. The restricted entry strategy includes the storage location number for which entry is restricted and the restricted entry start time, so that new disassembled components are prohibited from being allocated to the corresponding storage location number before the corresponding key recovery component has been transferred. When the restricted entry policy takes effect, if a new disassembled part needs to be assigned to a storage location number that is under restricted entry, the new disassembled part will be assigned to a storage location in the same temporary storage area that is not under restricted entry; if there is no storage location number in the same temporary storage area that is not under restricted entry, a temporary storage area allocation prompt will be output.
9. The collaborative management and control method for home appliance dismantling based on material flow tracking according to claim 8, characterized in that, The specific process of generating the priority transfer strategy and coordinating the extraction of key recycled components, temporary storage of materials, and transfer scheduling is as follows: When the extractable status of the priority intervention component is marked as pending intervention and the retention impact value is greater than the retention intervention threshold, the corresponding key recovery component will be added to the next batch of transfer tasks, and a priority transfer strategy will be generated. The priority transfer strategy includes the corresponding key recovery component number, component category number, temporary storage area number, storage location number and transfer trigger time. Once the transfer timestamp corresponding to the priority intervention component is written into the component flow record, it is determined that the corresponding priority intervention component has been transferred, and the component flow record and the material entry sequence in the storage location are updated; and only when there are no difficult-to-extract, extractable, or marked as pending intervention components under the storage location number and the retention impact value is greater than the retention intervention threshold, the restriction on the warehousing status of the corresponding storage location number is lifted. The pre-cleaning parts list, storage location cleaning strategy, restricted entry strategy, priority transfer strategy, temporary storage area allocation prompts, and normal circulation strategy are associated and stored in the home appliance dismantling and management database, and output to the dismantling site management terminal, temporary storage area management terminal, and transfer scheduling terminal.
10. A collaborative management and control system for home appliance dismantling based on material flow tracking, characterized in that, include: The material data acquisition and processing module is used to collect material flow data of disassembled parts in real time, preprocess the material flow data, establish part flow records and material entry sequence in the storage location, and identify key recycled parts. The key recycling component analysis module is used to determine whether key recycling components have been transferred out of the warehouse based on material flow data. For key recycling components that have not been transferred out of the warehouse, the module analyzes the degree of interference from subsequent materials in the warehouse location based on the component flow record and the material entry sequence in the warehouse location, and obtains the coverage characteristics of key recycling components. The key recycling component extraction assessment module is used to assess the extractability of key recycling components by combining the coverage characteristics of key recycling components and material flow data, identify the corresponding extractable status based on the assessment results, and generate an extractable status marker. The material flow collaborative management module is used to determine priority intervention component records based on the extractable status markers, generate normal flow strategies for key recycling components that do not belong to priority intervention component records, generate corresponding location clearing strategies and restricted entry strategies for priority intervention component records, and generate priority transfer strategies to carry out collaborative management of key recycling component extraction, material temporary storage and transfer scheduling.
Citation Information
Patent Citations
Material tracking method and material tracking device
CN114239773B
Material tracking management system using electronic label and application thereof
CN115660013A
