A method for treating the cavitation of short sleeper support type integral ballast bed

By using grouting reinforcement, interlayer rebar connection, and lateral limiting methods, the problem of the integral track bed with short sleeper support platform in the curved position was solved, and a stable connection between the track bed block and the beam surface was achieved, ensuring the durability of the track structure and the safety of train operation.

CN118668536BActive Publication Date: 2024-11-08CHINA RAILWAY NO 2 ENG GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411163671.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-08
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

Existing technologies, when dealing with the delamination of short sleeper-supported integral track beds at curved locations, have insufficient filling strength and limited durability, making them prone to secondary delamination under the dynamic load of trains.

Method used

The method of grouting reinforcement, interlayer rebar connection and lateral limiting is adopted. Modified epoxy material is injected by drilling grouting holes in the track bed block, anchor steel bars are implanted to connect the track bed block and the beam surface, and limiting mechanisms are set on both sides of the lateral side to stabilize the connection.

Benefits of technology

The durability of the track structure was restored, ensuring the track remained in good service condition within its design life, preventing secondary separation between the track bed blocks and the beam surface, and achieving permanent treatment of track bed separation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118668536B_ABST
    Figure CN118668536B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of rail transit disease treatment, and specifically to a method for treating the hollowing of an integral ballast with a short rail sleeper support. The method adopts the technical means of grouting reinforcement, interlayer reinforcement connection and lateral limiting to treat the hollowing of ballast blocks, so as to restore the durability of the track structure, ensure the good service state of the track structure and ensure the driving safety. The interlayer reinforcement connection can strengthen the connection between the ballast block and the beam surface, and vertically tighten the hollowing gap reinforced by grouting, so that the force of the rail on the ballast block during driving can be transmitted to the beam surface along the anchoring steel bar, and secondary hollowing is not easy to occur. At the same time, through the setting of the limiting mechanism, the relative position of the ballast block and the beam surface is fixed, and the ballast block is not easy to displace in the lateral direction, so that the transmission of lateral force and vertical force between the ballast block and the beam surface at the curved position is realized, so that the connection between the ballast block and the beam surface is more stable, and hollowing is not easy to occur again, thereby realizing the permanent treatment of the ballast bed hollowing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rail transit disease treatment, and in particular to a method for treating a short rail sleeper support type integral track bed void. Background Art

[0002] During the use of the overall ballast structure of urban rail transit, the spring clip fasteners exert a clamping pressure on the rails, and the force is transmitted to the ballast blocks. The ballast blocks will be subjected to the upward force of the rails. As the operating time increases, gaps will appear at the bonding interface between the ballast blocks and the new and old concrete on the beam surface. Subsequently, rainwater invades. Under the continuous action of the dynamic load of the train, the gap between the ballast blocks and the beam surface increases, and gradually evolves into air gaps, seriously endangering driving safety.

[0003] The existing rail transit hollowing repair technology mainly adopts the method of injecting concrete slurry or chemical slurry into the hollow gap to achieve filling and reinforcement of the gap. The Chinese patent application with application number CN202210254322.3 discloses a construction method for repairing the hollowing of sleepers on a long-sleeper embedded type trackless track. The method comprises drilling grouting holes on the ballast plate, setting drainage holes, and injecting a two-component grouting material configured in proportion through a water-stop needle tube set in the grouting hole. After the grouting material is completely cured, the hollowing of the sleeper is repaired.

[0004] However, for the short-sleeper-supported integral ballast located in the curve, the force exerted by the rails is more complex than that of the straight section, especially the curved section with a slope. It is very easy to produce a greater impact at the intersection of the curved section and the straight section of the track line, causing the ballast to shift or detach from the roadbed base. If only grouting is used to deal with the voids, its filling strength is insufficient and the durability is limited. It is very easy to cause secondary voids under the dynamic load of the train. Summary of the invention

[0005] The purpose of the present invention is to overcome the existing technology of using grouting to deal with the debonding of the track bed at the curved position, to make up for the shortcomings of insufficient strength, limited durability, and easy secondary debonding under the action of train dynamic load, and to provide a method for dealing with the debonding of the integral track bed with a short rail sleeper support.

