Sewage treatment system

CN221797242UActive Publication Date: 2024-10-01BEIJING HUAYUAN HENGDA ENVIRONMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420189989.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-10-01
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

The traditional A2O process is difficult to achieve simultaneous and efficient removal of nitrogen and phosphorus under the requirements of high emission standards. There is competition between denitrification and denitrification and anaerobic phosphorus release for carbon sources, interference from nitrates and dissolved oxygen in the return sludge, and low water inflow. The carbon-nitrogen ratio and the problem of reduced nitrification performance at low temperatures in winter.

Method used

Add vertical baffles in the anaerobic zone and/or anoxic zone, extend the process to intercept and screen activated sludge, and set up a sludge return system at intervals between the secondary sedimentation tank and the improved biochemical combination tank to utilize hydrolysis and acidification in the anoxic zone. The small-molecule volatile fatty acids produced undergo anaerobic phosphorus release and anoxic denitrification to improve the interference of nitrate and dissolved oxygen.

Benefits of technology

The effluent water quality is stable and up to standard, the comprehensive operating cost is reduced, filler blockage and secondary investment are avoided, the system operation is simple, and the later costs are low.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221797242U_ABST
    Figure CN221797242U_ABST
Patent Text Reader

Abstract

The embodiment of the utility model provides a sewage treatment system. The water treatment system comprises an improved biochemical combination tank and a secondary sedimentation tank, the improved biochemical combination tank comprises an anaerobic zone, an anoxic zone and an aerobic zone which are sequentially communicated, and a vertical baffle plate is arranged in at least one of the anaerobic zone and the anoxic zone, so that a plurality of vertical baffle reaction chambers connected in series are formed in the anaerobic zone, and / or a plurality of vertical baffle plates are arranged in the anoxic zone. A plurality of vertical baffling reaction chambers which are connected in series are formed in the anoxic zone; the secondary sedimentation tank and the improved biochemical combination tank are arranged at an interval and are communicated with the aerobic zone, the secondary sedimentation tank comprises a water outlet system and a sludge discharge system, the sludge discharge system comprises a sludge return system and a residual sludge discharge system, the sludge return system is used for returning part of sludge to the aerobic zone and the anoxic zone, and the residual sludge discharge system is used for discharging residual sludge. According to the treatment scheme provided by the invention, the effluent quality is stable and reaches the standard under the requirement of high effluent discharge standard, the operation is simple, and the comprehensive operation cost is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of sewage treatment, and in particular to a sewage treatment system. Background Art

[0002] In the context of increasingly stringent requirements for water environment protection, higher requirements are put forward for sewage treatment, especially the continuous improvement of ammonia nitrogen, total nitrogen and total phosphorus emission indicators. Under the high emission standards, the upgrading and transformation of existing sewage treatment plants has become a general trend, and new sewage treatment plants are strictly required to meet the new emission standards. Among the many sewage treatment processes, the A2O process (AAO process, i.e. "anaerobic-anoxic-aerobic" process) has become the most widely used sludge simultaneous nitrogen and phosphorus removal process due to its mature technology, stable operation, simple process, low energy consumption and operating costs. However, due to the competition of denitrification and anaerobic phosphorus release for carbon sources in the traditional A2O process, the interference of nitrate and dissolved oxygen (DO) residual in the return sludge on anaerobic phosphorus release, low carbon-nitrogen ratio (C / N) of the influent, and the decline of nitrification performance at low temperature in winter, it is difficult for the traditional A2O process to achieve simultaneous and efficient removal of nitrogen and phosphorus in the same sewage treatment system, and it cannot meet the current high emission standards. Utility Model Content

[0003] In view of this, an embodiment of the present application provides a sewage treatment system that at least partially solves the problems existing in the prior art.

[0004] The embodiment of the present application provides a sewage treatment system, including a modified biochemical combination tank and a secondary sedimentation tank, wherein the modified biochemical combination tank includes an anaerobic zone, an anoxic zone and an aerobic zone connected in sequence, and a vertical baffle is provided in at least one of the anaerobic zone and the anoxic zone, so that a plurality of vertical baffle reaction chambers connected in series are formed in the anaerobic zone, and / or a plurality of vertical baffle reaction chambers connected in series are formed in the anoxic zone. The secondary sedimentation tank is arranged at intervals from the modified biochemical combination tank and is connected to the aerobic zone, and the secondary sedimentation tank includes an effluent system and a sludge discharge system, and the sewage treated by the modified biochemical combination tank is precipitated and separated in the secondary sedimentation tank to obtain a supernatant and sludge, the supernatant flows to the effluent system, and the sludge enters the sludge discharge system, and the sludge discharge system includes a sludge return system and a residual sludge discharge system, the sludge return system is used to return part of the sludge to the aerobic zone and the anoxic zone, and the residual sludge discharge system is used to discharge the residual sludge.

[0005] According to a specific implementation method of an embodiment of the present application, the improved biochemical combination pool also includes a multi-stage reflux system, which includes: a first reflux from the aerobic zone to the front end of the anoxic zone, a second reflux from the end of the anoxic zone to the front end of the anoxic zone, and a third reflux from the front end of the anoxic zone to the front end of the anaerobic zone.

[0006] According to a specific implementation of an embodiment of the present application, the multi-stage reflux system also includes a driving device, which is used to provide power for the first reflux, the second reflux, and the second reflux.

[0007] According to a specific implementation of the embodiment of the present application, the aerobic zone is provided with a first aeration membrane, and the driving device is connected to the first aeration membrane through an air pipe.

[0008] According to a specific implementation of the embodiment of the present application, an OPR detector is provided in the aerobic zone, and the OPR detector is used to detect the redox potential of the aerobic zone.

[0009] According to a specific implementation of an embodiment of the present application, the multi-stage reflux system further includes a reflux well, the first reflux, the second reflux and the third reflux are all connected to the reflux well, and a second aeration membrane is arranged in the reflux well.

