A dual-layer optimization configuration method for wind, solar, and energy storage capacity and location in AC / DC power distribution networks

By employing a two-layer optimization configuration method in AC/DC hybrid distribution networks, combined with a green certificate and carbon trading coupling model and a multi-objective particle swarm optimization algorithm, the access location and installed capacity of wind power, photovoltaics, and energy storage are optimized in a coordinated manner. This solves the problem of balancing investment economics and carbon emission reduction effects in existing technologies, achieves precise equipment configuration and low-carbon economic operation, reduces the total system cost, and improves voltage stability.

CN123121874APending Publication Date: 2026-11-17SHANGHAI UNIVERSITY OF ELECTRIC POWER
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611313723.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In AC/DC hybrid distribution networks, existing technologies struggle to balance investment economics with carbon emission reduction, and fail to effectively coordinate and optimize the access locations and installed capacities of wind power, photovoltaics, and energy storage, making it difficult to reconcile voltage security and low-carbon economics.

Method used

A two-layer optimization configuration method is adopted. By constructing a green certificate-carbon trading coupled cost model and combining it with a multi-objective particle swarm optimization algorithm, the access location and installed capacity of wind power, photovoltaic and energy storage are optimized in a coordinated manner. An upper-layer planning model is constructed to minimize investment costs, and a lower-layer operation model is used to optimize the system operation strategy. Voltage vulnerability index and power balance constraints are introduced to achieve precise equipment configuration and low-carbon economic operation.

Benefits of technology

It significantly reduces the total cost of the system throughout its entire life cycle, reduces carbon emissions, improves voltage stability and power quality, and achieves a synergistic closed loop of equipment location and capacity determination and dynamic scheduling, balancing economic benefits with low-carbon emission reduction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121874A_ABST
    Figure CN123121874A_ABST
Patent Text Reader

Abstract

This invention relates to a two-layer optimization configuration method for the capacity and location of wind, solar, and energy storage in AC / DC distribution networks. The method first acquires basic distribution network operation data, distributed equipment parameters, and external market transaction parameters. Then, it constructs a green certificate-carbon trading coupled cost model and voltage vulnerability indicators. Next, it builds an upper-layer planning model to determine the access location and capacity of wind, solar, and energy storage, and a lower-layer operation model to optimize operational strategies such as power purchase, wind and solar curtailment, and converter and energy storage charging and discharging. Finally, it uses a multi-objective particle swarm optimization algorithm for a two-layer iterative solution, outputting a configuration scheme and operation strategy that balances economy, low carbon emissions, and voltage security. Compared with existing technologies, this invention overcomes the limitations of a single market mechanism, achieves coordinated optimization of planning and operation, reduces total system cost, and significantly reduces carbon emissions while ensuring voltage quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the fields of electrical engineering and power distribution network optimization operation technology, and in particular to a two-layer optimization configuration method for the capacity and location of wind, solar and energy storage in AC and DC power distribution networks. Background Technology

[0002] Against the backdrop of rapid development in new energy power generation, the scale of wind power, photovoltaic power, DC charging stations for electric vehicles, and energy storage devices connected to the distribution side continues to increase. Compared with traditional AC distribution networks, AC / DC hybrid distribution networks can more flexibly accommodate DC power sources, DC loads, and energy storage devices, reduce unnecessary power conversion links, and improve the absorption capacity of new energy sources, thus becoming an important development direction for future power distribution systems.

[0003] However, wind and solar power output is random, volatile, and intermittent, resulting in a spatiotemporal mismatch between their output curves and load demand. When large-scale wind and solar resources are integrated into a hybrid AC / DC distribution network, the system may experience increased node voltage deviations, line power flow fluctuations, increased power exchange with the upstream grid, and wind and solar curtailment. Energy storage devices can suppress wind and solar power output fluctuations through charge and discharge levels, but excessive storage capacity significantly increases investment and operation and maintenance costs; insufficient capacity makes it difficult to improve voltage quality and the absorption of new energy sources. Therefore, rationally determining the integration locations, installed capacities, and operating strategies for wind, solar, and energy storage in a hybrid AC / DC distribution network is a key issue for achieving economical and reliable operation of the distribution network.

[0004] Existing research on wind, solar, and energy storage configurations primarily focuses on investment costs, grid losses, or renewable energy absorption rates, with some studies considering low-carbon policy tools such as carbon trading or green certificates. However, a single market mechanism often struggles to simultaneously balance investment economics and carbon reduction effects. Considering only carbon trading may lead to excessively high energy storage configurations and investment pressures, while focusing solely on green certificate trading may reduce initial investment but result in excessively high carbon emissions. Furthermore, existing research does not adequately consider evaluation indicators such as converter power coupling in AC / DC hybrid distribution networks, DC regional power balance, and voltage vulnerability, making it difficult to achieve a balance between voltage safety and low-carbon economics in the resulting configuration schemes.