[0006] The present invention provides a method for treating a short sleeper support type integral track bed which is emptied, comprising:

[0007] S1. Grouting reinforcement: Drill grouting holes on the ballast block to the gaps and inject modified epoxy materials into the gaps for filling and reinforcement;

[0008] S2, interlayer planting connection: Anchor steel bars are implanted between the ballast block and the beam surface for connection, and the anchor steel bars are staggered with the steel bars inside the ballast block;

[0009] S3. Lateral limit: Limit mechanisms are arranged on both lateral sides of the ballast block, and the limit mechanisms are connected to the ballast block and the beam surface through anchors.

[0010] The present invention discloses a method for treating the hollowing of a short rail sleeper support platform integral track bed, which adopts the technical means of grouting reinforcement, interlayer reinforcement connection and lateral limiting to treat the hollowing of track bed blocks, can restore the durability of the track structure, ensure the good service state of the track structure within the design life, and ensure driving safety, wherein the interlayer reinforcement connection can strengthen the connection between the track bed block and the beam surface, and vertically tighten the hollowing gap reinforced by grouting, so that the force of the rail on the track bed block during driving can be transmitted to the beam surface along the anchoring steel bar, so that the filling and solidifying material in the hollowing gap is not easy to be separated due to the force again, and secondary hollowing is not easy to occur. At the same time, through the setting of the limiting mechanism, the relative position of the track bed block and the beam surface is fixed, and the track bed block is not easy to displace in the lateral direction. The lateral force and vertical force between the track bed block and the beam surface in the curved position are transmitted by the limiting mechanism, so that the connection between the track bed block and the beam surface is more stable, and hollowing is not easy to occur again, thereby realizing permanent treatment of track bed hollowing.

[0011] Preferably, the method further includes: before grouting reinforcement, a groove is formed on the beam surface along the edge of the ballast block, and an edge sealing material is filled in the groove to seal the circumference of the gap. The groove can more fully expose the gap between the ballast block and the beam surface, facilitate monitoring of the grouting condition, and achieve a better grouting effect. At the same time, the edge sealing material is used to seal the gap circumference, which can limit the grouting range, ensure full grouting, and achieve complete sealing of the gap area of ​​the ballast block.

[0012] Preferably, the length of the groove exceeds the longitudinal length of the hollowing gap, the depth of the groove exceeds the bottom surface of the hollowing gap, and the width of the groove is 25-30 cm; and the edge sealing material includes polymer waterproof mortar.

[0013] Preferably, the method further comprises: setting up a template outside the limiting mechanism, forming a grouting space surrounding the limiting mechanism between the template and the ballast block, and injecting mortar into the grouting space to seal the limiting mechanism. The limiting mechanism is sealed in the formed mortar block, which has a good protective effect on the limiting mechanism. At the same time, the formed mortar block further strengthens the connection between the ballast block and the beam surface, and blocks the gap at the contact position between the ballast block and the beam surface.

[0014] Preferably, the limiting mechanism comprises a bottom plate, a vertical plate and two rib plates, the bottom plate is used to fit the beam surface, the vertical plate is used to fit the lateral side wall of the roadbed block, the rib plates connect the bottom plate and the vertical plate, and the bottom plate and the vertical plate are respectively fixed by the anchoring parts. The limiting mechanism can achieve force dispersion through surface contact between the roadbed block and the beam surface, so that the limiting mechanism is stably arranged and has a better use effect.

[0015] Preferably, the limiting mechanism and the anchoring steel bar are arranged in a transverse alignment in the ballast block, so as to better withstand the lateral impact force caused by driving on the curved track section, and achieve a better effect of handling the emptying of the curved short sleeper support platform integral ballast.

[0016] Preferably, the interlayer reinforcement connection includes:

[0017] By detecting the steel bars inside the ballast block, a distribution diagram of the steel bars inside the ballast block is determined, and the positions of the anchor holes for setting the anchor steel bars are determined;

[0018] The anchor hole is drilled by a water drill, and the anchor hole extends into the beam surface by at least 150 mm;

[0019] Anchoring steel bars are implanted in the anchor holes by using anchoring glue; the thickness of the anchoring glue sealing the anchoring steel bars near the opening of the anchor holes is not less than 3 cm.

[0020] It can avoid that the setting of the anchor steel bars affects the strength of the steel bars inside the ballast block, and strengthen the connection between the ballast block and the beam surface through the anchor steel bars.