[0010] According to a specific implementation of the embodiment of the present application, a horizontal baffle is provided in the aerobic zone to form a plug flow in the aerobic zone and thus promote the first reflux.

[0011] According to a specific implementation method of an embodiment of the present application, the improved biochemical combination pool also includes a phosphorus removal dosing system, which includes a connected phosphorus removal storage barrel, a phosphorus removal metering pump and a phosphorus removal dosing pipe, and the phosphorus removal dosing pipe is connected to the front end of the aerobic zone.

[0012] According to a specific implementation of an embodiment of the present application, the sludge return system includes a return pump and a return pipe, and the residual sludge discharge system includes a sludge pump and a sludge discharge pipe.

[0013] According to a specific implementation of the embodiment of the present application, an outlet channel and a combined pool outlet weir are provided at the end of the aerobic zone, the outlet channel connects the aerobic zone and the combined pool outlet weir, and the combined pool outlet weir is connected to the secondary sedimentation tank.

[0014] The sewage treatment system of the embodiment of the present application, by adding vertical baffles in the anaerobic zone and / or the anoxic zone, extends the process of the anaerobic zone 1 and / or the anoxic zone 2, realizes the interception and screening of the activated sludge, makes the sludge concentration in the anaerobic and anoxic zone 6000~8000mg / L, does not need to increase the filler, thereby avoiding a series of problems such as filler blockage, loss, and secondary investment. The system is simple to operate and the later operating cost is low. In addition, the secondary sedimentation tank and the improved biochemical combination tank are arranged at intervals and a sludge return system is set, part of the sludge is returned to the aerobic zone and the anoxic zone, and the small molecular volatile fatty acids produced by the hydrolysis and acidification of the anoxic zone are used for anaerobic phosphorus release and anoxic denitrification, thereby improving the interference of nitrate and dissolved oxygen (DO) residues on anaerobic phosphorus release, further ensuring the phosphorus removal effect, and finally achieving the effluent water quality stable and up to standard under the high discharge standard requirements of the effluent, simple operation, and effectively reducing the comprehensive operating cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 A2O process flow chart of the prior art;

[0017] Figure 2 A schematic diagram of the structure of a sewage treatment system provided in an embodiment of the present application;

[0018] Figure 3 A schematic diagram of the plan layout of a sewage treatment system provided in an embodiment of the present application;

[0019] Figure 4 A schematic diagram of the plan layout of another sewage treatment system provided in an embodiment of the present application.

[0020] Reference numerals:

[0021] 1. Improved biochemical combined pool; 2. Second sedimentation tank; 1-1. Anaerobic zone; 1-2. Anoxic zone; 1-3. Aerobic zone; 1-4. Recirculation well; 002. Vertical baffle; 003. Multi-stage recirculation system; 031. First recirculation; 032. Second recirculation; 033. Third recirculation; 004. First aeration membrane; 005. Combined pool outlet pipe; 006. Inlet zone; 007. Sedimentation zone; 008. Second sedimentation tank outlet weir ; 009, outlet area; 010, outlet pipe of the second sedimentation tank; 011, mud hopper; 012, reflux pump; 013, reflux pipe; 14, sludge pump; 015, sludge discharge pipe; 016, dephosphorus storage barrel; 017, dephosphorus metering pump; 018, dephosphorus dosing pipe; 019, driving device; 020, air pipe; 21, filter; 023, horizontal baffle; 024, outlet channel; 025, combined pool outlet weir. DETAILED DESCRIPTION

[0022] The embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0023] The following describes the implementation methods of the present application through specific examples, and those skilled in the art can easily understand other advantages and effects of the present application from the contents disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. The present application can also be implemented or applied through other different specific implementation methods, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present application. It should be noted that, in the absence of conflict, the following embodiments and the features in the embodiments can be combined with each other. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work belong to the scope of protection of the present application.

[0024] It should be noted that various aspects of the embodiments within the scope of the appended claims are described below. It should be apparent that the aspects described herein may be embodied in a wide variety of forms, and any specific structure and / or function described herein is merely illustrative. Based on the present application, it should be understood by those skilled in the art that an aspect described herein may be implemented independently of any other aspect, and two or more of these aspects may be combined in various ways. For example, any number of aspects described herein may be used to implement the device and / or practice the method. In addition, other structures and / or functionalities other than one or more of the aspects described herein may be used to implement this device and / or practice this method.

[0025] It should also be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present application. The drawings only show components related to the present application rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0026] Additionally, in the following description, specific details are provided to facilitate a thorough understanding of the examples. However, it will be understood by those skilled in the art that the aspects described may be practiced without these specific details.

[0027] In the context of increasingly stringent requirements for water environment protection, higher requirements are placed on sewage treatment, especially the continuous improvement of ammonia nitrogen, total nitrogen, and total phosphorus emission indicators. Under the high emission standards, the upgrading and transformation of existing sewage treatment plants has become a general trend, and new sewage treatment plants are strictly required to meet the new emission standards. Among the many sewage treatment processes, the A2O process (AAO process, i.e. "anaerobic-anoxic-aerobic" process) has become the most widely used sludge simultaneous nitrogen and phosphorus removal process due to its mature technology, stable operation, simple process, low energy consumption and operating costs. Please refer to Figure 1 , Figure 1 This is the A2O process flow chart of the prior art. The raw water and the return sludge from the secondary sedimentation tank are mixed and enter the anaerobic tank. In this area, the polyphosphate bacteria use the small molecular organic matter in the raw water as a carbon source to complete the release of phosphorus, while hydrolyzing and acidifying the large molecular organic matter and ammonifying the organic nitrogen. In the anoxic tank, the denitrifying bacteria use the small molecular organic matter as a carbon source to convert the mixed liquid in the aerobic zone containing a large amount of NO3--N and NO3 - -N, reduced to N2 and released into the air, thus achieving the purpose of biological denitrification. In the aerobic pool, organic matter is biochemically degraded, and ammonia nitrogen is oxidized to NO3 through nitrification. - -N and NO2 - -N, polyphosphate bacteria absorb phosphorus excessively, causing TP in the sewage to be discharged from the treatment system in the form of phosphorus-rich sludge along with the remaining sludge. Contains a large amount of NO3 - -N and NO2 - -N mixed liquid (nitrification liquid) flows back from the aerobic zone to the front end of the anoxic zone. The effluent from the aerobic zone enters the secondary sedimentation tank for mud and water separation, and part of the sludge is returned to the anaerobic tank, and the other part enters the sludge treatment system in the form of residual sludge. The supernatant of the secondary sedimentation tank is discharged as treated water or enters the subsequent treatment system.

