Waterproof structure for open section construction joint of open cut tunnel
By using a waterproof structure that combines continuous spraying of quick-setting rubber asphalt waterproof coating and buried steel-edge rubber waterstop in the open-cut tunnel, the problem of poor waterproofing performance of the open-cut tunnel is solved, forming a fully wrapped skin waterproofing system. The risk of water leakage is reduced and repair costs are reduced.
Patent Information
- Application Number
- CN202323320113.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-06
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-06
AI Technical Summary
The waterproof performance of open-cut tunnels in the existing technology is poor and water leakage is prone to occur, resulting in high maintenance costs in the future and treating the symptoms rather than the root cause.
A waterproof structure including the tunnel body, enclosure structure and embedded steel-edge rubber waterstop is adopted. A continuous layer of quick-setting rubber asphalt waterproof coating is sprayed on the outside of the tunnel body and enclosure structure, and is installed between the circumferential construction joints. The embedded steel-edge rubber waterstop is combined with water-swellable putty block and cement-based penetrating crystallized waterproof coating to form a fully wrapped skin-type waterproofing system.
The waterproof coating is fully adhered to the structural surface without peeling off or water channeling, forming a continuous and complete waterproof layer, which effectively alleviates the problem of poor waterproofing performance of open-cut tunnels and reduces the risk of water leakage.
Smart Images

Figure CN221798523U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building waterproof construction, in particular to a waterproof structure for construction joints in an open section of an open-cut tunnel. Background Art
[0002] The construction methods of tunnels under urban roads at home and abroad can be divided into open-cut method and dark-cut method. When the tunnel is shallow, the open-cut method is generally used, and when the tunnel is deep, the dark-cut method is generally used. According to the excavation depth of the foundation pit, engineering geology, hydrogeology and surrounding environmental conditions, the open-cut method can adopt slope excavation, combined with retaining structures such as soil nail walls, anchor retaining walls, and pile rows. When there are dense buildings around the foundation pit, pile row retaining structures are generally set up. The construction sequence of the open-cut tunnel is usually to construct the foundation pit retaining structure first, then excavate the rock and soil from top to bottom in layers, cast the tunnel lining structure after excavating to the bottom of the pit, and finally backfill the top of the tunnel to restore the surface.
[0003] For open-cut tunnels, the overall level of tunnel projects built in my country has been improved to a certain extent, whether in terms of design standards or construction technology. However, water leakage still occurs frequently. Water leakage not only affects the service life and safety of tunnel structures, but also because waterproofing is a concealed project, once leakage occurs, the large-scale grouting technology currently adopted not only treats the symptoms but not the root cause, but also because the empty area behind the leakage point is large, and if it is blocked here, it will leak there again. The high subsequent maintenance costs of continuous large-scale grouting will bring a heavy economic burden. Utility Model Content
[0004] The utility model aims to provide a waterproof structure for construction joints in an open section of an open-cut tunnel, so as to solve the problem in the prior art that the waterproof performance of the open-cut tunnel is poor and water leakage is easy to occur.
[0005] Based on the above purpose, the present application provides a waterproof structure for construction joints in an open section of an open-cut tunnel, comprising a tunnel body, a retaining structure and a centrally embedded steel-edge rubber waterstop;
[0006] The tunnel body comprises a side wall and a bottom plate, and a fine stone concrete protective layer, a first sprayed quick-setting rubber asphalt waterproof coating layer, a non-woven fabric layer and a concrete cushion layer are sequentially arranged below the bottom plate;
[0007] The enclosure structure is arranged on the outside of the side wall, and a second sprayed quick-setting rubber asphalt waterproof coating layer and a base surface leveling layer are sequentially arranged between the side wall and the enclosure structure;
[0008] Furthermore, the first sprayed quick-setting rubber asphalt waterproof coating layer and the second sprayed quick-setting rubber asphalt waterproof coating layer are formed by continuous spraying;
[0009] An embedded steel-edge rubber waterstop is arranged between each section of the circumferential construction joints along the extension direction of the tunnel body, wherein both side ends of the embedded steel-edge rubber waterstop are respectively wrapped with water-expanding putty blocks.