[0021] Preferably, the grouting holes are obliquely extended from the lateral side of the roadbed block, and the anchoring holes are extended from the top surface of the roadbed block. This realizes the reinforced connection from different directions, so that the treated structure can effectively transmit and disperse the force under the impact of driving in the curved section, and the treatment durability is better.

[0022] Preferably, the anchoring steel bars are arranged vertically and / or obliquely;

[0023] A plurality of anchoring steel bars are arranged oppositely on both sides of the track;

[0024] A plurality of the anchoring steel bars are arranged at intervals along the longitudinal direction of the track.

[0025] The anchor steel bars are arranged in a dispersed manner to further strengthen the stable connection between the ballast block and the beam surface.

[0026] Preferably, it also includes: using sealing materials to seal the surface of the roadbed block as a whole, so as to seal the hollow side of the roadbed and the surface of the joint between the new and old concrete, avoid subsequent erosion by rainwater, etc., and further improve the durability of the structure after treatment.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. The present invention provides a method for treating the cavitation of a short sleeper cap type integral ballast bed, which can restore the durability of the track structure, ensure the good service state of the track structure within the design life, and ensure driving safety by adopting grouting reinforcement, interlayer reinforcement connection and lateral limit technical means to treat the cavitation of the ballast bed block;

[0029] 2. The present invention provides a method for treating the short rail sleeper support type integral ballast bed voids. By adopting interlayer reinforcement connection, the ballast block and the beam surface can be strengthened and the void gap can be vertically tightened, so that the force of the rail on the ballast block during driving can be transmitted to the beam surface along the anchoring steel bar, so that the filling and solidifying material in the void gap is not easy to be separated due to force, and secondary voiding is not easy to occur;

[0030] 3. The present invention provides a method for dealing with the short sleeper support type integral ballast bed being emptied. By setting a limiting mechanism, the relative position of the ballast block and the beam surface is fixed, and the ballast block is not easily displaced in the lateral direction;

[0031] 4. The present invention provides a method for dealing with the emptying of a short sleeper cap type integral ballast bed, which transmits the lateral force and vertical force between the ballast block and the beam surface at the curved position through a limit mechanism, so that the connection between the ballast block and the beam surface is more stable and the emptying situation is not likely to occur again;

[0032] 5. The present invention provides a method for treating the hollowing of a short-sleeper-capped integral ballast, thereby achieving permanent treatment of the hollowing of the integral ballast. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic flow chart of a method for treating a short sleeper cap type integral track bed void according to the present invention;

[0034] Figure 2 It is a schematic diagram of the ballast bed emptying position illustrated in Example 1;

[0035] Figure 3 It is a side view of the positional relationship between the grouting hole and the ballast block in Example 1;

[0036] Figure 4 A top view showing the positional relationship among the anchor hole, the limiting mechanism and the ballast block in Example 1;

[0037] Figure 5 Schematic diagram of the positional relationship between the grouting holes, anchor holes and grooves on the ballast block in Example 2;

[0038] Figure 6 Schematic diagram of the positional relationship between the limiting mechanism and the ballast block in Example 3;

[0039] Figure 7 This is a schematic diagram of the structure of the limiting mechanism described in Example 3.

[0040] Markings in the figure:

[0041] 1-ballast block, 11-grouting hole, 12-anchor hole, 2-beam surface, 3-voided gap, 4-anchor steel bar, 5-limiting mechanism, 51-anchor part, 52-base plate, 53-vertical plate, 54-rib plate, 6-groove, 7-template. DETAILED DESCRIPTION

[0042] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0043] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0044] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0045] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0046] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0047] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0048] Example 1

[0049] like Figure 2 As shown in the figure, taking the short sleeper pedestal integral ballast bed hollowing disease of a certain elevated section as an example, the ballast bed hollowing area T is located at the end of the curve section of the line. The curve radius of the upline of this section is 410m, the length of the transition curve is 65m, the curve radius of the downline is 430m, the length of the transition curve is 65m, and the longitudinal slope of the line is designed to be 34%. Short sleepers are arranged in blocks on the ballast bed block 1. The connection interface between the ballast bed block 1 and the bottom beam surface 2 produces separation and grouting under the continuous action of the train dynamic load, which gradually evolves into ballast bed hollowing, and cracks appear on some ballast bed blocks 1, endangering driving safety.