[0028] However, due to the competition for carbon sources between denitrification and anaerobic phosphorus release, the interference of residual nitrate and dissolved oxygen (DO) in the return sludge on anaerobic phosphorus release, the low carbon-nitrogen ratio (C / N) of the influent, and the decline in nitrification performance at low temperatures in winter, the traditional A2O process is difficult to achieve simultaneous and efficient removal of nitrogen and phosphorus in the same sewage treatment system, and cannot meet the current high emission standards.

[0029] In response to the above problems of traditional A2O process, the existing improved processes can be divided into two categories: in-situ optimization improvement and back-end improvement with increased deep processing.

[0030] 1. In-situ optimization and improvement:

[0031] (1) Multi-point water inlet improved A2O process: In the traditional A2O process, due to excessive consumption of carbon sources in the anaerobic tank, the carbon source in the anoxic zone of the sewage is insufficient, resulting in incomplete denitrification. In order to better achieve the optimal distribution of carbon sources in the raw water, the multi-point water inlet improved A2O process is adopted. Under the condition of limited carbon sources, this process can enable the system to achieve better nitrogen and phosphorus removal effects. However, in the case of insufficient carbon sources in the raw water, high total nitrogen and total phosphorus in the inlet water, high effluent requirements, or the presence of difficult-to-degrade organic matter in the inlet water, the treatment effect is limited and it cannot be guaranteed that the effluent water quality will directly meet the standards.

[0032] (2) Optimization of process flow, such as the A+A2O process. On the basis of the traditional A2O process, a pre-sedimentation anoxic tank is added, so that about 10% to 20% of the sewage is mixed with the return sludge from the secondary sedimentation tank and enters the pre-anoxic tank of the system. Denitrification and denitrification are carried out in the pre-anoxic tank to eliminate the adverse effects of nitrate nitrogen in the secondary sedimentation tank on anaerobic phosphorus release, thereby ensuring the phosphorus removal effect of the system.

[0033] The pre-anoxic tank of this improved A2O process reduces or basically completely eliminates the effects of dissolved oxygen and nitrate on carbon sources and anaerobic phosphorus release by polyphosphate bacteria, and basically improves the competition and utilization of carbon sources by denitrifying bacteria and polyphosphate bacteria in the system. Although the nitrogen and phosphorus removal effects of this process have been significantly improved compared with the traditional A2O process, in many cases, using it alone cannot make the treated effluent meet the discharge requirements.

[0034] (3) Optimization of microbial self-fixation mode: Bacteria such as polyphosphate-accumulating bacteria, nitrifying bacteria and denitrifying bacteria are the main functional microorganisms for nitrogen and phosphorus removal in the A2O process. The number and activity of functional microorganisms determine the effect of nitrogen and phosphorus removal in the system. Therefore, by adding fixed fillers or suspended fillers to the biological pool of the A2O process, the biomass of the functional bacteria in the pool can be increased, and the nitrogen and phosphorus removal capacity of the system can be enhanced. Such as A2O+BAF, A2O+MBBR, IFSA (fixed biofilm-activated sludge) and other processes.

[0035] This process can improve the removal efficiency of pollutants to a certain extent by adding fillers to the biochemical pool to increase the types and quantity of organisms in the system. However, the improvement in the denitrification and phosphorus removal effects is not obvious. At the same time, there is also the problem of regular replacement of fixed fillers, and the problem of suspended fillers clogging the water outlet or being lost with the water, which makes the system operation complicated and the later operation cost high.

[0036] 2. Improvement of back-end deep processing

[0037] In order to solve the problem that the effluent quality is difficult to meet the standards stably when relying solely on the improved A2O process to treat sewage, the A2O process is combined with deep treatment to form a variety of improved sewage treatment processes.

[0038] (1) A2O+denitrification filter process: TN is a limiting factor for the stable compliance of sewage treatment plant effluent under high emission standards. At present, the risk of TN exceeding the standard in sewage treatment plant effluent is mainly concentrated on nitrate nitrogen. In order to strengthen the denitrification of the system and reduce the content of nitrate nitrogen in the effluent during deep treatment, sewage treatment plants often use deep treatment processes such as denitrification biological filter and denitrification deep bed filter. This process can solve the problem of TN and SS exceeding the standard in effluent to a certain extent, but it has high requirements for the accuracy of the carbon source addition system: when the carbon source is not added enough, the purpose of denitrification and nitrogen removal cannot be achieved; when the carbon source is added too much, the effluent COD exceeds the standard, and the carbon source is wasted, resulting in increased operating costs.

[0039] (2) A2O+coagulation and sedimentation+V-type filter process: The effluent from A2O enters the coagulation and sedimentation tank. Coagulation and sedimentation can remove organic matter, inorganic matter, color and turbidity that are difficult to remove by the A2O process, and also have a certain removal capacity for some soluble substances. On the other hand, the addition of coagulant can play a role in chemical phosphorus removal. The effluent from the coagulation and sedimentation tank enters the V-type filter, which further improves the removal rate of pollutants such as SS in the water. This process can effectively remove SS, turbidity and color from sewage, and has a certain removal effect on total phosphorus after biochemical treatment. However, this process has no obvious removal effect on TN and cannot ensure that the total nitrogen in the effluent meets the standard stably. On the other hand, the addition of coagulant leads to an increase in chemical sludge production and increased operating costs.