[0010] Furthermore, the embedded steel-edge rubber waterstop includes a rubber connecting belt and a steel belt, and the two ends of the rubber connecting belt are respectively connected to the steel belt; and the two sides of the center line of the rubber connecting belt in the length direction are respectively wrapped with water-expandable putty blocks.
[0011] Furthermore, the embedded steel-edged rubber waterstop is adapted to the cross-sectional shape of the tunnel body.
[0012] Furthermore, a first grouting conduit is pre-buried in the annular construction joint of the side wall, and is used to fill the annular construction joint outside the embedded steel edge rubber water stop with cement-based penetrating crystallization waterproof coating;
[0013] Furthermore, the annular construction joint inside the embedded steel-edge rubber waterstop is filled with water-swellable waterstop glue.
[0014] Furthermore, a second grouting conduit is pre-buried in the annular construction joint of the base plate, and is used to fill the annular construction joint below the embedded steel edge rubber water stop with cement-based penetrating crystallization waterproof coating;
[0015] Furthermore, the annular construction joint above the embedded steel-edge rubber waterstop is filled with water-swellable waterstop glue.
[0016] Furthermore, the longitudinal construction joint between the base plate and the side wall is filled with cement-based penetrating crystalline waterproof coating, and a steel plate waterstop is arranged in a direction perpendicular to the construction joint, and a water-swellable waterproof glue is filled between the steel plate waterstop and the longitudinal construction joint.
[0017] Furthermore, a third grouting conduit is pre-buried in the side wall for injecting cement-based penetrating crystalline waterproof coating into the longitudinal construction joint.
[0018] Furthermore, the steel plate waterstop and the steel strip of the embedded steel-edge rubber waterstop are connected by rivets.
[0019] Furthermore, anti-pullout piles inserted into the ground are arranged below the concrete cushion layer.
[0020] Furthermore, the base leveling layer extends downward to the connection between the concrete cushion layer and the enclosure structure to form a cement mortar chamfer;
[0021] A first sprayed quick-setting rubber asphalt waterproof coating reinforcement layer is arranged between the cement mortar chamfer and the first sprayed quick-setting rubber asphalt waterproof coating layer and the second sprayed quick-setting rubber asphalt waterproof coating layer.
[0022] By adopting the above technical solution, the waterproof structure of the construction joint of the open section of the open-cut tunnel provided by the present application has the following technical effects compared with the prior art:
[0023] In the technical solution of the present application, firstly, by spraying a continuous first spray quick-setting rubber asphalt waterproof coating layer and a second spray quick-setting rubber asphalt waterproof coating layer on the outer side of the bottom plate and the side wall, the waterproof coating is directly adhered to the structural surface, does not peel off, does not leak water, the waterproof layer is continuous and complete, and has no overlaps, forming a fully wrapped skin-type waterproof layer, forming a continuous overall fully wrapped waterproof system for the entire tunnel structure; secondly, an embedded steel-edge rubber waterstop is arranged between each section of the circumferential construction joints along the extension direction of the tunnel body, wherein the two side ends of the embedded steel-edge rubber waterstop are respectively wrapped with water-expanding putty blocks. During construction, before pouring concrete on one side, Wrap half of the end section of the embedded steel-edge rubber waterstop with a water-swellable putty block, with the putty block extending 5mm beyond the end of the rubber waterstop, and then pour concrete; before pouring concrete on the other side, wrap the remaining end section of the waterstop with the same water-swellable putty block, and then pour concrete, so that the embedded steel-edge rubber waterstop is used in combination with the water-swellable putty block, and is fully integrated with the concrete on both sides of the circumferential construction joint. Combined with the first sprayed quick-setting rubber asphalt waterproof coating layer and the second sprayed quick-setting rubber asphalt waterproof coating layer on the outside, it can effectively alleviate the problem of poor waterproof performance of open-cut tunnels and easy water leakage in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 A schematic diagram of a waterproof structure for a construction joint in an open section of an open-cut tunnel provided in an embodiment of the present application;
[0026] Figure 2 for Figure 1 A schematic diagram of the structure of a centrally embedded steel-edge rubber waterstop provided between the annular construction joints of the front and rear sections along the extension direction of the tunnel body at F in the middle;
[0027] Figure 3 This is a structural diagram of the embedded steel-edge rubber waterstop;
[0028] Figure 4 for Figure 1 Sectional view at AA in the middle;
[0029] Figure 5 for Figure 1 Sectional view at the middle BB;
[0030] Figure 6 for Figure 1 Schematic diagram of the structure at C in the middle;
[0031] Figure 7 for Figure 1 Schematic diagram of the structure at D in the middle;
[0032] Figure 8 This is a schematic diagram of the connection structure between the steel plate waterstop and the embedded steel-edge rubber waterstop.
