Perforating device for engineering construction
By designing a drilling device with a lifting mechanism and a dust collection component, the problem of deviation easily caused by workers drilling holes with a hand-held electric drill during the installation of ventilation ducts in underground garages is solved, achieving higher installation accuracy and a cleaner drilling process. .
Patent Information
- Application Number
- CN202323087835.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-16
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-11-16
AI Technical Summary
During the installation of ventilation ducts in underground garages, workers holding electric drills to drill holes can easily cause drilling deviations and affect the installation quality of ventilation ducts.
Design a drilling device for engineering construction, including a lifting mechanism and a drilling mechanism. The motor drives the gear and rack to mesh, and the slide rod rises to the top of the wall to drill holes. A dust collection component is set on the drill bit to collect dust and reduce Deviation and dust scatter caused by hand shaking.
It effectively reduces the drilling deviation caused by hand shaking, ensures the installation accuracy of ventilation ducts, and prevents dust from scattering through the dust collection component, improving the installation quality.
Smart Images

Figure CN221793299U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of punching, in particular to a punching device for engineering construction. Background Art
[0002] Construction engineering refers to the engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. "Buildings" refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, and public activities. In the current construction of residential and commercial buildings, underground garages are generally built at the bottom of the building. In order to ensure the circulation of air in the underground garage, ventilation ducts need to be installed on the roof of the underground garage. The installation of ventilation ducts requires drilling holes in the roof of the garage and then installing the ventilation ducts through expansion screws.
[0003] At present, the drilling of holes in the roof of a low garage mainly relies on workers standing on a stepladder and holding an electric drill to drill holes. Because the drilling angle is upward, it is difficult for workers to hold the electric drill. In addition, if the workers shake their hands during the drilling process, it is easy to cause deviations in the drilling, affecting the installation of the ventilation duct in the later stage. In view of this, we propose a drilling device for engineering construction. Utility Model Content
[0004] The utility model aims to overcome the deficiencies of the prior art, meet practical needs, and provide a drilling device for engineering construction to solve the technical problem that drilling with a hand-held electric drill by installation workers in existing underground garage ventilation ducts is prone to deviation.
[0005] In order to achieve the purpose of the utility model, the technical solution adopted by the utility model is: designing a drilling device for engineering construction, including a base, and a lifting mechanism is provided on the top of the base;
[0006] The lifting mechanism includes a sliding sleeve, which is hollow inside and open at the top and bottom. One end of the sliding sleeve is fixedly connected to the top surface of the base through a support frame. A sliding rod is slidably connected in the sliding sleeve. A through groove is provided on one side of the sliding sleeve. A rack is provided on the sliding rod relative to one side of the through groove. A support plate is fixedly provided on the outer wall of the top of the sliding sleeve. A motor A is fixedly installed on the top surface of the support plate by screws. A gear is provided at the output end of the motor A. One side of the gear is penetrated by the
[0007] Preferably, the punching mechanism includes a mounting plate, a motor B and a drill bit; the mounting plate is fixedly mounted on the top of the sliding rod, the motor B is fixedly mounted on the top surface of the mounting plate through a mounting sleeve, the drill bit is fixedly mounted on the output end of the motor B, and a dust collection assembly is provided on the surface of the drill bit.
[0008] Preferably, the dust collecting assembly includes a collecting bucket, a pressure plate is sleeved on the outer middle part of the collecting bucket, two guide rods are symmetrically provided at both ends of the bottom of the pressure plate, one end of the bottom of the two guide rods is respectively passed through the two ends of the mounting plate, and a spring is sleeved on the surface of the guide rod, and the two ends of the spring are respectively fixedly connected to the pressure plate and the opposite side of the mounting plate.
[0009] Preferably, the collecting barrel is open at the top, and the bottom barrel wall of the collecting barrel is an arc-shaped surface protruding upward. One end of the drill bit is inserted through the bottom barrel wall of the collecting barrel, and the opening end of the collecting barrel and the output end of the drill bit are located at the same horizontal plane.
[0010] Compared with the prior art, the beneficial effects of the utility model are:
[0011] 1. The invention uses a new type of lifting mechanism and drilling mechanism. The motor B drives the drill bit to rotate, and the motor A drives the gear to rotate. The gear and the rack are engaged to drive the slide bar to rise until the drill bit is connected with the wall top surface, so as to drill holes in the basement roof. During the drilling process, workers do not need to hold the electric drill, which effectively reduces the phenomenon that the drilling deviation caused by the shaking of the workers' hands when drilling with the electric drill affects the later installation of the air duct.
