Heat pump heat supply system

By combining air source CO2 heat pumps and absorption heat pumps, and using heat storage devices, the problem of high electricity costs during peak power periods of air source CO2 heat pumps and absorption heat pumps in the existing technology is solved, and low energy consumption and high efficiency of system operation are achieved. Heating.

CN221801908UActive Publication Date: 2024-10-01RUINA INTELLIGENT EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420377427.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-01
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

Existing air source CO2 heat pumps and absorption heat pumps have problems with low energy efficiency and high electricity costs when used alone. Especially using air source CO2 heat pumps for heating during peak power periods will increase electricity costs and waste energy.

Method used

Design a heat pump heating system that combines air source CO2 heat pumps and absorption heat pumps, and introduces heat storage devices into the system. It uses the peak-valley electricity price difference to store hot water at full load during off-peak periods, and through the heat storage device during peak periods. Provides heat and reduces electricity costs.

Benefits of technology

The absorption heat pump is used to reduce the air source CO2 heat pump return water temperature to improve heating efficiency, and the heat storage device is used to reduce power consumption during peak power periods to achieve the lowest power cost for system operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221801908U_ABST
    Figure CN221801908U_ABST
Patent Text Reader

Abstract

The utility model discloses a heat pump heat supply system which comprises an air source CO2 heat pump, an absorption heat pump, a heat exchanger and a heat storage device, the air source CO2 heat pump comprises a first evaporator, a compressor, a gas cooler and a throttling device, and the first evaporator, the compressor, the gas cooler and the throttling device are sequentially connected to form a first circulation loop; the absorption heat pump comprises a generator, a second evaporator, an absorber and a condenser. The gas cooler, the generator, the heat release side of the heat exchanger and the second evaporator are sequentially connected to form a second circulation loop. The heat storage device is arranged on the second circulation loop; the absorber, the condenser and the user side are sequentially connected to form a first heat supply loop so as to supply heat to the user side. According to the heat pump heat supply system provided by the utility model, the air source CO2 heat pump runs in a full-load manner to store hot water for the heat storage device during valley electricity, the air source CO2 heat pump runs in a low-load manner or does not run during peak electricity, and the hot water in the heat storage device supplies heat, so that the cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of heat pumps, and in particular relates to a heat pump heating system. Background Art

[0002] Cogeneration is the main heat source for centralized heating in northern my country. With the advancement of the "dual carbon" strategy, new energy sources such as photovoltaics and wind power are connecting to the grid to an increasingly larger proportion, and the grid's demand for peak and frequency regulation of thermal power plants is becoming more frequent, resulting in frequent and dramatic fluctuations in heating parameters of the heating network. With the progress of urbanization, the demand for heating has increased. At the same time, extreme weather caused by climate change has occurred frequently, which has reduced the overall stability of the heating network and caused insufficient heat supply.

[0003] At present, air source CO2 heat pumps can produce high-temperature hot water, but the energy efficiency is low when the return water temperature is high; absorption heat pumps have low power consumption, but they need to drive the heat source at a high temperature. At present, there are certain limitations when they are used alone in the heat exchange station. In addition, the electricity price is different during peak and valley periods. Using air source CO2 heat pumps for heating during peak periods will increase electricity costs and waste energy.

[0004] Therefore, it is urgent to design a heat pump heating system to solve the limitations of using air source CO2 heat pumps and absorption heat pumps alone mentioned above. Using air source CO2 heat pumps for heating during peak power periods increases electricity costs and wastes energy. Utility Model Content

[0005] In order to solve the limitations of using air source CO2 heat pumps and absorption heat pumps alone as mentioned in the background technology, and the technical problems of using air source CO2 heat pumps for heating during peak hours, increasing electricity costs and wasting energy, a heat pump heating system is provided to solve the above problems.

[0006] To achieve the above purpose, the specific technical solution of the heat pump heating system of the utility model is as follows:

[0007] A heat pump heating system, characterized in that it comprises an air source CO2 heat pump, an absorption heat pump, a heat exchanger and a heat storage device,

[0008] The air source CO2 heat pump comprises a first evaporator, a compressor, a gas cooler and a throttling device, wherein the first evaporator, the compressor, the gas cooler and the throttling device are sequentially connected to form a first circulation loop;

[0009] The absorption heat pump comprises a generator, a second evaporator, an absorber and a condenser, and the gas cooler, the generator, the heat release side of the heat exchanger and the second evaporator are sequentially connected to form a second circulation loop;

[0010] The heat storage device is arranged on the second circulation loop, and the heat storage device can provide auxiliary heat to the second circulation loop;

[0011] The absorber, the condenser and the user end are connected in sequence to form a first heating circuit to supply heat to the user end.

