Ventilation device for buried sewage treatment tank
By installing a blower and air blowing structure in the underground sewage treatment tank, the problem of insufficient ventilation is solved, sufficient oxygen supply is provided, and construction safety and sustainability are improved.
Patent Information
- Application Number
- CN202323383998.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-12
AI Technical Summary
During the construction of underground sewage treatment tanks, insufficient ventilation may lead to an increase in toxic gases and insufficient oxygen supply, affecting the safety and physical condition of workers.
A ventilation device for an underground sewage treatment tank is designed, including a blower, a ventilation pipe, a diverter pipe and a blowing structure. The outside air is sent into the diverter pipe through the ventilation pipe to provide sufficient oxygen, and through the blowing structure The second hose blows air to the worker area.
It effectively solves the problem of insufficient ventilation, ensures the oxygen supply for workers, and improves the safety and sustainability of the construction process.
Smart Images

Figure CN221801990U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ventilation and air exchange, in particular to a ventilation and air exchange device for an underground sewage treatment pool. Background Art
[0002] During the construction and equipment installation of underground sewage treatment pools, workers need to enter the interior of the treatment pool. During this process, since the internal space of the underground sewage treatment pool is large and the inspection well connected to the outside world is small, it is necessary to ensure that the interior of the treatment pool is well ventilated during the construction process. At this time, a ventilation device is needed.
[0003] The Chinese utility model with publication number CN216584256U proposes a closed water pool ventilation device: first, the original air inside the pool body can be squeezed out through the ventilator, the third pipe and the perforated pipe, and then the air inside the pool body can be extracted through the second pipe, the air valve and the fifth pipe, so that a negative pressure state is formed inside the pool body, thereby making the ventilation work of the pool body more efficient and improving work efficiency.
[0004] However, in the above-mentioned practice, the bottom of the pool is only ventilated by perforated pipes. When the staff are working in the pool, insufficient ventilation may occur, resulting in an increase in toxic gases and insufficient oxygen supply in the pool, which will cause discomfort to the staff and easily affect the physical condition of the internal workers. There is also a risk of fainting due to the increase in toxic gases and insufficient oxygen supply, which is not conducive to the safety of operations inside the pool. Utility Model Content
[0005] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model proposes an underground sewage treatment pool ventilation device, which solves the problem that insufficient ventilation may occur when working in the pool in the above-mentioned practical application, resulting in the increase of toxic gases in the pool, insufficient oxygen supply and other phenomena, which will cause discomfort to the staff, easily affect the physical condition of the internal workers, and there is also a risk of fainting due to the increase of toxic gases and insufficient oxygen supply, which is not conducive to the safety of operations inside the pool.
[0006] To achieve the above-mentioned purpose, the utility model proposes an underground sewage treatment pool ventilation device, comprising: a sewage treatment pool, a blower, a ventilation pipe fixedly connected to the side of the blower, a connecting pipe fixedly connected to the middle of the ventilation pipe, a blowing structure connected to the side of the connecting pipe, a shunt pipe symmetrically fixedly connected to the lower end of the ventilation pipe, and an exhaust hole opened on the shunt pipe;
[0007] The blowing structure includes a connecting head, a first hose, and a second hose. The connecting pipe is communicated with the connecting head. The first hose is fixedly connected to the connecting head. The outer side of the first hose is slidably connected to the second hose. An adjustment component is fixedly arranged on the side of the second hose. The adjustment component includes a mounting sleeve. A support component is inserted into the interior of the mounting sleeve.
[0008] As a further solution of the utility model: a blower is fixedly arranged at the upper end and close to one side of the sewage treatment tank, and the ventilation pipe is fixedly arranged inside the sewage treatment tank.
[0009] As a further solution of the utility model: the first hose and the second hose are hollow inside.
[0010] As a further solution of the utility model: the side wall of the installation sleeve is threadedly connected with a fixing screw, the outer side of the installation sleeve is fixedly connected with a connecting seat, a through hole is opened on the connecting seat, and the inner wall of the through hole is fixedly connected to the outer side wall of the second hose.
[0011] As a further solution of the utility model: the support assembly includes a support rod, the upper end of the support rod is provided with a threaded groove, the lower end of the support rod is fixedly connected with a threaded joint, and the lower end of the threaded joint is threadedly connected with a base plate.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. By setting up blowers, ventilation pipes, and diversion pipes, set up blowers in appropriate places. The ventilation pipes pass through the inspection wells and enter the sewage treatment pool. Then the workers enter the sewage treatment pool to carry out construction. Before entering the sewage treatment pool, start the blower in advance. The blower sends the outside air into the diversion pipe through the ventilation pipe, and finally discharges it from the exhaust hole to achieve the purpose of ventilation inside the treatment pool.