[0050] To restore track durability and ensure driving safety, Figure 1 As shown, this embodiment proposes a method for treating the hollowing of the short sleeper cap type monolithic ballast bed in view of the hollowing disease of the short sleeper cap type monolithic ballast bed in the elevated curved section, comprising the following steps:

[0051] S1. Grouting reinforcement: Drill grouting holes 11 on the ballast block 1 to the hollow gap 3, and inject modified epoxy material into the hollow gap 3 for filling and reinforcement, such as Figure 5 As shown;

[0052] S2, interlayer planting connection: Anchor steel bars 4 are implanted between the ballast block 1 and the beam surface 2 for connection. The anchor steel bars 4 are staggered with the internal steel bars of the ballast block 1, such as Figure 5 As shown;

[0053] S3, lateral limit: The lateral side walls of the ballast block 1 are oppositely provided with limit mechanisms 5, which are connected to the ballast block 1 and the beam surface 2 through anchoring members 51. The limit mechanisms 5 are used to play a lateral limit role, such as Figure 6 shown.

[0054] In an optional implementation, before on-site work, the surfaces of the rails and related equipment in the working area are covered with geotextile or polypropylene cloth and tied and fixed with wire to prevent pollution and damage to the surfaces of the rails and related equipment during construction.

[0055] In an optional embodiment, the modified epoxy material in step S1 can be a mixture of 55% epoxy resin, 2% nano-aluminum oxide, 3% nano-boron nitride, 5% rubber, 35% curing agent, and 2% accelerator in mass percentage.

[0056] In an optional implementation manner, step S1 may specifically include:

[0057] S1.1. Drilling: Drill grouting holes 11 obliquely from the lateral side of the ballast block 1. Multiple grouting holes 11 are arranged at intervals along the longitudinal direction of the track. Every two grouting holes 11 are arranged opposite to each other on the lateral sides of the ballast block 1. Grouting is performed through multiple grouting holes 11 at the same time to fill and reinforce the empty gap 3. The grouting condition can be judged by observing the grouting condition of each grouting hole 11 during the grouting process. Figure 3 As shown;

[0058] S1.2, cleaning the grouting hole 11: use a hair dryer to blow and clean the grouting hole 11 to ensure that the grouting hole 11 and the empty gap 3 are clean;

[0059] S1.3, burying the grouting pipe: bury the grouting pipe into the grouting hole 11 in sequence, and prevent the grouting pipe from being blocked;

[0060] S1.4. Use a grouting machine to inject the configured special modified epoxy material into the hollow gap 3, and ensure that the grouting is full, so that the injected slurry can not only fill, reinforce and seal the hollow gap 3, but also fill and reinforce the cracks on the ballast block 1 from the inside to the outside.

[0061] Preferably, the angle between the grouting hole 11 and the lateral side of the ballast block 1 can be 50°. The grouting hole 11 set at this angle can be close to the middle area of ​​the de-airing crack 3, so that the slurry can be dispersed and flow more evenly after being injected into the de-airing crack 3, thereby improving the grouting effect.

[0062] In an optional implementation, a track gauge is used to detect and record the track gauge and superelevation at the construction location before grouting. The changes in track gauge and superelevation are monitored multiple times during the grouting process. Once it is found that the allowable limit is exceeded, the grouting is immediately stopped, and emergency measures such as replacing the track gauge block and rail pad are taken to restore the geometric shape of the rails to ensure the safety of train operation.

[0063] In an optional implementation manner, the interlayer reinforcement connection in step S2 may specifically include:

[0064] S2.1. By detecting the steel bars inside the ballast, the distribution map of the steel bars inside the ballast is determined, and the positions of the anchor holes 12 for setting the anchor steel bars 4 are determined to avoid damaging the steel bars inside the ballast block 1 due to the setting of the anchor steel bars 4. Figure 4 As shown;

[0065] S2.2. Use a water drill to vertically drill anchor holes 12 on the top surface of the ballast block 1. The anchor holes 12 extend into the beam surface 2 by at least 150 mm. Several anchor holes 12 are relatively arranged on both sides of the track in the horizontal direction. Several anchor holes 12 are arranged at intervals along the longitudinal direction of the track. Each anchor hole 12 is respectively provided with an anchor steel bar 4, so that the anchor steel bars 4 are dispersedly arranged to stably connect the ballast block 1 and the beam surface 2 in the empty area. Figure 4 As shown;

[0066] S2.3. Anchoring steel bars 4 are implanted in the anchoring holes 12 using an implanting adhesive.