[0005] Patent application CN121440692A proposes a method for optimizing the energy storage configuration of AC / DC hybrid distribution networks, taking into account carbon trading mechanisms. The method includes the following steps: constructing a mathematical model of the carbon trading mechanism for AC / DC hybrid distribution networks; establishing a two-level programming model for energy storage in AC / DC hybrid distribution networks based on the carbon trading mechanism mathematical model; and applying an improved multi-objective particle swarm optimization algorithm with chaotic initialization to solve the two-level programming model. However, considering only a single carbon trading mechanism and optimizing only the energy storage configuration not only lacks the positive incentive for renewable energy consumption through green certificate trading, easily leading to over-configuration of energy storage and high investment costs, but also fails to achieve coordinated site selection and capacity optimization of wind power, photovoltaics, and energy storage. Summary of the Invention

[0006] The purpose of this invention is to overcome the shortcomings of the existing technology and provide a two-layer optimization configuration method for the capacity and location of wind, solar and energy storage in AC / DC distribution networks, which, under the premise of meeting the operational constraints and voltage security of AC / DC hybrid distribution networks, achieves precise configuration and low-carbon economic operation of wind, solar and energy storage equipment, significantly reduces the total cost of the system's entire life cycle and reduces carbon emissions.

[0007] The objective of this invention can be achieved through the following technical solutions: A two-tiered optimization method for the allocation of wind, solar, and storage capacity and location in AC / DC power distribution networks includes: Acquire basic operational data, distributed equipment parameters, and external market transaction parameters for AC / DC hybrid distribution networks; A green certificate-carbon trading coupling cost model is constructed based on the external market trading parameters, and a voltage vulnerability index is constructed based on the basic operating data. A wind-solar-storage upper-level planning model is constructed with the objective function of minimizing the sum of annualized investment costs of wind power, photovoltaics, and energy storage. The access location and installed capacity of wind power, photovoltaics, and energy storage are set as upper-level decision variables. Access location constraints and installed capacity constraints are set to limit the site selection and capacity boundaries of each device. A wind-solar-storage lower-layer operation model is constructed with the objective function of minimizing the sum of system operating cost, the voltage vulnerability index, and the green certificate-carbon trading coupling cost. The power purchase, wind and solar curtailment, converter transmission power, and energy storage charging and discharging power are set as lower-layer decision variables to regulate the power flow and equipment output status of the system. By setting AC / DC power balance constraints, voltage and current constraints, wind and solar output constraints, converter constraints, and energy storage operation constraints, the safety boundaries of grid power flow transmission and equipment operation are limited. Based on the acquired data and parameters, the upper-level decision variables are encoded as particles and the particle swarm is initialized. The lower-level operating model is solved using a multi-objective particle swarm optimization algorithm to obtain the lower-level operating Pareto solution set. The lower-level operating Pareto solution set is fed back to the upper-level planning model to calculate the particle fitness. The upper-level decision variables are iteratively updated using a particle swarm optimization algorithm. When the convergence condition is met, the access nodes, installed capacity, and system operation strategies for wind power, photovoltaics, and energy storage are output.

[0008] Furthermore, the external market trading parameters include green certificate trading parameters, carbon trading parameters, electricity purchase price, unit wind and solar curtailment penalty coefficient, and unit equipment operating cost; the green certificate-carbon trading coupling cost model includes green certificate trading costs and carbon trading costs, calculated using the following formula: in, Indicates the transaction cost of green certificates. Indicates carbon trading costs; Indicates the green certificate transaction coefficient; express Time-of-use load power; express Forecasted wind power output for the specified time period; express Forecasted photovoltaic power output for the specified time period; Indicates the benchmark price for carbon trading; This represents the carbon emission factor per unit of electricity purchased from the upper-level power grid. express Power purchased from the upper-level power grid during the specified time period; Indicates carbon emission allowance per unit load; This represents the total cost of the green certificate-carbon trading coupling.

[0009] Furthermore, the basic operating data includes the network topology, branch parameters, load power, wind power forecast power, and photovoltaic power forecast power of the AC / DC hybrid distribution network; The process of constructing the voltage vulnerability index is as follows: in, An indicator of overall voltage vulnerability. N S Indicates the number of nodes; Indicates the node in time period t The voltage; express Average node voltage over a given period; Indicates the maximum permissible voltage deviation; v i,t Represents a node exist Voltage deviation before normalization during the time period V i,t This represents the normalized node voltage vulnerability index. and These represent the maximum and minimum values ​​of the node voltage deviation index before normalization, respectively.

