Reinforced concrete hollow slab
By arranging U-shaped buckles and arc-shaped plates on the cast-in-place reinforced concrete hollow slab formwork, combined with the limit design of the bending rod, the problem of position deviation of the steel bars during bundling in the existing technology is solved, and the efficiency of the reinforced concrete hollow slab is improved. stability and watering efficiency.
Patent Information
- Application Number
- CN202420312264.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-20
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-20
AI Technical Summary
The existing cast-in-place reinforced concrete hollow slabs do not pre-position the steel bars before bundling the wires, which causes the steel bars to easily shift, affecting the bundling efficiency and stability.
By setting U-shaped buckles and arc-shaped plates on the top of the formwork, U-shaped buckles and arc-shaped plates are used to pre-position and limit the steel bars and pipes to ensure that the steel bars and pipes do not sway and shift at will when pouring concrete, and bending is used The rod further fixes the position of steel bar three.
It effectively avoids the position deviation of the steel bars during bundling, improves the bundling efficiency and stability, and ensures that no shaking or displacement occurs under the force of concrete.
Smart Images

Figure CN221798863U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of cast-in-place floor slabs, and in particular to a reinforced concrete hollow slab. Background Art
[0002] Cast-in-place slab refers to the formwork made on site according to the designed position by supporting the formwork, tying steel bars, pouring concrete, and then maintaining and dismantling the formwork. The cast-in-place reinforced concrete hollow slab is mainly made by setting a hollow inner membrane in the concrete and evacuating the concrete through the hollow inner membrane, thereby achieving the purpose of reducing the amount of concrete used.
[0003] In the patent document with the published announcement number CN219219506U, a cast-in-place reinforced concrete hollow formwork is provided, which includes a first steel bar layer, a second steel bar layer, a third steel bar layer and a plurality of thin-walled tubes, wherein the first steel bar layer, the second steel bar layer and the third steel bar layer are arranged from top to bottom in the vertical direction, and the plurality of thin-walled tubes are sandwiched between the first steel bar layer and the third steel bar layer, wherein the first steel bar layer is composed of a plurality of first steel bars, the second steel bar layer is composed of a plurality of second steel bars, and the third steel bar layer is composed of a plurality of third steel bars. The present application has the effect of improving the structural strength of the cast-in-place formwork.
[0004] The above device connects the first steel bar, the second steel bar and the third steel bar together by means of a binding wire, but the above device does not perform any pre-positioning on the steel bars before tying the binding wire, which results in the steel bars being easily shaken and shifted in position when the binding wire is used for connection, thereby easily affecting the efficiency of bundling and also affecting the stability after bundling. Utility Model Content
[0005] In view of the shortcomings of the prior art, the present application provides a reinforced concrete hollow slab that overcomes the shortcomings of the prior art and aims to solve the problem that in the prior art, no pre-positioning of the steel bars is performed before tying with tying wires, which leads to the steel bars being prone to shaking and positional deviation when using tying wires for connection, which easily affects the efficiency during tying and also affects the stability after tying.
[0006] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a reinforced concrete hollow slab, comprising a formwork, a steel bar one is provided on the top of the formwork, a U-shaped buckle one is fixedly provided on the top of the formwork, a steel bar two is provided on the top of the steel bar one, a U-shaped buckle two is fixedly provided on the top of the formwork, a support bar is fixedly connected to the top of the formwork, an arc-shaped plate is fixedly assembled on the top of the support bar, a pipe is provided on the top of the arc-shaped plate, a bending rod is provided on the outer edge of the pipe, a steel bar three is fixedly connected to the outer side of the bending rod, and a U-shaped buckle three is provided on the outer edge of the pipe.
[0007] As a preferred technical solution of the present application, the steel bar 1 is arranged at the inner wall position of the U-shaped buckle 1, there are several steel bars 1, and several steel bars 1 are distributed in parallel at the top position of the template, there are several U-shaped buckles 1, and several U-shaped buckles 1 are symmetrically arranged at both ends of the steel bar 1.
[0008] By adopting the above technical solution, the two ends of the steel bar 1 can be firmly connected to the template through the U-shaped buckle 1, thereby ensuring the stability of the steel bar 1 set above the template and ensuring that it will not roll at will.
[0009] As a preferred technical solution of the present application, there are several steel bars 2, and several steel bars 2 are distributed in parallel above the steel bar 1. The steel bars 2 and the steel bar 1 are distributed in a cross shape. The steel bar 2 is arranged on the inner wall of the U-shaped buckle 2. There are several U-shaped buckles 2, and several U-shaped buckles 2 are symmetrically arranged at the two ends of the steel bar 2.
[0010] By adopting the above technical solution, the two ends of the steel bar 2 can be fixedly connected to the steel bar 1 through the U-shaped buckle 2, and then the steel bars 1 and 2 can be initially positioned to ensure that they will not be arbitrarily offset in position.
