Permanent and temporary combined detachable curtain wall stand column mounting structure for equipment hoisting
Through the combination of the detachable curtain wall column installation structure and the φ20 round steel hook, the problem of complex reserved structural design and high cost of exterior facade enclosure during equipment hoisting is solved, achieving flexible hoisting of equipment and cost-saving effects. .
Patent Information
- Application Number
- CN202323434979.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-15
AI Technical Summary
During the equipment hoisting process, the existing technology has complex design of reserved structural floor holes and long protection period. It causes inconvenience to adjacent functional areas when equipment is replaced. Moreover, the installation cost of the facade enclosure structure is high and the frequency of use is low, which affects the energy-saving performance. and decorative appearance.
The detachable curtain wall column installation structure is adopted, and the core fixing parts are replaced by U-shaped installation parts and pull bolt sets to realize flexible disassembly of the curtain wall columns, and φ20 round steel hooks are used to realize vertical hoisting and horizontal transportation of large equipment.
It reduces the process of equipment transportation and replacement, saves costs, and enables flexible hoisting of large equipment through horizontal traction of the detachable curtain wall, improving the efficiency of the hoisting process and the convenience of equipment management.
Smart Images

Figure CN221798834U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of curtain walls, in particular to a detachable curtain wall column installation structure for permanent and temporary combination of equipment hoisting. Background Art
[0002] At present, large equipment is transported vertically by vertically hoisting the reserved structural floor holes or installing the facade enclosure structure later. The equipment is hoisted vertically to the reserved opening and transported horizontally. The reserved structural floor holes need to be designed and checked before the structure is constructed. The large-size reserved openings need to be stressed. The reserved lap steel bars are hoisted later, tied, and then poured with concrete to close the holes before the decorative surface layer is constructed. When this method is used, if the equipment is purchased later than the machine room construction time, the structural floor above this part is in an open state for a long time, the opening protection cycle is long, and water is easy to accumulate in the equipment room. The later reserved opening closure cycle is long, which is not conducive to on-site construction. When the equipment is replaced, it will bring many inconveniences to the normal operation of the adjacent functional areas, and the equipment management cost investment will increase. If the facade enclosure structure is installed later, the cost of edge protection will account for a larger proportion of the project investment and the frequency of use will be lower. There will be considerable damage to the energy-saving performance of the adjacent functional areas, and the decorative appearance will be inconsistent. Utility Model Content
[0003] The utility model aims to at least solve the technical problem that the protective strength of the anti-collision guardrail mentioned above basically does not meet the requirements of existing specifications, and provides a detachable curtain wall column installation structure for equipment hoisting, which is a combination of permanent and temporary, to upgrade the original old guardrail and improve the protective strength of the original guardrail.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0005] A detachable curtain wall column installation structure for permanent and temporary equipment hoisting includes a column, a wall, a first connecting member and a second connecting member. The first and second installing members are respectively fixed on the outer walls on both sides of the wall. One end of the column is detachably connected to the first installing member via the first connecting member, and the other end of the column is detachably connected to the second installing member via the second connecting member. The first connecting member and the second connecting member may be tension bolts. In this way, the curtain wall column can be disassembled by loosening the connecting member, which is more flexible and convenient than the disassembly of the traditional sleeve core fixing member. At the same time, before and after the transportation and replacement of large equipment, the process of chiseling and restoring the finished curtain wall sleeve core fixing member is reduced, thereby saving costs.
[0006] As an improvement of the above technical solution, the first installation component includes a first connection part and a second connection part, the column is detachably connected to the first connection part through the first connection part, and the second connection part is fixedly connected to the wall. The first installation component is U-shaped, one side of the U-shaped first installation component is detachably connected to the side wall of the column through the first connection part, and the top of the U-shaped first installation component is fixedly connected to the wall.
[0007] As an improvement of the above technical solution, a first embedded part is provided on one side of the wall, and the second connecting part is welded to the first embedded part. The first embedded part is pre-embedded when the wall is poured with concrete, and the second connecting part is fixedly connected to the first embedded part by welding.