[0040] (3) A2O+MBR: To ensure that the A2O effluent meets the standard stably, the MBR process is a biological treatment method that is widely used for deep sewage treatment under high emission standards. By adding a membrane bioreactor after the effluent from the A2O process, the effluent quality can be further improved. The MBR membrane can ensure the effect of mud-water separation and removal of large molecular organic matter in the initial operation. Except for the total nitrogen index that may not meet the standard, COD and SS can ensure that they meet the standard, the effluent visibility is good, and the early acceptance effect is good. However, as the operation time increases, the membrane is gradually polluted, and the effluent membrane flux decreases. At this time, it is inevitable to face the contradiction between the designed water volume and the designed water quality. Therefore, the ultrafiltration membrane needs to be replaced after about three years of operation, involving secondary investment. In addition, the operation and daily life of the MBR membrane are complicated, and it is necessary to perform online backwashing according to the pollution situation and regular chemical cleaning. It has high requirements for operating personnel, and the operating energy consumption and comprehensive cost are increased by 30%-50%. After long-term operation, difficult-to-degrade organic matter will also accumulate in the system.

[0041] In summary, in the existing A2O improved process, the in-situ optimization and improvement only improves a certain aspect of the A2O process problem, and cannot systematically solve the existing problems of the A2O process, and the effluent quality cannot stably meet the standards. The process flow is prolonged by increasing the depth of treatment, which not only leads to complex management and increased operating costs, but also high material consumption, energy consumption, and drug consumption. The process also deviates from the principle of sustainability. Neither the in-situ optimization and improvement nor the increase of depth treatment can effectively solve the problems of the A2O process.

[0042] To solve the above problems, an embodiment of the present application provides a sewage treatment system, which at least partially solves the problems existing in the prior art. The sewage treatment system of the embodiment of the present application will be described below with reference to the accompanying drawings.

[0043] Please refer to Figures 2 to 4The embodiment of the present application provides a sewage treatment system, including a modified biochemical combination pool 1 and a secondary sedimentation tank 2, wherein the modified biochemical combination pool 1 includes an anaerobic zone 1-1, an anoxic zone 1-2 and an aerobic zone 1-3 which are connected in sequence, and a vertical baffle 002 is provided in at least one of the anaerobic zone 1-1 and the anoxic zone 1-2 to form a plurality of vertical baffle reaction chambers in series in the anaerobic zone 1-1, and / or to form a plurality of vertical baffle reaction chambers in series in the anoxic zone 1-2. The secondary sedimentation tank 2 is spaced apart from the improved biochemical combination tank 1 and is connected with the aerobic zones 1-3. The secondary sedimentation tank 2 includes an effluent system and a sludge discharge system. The sewage treated by the improved biochemical combination tank 1 is precipitated and separated in the secondary sedimentation tank 2 to obtain supernatant and sludge. The supernatant flows to the effluent system, and the sludge enters the sludge discharge system. The sludge discharge system includes a sludge return system and a residual sludge discharge system. The sludge return system is used to return part of the sludge to the aerobic zones 1-3 and the anoxic zones 1-2, and the residual sludge discharge system is used to discharge the residual sludge.

[0044] The anaerobic zone 1-1 and the anoxic zone 1-2 can be built together with the aerobic zone 1-3, or they can be built separately. Each improved biochemical combination pool 1 includes at least one aerobic zone 1-3, and each aerobic zone 1-3 corresponds to at least one group of anaerobic and anoxic zones 1-2. Each group of anaerobic and anoxic zones 1-2 includes 4 to 30 independent vertical baffle reaction chambers. An outlet channel 024 and a combined pool outlet weir 025 are set at the end of the aerobic zone 1-3. The outlet channel 024 connects the aerobic zone 1-3 and the combined pool outlet weir 025. The combined pool outlet weir 025 is used to adjust the speed and flow of the sewage flow. The combined pool outlet weir 025 is connected to the water inlet area 006 of the secondary sedimentation tank 2 through the combined pool outlet pipe 005. The secondary sedimentation tank 2 also includes a sedimentation area 007, a secondary sedimentation tank outlet weir 008, an outlet area 009 and a mud hopper 011. After the sewage is precipitated and separated in the secondary sedimentation tank 2, a supernatant and sludge are obtained. The supernatant is discharged through the outlet weir and the outlet channel 024, and the sludge is discharged or refluxed through the sedimentation area 007 and the mud hopper 011.

[0045] The sewage treatment system of the embodiment of the present application, by adding a vertical baffle 002 in the anaerobic zone 1-1 and / or the anoxic zone 1-2, extends the process of the anaerobic zone 1-1 and / or the anoxic zone 1-2, realizes the interception and screening of the activated sludge, makes the sludge concentration of the anaerobic and anoxic zone 1-2 6000 ~ 8000 mg / L, strengthens the hydrolysis and fermentation, hydrolyzes and acidifies the macromolecular organic matter in the raw water into small molecular fatty acids, provides a carbon source for denitrification and anaerobic phosphorus release, and improves the efficiency of nitrogen removal and phosphorus removal; at the same time, the washing and particle screening of the sludge by the raw water in the vertical baffle reaction chamber is conducive to the cultivation of activated sludge, so that the activated sludge in the system has the characteristics of granular sludge, good sedimentation performance, and can achieve good mud and water separation in the sedimentation zone 007. In addition, there is no need to add fillers, avoiding a series of problems such as filler blockage, loss, and secondary investment, and the system is simple to operate, and the later operation cost is low. In addition, the secondary sedimentation tank 2 and the improved biochemical combination tank 1 are separated and a sludge return system is set, part of the sludge is returned to the aerobic zone 1-3 and the anoxic zone 1-2, and the small molecular volatile fatty acids produced by hydrolysis and acidification in the anoxic zone 1-2 are used for anaerobic phosphorus release and anoxic denitrification, thereby improving the interference of nitrate and dissolved oxygen (DO) residual on anaerobic phosphorus release, and further ensuring the phosphorus removal effect. Through the scheme of this application, it can be finally achieved that the effluent water quality is stable and up to standard under the high effluent discharge standard requirements, the operation is simple, and the comprehensive operation cost is effectively reduced.