[0012] Furthermore, the outlet of the gas cooler is connected to the inlet of the generator through a first pipeline, the inlet of the gas cooler is connected to the outlet of the second evaporator through a second pipeline, one end of the heat storage device is connected to the first pipeline, and the other end of the heat storage device is connected to the second pipeline.

[0013] Furthermore, the heat storage device includes a water tank, the outlet of the gas cooler is connected to the top of the water tank, and the inlet of the gas cooler is connected to the bottom of the water tank to form a third circulation loop. When the air source CO2 heat pump is running at full load, hot water is stored in the water tank.

[0014] Furthermore, the top of the water tank is connected to the inlet of the generator, the outlet of the generator is connected to the inlet of the heat release side of the heat exchanger, the outlet of the heat release side of the heat exchanger is connected to the inlet of the second evaporator, and the outlet of the second evaporator is connected to the bottom of the water tank to form a fourth circulation loop. When the air source CO2 heat pump is operating at low load or not operating, the hot water in the water tank can assist in heating the fourth circulation loop.

[0015] Furthermore, the heat storage device also includes a first water pipe, a second water pipe, a third water pipe, a fourth water pipe and a fifth water pipe, one end of the first water pipe is connected to the first pipeline, the other end of the first water pipe is connected to the second pipeline, one end of the second water pipe is connected to the first pipeline, the other end of the second water pipe is connected to the top of the water tank, one end of the third water pipe is connected to the first water pipe, the other end of the third water pipe is connected to the bottom of the water tank, one end of the fourth water pipe is connected to the second water pipe, the other end of the fourth water pipe is connected to the third water pipe, one end of the fifth water pipe is connected to the first water pipe, and the other end of the fifth water pipe is connected to the fourth water pipe.

[0016] Furthermore, the heat storage device also includes a first valve, a second valve, a third valve, a fourth valve, a fifth valve, a sixth valve, a seventh valve, an eighth valve and a first water pump. The first valve, the third valve, the fifth valve and the eighth valve are arranged on the first water pipe, the second valve is arranged on the second water pipe, one end of the second water pipe is connected between the first valve and the third valve, the seventh valve is arranged on the third water pipe, one end of the third water pipe is connected between the fifth valve and the eighth valve, the fourth valve and the sixth valve are arranged on the fourth water pipe, the first water pump is arranged on the fifth water pipe, one end of the fifth water pipe is arranged between the third valve and the fifth valve, and the other end of the fifth water pipe is arranged between the fourth valve and the sixth valve.

[0017] Furthermore, it also includes a second water pump, a third water pump, a fourth water pump and a fifth water pump. The second water pump is arranged on the first pipeline, the third water pump is arranged on the second pipeline, the fourth water pump is arranged on the first heating circuit, and the fifth water pump is arranged on the second heating circuit.

[0018] Furthermore, it also includes a first switch valve, a second switch valve, a third switch valve and a fourth switch valve. The first switch valve and the second switch valve are both arranged on the first pipeline, the first switch valve is placed between the gas cooler and the heat storage device, the second switch valve is placed between the heat storage device and the generator, the third switch valve is arranged on the first heating circuit, and the fourth switch valve is arranged on the second heating circuit.

[0019] Furthermore, the water tank is a thermocline water tank.

[0020] Furthermore, the heat absorption side of the heat exchanger is connected to the user end to form a second heating circuit to supply heat to the user end.