[0067] In an optional embodiment, the anchor hole 12 extends vertically from the top surface of the ballast block 1 and passes through the vacant gap 3 filled in step S1 , so as to strengthen the connection between the ballast block 1 and the beam surface 2 through the anchor steel bar 4 .

[0068] In an optional embodiment, the anchor hole 12 extends obliquely from the top surface of the ballast block 1 at a certain inclination angle to match the structural characteristics of the inclined road surface in the curved section, so that the connection reinforcement effect of the anchor steel bar 4 is better. The drilling direction of the anchor hole 12 can be adjusted according to the actual situation, and then after the anchor steel bar 4 is implanted, the anchor steel bar 4 applies a tensioning force to the ballast block 1 and the beam surface 2, and the vacant gap 3 is tightly squeezed to achieve a reinforced connection from different directions, so that the force of the treated structure under the impact of driving in the curved section can be effectively transmitted and dispersed downward along the distributed anchor steel bars 4, so that the treatment durability is better.

[0069] Preferably, the anchor hole 12 can be formed by drilling with a water drill, the drill hole diameter is 35 mm, the anchor steel bar 4 can be a φ28 mm ribbed steel bar, the ribbed steel bar is implanted into the anchor hole 12 using anchor glue, and the anchor glue sealing thickness of the anchor steel bar 4 near the hole mouth of the anchor hole 12 is not less than 3 cm.

[0070] In one or more embodiments, it also includes: using sealing materials to seal the surface of the ballast block 1 as a whole, so as to seal the hollow side of the ballast and the surface of the joint between the new and old concrete, avoid subsequent erosion by rainwater, etc., and further improve the durability of the structure after treatment.

[0071] In an optional embodiment, the overall sealing of the surface of the ballast block 1 may include:

[0072] A1. Interface cleaning: Use tools such as wire brush, angle grinder, hair dryer, etc. to clean the surface;

[0073] A2. Surface sealing: Use sealing materials to brush the repaired structure surface to achieve tight surface sealing. Apply the surface sealing material more than 3 times. Each coat must wait until the previous coat of sealing material is dry before applying it to ensure the coating thickness and width.

[0074] Preferably, the sealing material can be a mixture of 60-70 parts by weight of modified epoxy resin, 4-8 parts by weight of ethylenediamine, 10-15 parts by weight of dibutyl amine and 15-20 parts by weight of acetoneamine.

[0075] The present embodiment provides a method for dealing with the debonding of a short rail sleeper support integral ballast bed, which adopts grouting reinforcement, interlayer reinforcement connection and lateral limiting technical means to deal with the debonding of the ballast bed block 1, which can restore the durability of the track structure, ensure the good service state of the track structure within the design life, and ensure driving safety. Among them, the interlayer reinforcement connection can strengthen the connection between the ballast bed block 1 and the beam surface 2, and vertically tighten the debonding gap 3 reinforced by grouting, so that the force of the rail on the ballast bed block 1 during driving can be transmitted to the beam surface 2 along the anchor steel bar 4, so that the filling and solidifying material in the debonding gap 3 is not easy to be separated due to force, and secondary debonding is not easy to occur. At the same time, through the limiting mechanism 5 The arrangement fixes the relative position of the ballast block 1 and the beam surface 2, and the ballast block 1 is not easily displaced in the lateral direction. The lateral force and vertical force between the ballast block 1 and the beam surface 2 in the curved position are transmitted through the limiting mechanism 5, so that the lateral push / pull force of the ballast block 1 is transmitted to the limiting mechanism 5 through the anchor 51 connected to the ballast block 1 and then to the anchor 51 connected to the beam surface 2, converting the push / pull force into the shear force of another anchor 51. Similarly, the upward push / pull force on the track during driving is converted into the shear force of another anchor 51, making the connection between the ballast block 1 and the beam surface 2 more stable and less likely to become empty, thereby achieving permanent treatment of the overall ballast bed emptying.