[0046] In some optional embodiments, the improved biochemical combination pool 1 further includes a multi-stage reflux system 003, which includes: a first reflux 031 from the aerobic zone 1-3 to the front end of the anoxic zone 1-2, a second reflux 032 from the end of the anoxic zone 1-2 to the front end of the anoxic zone 1-2, and a third reflux 033 from the front end of the anoxic zone 1-2 to the front end of the anaerobic zone 1-1. Optionally, the multi-stage reflux system 003 adopts an intermittent reflux method.

[0047] In these optional embodiments, the raw water is diluted by setting the first reflux 031, the second reflux 032 and the third reflux 033 to alleviate the impact of water inlet shock on the system; and the multi-stage reflux system 003 is used to maintain a certain upward flow rate in each reaction zone to ensure a good hydraulic flow state, so that the sludge is in a suspended state and the reaction is fully carried out; furthermore, the multi-stage reflux can effectively eliminate the influence of dissolved oxygen and nitrate on the carbon source and the anaerobic phosphorus release of polyphosphate bacteria, thereby ensuring the denitrification and phosphorus removal effect; it can also provide sufficient electron acceptors for the denitrification reaction to ensure the denitrification reaction is fully carried out.

[0048] In some optional embodiments, the multi-stage reflux system 003 further includes a driving device 019 , and the driving device 019 is used to provide power for the first reflux 031 , the second reflux 032 , and the second reflux 032 .

[0049] Wherein, the driving device 019 can be a blower or a driving pump. Optionally, when the anaerobic zone 1-1 and the anoxic zone 1-2 of the improved biochemical combination pool 1 are built together with the aerobic zone 1-3, or the anaerobic zone 1-1 and the anoxic zone 1-2 and the aerobic zone 1-3 are built separately but the distance between the anaerobic zone 1-1 and the anoxic zone 1-2 and the aerobic zone 1-3 is less than or equal to 2 meters, the driving device 019 uses a blower to ensure reflux by air lift. When the anaerobic zone 1-1 and the anoxic zone 1-2 and the aerobic zone 1-3 are built separately and the distance between the anaerobic zone 1-1 and the anoxic zone 1-2 and the aerobic zone 1-3 is greater than 2m, the driving device 019 uses a driving pump. Optionally, a reflow well 1-4 can also be set, and the mixed liquid of the first reflow 031 and the second reflow 032 first enters the reflow well 1-4, and then flows into the anoxic zone 1-2 by gravity from the reflow well 1-4. Furthermore, a second aeration membrane may be provided in the recirculation well 1-4 to prevent sludge deposition and sludge anaerobicity in the recirculation well 1-4.

[0050] In some optional embodiments, the aerobic zones 1 - 3 are provided with a first aeration membrane 004 , and the driving device 019 is connected to the first aeration membrane 004 via an air pipe 020 .

[0051] In these optional embodiments, air is transported from the first aeration membrane 004 to the aerobic zone 1-3 through the driving device 019 and the air pipe 020, so as to ensure the O2 required for the nitrification reaction and the degradation of BOD5 by alloxanic microorganisms in the aerobic zone 1-3. Optionally, the aeration to the aerobic zone 1-3 is performed in an intermittent aeration manner. Specifically, the reflow cycle of the multi-stage reflow system 003 is consistent with the aeration cycle of the aeration to the aerobic zone 1-3, and the reflow time in each cycle is not greater than the aeration time to the aerobic zone 1-3. In other words, in one aeration / reflow cycle, there is an idling time of aeration and reflow, and the aeration idling time is not greater than the idling time of reflow.

[0052] In some optional embodiments, the aerobic zones 1-3 are provided with an OPR detector, which is used to detect the redox potential of the aerobic zones 1-3.

[0053] In these optional embodiments, an OPR detector is provided in the aerobic zone 1-3 to detect the redox potential of the aerobic zone 1-3, and the operation time and idling time of aeration / reflux in one aeration / reflux cycle are controlled according to the redox potential of the aerobic zone 1-3.

[0054] In some optional embodiments, a horizontal baffle 023 is provided in the aerobic zone 1-3 to form a plug flow in the aerobic zone 1-3 and then push the first reflux 031, thereby ensuring that the nitrification liquid in the first reflux 031 can flow back from the end of the aerobic zone 1-3 to the anoxic zone 1-2.

[0055] In some optional embodiments, the improved biochemical combination pool 1 also includes a phosphorus removal dosing system, which includes a phosphorus removal storage barrel 016, a phosphorus removal metering pump 017 and a phosphorus removal dosing pipe 018 that are connected, and the phosphorus removal dosing pipe 018 is connected to the front end of the aerobic zone 1-3.

[0056] In these optional embodiments, a phosphorus removal dosing system is provided to further enhance the phosphorus removal effect of the aerobic zones 1-3. Specifically, the phosphorus removal agent of the phosphorus removal storage tank 016 is FeCl3, and when the phosphorus content in the influent of the improved biochemical combination pool 1 is less than 2 mg / L and the phosphorus content in the effluent of the improved biochemical combination pool 1 is greater than or equal to 0.5 mg / L, the phosphorus removal dosing system may not work.

