Blocking device for pouring elastic short sleeper transformation material
By designing a blocking device for the transformation of elastic short sleepers, using blocking plates with large dead weight and elastic materials to block the overflow of liquid materials in the sleeper pits, the problems of track gauge changes and safety hazards in rail transit are solved, and the track bed is realized. Effective protection and shortened cleaning time.
Patent Information
- Application Number
- CN202420178395.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-25
AI Technical Summary
In rail transit, after the elastic short sleepers are used for an extended period of time, the aging, deformation, and wear of the rubber boots lead to peeling between the sleeper, the boots, and the track bed, resulting in changes in track gauge, reduction in vibration damping performance, and safety hazards. Existing rectification measures are difficult to be effective. Prevent material spillage from contaminating the track bed.
Design a sealing device for the injection of materials for elastic short sleeper reconstruction. It includes a sealing plate composed of a large dead weight material and an elastic material to form a rectangular frame. The sealing plate is pressed down by its own weight and elastically connected to block the liquid in the sleeper pit. Material overflow, simple structure, easy to carry, suitable for straight and curved ultra-high areas.
It effectively prevents liquid materials in the sleeper pit from overflowing and contaminating the track bed, reducing the cleaning workload, shortening the cleaning time, reducing equipment costs, and is suitable for reuse in a variety of locations.
Smart Images

Figure CN221798034U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rail transportation, in particular to a blocking device used for pouring elastic short rail sleeper transformation materials. Background Art
[0002] Elastic short sleepers are a type of vibration reduction product used in rail transit vibration reduction measures and are widely used in rail transit lines. As the use time increases, the elastic short sleepers will cause the rubber boots to age, deform, and wear, which will lead to peeling between the sleeper, boots, and ballast bed, and the gap will expand, resulting in sleeper hanging, large gauge changes, reduced vibration reduction performance, sleeper rupture, etc., which will bury safety hazards to driving safety.
[0003] In response to such problems, the industry has taken a variety of rectification and control measures; the general rectification work is to remove the rubber boots of the elastic short sleepers and pour new materials to fill them.
[0004] Since the window period of existing lines is relatively short, the overall renovation work has very strict time control for each process. Therefore, strengthening the protection of the trackbed when pouring new materials in the sleeper pit can reduce the workload of cleaning the construction surface and shorten the clearance time. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides a blocking device for the injection of elastic short sleeper reconstruction materials, which has the advantages of simple structure and can effectively block the liquid material overflowing from the sleeper pit during the falling process of the sleeper.
[0007] (II) Technical solution
[0008] In order to achieve the purpose of having a simple structure and being able to effectively block the liquid material overflowing from the sleeper pit during the falling process of the sleeper, the utility model provides the following technical solution: a blocking device for pouring elastic short sleeper transformation materials, comprising a sleeper, and also comprising:
[0009] Blocking devices are placed on the ballast bed around the sleepers;
[0010] The blocking device is composed of a plurality of blocking plates which are connected end to end in sequence, and the bottom of the blocking plates can produce flexible deformation.
[0011] As a preferred technical solution of the utility model, the sealing plate is composed of an upper sealing plate and a lower sealing strip, the sealing plate is made of a heavy-duty material, and the sealing strip is made of an elastic material.
[0012] As a preferred technical solution of the utility model, one end of the sealing plate is protruding to form a clamping head, and the other end is concave to form a clamping groove coupled with the clamping head.
[0013] As a preferred technical solution of the utility model, the upper half of the clamp head is made of a heavy weight material, and the lower half is made of an elastic material; the upper half of the clamping slot is made of a heavy weight material, and the lower half is made of an elastic material.
[0014] As a preferred technical solution of the present invention, the sealing plate and the sealing strip are connected by bonding, vulcanization, mechanical connection or clamping.
[0015] As a preferred technical solution of the utility model, four sealing baffles are provided, and the four sealing baffles are connected end to end in sequence to form a rectangular frame.
[0016] As a preferred technical solution of the utility model, a through groove is opened on the clamping head along the width direction of the sealing plate, and a bolt groove corresponding to the through groove is opened on the inner side wall of the clamping groove along the length direction of the sealing plate, and also includes a locking bolt, which passes through the through groove and is screwed into the bolt groove.
[0017] (III) Beneficial effects
[0018] Compared with the prior art, the utility model provides a blocking device for pouring elastic short sleeper reconstruction materials, which has the following beneficial effects:
[0019] 1. The sealing device used for the injection of elastic short sleeper reconstruction materials is composed of sealing plates connected end to end to form a rectangular frame and placed on the roadbed around the sleeper. The sealing strip is pressed down by the deadweight of the sealing plate so that the sealing strip fits tightly with the roadbed, thereby effectively blocking the liquid material overflowing from the sleeper pit during the falling process of the sleeper, protecting the roadbed, reducing the workload of cleaning the construction surface, and shortening the cleaning time.
[0020] 2. The sealing device used for the injection of elastic short sleeper reconstruction materials has a simple structure and is easy to carry and assemble. It can effectively prevent the liquid material in the pit from overflowing and polluting the roadbed. It is suitable for straight and curved super-elevated sections. After implementation, it can be recycled and reused, effectively reducing the equipment cost of roadbed protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the implementation state of the utility model;
[0022] Figure 2 It is a three-dimensional schematic diagram of the overall structure of the utility model;
[0023] Figure 3 It is an enlarged schematic diagram of the sealing baffle part of the utility model.