[0021] The heat pump heating system of the utility model has the following advantages:

[0022] Air source CO2 heat pumps can produce high-temperature hot water and drive absorption heat pumps. Absorption heat pumps have low power consumption. Absorption heat pumps reduce the return water temperature of air source CO2 heat pumps so that the return water temperature can meet the air source CO2 heat pumps' high energy efficiency. The absorption heat pumps can increase the supply and return water temperature difference, making the heat network's heat transfer efficiency higher. A heat storage device is set up to utilize the peak-valley electricity price difference. During valley electricity periods, the air source CO2 heat pumps run at full load to store hot water in the heat storage device. During peak electricity periods, the air source CO2 heat pumps run at low load or not at all, and the hot water in the heat storage device is used for heating, which can minimize the system's operating electricity costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of the heat pump heating system of the utility model;

[0024] Figure 2 It is a structural schematic diagram of the heat storage device of the utility model.

[0025] Description of the markings in the figure:

[0026] 100, user end; 1, air source CO2 heat pump; 11, first evaporator; 12, compressor; 13, gas cooler; 14, throttling device; 2, absorption heat pump; 21, generator; 22, second evaporator; 23, absorber; 24, condenser; 3, heat exchanger; 31, heat release side; 32, heat absorption side; 4, heat storage device; 41, water tank; 42, first water pipe; 421, first valve; 422, third valve; 423 , the fifth valve; 424, the eighth valve; 43, the second water pipe; 431, the second valve; 44, the third water pipe; 441, the seventh valve; 45, the fourth water pipe; 451, the fourth valve; 452, the sixth valve; 46, the fifth water pipe; 461, the first water pump; 5, the first pipeline; 51, the first switch valve; 52, the second switch valve; 6, the second pipeline; 7, the second water pump; 8, the third water pump; 9, the fourth water pump; 10, the fifth water pump. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.

[0028] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.

[0029] Please refer to the attached Figure 1 To Attachment Figure 2 The utility model is described in detail.

[0030] like Figure 1 and Figure 2As shown, the heat pump heating system in the utility model includes an air source CO2 heat pump 1, an absorption heat pump 2, a heat exchanger 3 and a heat storage device 4. The air source CO2 heat pump 1 includes a first evaporator 11, a compressor 12, a gas cooler 13 and a throttling device 14. The first evaporator 11, the compressor 12, the gas cooler 13 and the throttling device 14 are connected in sequence to form a first circulation loop; the absorption heat pump 2 includes a generator 21, a second evaporator 22, an absorber 23 and a condenser 24. The gas cooler 13, the generator 21, the heat release side 31 of the heat exchanger 3 and the second evaporator 22 are connected in sequence to form a second circulation loop; the heat storage device 4 is arranged on the second circulation loop. When the air source CO2 heat pump 1 is in low load operation or not in operation, the heat storage device 4 supplies heat to the second circulation loop; the absorber 23, the condenser 24 and the user end 100 are connected in sequence to form a first heating loop to supply heat to the user end 100. In this embodiment, the medium in the first circulation loop is CO2, and the medium in the second circulation loop is water. The second circulation loop and the first circulation loop perform heat exchange in the gas cooler 13. During the heat exchange, the gas cooler 13 releases heat in the first circulation loop, and the gas cooler 13 absorbs heat in the second circulation loop.

[0031] The air source CO2 heat pump 1 can produce high-temperature hot water and drive the absorption heat pump 2 to operate. The absorption heat pump 2 has low power consumption. The absorption heat pump 2 reduces the return water temperature of the air source CO2 heat pump 1 so that the return water temperature can satisfy the air source CO2 heat pump 1 to always work in a high energy efficiency state. The absorption heat pump 2 can increase the supply and return water temperature difference, so that the heat network heat transmission efficiency is higher. A heat storage device 4 is set up to utilize the peak-valley electricity price difference. During the valley period, the air source CO2 heat pump 1 operates at full load to store hot water for the heat storage device 4. During the peak period, the air source CO2 heat pump 1 operates at low load or does not operate, and the hot water in the heat storage device 4 is used for heating, thereby reducing the cost of system operation electricity.

[0032] The outlet of the compressor 12 of the air source CO2 heat pump 1 is connected to the inlet of the gas cooler 13, the outlet of the gas cooler 13 is connected to the inlet of the throttling device 14, the outlet of the throttling device 14 is connected to the inlet of the first evaporator 11, and the outlet of the first evaporator 11 is connected to the inlet of the compressor 12, forming a first circulation loop. The low-temperature and low-pressure CO2 in the air source CO2 heat pump 1 is compressed by the compressor 12 and enters the supercritical zone, and heat is exchanged with the low-temperature water in the second circulation loop from the second evaporator 22 outside in the gas cooler 13. The high-pressure CO2 cooled by the low-temperature water enters the throttling device 14 to a low-temperature and low-pressure two-phase state, and then enters the first evaporator 11 to absorb the heat of the low-temperature heat source and evaporates before re-entering the compressor 12, thereby realizing the circulation heating of the air source CO2 heat pump 1.