[0010] Furthermore, the distributed equipment parameters include wind power generation equipment parameters, photovoltaic power generation equipment parameters, energy storage equipment parameters, and converter parameters; In the objective function of the wind-solar-storage upper-layer planning model, the annualized investment costs of wind power, photovoltaics, and energy storage are the products of the unit capacity investment cost, installed capacity, and capital recovery coefficient of the corresponding equipment, respectively. The unit capacity investment cost and installed capacity are respectively attributed to the parameters of the wind power equipment, photovoltaic equipment, and energy storage equipment, and the capital recovery coefficient is calculated based on the discount rate and the service life of the equipment in the parameters of the wind power equipment, photovoltaic equipment, and energy storage equipment.

[0011] Furthermore, the access location constraints are as follows: the wind power access node, the photovoltaic access node, and the energy storage access node are all located within the set of selectable nodes of the AC / DC hybrid distribution network determined by the network topology, and the wind power access node, the photovoltaic access node, and the energy storage access node do not overlap with the upstream grid access node, and the wind power access node, the photovoltaic access node, and the energy storage access node are different from each other.

[0012] Furthermore, the installed capacity constraints are as follows: the wind power installed capacity is located between the lower and upper limits of the wind power installed capacity specified by the wind power generation equipment parameters; the photovoltaic installed capacity is located between the lower and upper limits of the photovoltaic installed capacity specified by the photovoltaic generation equipment parameters; and the energy storage installed capacity is located between the lower and upper limits of the energy storage installed capacity specified by the energy storage equipment parameters.

[0013] Furthermore, the system operating costs include electricity purchase and equipment operating costs, grid loss costs, and wind and solar curtailment costs; The electricity purchase and equipment operating costs are obtained by multiplying the electricity purchase power, wind power output, photovoltaic power output, and energy storage output power for each time period by the electricity purchase price and the corresponding unit operating cost of the equipment, and then summing the results. The network loss cost is the product of the system network loss obtained by solving the lower-level operation model and the electricity purchase price; The cost of wind and solar curtailment is the product of the unit wind and solar curtailment penalty coefficient and the total amount of wind and solar curtailment in each time period.

[0014] Furthermore, the AC / DC power balance constraint includes AC region power balance constraint and DC region power balance constraint; The AC region power balance constraint, based on the network topology and branch parameters, is used to ensure that the inflow and outflow power, purchased power, wind power, photovoltaic power, energy storage power, AC side power of the converter, and AC load power of the AC side branch meet the node power balance. The DC region power balance constraint, based on the network topology and branch parameters, is used to ensure that the inflow and outflow power of the DC side branches, wind power, photovoltaic power, DC side power of the converter, energy storage power, and DC load power meet the node power balance.

[0015] Furthermore, the converter constraint is that the active power on the AC side of the converter is equal to the active power on the DC side, as defined by the converter parameters. The energy storage operation constraints include constraints on energy storage charging and discharging efficiency, upper and lower limits of charging and discharging power, upper and lower limits of state of charge, and the constraint that the state of charge is consistent between the initial period and the final period, as defined by the parameters of the energy storage device.

[0016] Furthermore, the process of iteratively updating the upper-level decision variables using the particle swarm optimization algorithm, and outputting the access nodes, installed capacity, and system operation strategies for wind power, photovoltaics, and energy storage when convergence conditions are met, specifically includes: The access nodes and installed capacity of wind power, photovoltaics and energy storage are used as upper-level particle codes to initialize the velocity and position of the upper-level particles; Based on the access nodes and installed capacity determined by the current upper-layer particles, the input parameters of the lower-layer operation model are generated; The lower-level operating model is solved using a multi-objective particle swarm optimization algorithm to obtain a Pareto optimal operating solution set that includes the system operating cost, the voltage vulnerability index, and the green certificate-carbon trading coupling cost. The optimal operating results that satisfy the AC / DC power balance constraint, the voltage and current constraint, the wind and solar power output constraint, the converter constraint, and the energy storage operation constraint in the Pareto optimal operating solution set are fed back to the upper-level planning model to calculate the comprehensive fitness of the upper-level particles. Update the velocity and position of upper-level particles based on the individual particle's best historical position and the global best historical position; Repeat the above update operation. The specific way to determine whether the convergence condition is met is as follows: when the number of iterations reaches the preset maximum number of iterations, or when the change in the global optimal fitness is less than the preset threshold in a consecutive preset number of iterations, stop the iterative update and output the optimal access node, optimal installed capacity, energy storage charging and discharging strategy, converter transmission power, purchased power and curtailed wind and solar power for wind power, photovoltaic and energy storage.