[0057] In some optional embodiments, the sludge return system includes a return pump 012 and a return pipe 013, and the excess sludge discharge system includes a sludge pump 14 and a sludge discharge pipe 015. Optionally, the sludge return system adopts an intermittent return mode, and the sludge return cycle is consistent with the return cycle of the multi-stage return system 003 in the improved biochemical combination pool 1.

[0058] In some optional embodiments, the effluent system includes a secondary sedimentation tank effluent pipe 010, a filter 21 and an effluent disinfection system that are connected in sequence, and the secondary sedimentation tank effluent pipe 010 is connected to the secondary sedimentation tank 2 effluent area 009. Specifically, the filter 21 can be a precision drum filter. The filter 21 is used to remove water suspended matter in the secondary sedimentation tank effluent pipe 010, and the effluent disinfection system is used to disinfect the water to meet the discharge standard. Optionally, when the solid suspended matter concentration in the effluent requirement is greater than 10 mg / L, the filter 21 may not be operated.

[0059] In summary, the sewage treatment system provided in the embodiment of the present application has at least the following beneficial effects:

[0060] (1) The sewage treatment system provided in the embodiment of the present application makes full use of the original A2O anoxic zone tank body, retains the structure and function of the secondary sedimentation tank, and optimizes and improves the traditional A2O process in situ, so as to achieve stable effluent water quality under high effluent discharge standard requirements, effectively reduce investment costs, and save land.

[0061] (2) The sewage treatment system provided in the embodiment of the present application fully utilizes the denitrification and phosphorus removal capacity of the biochemical system, and effectively reduces the C / N required for denitrification by strengthening the hydrolysis and acidification of the anaerobic zone. Under various unfavorable conditions such as insufficient carbon source of raw water, high total nitrogen and total phosphorus in the influent, high effluent requirements, or the presence of difficult-to-degrade organic matter in the influent, it can still achieve good denitrification and phosphorus removal effects;

[0062] (3) The sewage treatment system provided in the embodiment of the present application achieves the interception and screening of activated sludge by adding vertical baffles, horizontal baffles and a multi-stage reflux system, so that the sludge concentration in the anaerobic and anoxic zone is between 6000 and 8000 mg / L. There is no need to add fillers, thereby avoiding a series of problems such as filler blockage, loss, and secondary investment. The system is simple to operate and the subsequent operating costs are low.

[0063] (4) The sewage treatment system provided in the embodiment of the present application has a short process flow and does not require the addition of deep treatment units such as denitrification filters, coagulation sedimentation tanks, MBRs, etc., which effectively reduces material consumption, energy consumption, and drug consumption in sewage operation, thereby reducing the overall operating cost.

[0064] In order to better illustrate the sewage treatment system of the embodiment of the present application, the following embodiments are provided.

[0065] Embodiment 1:

[0066] The sewage treatment capacity is 5000m3 / d, and the influent water quality indicators are as follows: COD cr =400mg / L, BOD5=180mg / L, SS=220mg / L, ammonia nitrogen=50mg / L, TN=70mg / L, TP=6mg / L. The water quality indicators of the treated effluent are as follows: COD cr ≤50mg / L, BOD5≤10mg / L, SS≤10mg / L, ammonia nitrogen≤5(8)mg / L, TN≤15mg / L, TP≤0.5mg / L.

[0067] Please refer to Figure 3 The anaerobic zone 1-1 and the anoxic zone 1-2 of the improved biochemical combination pool 1 are built separately from the aerobic zone 1-3. The improved biochemical combination pool 1 and the secondary sedimentation tank 2 are built separately. Vertical baffles 002 are set in the anaerobic zone 1-1 and the anoxic zone 1-2. The improved biochemical combination pool 1 includes two aerobic zones 1-3. Each aerobic zone 1-3 includes a group of anaerobic zones 1-1 and anoxic zones 1-2. Each group of anaerobic zones 1-1 and anoxic zones 1-2 includes 24 independent vertical flow reaction chambers, and a multi-stage reflux system 003 is set. Each group of anaerobic zones 1-1 and anoxic zones 1-2 includes a set of multi-stage reflux system 003. The multi-stage reflux system 003 adopts the form of air lift, and the air source comes from the blower. The multi-stage reflux system 003 adopts a short-cycle intermittent reflux method. In each reflux cycle, there is a reflux idling cycle. The specific reflux cycle and the operating time and idling time of each cycle are controlled by online monitoring of the ORP of the aerobic zone 1-3.

[0068] The anaerobic zone 1-1 and the anoxic zone 1-2 of the improved biochemical combined pool 1 are built separately from the aerobic zone 1-3, with a distance of 5.4m. The mixed liquid from the aerobic zone 1-3 is returned to the anoxic zone 1-2 by gas lift to the return well 1-4, and then flows into the anoxic zone 1-2 by gravity from the return well 1-4. In order to prevent the sludge from settling and anaerobic in the return well 1-4, a second aeration membrane is set in the return well 1-4.

[0069] The first aeration membrane 004 is set in the aerobic zone 1-3, and the aerobic zone 1-3 is aerated through the blower and the air pipe 020 to ensure the oxygen required for the nitrification reaction and the degradation of BOD5 by alloxanic microorganisms in the aerobic zone 1-3. Aeration adopts a short-cycle intermittent aeration method. In each aeration cycle, there is an idling cycle of reflux. The specific aeration cycle and the running time and idling time of each cycle are controlled through the online monitoring of the ORP of the aerobic zone 1-3. The reflux cycle is consistent with the aeration cycle, and the reflux time in each cycle is not greater than the aeration time. That is, in a short aeration / reflux cycle, there is an idling time for aeration and reflux, and the aeration idling time is not greater than the reflux idling time.

[0070] In order to enhance the phosphorus removal effect of aerobic zone 1-3, a phosphorus removal dosing system is set up, and the solution in the phosphorus removal storage tank 016 enters the front end of aerobic zone 1-3 through the phosphorus removal metering pump 017 and the phosphorus removal dosing pipe 018. The phosphorus removal agent is FeCl3.