[0011] As a preferred technical solution of the present application, the bottom of the U-shaped buckle three is fixedly connected to the top of the template, there are eight U-shaped buckles three, there are four pipes, and the eight U-shaped buckles three are symmetrically arranged outside the four pipes.
[0012] By adopting the above technical solution, it is possible to limit the two ends of the pipeline, ensuring that the pipeline will not roll randomly after being set above the arc plate, thereby improving the stability of the device.
[0013] As a preferred technical solution of the present application, the bending rod is in an arc shape, and the outer edge of the bending rod fits tightly with the outer edge of the pipe.
[0014] By adopting the above technical solution, the bending rod can further limit the position of the pipeline, thereby ensuring that after the three positioning of the steel bars are completed, the bending rod can be used to position the pipeline again, ensuring that there will be no random positional deviation and shaking during the pouring of concrete.
[0015] As a preferred technical solution of the present application, the top of the arc-shaped plate fits tightly with the bottom of the outer edge of the pipe, and the steel bars one, two and three are connected by tying wires.
[0016] By adopting the above technical solution, the arc-shaped plate can support and limit the bottom of the pipe, and at the same time, the U-shaped buckle three can limit the pipe from the upper and lower sides, thereby ensuring its stability. The steel bars one, two and three can be connected together through the binding wire to ensure that they will not shake or move at will when subjected to the force of concrete.
[0017] Beneficial effects of this application:
[0018] 1. U-shaped buckle 1, U-shaped buckle 2 and the template are prefabricated in the factory instead of being fixed on site. The use of U-shaped buckle 1 and U-shaped buckle 2 can play a preliminary positioning role on both ends of steel bar 1 and steel bar 2, and then steel bar 1 and steel bar 2 can be firmly connected, thereby ensuring that steel bar 1 and steel bar 2 will not be randomly offset or shaken when installing the pipeline, avoiding the problem of the first steel bar, the second steel bar and the third steel bar being easily shaken and offset when the existing device is connected by wire, which can easily affect the efficiency of bundling.
[0019] 2. The arc plate and U-shaped buckle can be used to stably position the pipeline from two relative directions, thereby ensuring that the pipeline will not shake randomly when subjected to the impact force of concrete, and will not randomly shift in position, thereby ensuring stability during concrete pouring. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the overall structure of this application;
[0021] Figure 2 It is a schematic diagram of the local structure of this application;
[0022] Figure 3 For this application Figure 3 The enlarged structural diagram at A in the middle;
[0023] Figure 4 This is a schematic diagram of the partial expanded structure of this application.
[0024] In the figure: 1. Formwork; 2. Steel bar one; 3. U-shaped buckle one; 4. Steel bar two; 5. U-shaped buckle two; 6. Support bar; 7. Arc plate; 8. Pipe; 9. Steel bar three; 10. Bending rod; 11. U-shaped buckle three. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0026] Reference Figure 1-4 A reinforced concrete hollow slab comprises a template 1, a steel bar 2 is provided on the top of the template 1, a U-shaped buckle 3 is fixedly provided on the top of the template 1, a steel bar 2 is provided on the top of the steel bar 2, a U-shaped buckle 5 is fixedly provided on the top of the template 1, a support bar 6 is fixedly connected to the top of the template 1, an arc-shaped plate 7 is fixedly assembled on the top of the support bar 6, a pipe 8 is provided on the top of the arc-shaped plate 7, a bending rod 10 is provided on the outer edge of the pipe 8, a steel bar 3 9 is fixedly connected to the outer side of the bending rod 10, and a U-shaped buckle 3 11 is provided on the outer edge of the pipe 8.
[0027] Reference Figure 3 , steel bar 2 is arranged on the inner wall position of U-shaped buckle 3, there are several steel bars 2, and several steel bars 2 are distributed in parallel at the top position of template 1, there are several U-shaped buckles 3, and several U-shaped buckles 3 are symmetrically arranged at both ends of steel bar 2, and several U-shaped buckles 3 are symmetrically arranged at both ends of steel bar 2, so that the two ends of steel bar 2 can be firmly connected with template 1 through U-shaped buckle 3, thereby ensuring the stability of steel bar 2 arranged above template 1 and preventing it from rolling at will.
[0028] Reference Figure 3 There are several steel bars 4, and several steel bars 4 are distributed in parallel above steel bar 2. Steel bars 4 and steel bar 2 are distributed in a cross shape. Steel bars 4 are arranged on the inner wall of U-shaped buckles 5. There are several U-shaped buckles 5, and several U-shaped buckles 5 are symmetrically arranged at the two ends of steel bars 4. By symmetrically arranging several U-shaped buckles 5 at the two ends of steel bars 4, the two ends of steel bars 4 can be fixedly connected with steel bars 2 through U-shaped buckles 5, so as to preliminarily position steel bars 2 and steel bars 4 to ensure that they will not be arbitrarily offset in position.