[0008] As an improvement of the above technical solution, a first fastener is further included, one end of the second connection part is welded to the first embedded part, and one end of the second connection part is connected to the wall through the first fastener. The first fastener can reinforce the column and the first installation component, so that the detachable curtain wall of the present application can withstand the bearing capacity and overturning force of the openable curtain wall.
[0009] As an improvement of the above technical solution, the second mounting component includes a third connecting portion and a fourth connecting portion, the column is detachably connected to the third connecting portion through the second connecting member, and the fourth connecting portion is fixedly connected to the wall. The second mounting component is U-shaped, one side of the U-shaped second mounting portion is detachably connected to the side wall of the column through the second connecting member, and the bottom of the U-shaped second mounting component is fixedly connected to the wall.
[0010] As an improvement of the above technical solution, a second embedded part is provided on the other side of the wall, and the fourth connecting part is welded to the second embedded part. The second embedded part is pre-embedded when the wall is poured with concrete, and the fourth connecting part is fixedly connected to the first embedded part by welding.
[0011] As an improvement of the above technical solution, an embedded steel plate is provided between the second connection part and the wall, and the first fastener is connected to the second connection part and the wall. The first fastener can reinforce the column and the first installation component, so that the detachable curtain wall of the present application can withstand the bearing capacity and overturning force of the openable curtain wall.
[0012] As an improvement of the above technical solution, a first gasket is provided between the first connecting portion and the column.
[0013] As an improvement of the above technical solution, a second gasket is provided between the third connecting portion and the column.
[0014] As an improvement of the above technical solution, a third installation component and a third connecting member are further included, wherein the third installation component is provided with a hook, and the third installation component is connected to the inner side of the wall through the third connecting member. The hook is installed in cooperation with one side of the wall, so that large equipment can be vertically hoisted to the hoisting port and horizontally pulled into the room through the detachable curtain wall, providing the possibility of horizontal transportation for the realization of the hoisting process design.
[0015] Compared with the prior art, the beneficial effects of this application are:
[0016] The utility model is a detachable curtain wall column installation structure for permanent and temporary equipment hoisting. It adopts U-shaped installation components combined with tension bolt groups to replace sleeve core fixings to fix curtain wall columns. The curtain wall columns can be disassembled by loosening the bolt groups. It is more flexible and convenient than traditional sleeve core fixings. At the same time, before and after the transportation and replacement of large equipment, it reduces the process of chiseling and restoring the finished curtain wall sleeve core fixings, thereby saving costs. It adopts φ20 round steel hooks for installation, realizes the vertical hoisting of large equipment to the hoisting port and horizontal traction to the room through the detachable curtain wall, which provides the possibility of horizontal transportation for the realization of hoisting process design. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings, wherein:
[0018] Figure 1 It is a structural schematic diagram of an embodiment of the utility model;
[0019] Figure 2 for Figure 1 A local magnified view of the middle II region;
[0020] Figure 3 for Figure 1 A partial magnified view of the middle I area;
[0021] Figure 4 for Figure 2 Partial cross-sectional view of section AA;
[0022] Figure 5 for Figure 3 Partial cross-sectional view of the middle BB section;
[0023] Figure 6 It is a schematic diagram of the structure of the hook in the embodiment of the utility model.
[0024] The reference numerals in the figure are: 1. column; 2. wall; 21. first embedded part; 22. second embedded part; 3. first connecting part; 4. second connecting part; 5. first installation component; 51. first connecting part; 52. second connecting part; 53. embedded steel plate; 54. first gasket; 6. second installation component; 61. third connecting part; 62. fourth connecting part; 63. second gasket; 7. first fastener; 8. third installation component; 9. third connecting part; 10. hook. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0026] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may be a central component. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may be a central component at the same time. When a component is considered to be "set on" another component, it may be directly set on the other component or there may be a central component at the same time. When a component is referred to as being "set in the middle", it does not only mean being set in the middle, as long as it is not set at both ends within the range defined by the middle. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.