[0017] Compared with the prior art, the present invention has the following beneficial effects: 1. Balancing low-carbon emission reduction with economic benefits: By using a cost model that couples green certificates and carbon trading, lower-level operations are constrained. The green certificate mechanism incentivizes the clean consumption of wind and solar power, while the carbon trading mechanism restricts carbon emissions from purchased electricity. This effectively overcomes the shortcomings of a single market mechanism that leads to over-configuration of energy storage or insufficient carbon reduction. It significantly reduces system carbon emissions while lowering the total investment and operating costs of the distribution network.

[0018] 2. Achieve precise equipment configuration and optimal economic efficiency throughout the entire lifecycle: A two-layer model of upper-level planning and lower-level operation is adopted for bidirectional iterative solution to achieve a collaborative closed loop of equipment location and capacity determination and dynamic scheduling strategies; the upper layer dynamically optimizes capacity configuration based on the operational feedback from the lower layer, avoiding redundant configuration of energy storage and distributed power sources, and achieving global economic optimization of system investment and real-time operation scheduling throughout the entire lifecycle.

[0019] 3. Improve voltage stability and power quality: The voltage vulnerability index is introduced as an optimization target into the lower-level operation model and solved in combination with AC / DC power balance, converter and energy storage operation constraints. It actively guides the energy storage throughput and converter power balance, effectively suppresses voltage deviation and power flow impact caused by random fluctuations in wind and solar power output, and significantly improves the power quality of key system nodes and the safety of grid operation.

[0020] 4. Balancing multiple objectives and ensuring global optimality: By using upper-level particle swarm optimization to update the configuration scheme and combining it with lower-level multi-objective particle swarm optimization to output the Pareto optimal solution set, the complex location selection and capacity grading and power flow scheduling are decoupled and solved collaboratively. This balances multiple objectives such as economy, security and low carbon emissions, with fast convergence speed and strong optimization ability, ensuring that the final configuration scheme and operation strategy have engineering feasibility and global optimality. Attached Figure Description

[0021] Figure 1 This is a flowchart of the method of the present invention; Figure 2 This is a schematic diagram of the wind-solar-storage dual-layer optimized configuration model structure of the present invention; Figure 3 Here is the flowchart of the PSO-MOPSO algorithm; Figure 4 Topology diagram of IEEE 33 AC / DC coordination nodes; Figure 5 The configuration result image. Detailed Implementation

[0022] The present invention will now be described in detail with reference to the accompanying drawings and specific embodiments. These embodiments are based on the technical solution of the present invention and provide detailed implementation methods and specific operating procedures. However, the scope of protection of the present invention is not limited to the following embodiments.

[0023] This embodiment provides a two-tiered optimization configuration method for the capacity and location of AC / DC power distribution networks, including wind, solar, and energy storage. Figure 1 As shown, the specific steps are as follows: Acquire basic operational data, distributed equipment parameters, and external market transaction parameters for the AC / DC hybrid distribution network; specifically including the set of AC / DC hybrid distribution network nodes, AC branch set, DC branch set, converter set, branch resistance and reactance, node load, active / reactive power boundaries, wind power forecast power, photovoltaic forecast power, energy storage capacity boundaries, energy storage charging and discharging efficiency, investment cost per unit capacity of wind and photovoltaic power, investment cost per unit capacity of energy storage, equipment lifespan, discount rate, electricity purchase price, wind and solar curtailment penalty coefficient, green certificate trading coefficient, carbon trading benchmark price, electricity purchase carbon emission factor, and load carbon emission quota.

[0024] In one implementation example, the predicted wind power and photovoltaic power can be obtained from historical wind speed, irradiance, temperature, and actual power generation data through a prediction model. This prediction model is not a necessary limitation of the invention, as long as it can provide the time-series predicted wind and photovoltaic power required by the underlying operating model.