[0012] 2. The utility model provides a dust collecting assembly in the punching mechanism. When the drill bit continuously enters the wall, it drives the collecting bucket to continuously move toward the output end of the motor B, drives the pressure plate to compress the spring, and drives the guide rod to slide on the upper limit of the mounting plate. Due to the action of the spring, the opening end of the collecting bucket is always in close contact with the wall to prevent the dust generated by the punching from scattering. The bottom wall of the collecting bucket is in an arc shape protruding upward, which can reduce the dust from flowing out of the gap between the bottom wall of the collecting bucket and the drill bit. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0014] Figure 2 This is a schematic diagram of the cross-sectional structure of the lifting mechanism of the utility model;
[0015] Figure 3 It is a schematic diagram of the cross-sectional structure of the punching mechanism of the utility model.
[0016] In the figure: 1. base; 2. lifting mechanism; 201. sliding sleeve; 2011. through groove; 202. sliding rod; 203. rack; 204. supporting plate; 205. motor A; 206. gear; 3. punching mechanism; 301. mounting plate; 302. motor B; 303. drill bit; 304. dust collection assembly; 3041. collecting bucket; 3042. pressing plate; 3043. guide rod; 3044. spring. DETAILED DESCRIPTION
[0017] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0018] Example:
[0019] This embodiment discloses a drilling device for engineering construction. Figures 1 to 3 , including a base 1, a lifting mechanism 2 and a punching mechanism 3.
[0020] like Figure 1 , Figure 2 As shown, the lifting mechanism 2 is arranged on the top of the base 1.
[0021] Specifically, Figure 1 , Figure 2 As shown, the lifting mechanism 2 includes a sleeve 201, which is hollow inside and open at the top and bottom. One end of the sleeve 201 is fixedly connected to the top surface of the base 1 through a support frame, and a slide rod 202 is slidably connected inside the sleeve 201. A through slot 2011 is provided on one side of the sleeve 201, and a rack 203 is provided on the side of the slide rod 202 relative to the through slot 2011. A support plate 204 is fixedly provided on the top outer wall of the sleeve 201, and a motor A205 is fixedly installed on the top surface of the support plate 204 by screws. A gear 206 is provided at the output end of the motor A205, and one side of the gear 206 is penetrated through the through slot 2011 and meshed with the rack 203. The motor A205 is driven by an external control mechanism to drive the gear 206 to rotate, and the gear 206 meshes with the rack 203 to drive the slide rod 202 or down, thereby transporting the punching mechanism 3 to the height and position where holes need to be punched.
[0022] like Figure 1 , Figure 3 As shown, the punching mechanism 3 is arranged on the top of the slide bar 202 .
[0023] Further, such as Figure 1 , Figure 3 As shown, the drilling mechanism 3 includes a mounting plate 301, a motor B302 and a drill bit 303; the mounting plate 301 is fixedly mounted on the top of the slide rod 202, the motor B302 is fixedly mounted on the top surface of the mounting plate 301 through a mounting sleeve, the drill bit is fixedly mounted on the output end of the motor B302, and a dust collecting component 304 is sleeved on the surface of the drill bit 303; the motor B302 is driven by an external control mechanism, and the motor B302 drives the drill bit 303 to rotate to drill holes on the top of the basement.
[0024] Further, if Figure 1 , Figure 3As shown, the dust collecting component 304 includes a collecting barrel 3041, a pressure plate 3042 is sleeved on the outer middle part of the collecting barrel 3041, and two guide rods 3043 are symmetrically arranged at both ends of the bottom of the pressure plate 3042, and one end of the bottom of the two guide rods 3043 is respectively penetrated at both ends of the mounting plate 301, and a spring 3044 is sleeved on the surface of the guide rod 3043, and the two ends of the spring 3044 are respectively fixedly connected to the pressure plate 3042 and the opposite side of the mounting plate 301. When the output end of the drill bit 303 contacts the wall, the opening end of the collecting barrel 3041 is connected to the wall. When the drill bit 303 continuously enters the wall, it drives the collecting barrel 3041 to continuously move toward the output end of the motor B302, drives the pressure plate 3042 to compress the spring 3044, and at the same time drives the guide rod 3043 to slide on the upper limit of the mounting plate 301. Due to the action of the spring 3044, the opening end of the collecting barrel 3041 is always in close contact with the wall to prevent the dust generated by punching from scattering.