[0024] In the figure: 1, rail sleeper; 2, blocking device; 3, blocking plate; 301, sealing plate; 302, sealing strip; 303, clamping head; 304, clamping slot. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] Example:
[0027] See also Figure 1-Figure 3 A blocking device for injection of elastic short sleeper reconstruction materials comprises a sleeper 1, and a blocking device 2 is placed on the roadbed around the sleeper 1 to block the liquid material overflowing from the pit of the sleeper 1 during the falling process of the sleeper 1.
[0028] like Figure 2 As shown, the sealing device 2 is composed of a plurality of sealing plates 3 connected end to end in sequence. The bottom of the sealing plates 3 can produce flexible deformation. Specifically, four sealing plates 3 are provided, and the four sealing plates 3 are connected end to end in sequence to form a rectangular frame. Of course, the number of sealing plates 3 can also be changed as needed.
[0029] In this embodiment, the sealing plate 3 is composed of an upper sealing plate 301 and a lower sealing strip 302. The sealing plate 301 is a material with high dead weight, such as cast iron, steel and other materials, and the sealing strip 302 is an elastic material, such as sponge, plastic, rubber and other materials. The sealing plate 301 and the sealing strip 302 can be connected by bonding, vulcanization, mechanical connection or clamping. When the sealing plate 3 is placed, the gravity of the high dead weight material of the sealing plate 301 itself can be used to press down the elastic sealing strip 302, so that the sealing strip 302 fits tightly against the roadbed, thereby effectively blocking the liquid material overflowing from the pit of the sleeper 1 during the falling process of the sleeper 1, thereby protecting the roadbed, reducing the workload of cleaning the construction surface, and shortening the cleaning time.
[0030] like Figure 3 As shown, one end of the sealing plate 3 is protruding to form a clamping head 303, and the other end is concave to form a clamping groove 304 coupled with the clamping head 303. By inserting the clamping head 303 into the clamping groove 304, two adjacent sealing plates 3 can be connected, which is convenient to assemble and has a simple structure.
[0031] In this embodiment, the upper part of the clamp head 303 is made of a heavy-weight material, and the lower part is made of an elastic material. The upper part of the clamping slot 304 is made of a heavy-weight material, and the lower part is made of an elastic material. When the clamp head 303 is inserted into the clamping slot 304, the elastic material itself deforms, so that the clamp head 303 can be inserted more tightly and will not be easily separated. The friction force and the elastic clamping force are used to lock the connection.
[0032] Of course, other structures can also be provided to further lock the connection. For example, a through slot can be provided on the clamp head 303 along the width direction of the sealing plate 3, and a bolt slot corresponding to the through slot can be provided on the inner wall of the clamping slot 304 along the length direction of the sealing plate 3. After the clamp head 303 is inserted into the clamping slot 304, the locking bolt is passed through the through slot and screwed into the bolt slot to further lock the connection at the end.
[0033] The utility model has a simple overall structure and is easy to carry and assemble. It can effectively prevent liquid materials in the pit from overflowing and polluting the roadbed. It is suitable for straight and curved super-high sections. At the same time, it can be recycled and reused after implementation, effectively reducing the equipment cost of roadbed protection.
[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A blocking device for injection of elastic short sleeper reconstruction material, comprising a sleeper (1), characterized in that: Also includes: A blocking device (2) is placed on the roadbed around the sleeper (1); The blocking device (2) is composed of a plurality of blocking plates (3) connected end to end in sequence, and the bottom of the blocking plate (3) can generate flexible deformation.
2. A blocking device for injection of elastic short sleeper reconstruction material according to claim 1, characterized in that: The sealing plate (3) is composed of an upper sealing plate (301) and a lower sealing strip (302), the sealing plate (301) is made of a heavy-duty material, and the sealing strip (302) is made of an elastic material.
3. The blocking device for injection of elastic short sleeper reconstruction material according to claim 2 is characterized in that: One end of the sealing plate (3) is protruding to form a clamping head (303), and the other end is concave to form a clamping groove (304) coupled to the clamping head (303).
4. The blocking device for injection of elastic short sleeper reconstruction material according to claim 3 is characterized in that: The upper part of the clamp head (303) is made of a heavy-duty material, and the lower part is made of an elastic material; the upper part of the clamping slot (304) is made of a heavy-duty material, and the lower part is made of an elastic material.
5. The blocking device for injection of elastic short sleeper reconstruction material according to claim 2, characterized in that: The sealing plate (301) and the sealing strip (302) are connected by bonding, vulcanization, mechanical connection or clamping.
6. A blocking device for injection of elastic short sleeper reconstruction material according to any one of claims 1 to 5, characterized in that: The sealing baffles (3) are provided with four pieces, and the four sealing baffles (3) are connected end to end in sequence to form a rectangular frame.
7. The blocking device for injection of elastic short sleeper reconstruction material according to claim 2 is characterized in that: A through slot is provided on the clamping head (303) along the width direction of the sealing baffle plate (3), and a bolt slot corresponding to the through slot is provided on the inner side wall of the clamping slot (304) along the length direction of the sealing baffle plate (3), and also includes a locking bolt, which passes through the through slot and is screwed into the bolt slot.