[0025] A green certificate-carbon trading coupling cost model is constructed based on the external market trading parameters, and a voltage vulnerability index is constructed based on the basic operating data. A wind-solar-storage upper-level planning model is constructed with the objective function of minimizing the sum of annualized investment costs of wind power, photovoltaics, and energy storage. The access location and installed capacity of wind power, photovoltaics, and energy storage are set as upper-level decision variables. Access location constraints and installed capacity constraints are set to limit the site selection and capacity boundaries of each device. The upper-level planning model is used to determine the access locations and configuration capacities of wind power, solar power, and energy storage. Its objective function is to minimize the sum of the annualized investment costs of wind power, solar power, and energy storage. , in, , , These represent the annualized investment costs for wind power, solar power, and energy storage, respectively. , , These represent the unit capacity investment costs for wind power, solar power, and energy storage, respectively. , , These represent the installed capacity of wind power, photovoltaic power, and energy storage, respectively. , , These represent the discount rates; , , These represent the service life of the equipment. This represents the capital recovery factor for device x. This objective function can convert the initial investment of different devices into annualized investment costs, thus facilitating interaction with the operational layer.

[0026] The access location constraints of the upper-level planning model are: in, , , These represent the access nodes for wind power, solar power, and energy storage, respectively. Indicates the upstream power grid access node; This represents the set of optional nodes in a hybrid AC / DC distribution network; the above constraints are used to avoid connecting wind power, photovoltaics, and energy storage to the upstream grid connection point, while also avoiding duplicate configuration of multiple devices at the same node.

[0027] The installed capacity constraint of the upper-level planning model is: Installed capacity constraints are used to limit the installed capacity of equipment to within the allowable range of the project. , , These represent the installed capacity of wind power, photovoltaic power, and energy storage, respectively. and These represent the lower and upper limits of the installed capacity of the corresponding equipment, respectively.

[0028] like Figure 2 As shown, the upper-level planning model passes candidate access nodes and capacity schemes to the lower-level operation model; the lower-level operation model optimizes the operation strategy under a given configuration scheme and feeds back the operation cost, voltage vulnerability and green certificate-carbon trading cost to the upper level.

[0029] A wind-solar-storage lower-layer operation model is constructed with the objective function of minimizing the sum of system operating cost, the voltage vulnerability index, and the green certificate-carbon trading coupling cost. The power purchase, wind and solar curtailment, converter transmission power, and energy storage charging and discharging power are set as lower-layer decision variables to regulate the power flow and equipment output status of the system. By setting AC / DC power balance constraints, voltage and current constraints, wind and solar output constraints, converter constraints, and energy storage operation constraints, the safety boundaries of grid power flow transmission and equipment operation are limited. The objective function of the lower-level running model is as follows: in, Indicates system operating costs. Indicators of voltage vulnerability This indicates the cost of coupling green certificates and carbon trading.

[0030] System operating costs include electricity purchase and equipment operating costs, grid loss costs, and wind and solar curtailment costs. in, This represents the total operating cost of the system. This indicates the cost of electricity purchase and equipment operation. Indicates network loss cost, This indicates the cost of curtailing wind and solar power. Indicates the total number of time periods; express Unit electricity purchase cost during the time period; express Power purchased during specific time periods; , and These represent the unit operating costs of wind power, solar power, and energy storage, respectively. , and They represent Wind power output, photovoltaic power output, and energy storage output power during different time periods; This represents the unit network loss cost coefficient; express Time-of-day branch The current; Indicates the branch resistance; This represents the unit penalty coefficient for wind and solar power curtailment; and They represent Wind curtailment power and solar curtailment power during specific time periods.

[0031] Voltage vulnerability index is constructed using the voltage deviation at each node: in, An indicator of overall voltage vulnerability. N S Indicates the number of nodes; Indicates the node in time period t The voltage; express Average node voltage over a given period; Indicates the maximum permissible voltage deviation; v i,t Represents a node exist Voltage deviation before normalization during the time period V i,t This represents the normalized node voltage vulnerability index. and These represent the maximum and minimum values ​​of the node voltage deviation index before normalization, respectively.

[0032] This index can characterize the degree to which the voltage at each node deviates from the system average level, and the influence of dimensions is eliminated through normalization.

[0033] The cost of green certificate-carbon trading coupling consists of green certificate trading costs and carbon trading costs: in, Indicates the transaction cost of green certificates. Indicates carbon trading costs; Indicates the green certificate transaction coefficient; express Time-of-use load power; express Forecasted wind power output for the specified time period; express Forecasted photovoltaic power output for the specified time period; Indicates the benchmark price for carbon trading; This represents the carbon emission factor per unit of electricity purchased from the upper-level power grid. express Power purchased from the upper-level power grid during the specified time period; Indicates carbon emission allowance per unit load; This represents the total cost of the green certificate-carbon trading coupling.

[0034] In this model, the green certificate trading mechanism encourages increased wind and solar power output, while the carbon trading mechanism constrains carbon emissions from purchasing electricity from the upper-level grid. The coupling of the two can guide the system to achieve a balance between rational energy storage configuration and lower carbon emissions.