[0033] On the other hand, in the second circulation loop, the low-temperature water becomes high-temperature water after heat exchange in the gas cooler 13, and enters the generator 21 through the first pipeline 5 first, and releases heat in the generator 21 to drive the absorption heat pump 2 to operate. The high-temperature water flows into the heat release side 31 of the heat exchanger 3 through the outlet of the generator 21, and flows into the second evaporator 22 for secondary cooling after heat exchange and cooling in the heat exchanger 3. The cooled low-temperature water flows back to the gas cooler 13, and the cycle repeats.

[0034] Specifically, Figure 1 As shown, heat is supplied by coupling the air source CO2 heat pump 1 with the absorption heat pump 2. Through transcritical CO2, the gas cooler 13 of the air source CO2 heat pump 1 provides high-temperature water to the second circulation loop, and the high-temperature water enters the generator 21 of the absorption heat pump 2 to drive the absorption heat pump 2 to operate. After the absorption heat pump 2 starts to operate, the high-temperature water in the second circulation loop then enters the heat release side 31 of the heat exchanger 3, and the high-temperature water on the heat release side 31 of the heat exchanger 3 exchanges heat with water at the user end 100 of the heat absorption side 32 of the heat exchanger 3. After the heat exchange, the high-temperature water is cooled once on the heat release side 31 of the heat exchanger 3, and after the first cooling, the water flows into the second evaporator 22 for a second cooling. After two coolings, the high-temperature water becomes low-temperature water and flows back to the inlet of the gas cooler 13 to exchange heat with the high-temperature and high-pressure CO2 in the gas cooler 13, thereby improving the heating performance of the compression heat pump system. At the same time, the user-end 100 water heated by heat exchange on the heat absorbing side 32 of the heat exchanger 3 is directly connected to the user-end 100 to form a second heating circuit, and the user-end 100 water heated by the heat absorbing side 32 of the heat exchanger 3 directly flows into the user-end 100 for use. At the same time, the user-end 100 water in the first heating circuit absorbs heat through the absorber 23 and the condenser 24, and finally the temperature of the user-end 100 water is increased, and the heating demand of the user-end 100 is met to supply heat to the user-end 100. By setting the first heating circuit and the second heating circuit to provide hot water to the user-end 100 respectively, the heating efficiency is improved.

[0035] Further, if Figure 1 and Figure 2 As shown, the outlet of the gas cooler 13 is connected to the inlet of the generator 21 through the first pipeline 5, the inlet of the gas cooler 13 is connected to the outlet of the second evaporator 22 through the second pipeline 6, one end of the heat storage device 4 is connected to the first pipeline 5, and the other end of the heat storage device 4 is connected to the second pipeline 6. In this embodiment, the heat storage device 4 is arranged in parallel with the air source CO2 heat pump 1 between the first pipeline 5 and the second pipeline 6.

[0036] Since the electricity price is different in different time periods, a heat storage device 4 is set. During the off-peak period, the air source CO2 heat pump 1 runs at full load, and the air source CO2 heat pump 1 is used to heat the second circulation loop. At the same time, the air source CO2 heat pump 1 stores hot water in the heat storage device 4; during the peak period, the air source CO2 heat pump 1 runs at a low load or does not run, and the heat storage device 4 is used to heat the second circulation loop, which can minimize the electricity cost of the system operation.

[0037] Further, if Figure 1 and Figure 2 As shown, the heat storage device 4 includes a water tank 41. In this embodiment, the water tank 41 is a temperature-slope layer water tank. Compared with the conventional heating system water storage tank, the temperature difference between the hot water and the cold water in the temperature-slope layer water tank is larger. Under the same heat storage capacity, the volume is smaller and the equipment investment is smaller. The outlet of the gas cooler 13 is connected to the top of the water tank 41, and the inlet of the gas cooler 13 is connected to the bottom of the water tank 41 to form a third circulation loop. When the air source CO2 heat pump 1 is running at full load, hot water is stored in the water tank 41. The top of the water tank 41 is continuously filled with high-temperature water, and the low-temperature water at the bottom of the water tank 41 is continuously returned to the gas cooler 13 for heat exchange and temperature rise, thereby ensuring that the water in the water tank 41 is in a high-temperature state.