[0071] The sewage enters the improved biochemical combined pool 1 through the water inlet pipe, and enters the anaerobic zone 1-1 and the anoxic zone 1-2 in sequence through the vertical baffle 002. The mixed liquid of the anoxic zone 1-2 enters the aerobic zone 1-3 through the upper pipe.

[0072] The mixed liquor of aerobic zones 1-3 enters the secondary sedimentation tank 2 through the combined tank outlet pipe 005 of the improved biochemical combined tank 1, and then enters the water inlet area 006 of the secondary sedimentation tank 2, and then enters the sedimentation area 007 of the secondary sedimentation tank 2. Since the sludge cultivated by the biochemical system has good sedimentation performance, after gravity sedimentation in the secondary sedimentation tank 2, good mud-water separation is achieved. The supernatant enters the outlet area 009 of the secondary sedimentation tank 2 through the secondary sedimentation tank outlet weir 008, and finally enters the precision drum filter 21 through the secondary sedimentation tank outlet pipe 010 to further remove suspended solids in the effluent. The effluent from the precision drum filter 21 enters the effluent disinfection system through the outlet pipe, and finally achieves standard discharge.

[0073] After the sludge and water separation in the secondary sedimentation tank 2, the sludge enters the sludge hopper 011 of the secondary sedimentation tank 2. The sludge discharge system includes a sludge return system and a residual sludge discharge system. The residual sludge discharge system is composed of a sludge pump 14 and a sludge discharge pipe 015. The residual sludge is discharged to the sludge dewatering system through the sludge pump 14 and the sludge discharge pipe 015 for sludge treatment. The sludge return system intermittently returns to the aerobic zone 1-3 and the anoxic zone 1-2 through the return pump 012 and the return pipe 013. Under the condition of multi-stage return of the anaerobic zone 1-1 and the anoxic zone 1-2, the small molecular volatile fatty acids produced by the hydrolysis and acidification of the anaerobic and anoxic zone 1-2 are used for anaerobic phosphorus release and anoxic denitrification, thereby improving the interference of nitrate and dissolved oxygen (DO) residual on anaerobic phosphorus release, and further ensuring the phosphorus removal effect of the process. The sludge return of the secondary sedimentation tank 2 adopts the short-cycle intermittent return method. Its return cycle is consistent with the return cycle of the improved combination tank. The specific operation time and idling time of each cycle are controlled by online monitoring of the ORP of the aerobic zone 1-3. Among them, the sludge return ratio of the secondary sedimentation tank 2 is 1.5:1. The secondary sedimentation tank 2 adopts the form of radial flow sedimentation tank, and the surface load of the secondary sedimentation tank 2 is 0.33m 3 / m 2 .h.

[0074] Embodiment 2:

[0075] Sewage treatment capacity: 1000m 3 / d, the influent water quality indicators are as follows: COD cr =380mg / L, BOD5=180mg / L, SS=220mg / L, ammonia nitrogen=30mg / L, TN=40mg / L, TP=4mg / L. The effluent water quality indicators are as follows: COD cr ≤50mg / L, BOD5≤10mg / L, SS≤10mg / L, ammonia nitrogen≤5(8)mg / L, TN≤15mg / L, TP≤0.5mg / L.

[0076] Please refer to Figure 4 The anaerobic zone 1-1 and the anoxic zone 1-2 of the improved biochemical combination pool 1 are built together with the aerobic zone 1-3, and the improved biochemical combination pool 1 and the secondary sedimentation tank 2 are built separately.

[0077] Vertical baffles 002 are set in the anaerobic zone 1-1 and the anoxic zone 1-2, so that the anaerobic zone 1-1 and the anoxic zone 1-2 form a number of vertical baffle reaction chambers in series. The improved biochemical combination pool 1 includes an aerobic zone 1-3, each aerobic zone 1-3 includes two groups of anaerobic zones 1-1 and anoxic zones 1-2, each group of anaerobic zones 1-1 and anoxic zones 1-2 includes 18 independent vertical baffle reaction chambers, and a multi-stage reflow system 003 is set, and each group of anaerobic zones 1-1 and anoxic zones 1-2 includes a set of multi-stage reflow system 003. The multi-stage reflow system 003 adopts the form of air lift, and the air source comes from the blower. The multi-stage reflow system 003 adopts a short-cycle intermittent reflow method. In each reflow cycle, there is a reflow idling cycle. The specific reflow cycle and the running time and idling time of each cycle are controlled by the online monitoring of the ORP of the aerobic zone 1-3.

[0078] A horizontal baffle 023 is added to the aerobic zone 1-3 to form a plug flow state in the mixed liquid in the aerobic zone 1-3 to ensure that the multi-stage reflux nitrification liquid refluxes from the end of the aerobic zone 1-3 to the anoxic zone 1-2. A first aeration membrane 004 is set in the aerobic zone 1-3, and the aerobic zone 1-3 is aerated through a blower and an air pipe 020 to ensure the O2 required for the nitrification reaction and the degradation of BOD5 by heteroaerobic microorganisms in the aerobic zone 1-3. Aeration adopts a short-cycle intermittent aeration method. In each aeration cycle, there is a reflux idling cycle. The specific aeration cycle and the running time and idling time of each cycle are controlled by online monitoring of the ORP of the aerobic zone 1-3.

[0079] The reflow cycle is consistent with the aeration cycle, and the reflow time in each cycle is not greater than the aeration time. That is, in a short aeration / reflow cycle, there is an idle time for aeration and reflow, and the aeration idle time is not greater than the reflow idle time.

[0080] In order to enhance the phosphorus removal effect of aerobic zone 1-3, a phosphorus removal dosing system is set up, and the solution in the phosphorus removal storage tank 016 enters the front end of aerobic zone 1-3 through the phosphorus removal metering pump 017 and the phosphorus removal dosing pipe 018. The phosphorus removal agent is FeCl3.