[0035] Lower-level operational model constraints: The AC / DC power balance constraints include AC region power balance constraints and DC region power balance constraints. The AC region power balance constraints ensure that the inflow and outflow power of AC-side branches, purchased power, wind power, photovoltaic power, energy storage power, AC-side power of converters, and AC load power satisfy node power balance. The DC region power balance constraints ensure that the inflow and outflow power of DC-side branches, wind power, photovoltaic power, DC-side power of converters, energy storage power, and DC load power satisfy node power balance. The specific formula is as follows: in, This represents the set of parent nodes of node i. This represents the set of branch terminal nodes starting from node i; Representing nodes respectively The adjacent nodes, and Representing inflow and outflow nodes respectively. The active power of the AC branch; and Representing inflow and outflow nodes respectively. The reactive power of the AC branch; and These represent the active power and reactive power purchased from the upper-level power grid, respectively. , and These represent the power outputs of wind power, photovoltaic power, and energy storage connected to the AC side, respectively. and These represent the active power and reactive power injected into the AC side of the converter, respectively. and These represent the active power and reactive power of the AC-side load, respectively. and Representing inflow and outflow nodes respectively. The active power of the DC branch; , and These represent the wind power, photovoltaic power, and energy storage power connected to the DC side, respectively. This represents the active power injected into the DC side of the converter; Indicates DC load power; This represents the set of DC region branches.

[0036] The voltage and current constraints are as follows: in, express Time period nodes The voltage; and Representing nodes respectively Permissible lower and upper voltage limits; express Time-of-day branch The current; and Representing branch roads The lower and upper limits of the permissible current.

[0037] The output constraints for wind and solar power are: in, and These represent the maximum allowable output values ​​for wind power and solar power, respectively.

[0038] The converter constraints are: in, This represents the set of nodes connected to the converter.

[0039] Energy storage operation constraints are: in, Indicates the energy storage charging and discharging efficiency; and They represent Time period and The remaining power of the time-limited energy storage system; express The charging and discharging power variation of the time-limited energy storage system; express The charging and discharging power of energy storage during a given time period; and These represent the lower and upper limits of the energy storage charging and discharging power, respectively. and They represent Actual electricity consumption and rated installed capacity of energy storage during specific time periods; and These represent the lower and upper limits of the energy storage state of charge, respectively; and These represent the energy storage state of charge at the start and end of the scheduling cycle, respectively.

[0040] The above constraints together ensure that the optimization results meet the power flow characteristics of the AC / DC hybrid distribution network, the energy conservation law of the converter, and the safety requirements for energy storage charging and discharging.

[0041] Based on the acquired data and parameters, the upper-level decision variables are encoded as particles and the particle swarm is initialized. The lower-level operating model is solved using a multi-objective particle swarm optimization algorithm to obtain the lower-level operating Pareto solution set. The lower-level operating Pareto solution set is fed back to the upper-level planning model to calculate the particle fitness. The upper-level decision variables are iteratively updated using a particle swarm optimization algorithm. When the convergence condition is met, the access nodes, installed capacity, and system operation strategies for wind power, photovoltaics, and energy storage are output.

[0042] The specific iterative update process is as follows: First, the particles are encoded according to the upper-level planning variables, with each particle corresponding to a wind power, photovoltaic, and energy storage access node and capacity combination; second, based on the configuration scheme represented by the particle, a corresponding lower-level operation model is established and solved using a multi-objective particle swarm optimization algorithm to obtain the Pareto solution set for system operation cost, voltage vulnerability, and green certificate-carbon trading cost; third, the operation results that satisfy the constraints and have the best comprehensive evaluation in the lower-level Pareto solution set are fed back to the upper level, and the fitness of the particle is calculated; finally, the upper-level particle swarm updates the position and velocity based on individual optimality and global optimality, and enters the next iteration.

[0043] When the number of iterations reaches a preset maximum value, or when the change in the global optimal fitness after several consecutive iterations is less than a preset threshold, the iteration stops, and the optimal access node, installed capacity, energy storage charging and discharging strategies for each time period, converter power, purchased power, and curtailed wind and solar power are output. The specific process is as follows: Figure 3 As shown.