[0038] Further, if Figure 1 and Figure 2 As shown, the top of the water tank 41 is connected to the inlet of the generator 21, the outlet of the generator 21 is connected to the inlet of the heat release side 31 of the heat exchanger 3, the outlet of the heat release side 31 of the heat exchanger 3 is connected to the inlet of the second evaporator 22, and the outlet of the second evaporator 22 is connected to the bottom end of the water tank 41 to form a fourth circulation loop. When the air source CO2 heat pump 1 is running at a low load or not running, the hot water in the water tank 41 is used for heating, that is, during peak power period, the air source CO2 heat pump 1 may not work, but only use the water tank 41 for heating, or the air source CO2 heat pump 1 and the water tank 41 may jointly provide heating, but the heating rate of the air source CO2 heat pump 1 at this time is lower than the heating rate during valley power period.

[0039] Further, if Figure 1 and Figure 2As shown, the heat storage device 4 also includes a first water pipe 42, a second water pipe 43, a third water pipe 44, a fourth water pipe 45 and a fifth water pipe 46, one end of the first water pipe 42 is connected to the first pipeline 5, the other end of the first water pipe 42 is connected to the second pipeline 6, one end of the second water pipe 43 is connected to the first pipeline 5, the other end of the second water pipe 43 is connected to the top of the water tank 41, one end of the third water pipe 44 is connected to the first water pipe 42, the other end of the third water pipe 44 is connected to the bottom of the water tank 41, one end of the fourth water pipe 45 is connected to the second water pipe 43, the other end of the fourth water pipe 45 is connected to the third water pipe 44, one end of the fifth water pipe 46 is connected to the first water pipe 42, and the other end of the fifth water pipe 46 is connected to the fourth water pipe 45. When the heat storage device 4 is not working, the heat storage device 4 can be directly disconnected from the second circulation pipeline; when the heat storage device 4 is working, the first water pipe 42, the second water pipe 43, the third water pipe 44, the fourth water pipe 45 and the fifth water pipe 46 are opened or closed to realize the opening and closing of the third circulation pipeline and the opening and closing of the fourth circulation pipeline.

[0040] Further, if Figure 1 and Figure 2 As shown, the heat storage device 4 also includes a first valve 421, a second valve 431, a third valve 422, a fourth valve 451, a fifth valve 423, a sixth valve 452, a seventh valve 441, an eighth valve 424 and a first water pump 461. The first valve 421, the third valve 422, the fifth valve 423 and the eighth valve 424 are arranged on the first water pipe 42, the second valve 431 is arranged on the second water pipe 43, one end of the second water pipe 43 is connected between the first valve 421 and the third valve 422, the seventh valve 441 is arranged on the third water pipe 44, one end of the third water pipe 44 is connected between the fifth valve 423 and the eighth valve 424, the fourth valve 451 and the sixth valve 452 are arranged on the fourth water pipe 45, the first water pump 461 is arranged on the fifth water pipe 46, one end of the fifth water pipe 46 is arranged between the third valve 422 and the fifth valve 423, and the other end of the fifth water pipe 46 is arranged between the fourth valve 451 and the sixth valve 452.

[0041] During the off-peak period, hot water is stored in the water tank 41, the first valve 421, the second valve 431, the fifth valve 423, the sixth valve 452 and the eighth valve 424 are opened, the third valve 422, the fourth valve 451 and the seventh valve 441 are closed, and the gas cooler 13, the first valve 421, the second valve 431, the water tank 41, the sixth valve 452, the first water pump 461, the fifth valve 423 and the eighth valve 424 are connected in sequence to form a third circulation loop, and heat is exchanged in the gas cooler 13 to store hot water in the water tank 41.