[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0028] like Figures 1 to 6 As shown, the utility model provides a detachable curtain wall column 1 installation structure for equipment hoisting and permanent and temporary combination, including a column 1, a wall 2, a first connecting member 3 and a second connecting member 4, a first installation component 5 and a second installation component 6 are respectively fixed on the outer walls on both sides of the wall 2, one end of the column 1 is detachably connected to the first installation component 5 through the first connecting member 3, and the other end of the column 1 is detachably connected to the second installation component 6 through the second connecting member 4. The first connecting member 3 and the second connecting member 4 can be tension bolts.
[0029] The curtain wall core is a special building accessory used to fix the curtain wall panels to the facade of the building. It usually consists of a metal core and two metal wings, where the metal core is used to insert into the slots on the curtain wall panels, and the metal wings are used to fix the core to the facade of the building.
[0030] The material of the curtain wall core is generally aluminum alloy or steel, and the shape and size vary with different curtain wall panels. When using, it is necessary to select and install according to the specific curtain wall panels and building facade conditions.
[0031] Compared with the prior art method of installing curtain walls by using a sleeve core, the present application adopts such a method that the curtain wall column 1 can be disassembled by loosening the connecting parts, which is more flexible and convenient than the disassembly of traditional sleeve core fixings. At the same time, before and after the transportation and replacement of large equipment, the process of chiseling and restoring the finished curtain wall sleeve core fixings is reduced, thereby saving costs.
[0032] See also Figure 1 , Figure 3 and Figure 5 Specifically, the first installation component 5 includes a first connection portion 51 and a second connection portion 52. The column 1 is detachably connected to the first connection portion 51 through the first connection member 3, and the second connection portion 52 is fixedly connected to the wall 2. The first installation component 5 is U-shaped, and one side of the U-shaped first installation component 5 is detachably connected to the side wall of the column 1 through the first connection member 3, and the top of the U-shaped first installation component 5 is fixedly connected to the wall 2. A first gasket 54 is provided between the first connection portion 51 and the column 1.
[0033] See also Figure 3 In the embodiment of the present application, a first embedded part 21 is provided on one side of the wall 2, and the second connecting portion 52 is welded to the first embedded part 21. The first embedded part 21 is pre-embedded when the wall 2 is poured with concrete, and the second connecting portion 52 is fixedly connected to the first embedded part 21 by welding.
[0034] See also Figure 3 In the embodiment of the present application, a first fastener 7 is further included, one end of the second connection portion 52 is welded to the first embedded part 21, and one end of the second connection portion 52 is connected to the wall 2 through the first fastener 7. The first fastener 7 can reinforce the column 1 and the first installation component 5, so that the detachable curtain wall of the present application can withstand the bearing capacity and overturning force of the openable curtain wall. The first fastener 7 can be a bolt.
[0035] In some possible embodiments of the present application, an embedded steel plate 53 is provided between the second connection portion 52 and the wall 2, and the first fastener 7 is connected to the second connection portion 52 and the wall 2. The first fastener 7 can reinforce the column 1 and the first mounting component 5, so that the detachable curtain wall of the present application can withstand the bearing capacity and overturning force of the openable curtain wall.
[0036] See also Figure 1 , Figure 2 and Figure 4 In some embodiments of the present application, the second mounting component 6 includes a third connection portion 61 and a fourth connection portion 62, the column 1 is detachably connected to the third connection portion 61 through the second connection member 4, and the fourth connection portion 62 is fixedly connected to the wall 2. The second mounting component 6 is U-shaped, one side of the U-shaped second mounting portion is detachably connected to the side wall of the column 1 through the second connection member 4, and the bottom of the U-shaped second mounting component 6 is fixedly connected to the wall 2. A second gasket 63 is provided between the third connection portion 61 and the column 1.
[0037] See also Figure 2 , the other side of the wall 2 is provided with a second embedded part 22, and the fourth connecting portion 62 is welded to the second embedded part 22. The second embedded part 22 is pre-embedded when the wall 2 is poured with concrete, and the fourth connecting portion 62 is fixedly connected to the first embedded part 21 by welding.