[0044] In one implementation case, an improved IEEE 33-node AC / DC hybrid distribution network can be used as the test system, with the network topology as follows: Figure 4As shown in the figure, the system includes AC lines 1-18 and DC lines 19-22, 23-25, and 26-33. The AC and DC sides are interconnected through converters VSC1, VSC2, and VSC3, respectively. VSC1 connects nodes 2 and 19, VSC2 connects nodes 3 and 23, and VSC3 connects nodes 6 and 26. A micro gas turbine (MT) is connected at node 10. Candidate nodes for wind power, photovoltaics, and energy storage are set as nodes 2 to 33. Maximum installed capacity and upper and lower limits for energy storage SOC are set for each node. Comparisons are made under four scenarios: without introducing market mechanisms, considering only green certificates, considering only carbon trading, and considering both green certificates and carbon trading. By comparing the investment costs, operating costs, voltage vulnerability, and carbon emissions under different scenarios, the comprehensive advantages of the method of this invention in terms of economy, low carbon emissions, and voltage stability can be verified. The results are shown in Table 1.

[0045] Table 1 Configuration schemes and results for each scenario And as Figure 5 As shown, the experimental results demonstrate that when green certificates and carbon trading mechanisms are considered simultaneously, the wind-solar-storage configuration scheme can maintain voltage quality while avoiding excessive energy storage configuration and reducing power exchange with the upper-level grid. Furthermore, by absorbing surplus power when wind and solar output is sufficient and discharging to compensate for load during evening peak hours, the system's reliability and low-carbon economy can be improved.

[0046] The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make numerous modifications and variations based on the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning, or limited experimentation on the basis of existing technology should be within the scope of protection defined by the claims.

Claims

1. A two-tiered optimization method for the capacity and location of wind, solar, and energy storage in AC / DC power distribution networks, characterized in that... include: Acquire basic operational data, distributed equipment parameters, and external market transaction parameters for AC / DC hybrid distribution networks; A green certificate-carbon trading coupling cost model is constructed based on the external market trading parameters, and a voltage vulnerability index is constructed based on the basic operating data. A wind-solar-storage upper-level planning model is constructed with the objective function of minimizing the sum of annualized investment costs of wind power, photovoltaics, and energy storage. The access location and installed capacity of wind power, photovoltaics, and energy storage are set as upper-level decision variables. Access location constraints and installed capacity constraints are set to limit the site selection and capacity boundaries of each device. A wind-solar-storage lower-layer operation model is constructed with the objective function of minimizing the sum of system operating cost, the voltage vulnerability index, and the green certificate-carbon trading coupling cost. The power purchase, wind and solar curtailment, converter transmission power, and energy storage charging and discharging power are set as lower-layer decision variables to regulate the power flow and equipment output status of the system. By setting AC / DC power balance constraints, voltage and current constraints, wind and solar output constraints, converter constraints, and energy storage operation constraints, the safety boundaries of grid power flow transmission and equipment operation are limited. Based on the acquired data and parameters, the upper-level decision variables are encoded as particles and the particle swarm is initialized. The lower-level operating model is solved using a multi-objective particle swarm optimization algorithm to obtain the lower-level operating Pareto solution set. The lower-level operating Pareto solution set is fed back to the upper-level planning model to calculate the particle fitness. The upper-level decision variables are iteratively updated using a particle swarm optimization algorithm. When the convergence condition is met, the access nodes, installed capacity, and system operation strategies for wind power, photovoltaics, and energy storage are output.

2. The method according to claim 1, characterized in that, The external market trading parameters include green certificate trading parameters, carbon trading parameters, electricity purchase price, unit wind and solar curtailment penalty coefficient, and unit equipment operating cost; the green certificate-carbon trading coupling cost model includes green certificate trading costs and carbon trading costs, and the calculation formula is as follows: in, Indicates the transaction cost of green certificates. Indicates carbon trading costs; Indicates the green certificate transaction coefficient; express Time-of-use load power; express Forecasted wind power output for the specified time period; express Forecasted photovoltaic power output for the specified time period; Indicates the benchmark price for carbon trading; This represents the carbon emission factor per unit of electricity purchased from the upper-level power grid. express Power purchased from the upper-level power grid during the specified time period; Indicates carbon emission allowance per unit load; This represents the total cost of the green certificate-carbon trading coupling.

3. The method according to claim 1, characterized in that, The basic operational data includes the network topology, branch parameters, load power, wind power forecast power, and photovoltaic power forecast power of the AC / DC hybrid distribution network; The process of constructing the voltage vulnerability index is as follows: in, An indicator of overall voltage vulnerability. N S Indicates the number of nodes; Indicates the node in time period t The voltage; express Average node voltage over a given period; Indicates the maximum permissible voltage deviation; v i,t Represents a node exist Voltage deviation before normalization during the time period V i,t This represents the normalized node voltage vulnerability index. and These represent the maximum and minimum values ​​of the node voltage deviation index before normalization, respectively.