[0076] Example 2

[0077] like Figure 5 As shown, a method for dealing with a hollowed-out short sleeper-pedestal integral ballast of this embodiment, based on Embodiment 1, further includes: before grouting reinforcement, a groove 6 is opened on the beam surface 2 along the edge of the ballast block 1, and edge sealing materials are filled in the groove 6 to seal the hollowed-out gap 3 circumferentially.

[0078] The present embodiment provides a method for dealing with a hollowing out of an integral ballast with a short rail sleeper support. The method is explained by taking the formation of a local hollowing out crack 3 between a ballast block 1 and a beam surface 2 as an example. By opening a groove 6 on the beam surface 2 along the longitudinal edge of the ballast block 1, the position of the hollowing out crack 3 between the ballast block 1 and the beam surface 2 can be more fully exposed, which facilitates the monitoring of the grouting condition and achieves a better grouting effect. At the same time, the hollowing out crack 3 is sealed circumferentially with edge sealing materials, which can limit the grouting range and ensure full grouting, thereby achieving complete sealing of the hollowing out area of ​​the ballast block 1. During the grouting process, the slurry is filled in a restricted space, which not only fully fills the hollowing out crack 3, but also effectively fills and reinforces the internal cracks on the ballast block 1, thereby achieving effective treatment of hollowing out and cracks in the ballast block 1.

[0079] In an optional embodiment, the length of the groove 6 exceeds the longitudinal length of the hollow gap 3, the depth of the groove 6 exceeds the bottom surface of the hollow gap 3, and the width of the groove 6 is 25-30 cm; the edge sealing material includes polymer waterproof mortar. The edge sealing material in the groove 6 can ensure the complete sealing of the hollow gap 3, forming a limited grouting range.

[0080] Preferably, long strip grooves 6 can be opened on both sides of the ballast block 1 along the longitudinal direction of the track. The grooves 6 are 25-30 cm wide and 20 cm deep, and are filled with edge sealing material. The filling height exceeds the empty gap 3. After the modified epoxy material is cured, the excess edge sealing material is chiseled out and cleaned.

[0081] Example 3

[0082] The method for dealing with the debonding of a short rail sleeper support integral track bed of the present embodiment, based on the first and second embodiments, further includes: setting up a template 7 outside the limiting mechanism 5, forming a grouting space surrounding the limiting mechanism 5 between the template 7 and the track bed block 1, and injecting mortar into the grouting space to seal the limiting mechanism 5.

[0083] The present embodiment provides a method for dealing with a hollowed-out integral ballast of a short rail sleeper support platform. By setting up a formwork 7 and pouring mortar to seal the limiting mechanism 5, the limiting mechanism 5 is enclosed in the formed mortar block, forming a protective layer for the limiting mechanism 5, which has a good protective effect on the limiting mechanism 5. At the same time, the formed mortar block further strengthens the connection between the ballast block 1 and the beam surface 2, and seals the grouting hole 11 and the gap between the ballast block 1 and the beam surface 2.

[0084] In an optional embodiment, if Figure 7 As shown, the limiting mechanism 5 includes a bottom plate 52, a vertical plate 53 and two rib plates 54. The bottom plate 52 is used to fit the beam surface 2, the vertical plate 53 is used to fit the lateral side wall of the roadbed block 1, and the rib plates 54 connect the bottom plate 52 and the vertical plate 53. The bottom plate 52 and the vertical plate 53 are respectively fixed by anchoring members 51. The limiting mechanism 5 can achieve force dispersion through surface contact between the roadbed block 1 and the beam surface 2, so that the limiting mechanism 5 is stably arranged and has a better use effect.

[0085] Preferably, the bottom plate 52 and the vertical plate 53 are both rectangular steel plates, the bottom plate 52 and the vertical plate 53 are perpendicular to each other, the rib plate 54 is a triangular steel plate, the rib plate 54 is vertically connected to the bottom plate 52 and the vertical plate 53 respectively, the two rib plates 54 are arranged in parallel, and the anchor 51 is arranged between the two rib plates 54.

[0086] Preferably, the anchoring member 51 can be a bolt, which can be embedded with anchor glue after drilling. Specifically, an M20 inverted cone anchor bolt can be used as the anchoring member 51, and the anchoring depth is at least 150 mm. The anchor bolt is tightened by a matching bolt.

[0087] Preferably, Figure 6 As shown, the template 7 can be a stainless steel cubic box, and the height of the template 7 box exceeds the grouting hole 11, so that the mortar block used to close the limiting mechanism 5 can further block the grouting hole 11.