[0038] It also includes a third mounting component 8 and a third connecting member 9. The third mounting component 8 is provided with a hook 10, and the third mounting component 8 is connected to the inner side of the wall 2 through the third connecting member 9. The hook 10 can be made by bending φ20 round steel. The hook 10 is installed in cooperation with one side of the wall 2, and can realize the vertical lifting of large equipment to the lifting port and horizontal pulling to the room through the detachable curtain wall, which provides the possibility of horizontal transportation for the realization of the lifting process design.
[0039] The utility model discloses a detachable curtain wall column 1 installation structure for permanent and temporary equipment hoisting. The curtain wall column 1 is fixed by replacing the sleeve core fixing piece with a U-shaped installation component in combination with a tension bolt group. The curtain wall column 1 can be disassembled by loosening the bolt group, which is more flexible and convenient than the traditional sleeve core fixing piece. At the same time, before and after the transportation and replacement of large equipment, the process of chiseling and restoring the finished curtain wall sleeve core fixing piece is reduced, thereby saving costs. The φ20 round steel hook 10 is used for installation, so that the large equipment can be vertically hoisted to the hoisting port and horizontally pulled into the room through the detachable curtain wall, which provides the possibility of horizontal transportation for the realization of the hoisting process design.
[0040] The above embodiments are only used to illustrate the technical solution of the utility model but not to limit it. Any modification or equivalent substitution that does not deviate from the spirit and scope of the utility model shall be included in the scope of the technical solution of the utility model.
Claims
1. A detachable curtain wall column installation structure for permanent and temporary equipment hoisting. Features: The invention comprises a column (1), a wall (2), a first connecting member (3) and a second connecting member (4); a first mounting member (5) and a second mounting member (6) are respectively fixedly provided on the outer walls on both sides of the wall (2); one end of the column (1) is detachably connected to the first mounting member (5) via the first connecting member (3); and the other end of the column (1) is detachably connected to the second mounting member (6) via the second connecting member (4).
2. According to claim 1, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that The first installation component (5) comprises a first connecting portion (51) and a second connecting portion (52); the column (1) is detachably connected to the first connecting portion (51) via the first connecting member (3); and the second connecting portion (52) is fixedly connected to the wall (2).
3. According to claim 2, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that A first embedded part (21) is provided on one side of the wall (2), and the second connecting portion (52) is welded to the first embedded part (21).
4. According to claim 3, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that It also comprises a first fastener (7), one end of the second connecting portion (52) is welded to the first embedded part (21), and one end of the second connecting portion (52) is connected to the wall (2) via the first fastener (7).
5. According to claim 4, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that The second mounting component (6) comprises a third connecting portion (61) and a fourth connecting portion (62); the column (1) is detachably connected to the third connecting portion (61) via the second connecting member (4); and the fourth connecting portion (62) is fixedly connected to the wall (2).
6. A detachable curtain wall column installation structure for permanent and temporary equipment hoisting according to claim 5, It is characterized in that A second embedded part (22) is provided on the other side of the wall (2), and the fourth connecting portion (62) is welded to the second embedded part (22).
7. According to claim 4, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that An embedded steel plate (53) is provided between the second connecting portion (52) and the wall (2), and the first fastener (7) is connected to the second connecting portion (52) and the wall (2).
8. According to claim 2, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that A first gasket (54) is provided between the first connecting portion (51) and the column (1).
9. According to claim 5, a detachable curtain wall column installation structure for permanent and temporary equipment hoisting, It is characterized in that A second gasket (63) is provided between the third connecting portion (61) and the column (1).
10. A detachable curtain wall column installation structure for permanent and temporary equipment hoisting according to any one of claims 1 to 9, It is characterized in that It also comprises a third mounting component (8) and a third connecting member (9); the third mounting component (8) is provided with a hook (10); and the third mounting component (8) is connected to the inner side of the wall (2) via the third connecting member (9).