[0033] Icons: 100- tunnel body; 110- side wall; 111- first grouting conduit; 120- bottom plate; 121- fine stone concrete protective layer; 122- first sprayed quick-setting rubber asphalt waterproof coating layer; 123- non-woven fabric layer; 124- concrete cushion layer; 125- pull-out pile; 126- third grouting conduit; 128- water-swelling water-stop glue; 129- steel plate water-stop strip; 130- longitudinal construction joint; 140- circumferential construction joint; 141- second grouting conduit; 200- retaining structure; 210-second sprayed quick-setting rubber asphalt waterproof coating layer; 220-base leveling layer; 230-cement mortar chamfer; 240-first sprayed quick-setting rubber asphalt waterproof coating reinforcement layer; 250-second sprayed quick-setting rubber asphalt waterproof coating reinforcement layer; 260-third sprayed quick-setting rubber asphalt waterproof coating reinforcement layer; 270-butyl rubber putty sheet; 300-buried steel-edge rubber waterstop; 301-rubber connecting belt; 302-steel belt; 310-water-expanding putty block; 400-rivet. DETAILED DESCRIPTION
[0034] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0035] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] like Figures 1 to 7 As shown, an embodiment of the present application provides a waterproof structure for construction joints in an open section of an open-cut tunnel, comprising a tunnel body 100, a retaining structure 200 and a buried steel-edge rubber waterstop 300;
[0038] The tunnel body 100 includes a side wall 110 and a bottom plate 120, and a fine stone concrete protective layer 121, a first sprayed quick-setting rubber asphalt waterproof coating layer 122, a non-woven fabric layer 123 and a concrete cushion layer 124 are sequentially arranged below the bottom plate 120;
[0039] The enclosure structure 200 is arranged on the outside of the side wall 110, and the second sprayed quick-setting rubber asphalt waterproof coating layer 210 and the base surface leveling layer 220 are arranged in sequence between the side wall 110 and the enclosure structure 200; that is, the base surface leveling layer 220 is arranged on the inner side of the side wall 110, and the second sprayed quick-setting rubber asphalt waterproof coating layer 210 is sprayed on the inner side of the base surface leveling layer 220, and then the side wall 110 is cast;
[0040] Furthermore, the first sprayed quick-setting rubber asphalt waterproof coating layer 122 and the second sprayed quick-setting rubber asphalt waterproof coating layer 210 are formed by continuous spraying.
[0041] It should be noted that Figure 3 The second sprayed quick-setting rubber asphalt waterproof coating layer 210 is shown to have a certain gap with the base surface leveling layer 220. The main purpose is to facilitate the clear display of the structure of the second sprayed quick-setting rubber asphalt waterproof coating layer 210 and the base surface leveling layer 220. In fact, the second sprayed quick-setting rubber asphalt waterproof coating layer 210 should be sprayed on the base surface leveling layer 220.
[0042] An embedded steel-edge rubber waterstop 300 is arranged between each section of the circumferential construction joints 140 along the extension direction of the tunnel body 100 , wherein both side ends of the embedded steel-edge rubber waterstop 300 are respectively wrapped with water-expandable putty blocks 310 .