4. The method according to claim 1, characterized in that, The distributed equipment parameters include wind power generation equipment parameters, photovoltaic power generation equipment parameters, energy storage equipment parameters, and converter parameters; In the objective function of the wind-solar-storage upper-layer planning model, the annualized investment costs of wind power, photovoltaics, and energy storage are the products of the unit capacity investment cost, installed capacity, and capital recovery coefficient of the corresponding equipment, respectively. The unit capacity investment cost and installed capacity are respectively attributed to the parameters of the wind power equipment, photovoltaic equipment, and energy storage equipment, and the capital recovery coefficient is calculated based on the discount rate and the service life of the equipment in the parameters of the wind power equipment, photovoltaic equipment, and energy storage equipment.

5. The method according to claim 3, characterized in that, The access location constraints are as follows: the wind power access node, the photovoltaic access node, and the energy storage access node are all located within the set of selectable nodes of the AC / DC hybrid distribution network determined by the network topology, and the wind power access node, the photovoltaic access node, and the energy storage access node do not overlap with the upstream grid access node, and the wind power access node, the photovoltaic access node, and the energy storage access node are different from each other.

6. The method according to claim 4, characterized in that, The installed capacity constraints are as follows: the wind power installed capacity is between the lower and upper limits of the wind power installed capacity specified by the wind power generation equipment parameters; the photovoltaic installed capacity is between the lower and upper limits of the photovoltaic installed capacity specified by the photovoltaic generation equipment parameters; and the energy storage installed capacity is between the lower and upper limits of the energy storage installed capacity specified by the energy storage equipment parameters.

7. The method according to claim 2, characterized in that, The system operating costs include electricity purchase and equipment operating costs, grid loss costs, and wind and solar curtailment costs. The electricity purchase and equipment operating costs are obtained by multiplying the electricity purchase power, wind power output, photovoltaic power output, and energy storage output power for each time period by the electricity purchase price and the corresponding unit operating cost of the equipment, and then summing the results. The network loss cost is the product of the system network loss obtained by solving the lower-level operation model and the electricity purchase price; The cost of wind and solar curtailment is the product of the unit wind and solar curtailment penalty coefficient and the total amount of wind and solar curtailment in each time period.

8. The method according to claim 3, characterized in that, The AC / DC power balance constraints include AC region power balance constraints and DC region power balance constraints. The AC region power balance constraint, based on the network topology and branch parameters, is used to ensure that the inflow and outflow power, purchased power, wind power, photovoltaic power, energy storage power, AC side power of the converter, and AC load power of the AC side branch meet the node power balance. The DC region power balance constraint, based on the network topology and branch parameters, is used to ensure that the inflow and outflow power of the DC side branches, wind power, photovoltaic power, DC side power of the converter, energy storage power, and DC load power meet the node power balance.

9. The method according to claim 4, characterized in that, The converter constraint is that the active power on the AC side of the converter is equal to the active power on the DC side, as defined by the converter parameters. The energy storage operation constraints include constraints on energy storage charging and discharging efficiency, upper and lower limits of charging and discharging power, upper and lower limits of state of charge, and the constraint that the state of charge is consistent between the initial period and the final period, as defined by the parameters of the energy storage device.

10. The method according to claim 1, characterized in that, The process of iteratively updating the upper-level decision variables using the particle swarm optimization algorithm, and outputting the access nodes, installed capacity, and system operation strategies for wind power, photovoltaics, and energy storage when convergence conditions are met, specifically includes: The access nodes and installed capacity of wind power, photovoltaics and energy storage are used as upper-level particle codes to initialize the velocity and position of the upper-level particles; Based on the access nodes and installed capacity determined by the current upper-layer particles, the input parameters of the lower-layer operation model are generated; The lower-level operating model is solved using a multi-objective particle swarm optimization algorithm to obtain a Pareto optimal operating solution set that includes the system operating cost, the voltage vulnerability index, and the green certificate-carbon trading coupling cost. The optimal operating results that satisfy the AC / DC power balance constraint, the voltage and current constraint, the wind and solar power output constraint, the converter constraint, and the energy storage operation constraint in the Pareto optimal operating solution set are fed back to the upper-level planning model to calculate the comprehensive fitness of the upper-level particles. Update the velocity and position of upper-level particles based on the individual particle's best historical position and the global best historical position; Repeat the above update operation. The specific way to determine whether the convergence condition is met is as follows: when the number of iterations reaches the preset maximum number of iterations, or when the change in the global optimal fitness is less than the preset threshold in a consecutive preset number of iterations, stop the iterative update and output the optimal access node, optimal installed capacity, energy storage charging and discharging strategy, converter transmission power, purchased power and curtailed wind and solar power for wind power, photovoltaic and energy storage.