[0081] The sewage enters the improved biochemical combined pool 1 through the water inlet pipe, and enters the anaerobic zone 1-1 and the anoxic zone 1-2 in turn through the vertical baffle 002. The mixed liquid of the anoxic zone 1-2 flows through the upper water weir plate between the anoxic zone 1-2 and the aerobic zone 1-3, and flows into the aerobic zone 1-3 by gravity.

[0082] The mixed liquor of aerobic zones 1-3 enters the secondary sedimentation tank 2 through the combined tank outlet pipe 005, and in turn enters the inlet area 006 of the secondary sedimentation tank 2, and then enters the sedimentation area 007 of the secondary sedimentation tank 2. Since the sludge cultivated by the biochemical process has good sedimentation performance, after gravity sedimentation in the secondary sedimentation tank 2, good mud-water separation is achieved. The supernatant enters the outlet area 009 of the secondary sedimentation tank 2 through the secondary sedimentation tank outlet weir 008, and finally enters the precision drum filter 21 through the secondary sedimentation tank outlet pipe 010 to further remove suspended solids in the effluent. The effluent from the precision drum filter 21 enters the effluent disinfection system through the outlet pipe, and finally achieves standard discharge.

[0083] After the sludge and water separation in the secondary sedimentation tank 2, the sludge enters the sludge hopper 011 of the secondary sedimentation tank 2. The sludge discharge system includes a sludge return system and a residual sludge discharge system. The residual sludge discharge system is composed of a sludge pump 14 and a sludge discharge pipe 015. The residual sludge is discharged to the sludge dewatering system through the sludge pump 14 and the sludge discharge pipe 015 for sludge treatment. The sludge return system intermittently returns to the aerobic zone 1-3 and the anoxic zone 1-2 through the return pump 012 and the return pipe 013. Under the condition of multi-stage return of the anaerobic zone 1-1 and the anoxic zone 1-2, the small molecular volatile fatty acids produced by the hydrolysis and acidification of the anaerobic and anoxic zone 1-2 are used for anaerobic phosphorus release and anoxic denitrification, thereby improving the interference of nitrate and dissolved oxygen (DO) residual on anaerobic phosphorus release, and further ensuring the phosphorus removal effect of the process. The sludge return of the secondary sedimentation tank 2 adopts the short-cycle intermittent return method. The return cycle is consistent with the return cycle of the improved combination tank. The specific operation time and idling time of each cycle are controlled by online monitoring of ORP in the aerobic zone 1-3. The sludge return ratio of the secondary sedimentation tank 2 is 1.2:1. The secondary sedimentation tank 2 adopts the form of a vertical flow sedimentation tank, and the surface load of the secondary sedimentation tank 2 is 0.65m 3 / m 2 .h.

[0084] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A sewage treatment system, characterized in that: include: The improved biochemical combined pool comprises an anaerobic zone, an anoxic zone and an aerobic zone which are connected in sequence, wherein a vertical baffle is arranged in at least one of the anaerobic zone and the anoxic zone, so that a plurality of vertical baffle reaction chambers connected in series are formed in the anaerobic zone, and / or a plurality of vertical baffle reaction chambers connected in series are formed in the anoxic zone; A secondary sedimentation tank is arranged at intervals from the improved biochemical combination tank and is connected to the aerobic zone. The secondary sedimentation tank includes an outlet system and a sludge discharge system. The sewage treated by the improved biochemical combination tank is precipitated and separated in the secondary sedimentation tank to obtain supernatant and sludge. The supernatant flows to the outlet system, and the sludge enters the sludge discharge system. The sludge discharge system includes a sludge return system and a residual sludge discharge system. The sludge return system is used to return part of the sludge to the aerobic zone and the anoxic zone, and the residual sludge discharge system is used to discharge the remaining sludge.

2. The sewage treatment system according to claim 1, characterized in that: The improved biochemical combination pool also includes a multi-stage reflow system, which includes: a first reflow from the aerobic zone to the front end of the anoxic zone, a second reflow from the end of the anoxic zone to the front end of the anoxic zone, and a third reflow from the front end of the anoxic zone to the front end of the anaerobic zone.

3. The sewage treatment system according to claim 2, characterized in that: The multi-stage reflux system further includes a driving device, which is used to provide power for the first reflux, the second reflux, and the second reflux.

4. The sewage treatment system according to claim 3, characterized in that: The aerobic zone is provided with a first aeration membrane, and the driving device is connected with the first aeration membrane through an air pipe.

5. The sewage treatment system according to claim 2, characterized in that: The aerobic zone is provided with an OPR detector, and the OPR detector is used to detect the redox potential of the aerobic zone.

6. The sewage treatment system according to claim 2, characterized in that: The multi-stage reflow system further includes a reflow well, the first reflow, the second reflow and the third reflow are all connected to the reflow well, and a second aeration membrane is arranged in the reflow well.

7. The sewage treatment system according to claim 2, characterized in that: A horizontal baffle is arranged in the aerobic zone to form a plug flow in the aerobic zone and then promote the first reflux.

8. The sewage treatment system according to claim 1, characterized in that: The improved biochemical combined pool also includes a phosphorus removal and dosing system, which includes a phosphorus removal storage tank, a phosphorus removal metering pump and a phosphorus removal dosing pipe that are connected. The phosphorus removal dosing pipe is connected to the front end of the aerobic zone.

9. The sewage treatment system according to claim 1, characterized in that: The sludge return system comprises a return pump and a return pipe, and the excess sludge discharge system comprises a sludge pump and a sludge discharge pipe.

10. The sewage treatment system according to claim 1, characterized in that: An outlet channel and a combined pool outlet weir are provided at the end of the aerobic zone. The outlet channel connects the aerobic zone and the combined pool outlet weir, and the combined pool outlet weir is connected to the secondary sedimentation tank.