[0043] In the technical solution of the present application, by spraying a continuous first spray quick-setting rubber asphalt waterproof coating layer 122 and a second spray quick-setting rubber asphalt waterproof coating layer 210 on the outer side of the bottom plate 120 and the side wall 110, the waterproof coating is directly fully adhered to the structural surface, without peeling, water leakage, continuous and complete waterproof layer, and no overlap, forming a fully wrapped skin-like waterproof layer, achieving the waterproof effect of external spraying and internal pasting, so that the entire tunnel structure can form a continuous overall full-coverage waterproof system;
[0044] Reference Figure 2 In addition, an embedded steel-edge rubber waterstop 300 is arranged between each section of the annular construction joint 140 along the extension direction of the tunnel body, wherein the two side ends of the embedded steel-edge rubber waterstop 300 are respectively wrapped with water-expandable putty blocks 310. During construction, before pouring concrete on one side, half of the cross-section of the end of the embedded steel-edge rubber waterstop 300 is wrapped with the water-expandable putty block 310, and the putty block exceeds the end of the rubber connecting belt 301 by 5 mm, and then concrete is poured; before pouring concrete on the other side, the remaining cross-section of the waterstop end is wrapped with the same water-expandable putty block 310, and then concrete is poured, so that the embedded steel-edge rubber waterstop 300 is used in combination with the water-expandable putty block 310, and is fully integrated with the concrete on both sides of the annular construction joint 140, and combined with the first sprayed quick-setting rubber asphalt waterproof coating layer and the second sprayed quick-setting rubber asphalt waterproof coating layer on the outside, it can effectively alleviate the problem of poor waterproof performance of open-cut tunnels and easy water leakage in the prior art.
[0045] In this embodiment, the first sprayed quick-setting rubber asphalt waterproof coating layer 122 and the second sprayed quick-setting rubber asphalt waterproof coating layer 210 both adopt a sprayed quick-setting rubber asphalt waterproof coating provided in the publication number CN107964362A, including component A and component B; component A includes anionic hard emulsified asphalt and polymer latex, and the needle penetration of the anionic hard emulsified asphalt is 30-50; component B includes a coagulant; wherein the polymer latex is a modified polymer latex, and the modified polymer latex is obtained by reacting a polymer latex containing a carboxyl group and a cross-linking agent that can react with the carboxyl group, and the cross-linking agent includes a coupling agent, a metal oxide, sulfur , peroxide, amine cross-linking agent, epoxy compound and isocyanate; the cross-linking reaction temperature of the carboxyl-containing polymer latex and the cross-linking agent is 20-25°C; in the component A, the weight proportion of the anionic hard emulsified asphalt is 30-90, and the weight proportion of the polymer latex is 10-70; in the component B, the concentration of the accelerator is 3-20%; the weight proportion ratio of the component A to the component B is 2:1-15:1; the tensile strength of the spray-applied quick-setting rubber asphalt waterproof coating reaches above 1.2MPa, the heat resistance reaches above 160°C, and the low temperature temperature is as low as below -25°C.
[0046] Based on the addition of anionic hard emulsified asphalt in component A, the prepared spray-coated quick-setting rubber asphalt waterproof coating has the characteristics of high tensile strength, good heat resistance and low low-temperature sensitivity, and is suitable for use in high-temperature construction environments and low-temperature environments. Since the material of the spray-coated quick-setting rubber asphalt waterproof coating topcoat belongs to the prior art, its specific components are not described in detail in this embodiment.
[0047] The spray-applied quick-setting rubber asphalt waterproof coating has no overlaps, which solves the risk of water seepage caused by overlaps; it provides perfect coverage to solve the problem of waterproofing special-shaped structures; it can cope with harsh natural exposed environments and has ultra-wide resistance to high and low temperatures, as well as ozone aging; it has high tensile strength, good heat resistance and low low-temperature temperature, and multiple properties of the waterproof coating are improved.
[0048] Reference Figure 3 Preferably, the embedded steel-edge rubber waterstop 300 includes a rubber connecting belt 301 and a steel belt 302, and the two ends of the rubber connecting belt 301 are respectively connected to the steel belt 302; the two sides of the center line of the rubber connecting belt 301 in the length direction are respectively wrapped with water-swelling putty blocks 310; through the use of the water-swelling putty blocks 310, a better sealing and waterproofing effect is achieved between the rubber connecting belt 301 and the steel belt 302 and the poured concrete.
[0049] Preferably, the embedded steel-edged rubber waterstop 300 is adapted to the cross-sectional shape of the tunnel body, that is, the embedded steel-edged rubber waterstop 300 is arranged as a U-shape as a whole, matching the shape of the bottom plate 120 and the side wall 110 of the tunnel body 100, so as to play a sufficient waterproof role.