[0088] In an optional embodiment, the limiting mechanism 5 and the anchoring steel bar 4 are arranged in transverse alignment with the ballast block 1, that is, the anchoring position of the limiting mechanism 5 and the anchoring hole 12 of the anchoring steel bar 4 are on the same cross-section of the ballast block 1, so that it can better withstand the lateral impact force caused by driving on the curved section of the track, and the emptying treatment effect of the integral ballast with short rail sleeper support in the curved section is better.

[0089] In an optional embodiment, the limiting mechanism 5 may be arranged only on the outside of the track to play a lateral limiting role, with one limiting mechanism being arranged for every two sleepers, and the longitudinal spacing between adjacent limiting mechanisms 5 being at least 1.2 m.

[0090] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for treating the short sleeper support type integral track bed, characterized in that: include: S1, grouting reinforcement: drilling a grouting hole (11) on the ballast block (1) to the debonded crack (3), and injecting a modified epoxy material into the debonded crack (3) for filling and reinforcement; S2, interlayer implanted reinforcement connection: implanting anchoring steel bars (4) between the ballast block (1) and the beam surface (2) for connection, wherein the anchoring steel bars (4) are offset from the internal steel bars of the ballast block (1); The interlayer reinforcement connection comprises: By detecting the steel bars inside the ballast block (1), a distribution diagram of the steel bars inside the ballast block (1) is determined, and the position of the anchor hole (12) for setting the anchor steel bar (4) is determined; The anchor hole (12) is drilled by a water drill, and the anchor hole (12) extends into the beam surface (2) by at least 150 mm; Anchoring steel bars (4) are implanted in the anchoring holes (12) by means of anchoring glue; the thickness of the anchoring glue sealing the anchoring steel bars (4) near the opening of the anchoring holes (12) is not less than 3 cm; the grouting holes (11) are inclinedly extended from the lateral side of the ballast block (1), and the anchoring holes (12) are extended from the top surface of the ballast block (1) and pass through the vacated gaps (3) filled in step S1; The anchoring steel bars (4) are arranged vertically and / or obliquely; A plurality of anchoring steel bars (4) are arranged oppositely on both sides of the track; A plurality of anchoring steel bars (4) are arranged at intervals along the longitudinal direction of the track; S3, lateral limiting: limiting mechanisms (5) are arranged on both lateral sides of the ballast block (1), the limiting mechanisms (5) are connected to the ballast block (1) and the beam surface (2) through anchoring members (51), the limiting mechanisms (5) and the anchoring steel bars (4) are arranged in a transversely aligned manner on the ballast block (1), and the limiting mechanisms transmit lateral force and vertical force between the ballast block and the beam surface at the curved position; The method further comprises: setting up a template (7) outside the limiting mechanism (5), forming a grouting space surrounding the limiting mechanism (5) between the template (7) and the ballast block (1), and injecting mortar into the grouting space to seal the limiting mechanism (5) to form a mortar block.

2. The method for treating the short sleeper support type integral track bed void according to claim 1, characterized in that: Also includes: Before grouting reinforcement, a groove (6) is opened on the beam surface (2) along the edge of the ballast block (1), and an edge sealing material is filled in the groove (6) to seal the circumference of the gap (3).

3. The method for treating the short sleeper cap type integral track bed according to claim 2 is characterized in that: The length of the groove (6) exceeds the longitudinal length of the hollowing gap (3), the depth of the groove (6) exceeds the bottom surface of the hollowing gap (3), and the width of the groove (6) is 25-30 cm; the edge sealing material includes polymer waterproof mortar.

4. The method for treating the short sleeper support type integral track bed void according to claim 1, characterized in that: The limiting mechanism (5) comprises a bottom plate (52), a vertical plate (53) and two rib plates (54); the bottom plate (52) is used to fit the beam surface (2); the vertical plate (53) is used to fit the lateral side wall of the roadbed block (1); the rib plates (54) connect the bottom plate (52) and the vertical plate (53); the bottom plate (52) and the vertical plate (53) are respectively fixed by the anchoring members (51).

5. The method for treating the short sleeper cap type integral track bed void according to claim 1, characterized in that: Also includes: The surface of the ballast block (1) is entirely sealed using a sealing material.