[0042] During peak electricity period, the air source CO2 heat pump 1 operates at low load or does not operate, and the heat storage device 4 is used to heat the second circulation loop, so that the power cost of the system operation can be minimized. The first valve 421, the third valve 422, the fourth valve 451, the seventh valve 441 and the eighth valve 424 are opened, the second valve 431, the fifth valve 423 and the sixth valve 452 are closed, and the water tank 41, the fourth valve 451, the first water pump 461, the third valve 422, the first valve 421, the generator 21, the heat release side 31 of the heat exchanger 3, the second evaporator 22, the eighth valve 424, and the seventh valve 441 are connected in sequence to form a fourth circulation loop. The high-temperature water in the water tank 41 enters the generator 21 of the absorption heat pump 2 to drive the absorption heat pump 2 to operate. After the absorption heat pump 2 starts to operate, the high-temperature water in the second circulation loop then enters the heat release side 31 of the heat exchanger 3. The high-temperature water on the heat release side 31 of the heat exchanger 3 and the user end 100 water on the heat absorption side 32 of the heat exchanger 3 exchange heat. After the heat exchange, the heat release side 31 of the heat exchanger 3 cools the high-temperature water once. After the first cooling, the water flows into the second evaporator 22 for a second cooling. After the high-temperature water is cooled twice, it becomes low-temperature water and flows back to the bottom of the water tank 41, thereby improving the heating performance of the compression heat pump system. At the same time, the user end 100 water after the heat exchange and heating on the heat absorption side 32 of the heat exchanger 3 is directly connected to the user end 100 to form a second heating circuit. The user end 100 water after the heat absorption side 32 of the heat exchanger 3 is heated directly flows into the user end 100 for use. At the same time, the water used by the user end 100 in the first heating loop absorbs heat through the absorber 23 and the condenser 24, and finally the water temperature of the user end 100 is increased, and the heating demand of the user end 100 is met to supply heat to the user end 100. In this embodiment, in the fourth circulation loop, low-temperature water is continuously injected into the bottom of the water tank 41, and the high-temperature water in the water tank 41 continuously flows out from the top until the water tank 41 stores all low-temperature water, and then the water tank 41 is stopped from being used to supply heat to the fourth circulation loop. In other embodiments, the user end 100 can set the size of the water tank 41 according to actual needs to meet the heating time of the fourth circulation loop, and ensure that the water tank 41 can be used to provide heat during the peak power period.

[0043] Further, if Figure 1 and Figure 2 As shown, in order to control the flow rate of water in the second circulation pipeline, the first heating circuit and the second heating circuit, the heat pump heating system in the utility model also includes a second water pump 7, a third water pump 8, a fourth water pump 9 and a fifth water pump 10. The second water pump 7 is arranged on the first pipeline 5, specifically between the heat storage device 4 and the generator 21, the third water pump 8 is arranged on the second pipeline 6, specifically between the heat storage device 4 and the second evaporator 22, the fourth water pump 9 is arranged on the first heating circuit, specifically between the user end 100 and the absorber 23, and the fifth water pump 10 is arranged on the second heating circuit.

[0044] Further, if Figure 1 and Figure 2 As shown, the heat pump heating system in the utility model also includes a first switch valve 51, a second switch valve 52, a third switch valve and a second fourth switch valve. The first switch valve 51 and the second switch valve 52 are both arranged on the first pipeline 5. The first switch valve 51 is placed between the gas cooler 13 and the heat storage device 4, the second switch valve 52 is placed between the heat storage device 4 and the generator 21, the third switch valve is arranged on the first heating circuit, and the fourth switch valve is arranged on the second heating circuit.

[0045] The outlet water temperature of the gas cooler 13 of the utility model is T1, T1>70℃, which can ensure that the absorption heat pump 2 always runs smoothly; the outlet water temperature of the evaporator 22 of the absorption heat pump 2 is T2, 0℃<T2<40℃, which can ensure that the water in the pipeline does not freeze; the outlet water temperature of the gas cooler 13 is the temperature of the hot water stored in the heat storage device 4, and the outlet water temperature of the evaporator 22 of the absorption heat pump 2 is the temperature of the cold water stored in the heat storage device 4. The user can adjust the temperature difference of the stored water according to actual conditions.

[0046] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the claims of the present invention.