[0050] Reference Figure 4 Preferably, a first grouting conduit 111 is pre-buried in the annular construction joint 140 of the side wall 110, and is used to fill the annular construction joint 140 on the outer side of the embedded steel-edge rubber waterstop 300 with a cement-based penetrating crystalline waterproof coating; and the annular construction joint 140 on the inner side of the embedded steel-edge rubber waterstop 300 is filled with a water-swellable waterproofing glue 128; through the combined use of the cement-based penetrating crystalline waterproof coating and the water-swellable waterproofing glue 128, the annular construction joint 140 on both sides of the side wall is fully sealed.
[0051] Reference Figure 5Preferably, a second grouting conduit 141 is embedded in the annular construction joint 140 of the base plate 120, and is used to fill the annular construction joint 140 below the embedded steel-edge rubber waterstop 300 with a cement-based penetrating crystalline waterproof coating; and the annular construction joint 140 above the embedded steel-edge rubber waterstop 300 is filled with a water-swellable waterproofing glue 128; by using the cement-based penetrating crystalline waterproof coating and the water-swellable waterproofing glue 128 in combination, the annular construction joint 140 on both sides of the base plate is fully sealed.
[0052] Preferably, anti-pullout piles 125 inserted into the ground are cast below the concrete cushion layer 124 to improve the supporting strength of the concrete cushion layer 124 .
[0053] Preferably, the anti-pulling piles 125 are provided in two rows and arranged along the extension direction of the tunnel body 100 .
[0054] Reference Figure 6 In addition, during construction, the base plate 120 is cast first, and then the side wall 110 is cast. The third grouting conduit 126 is pre-buried in the side wall 110, and the longitudinal construction joint 130 between the base plate 120 and the side wall 110 is filled with cement-based penetrating crystalline waterproof coating, and a steel plate waterstop 129 is arranged in a direction perpendicular to the construction joint, and the steel plate waterstop 129 and the longitudinal construction joint 130 are filled with water-swelling waterproof glue 128 to play a role in sealing and waterproofing the construction joint.
[0055] During the construction process, the steel plate water stop 129 and the embedded steel edge rubber water stop 300 are connected. In order to improve the firmness of the two, Figure 8 As shown, the steel plate waterstop 129 and the embedded steel-edge rubber waterstop 300 are connected by rivets 400, and a butyl rubber putty sheet 270 is arranged between the steel plate waterstop 129 and the embedded steel-edge rubber waterstop 300.
[0056] Reference Figure 7 In order to improve the waterproof performance between the concrete cushion layer 124 and the enclosure structure 200, in this embodiment, the base leveling layer 220 extends downward to the connection (inner corner) between the concrete cushion layer 124 and the enclosure structure 200 to form a cement mortar chamfer 230. In addition, a first sprayed quick-setting rubber asphalt waterproof coating reinforcement layer 240 is provided between the cement mortar chamfer 230 and the first sprayed quick-setting rubber asphalt waterproof coating layer 122 and the second sprayed quick-setting rubber asphalt waterproof coating layer 210 to further improve the waterproof performance.
[0057] Reference Figure 4In addition, a second sprayed quick-setting rubber asphalt waterproof coating reinforcement layer 250 is sprayed again on the inner side of the second sprayed quick-setting rubber asphalt waterproof coating layer 210 directly opposite to the annular construction joint 140 on the side wall 110 to improve the waterproof performance at the annular construction joint 140 of the side wall;
[0058] Similarly, refer to Figure 5 A third sprayed quick-setting rubber asphalt waterproof coating reinforcement layer 260 is sprayed again on the inner side of the first sprayed quick-setting rubber asphalt waterproof coating layer 122 opposite to the annular construction joint 140 on the base plate 120 to improve the waterproof performance of the annular construction joint 140 of the base plate 120.
[0059] Preferably, the thickness of the fine stone concrete protective layer 121 is 50 mm, and the thickness of the concrete cushion layer 124 is 100 mm.
[0060] Preferably, the thickness of the first sprayed quick-setting rubber asphalt waterproof coating layer 122 and the second sprayed quick-setting rubber asphalt waterproof coating layer 210 are both 1.5 mm.
[0061] Preferably, the thickness of the first sprayed quick-setting rubber asphalt waterproof coating reinforcement layer 240 is 1.5 mm.