[0029] Reference Figure 1 The bottom of the U-shaped buckle three 11 is fixedly connected to the top of the template 1. There are eight U-shaped buckles 11, and there are four pipes 8. The eight U-shaped buckles 11 are symmetrically arranged outside the four pipes 8. The eight U-shaped buckles 11 are symmetrically arranged at the two ends of the four pipes 8, so that the two ends of the pipes 8 can be limited, ensuring that the pipes 8 will not roll randomly after being arranged above the arc plate 7, thereby improving the stability of the device.
[0030] Reference Figure 4 The bending rod 10 is in an arc shape, and the outer edge of the bending rod 10 is tightly fitted with the outer edge of the pipe 8. By tightly fitting the outer edge of the bending rod 10 with the outer edge of the pipe 8, the bending rod 10 can further limit the pipe 8, thereby ensuring that after the positioning of the steel bar 9 is completed, the bending rod 10 can be used to position the pipe 8 again, ensuring that there will be no random positional deviation and shaking during the pouring of concrete.
[0031] Reference Figure 4 The top of the arc plate 7 fits tightly with the bottom of the outer edge of the pipe 8, and the steel bars 1 2, 2 4 and 3 9 are connected by tying wires. The top of the arc plate 7 fits tightly with the bottom of the outer edge of the pipe 8, so that the arc plate 7 can support and limit the bottom of the pipe 8. At the same time, the U-shaped buckle 3 11 can limit the pipe 8 from the upper and lower sides, thereby ensuring its stability. The tying wires can connect the steel bars 1 2, 2 4 and 3 9 together to ensure that they will not shake or move at will when subjected to the force of concrete.
[0032] Working principle: The fixation of U-shaped buckle 1 3, U-shaped buckle 2 5 and formwork 1 is prefabricated in the factory, rather than fixed on site. When using the device, first place steel bar 1 2 in parallel to the top position of formwork 1, then use U-shaped buckle 1 3 to stably limit steel bar 1 2 at the top position of formwork 1, then take steel bar 2 4 and place it at the top position of steel bar 1 2, then use U-shaped buckle 2 5 to fix steel bar 2 4 at the top position of formwork 1, then take pipe 8 and place it at the top position of arc plate 7, so that U-shaped buckle 3 11 can be used to stably limit pipe 8 at the top position of arc plate 7, then take steel bar 3 9 and install it above steel bar 2 4 until the bending rod 10 fits with the outside of pipe 8, so that steel bar 1 2, steel bar 2 4 and steel bar 3 9 can be connected together by binding wire to ensure that they will not shake or move at will when subjected to the force of concrete.
[0033] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. Although the present application is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A reinforced concrete hollow slab, comprising a formwork (1), characterized in that: A steel bar one (2) is provided on the top of the template (1), a U-shaped buckle one (3) is fixedly provided on the top of the template (1), a steel bar two (4) is provided on the top of the steel bar one (2), a U-shaped buckle two (5) is fixedly provided on the top of the template (1), a support bar (6) is fixedly connected to the top of the template (1), an arc-shaped plate (7) is fixedly assembled on the top of the support bar (6), a pipe (8) is provided on the top of the arc-shaped plate (7), a bending rod (10) is provided on the outer edge of the pipe (8), a steel bar three (9) is fixedly connected to the outer side of the bending rod (10), and a U-shaped buckle three (11) is provided on the outer edge of the pipe (8).
2. A reinforced concrete hollow slab according to claim 1, characterized in that: The steel bar one (2) is arranged at the inner wall position of the U-shaped buckle one (3), the number of the steel bar one (2) is several, and the several steel bar one (2) is distributed in parallel at the top position of the template (1), the number of the U-shaped buckle one (3) is several, and the several U-shaped buckle one (3) is symmetrically arranged at both ends of the steel bar one (2).
3. A reinforced concrete hollow slab according to claim 1, characterized in that: The number of the steel bars (4) is several, and the several steel bars (4) are distributed in parallel above the steel bars (2). The steel bars (4) and the steel bars (2) are distributed in a cross shape. The steel bars (4) are arranged on the inner wall of the U-shaped buckle (5). The number of the U-shaped buckle (5) is several, and the several U-shaped buckles (5) are symmetrically arranged at the two ends of the steel bars (4).
4. A reinforced concrete hollow slab according to claim 1, characterized in that: The bottom of the U-shaped buckle three (11) is fixedly connected to the top of the template (1), the number of the U-shaped buckle three (11) is eight, the number of the pipes (8) is four, and the eight U-shaped buckles three (11) are symmetrically arranged outside the four pipes (8).
5. A reinforced concrete hollow slab according to claim 1, characterized in that: The bending rod (10) is in an arc shape, and the outer edge of the bending rod (10) is tightly fitted with the outer edge of the pipe (8).
6. A reinforced concrete hollow slab according to claim 1, characterized in that: The top of the arc-shaped plate (7) is tightly fitted to the bottom of the outer edge of the pipe (8), and the steel bar one (2), the steel bar two (4) and the steel bar three (9) are connected by binding wires.