Claims

1. A heat pump heating system, characterized in that: Including air source CO2 heat pump, absorption heat pump, heat exchanger and heat storage device, The air source CO2 heat pump comprises a first evaporator, a compressor, a gas cooler and a throttling device, wherein the first evaporator, the compressor, the gas cooler and the throttling device are sequentially connected to form a first circulation loop; The absorption heat pump comprises a generator, a second evaporator, an absorber and a condenser, and the gas cooler, the generator, the heat release side of the heat exchanger and the second evaporator are sequentially connected to form a second circulation loop; The heat storage device is arranged on the second circulation loop, and the heat storage device can provide auxiliary heat to the second circulation loop; The absorber, the condenser and the user end are connected in sequence to form a first heating circuit to supply heat to the user end.

2. The heat pump heating system according to claim 1, characterized in that: The outlet of the gas cooler is connected to the inlet of the generator through a first pipeline, the inlet of the gas cooler is connected to the outlet of the second evaporator through a second pipeline, one end of the heat storage device is connected to the first pipeline, and the other end of the heat storage device is connected to the second pipeline.

3. The heat pump heating system according to claim 1, characterized in that: The heat storage device includes a water tank, the outlet of the gas cooler is connected to the top of the water tank, and the inlet of the gas cooler is connected to the bottom of the water tank to form a third circulation loop. When the air source CO2 heat pump runs at full load, hot water is stored in the water tank.

4. The heat pump heating system according to claim 3, characterized in that: The top of the water tank is connected to the inlet of the generator, the outlet of the generator is connected to the inlet of the heat release side of the heat exchanger, the outlet of the heat release side of the heat exchanger is connected to the inlet of the second evaporator, and the outlet of the second evaporator is connected to the bottom of the water tank to form a fourth circulation loop. When the air source CO2 heat pump is operating at low load or not operating, the hot water in the water tank can assist in heating the fourth circulation loop.

5. The heat pump heating system according to claim 4, characterized in that: The heat storage device also includes a first water pipe, a second water pipe, a third water pipe, a fourth water pipe and a fifth water pipe, one end of the first water pipe is connected to the first pipeline, the other end of the first water pipe is connected to the second pipeline, one end of the second water pipe is connected to the first pipeline, the other end of the second water pipe is connected to the top of the water tank, one end of the third water pipe is connected to the first water pipe, the other end of the third water pipe is connected to the bottom of the water tank, one end of the fourth water pipe is connected to the second water pipe, the other end of the fourth water pipe is connected to the third water pipe, one end of the fifth water pipe is connected to the first water pipe, and the other end of the fifth water pipe is connected to the fourth water pipe.

6. The heat pump heating system according to claim 5, characterized in that: The heat storage device also includes a first valve, a second valve, a third valve, a fourth valve, a fifth valve, a sixth valve, a seventh valve, an eighth valve and a first water pump. The first valve, the third valve, the fifth valve and the eighth valve are arranged on the first water pipe, the second valve is arranged on the second water pipe, one end of the second water pipe is connected between the first valve and the third valve, the seventh valve is arranged on the third water pipe, one end of the third water pipe is connected between the fifth valve and the eighth valve, the fourth valve and the sixth valve are arranged on the fourth water pipe, the first water pump is arranged on the fifth water pipe, one end of the fifth water pipe is arranged between the third valve and the fifth valve, and the other end of the fifth water pipe is arranged between the fourth valve and the sixth valve.

7. The heat pump heating system according to claim 6, characterized in that: It also includes a second water pump, a third water pump, a fourth water pump and a fifth water pump. The second water pump is arranged on the first pipeline, the third water pump is arranged on the second pipeline, the fourth water pump is arranged on the first heating circuit, and the fifth water pump is arranged on the second heating circuit.

8. The heat pump heating system according to claim 7, characterized in that: It also includes a first switch valve, a second switch valve, a third switch valve and a fourth switch valve. The first switch valve and the second switch valve are both arranged on the first pipeline. The first switch valve is placed between the gas cooler and the heat storage device, the second switch valve is placed between the heat storage device and the generator, the third switch valve is arranged on the first heating circuit, and the fourth switch valve is arranged on the second heating circuit.

9. The heat pump heating system according to claim 3, characterized in that: The water tank is a thermoclimatic water tank.

10. The heat pump heating system according to claim 1, characterized in that: The heat absorption side of the heat exchanger is connected to the user end to form a second heating circuit to supply heat to the user end.