[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.
Claims
1. A waterproof structure for construction joints in an open section of an open-cut tunnel, characterized in that: It includes the tunnel body, enclosure structure and embedded steel-edge rubber waterstop; The tunnel body comprises a side wall and a bottom plate, and a fine stone concrete protective layer, a first sprayed quick-setting rubber asphalt waterproof coating layer, a non-woven fabric layer and a concrete cushion layer are sequentially arranged below the bottom plate; The enclosure structure is arranged on the outside of the side wall, and a second sprayed quick-setting rubber asphalt waterproof coating layer and a base surface leveling layer are sequentially arranged between the side wall and the enclosure structure; Furthermore, the first sprayed quick-setting rubber asphalt waterproof coating layer and the second sprayed quick-setting rubber asphalt waterproof coating layer are formed by continuous spraying; An embedded steel-edge rubber waterstop is arranged between each section of the circumferential construction joints along the extension direction of the tunnel body, wherein both side ends of the embedded steel-edge rubber waterstop are respectively wrapped with water-expanding putty blocks.
2. The waterproof structure for construction joints in open sections of open-cut tunnels according to claim 1 is characterized in that: The embedded steel-edge rubber waterstop comprises a rubber connecting belt and a steel belt, the two ends of the rubber connecting belt are respectively connected to the steel belt; the two sides of the center line of the rubber connecting belt in the length direction are respectively wrapped with water-expanding putty blocks.
3. The waterproof structure for construction joints in open sections of open-cut tunnels according to claim 1, characterized in that: The embedded steel-edged rubber waterstop is adapted to the cross-sectional shape of the tunnel body.
4. The waterproof structure for construction joints in open sections of open-cut tunnels according to claim 1, characterized in that: A first grouting conduit is pre-buried in the annular construction joint of the side wall, and is used to fill the annular construction joint outside the embedded steel edge rubber water stop with cement-based penetrating crystallization waterproof coating; Furthermore, the annular construction joint inside the embedded steel-edge rubber waterstop is filled with water-swellable waterstop glue.
5. The waterproof structure for construction joints in an open section of an open-cut tunnel according to claim 1, characterized in that: A second grouting conduit is pre-buried in the annular construction joint of the base plate, and is used to fill the annular construction joint below the embedded steel edge rubber water stop with a cement-based penetrating crystallized waterproof coating; Furthermore, the annular construction joint above the embedded steel-edge rubber waterstop is filled with water-swellable waterstop glue.
6. The waterproof structure for construction joints in open sections of open-cut tunnels according to claim 1, characterized in that: The longitudinal construction joint between the bottom plate and the side wall is filled with cement-based penetrating crystalline waterproof coating, and a steel plate waterstop is arranged in a direction perpendicular to the construction joint, and water-expanding waterstop glue is filled between the steel plate waterstop and the longitudinal construction joint.
7. The waterproof structure for construction joints in open sections of open-cut tunnels according to claim 6, characterized in that: A third grouting conduit is pre-buried in the side wall and is used for injecting cement-based penetrating crystalline waterproof coating into the longitudinal construction joint.
8. The waterproof structure for construction joints in open sections of open-cut tunnels according to claim 6, characterized in that: The steel plate waterstop and the steel strip of the embedded steel-edge rubber waterstop are connected by rivets.
9. The waterproof structure for construction joints in an open section of an open-cut tunnel according to claim 1, characterized in that: Anti-pullout piles inserted into the ground are arranged below the concrete cushion layer.
10. The waterproof structure for construction joints in an open section of an open-cut tunnel according to claim 1, characterized in that: The base leveling layer extends downward to the connection between the concrete cushion layer and the enclosure structure to form a cement mortar chamfer; A first sprayed quick-setting rubber asphalt waterproof coating reinforcement layer is arranged between the cement mortar chamfer and the first sprayed quick-setting rubber asphalt waterproof coating layer and the second sprayed quick-setting rubber asphalt waterproof coating layer.
Citation Information
Cited By
Waterproof structure for deformation joint of open section of open cut tunnel
CN117569380A
Drainage and seepage prevention integrated structure for open section of sunken tunnel and construction method
CN121138353A