[0025] It is worth noting that if Figure 3 As shown, the collecting barrel 3041 is open at the top, and the bottom barrel wall of the collecting barrel 3041 is an arc-shaped surface protruding upward, so as to reduce the dust from flowing out from the gap between the bottom wall of the collecting barrel 3041 and the drill bit 303.
[0026] It is worth noting that Figure 1 , Figure 3 As shown, one end of the drill bit 303 is inserted through the bottom wall of the collecting barrel 3041 , and the opening end of the collecting barrel 3041 and the output end of the drill bit 303 are located at the same horizontal plane.
[0027] Working principle: When the utility model is used, the whole device is moved to the position directly below the position where a hole needs to be punched, and the motor B302 is driven by the external control mechanism. The motor B302 drives the drill bit 303 to rotate, and the motor A205 is driven by the external control mechanism to drive the gear 206 to rotate. The gear 206 engages with the rack 203 to drive the slide bar 202 to rise until the drill bit 303 is in contact with the top surface of the wall, and the motor A205 is driven by the external control mechanism to make the punching mechanism 3 continue to rise. When the output end of the head 303 contacts the wall, the opening end of the collecting barrel 3041 is in contact with the wall. When the drill bit 303 continuously enters the wall, it drives the collecting barrel 3041 to continuously move toward the output end of the motor B302, drives the pressure plate 3042 to compress the spring 3044, and at the same time drives the guide rod 3043 to slide on the upper limit of the mounting plate 301. Due to the action of the spring 3044, the opening end of the collecting barrel 3041 is always in close contact with the wall to prevent dust generated by punching from scattering.
[0028] The embodiments of the present invention disclose preferred embodiments, but are not limited thereto. A person skilled in the art can easily understand the spirit of the present invention based on the above embodiments and make different extensions and changes. However, as long as they do not deviate from the spirit of the present invention, they are all within the protection scope of the present invention.
Claims
1. A drilling device for construction engineering, characterized in that: It comprises a base (1), wherein a lifting mechanism (2) is provided on the top of the base (1); The lifting mechanism (2) comprises a sliding sleeve (201), the sliding sleeve (201) is hollow inside and open at the top and bottom, one end of the sliding sleeve (201) is fixedly connected to the top surface of the base (1) through a support frame, a sliding rod (202) is slidably connected inside the sliding sleeve (201), a through slot (2011) is provided on one side of the sliding sleeve (201), a rack (203) is provided on the side of the sliding rod (202) relative to the through slot (2011), a support plate (204) is fixedly provided on the top outer wall of the sliding sleeve (201), a motor A (205) is fixedly installed on the top surface of the support plate (204) by screws, a gear (206) is provided at the output end of the motor A (205), one side of the gear (206) is penetrated through the through slot (2011) and meshed with the rack (203), and a punching mechanism (3) is provided on the top of the sliding rod (202).
2. The drilling device for construction engineering as claimed in claim 1, characterized in that: The punching mechanism (3) comprises a mounting plate (301), a motor B (302) and a drill bit (303); the mounting plate (301) is fixedly mounted on the top of the sliding rod (202); the motor B (302) is fixedly mounted on the top surface of the mounting plate (301) via a mounting sleeve; the drill bit (303) is fixedly mounted on the output end of the motor B (302); and a dust collecting component (304) is sleeved on the surface of the drill bit (303).
3. The drilling device for construction engineering according to claim 2, characterized in that: The dust collecting assembly (304) comprises a collecting barrel (3041), a pressing plate (3042) is sleeved on the outside of the middle part of the collecting barrel (3041), two guide rods (3043) are symmetrically arranged at both ends of the bottom of the pressing plate (3042), one end of the bottom of the two guide rods (3043) is respectively passed through the two ends of the mounting plate (301), and a spring (3044) is sleeved on the surface of the guide rod (3043), and the two ends of the spring (3044) are respectively fixedly connected to the pressing plate (3042) and the opposite side of the mounting plate (301).
4. The drilling device for construction engineering as claimed in claim 3, characterized in that: The collecting barrel (3041) is in an open top shape, and the bottom barrel wall of the collecting barrel (3041) is in an upwardly protruding arc shape.
5. The drilling device for construction engineering as claimed in claim 3, characterized in that: One end of the drill bit (303) is inserted through the bottom wall of the collecting barrel (3041), and the opening end of the collecting barrel (3041) and the output end of the drill bit (303) are located on the same horizontal plane.