[0014] 2. By setting up the second hose and the first hose, part of the air is blown out through the second hose of the blowing structure to the construction area of the workers, which can provide sufficient oxygen for the workers, ensuring that the workers can work inside the sewage treatment tank for a long time, avoiding physical discomfort due to lack of oxygen, and ensuring the normal progress of the entire construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 It is a partial structural schematic diagram of the utility model;
[0017] Figure 3 It is a partial structural schematic diagram of the utility model;
[0018] Figure 4 It is a structural schematic diagram of the adjustment component of the utility model;
[0019] Figure 5 It is a structural schematic diagram of the support assembly of the utility model.
[0020] In the figure: 1. blower; 2. ventilation pipe; 3. sewage treatment tank; 4. connecting pipe; 5. diverter pipe; 6. connector; 7. first hose; 8. second hose; 9. adjustment assembly; 91. mounting sleeve; 92. fixing screw; 93. connecting seat; 94. through hole; 10. bottom plate; 11. supporting assembly; 1101. supporting rod; 1102. threaded joint; 1103. threaded groove. DETAILED DESCRIPTION
[0021] The technical solution of the utility model will be described clearly and completely in conjunction with the embodiments below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] like Figure 1-5 As shown, a ventilation and air exchange device for an underground sewage treatment pool 3 comprises: a sewage treatment pool 3, a blower 1 is fixedly arranged at the upper end and near one side of the sewage treatment pool 3, a ventilation pipe 2 is fixedly connected to the side of the blower 1, and the ventilation pipe 2 is fixedly arranged inside the sewage treatment pool 3.
[0023] A connecting pipe 4 is fixedly connected to the middle of the ventilation pipe 2, and a blowing structure is connected to the side of the connecting pipe 4. A diverter pipe 5 is symmetrically fixedly connected to the lower end of the ventilation pipe 2, and an exhaust hole is opened on the diverter pipe 5.
[0024] When carrying out internal construction of the buried sewage treatment pool 3, a blower 1 is installed at a suitable place, and the ventilation pipe 2 passes through the inspection well into the sewage treatment pool 3, and then the workers enter the sewage treatment pool 3 to carry out construction. Before the workers enter the sewage treatment pool 3, the blower 1 is started in advance, and the blower 1 sends the outside air into the diversion pipe 5 through the ventilation pipe 2, and finally discharges it from the exhaust hole, so as to achieve the purpose of ventilating the inside of the treatment pool.
[0025] The blowing structure includes a connecting head 6, a first hose 7, and a second hose 8. The first hose 7 and the second hose 8 are hollow inside. The connecting pipe 4 is connected to the connecting head 6. The first hose 7 is fixedly connected to the connecting head 6. The outer side of the first hose 7 is slidably connected to the second hose 8.
[0026] Part of the air is blown out to the construction area of the workers through the second hose 8 of the blowing structure, which can provide sufficient oxygen for the workers, ensuring that the workers can work inside the sewage treatment tank 3 for a long time, avoiding physical discomfort due to lack of oxygen, and ensuring the normal progress of the entire construction process.
[0027] An adjustment component 9 is fixedly arranged on the side of the second hose 8, and the adjustment component 9 includes a mounting sleeve 91, a side wall of the mounting sleeve 91 is threadedly connected with a fixing screw 92, and the outer side of the mounting sleeve 91 is fixedly connected with a connecting seat 93, and a through hole 94 is opened on the connecting seat 93, and the inner wall of the through hole 94 is fixedly connected to the outer side wall of the second hose 8.
[0028] A support assembly 11 is inserted into the interior of the mounting sleeve 91, and the support assembly 11 includes a support rod 1101, a threaded groove 1103 is formed at the upper end of the support rod 1101, a threaded joint 1102 is fixedly connected to the lower end of the support rod 1101, and the lower end of the threaded joint 1102 is threadedly connected to the base plate 10.
[0029] By rotating the fixing screw 92 , the fixing screw 92 squeezes the outer wall of the support rod 1101 , so that the support rod 1101 can be fixed on the inner side of the installation sleeve 91 .
[0030] The height of the second hose 8 from the ground can be adjusted: after loosening the fixing screw 92, since the second hose 8 can slide on the outside of the first hose 7, you can hold the installation sleeve 91 to drive the second hose 8 to slide in the vertical direction. If the height of the support rod 1101 is not enough, the rod to be connected can be installed to the upper end of the support rod 1101. The structure of the rod to be connected is consistent with the structure of the support rod 1101.
[0031] Steps for installing the rod to be connected to the upper end of the support rod 1101: connect the threaded joint 1102 of the rod to be connected with the threaded groove 1103 of the support rod 1101, loosen the fixing screw 92, hold the installation sleeve 91 to drive the second hose 8 to slide to the position of the rod to be connected, and tighten the fixing screw 92.
[0032] Working principle:
[0033] When carrying out internal construction of the buried sewage treatment pool 3, a blower 1 is installed at a suitable place, and the ventilation pipe 2 passes through the inspection well into the sewage treatment pool 3, and then the workers enter the sewage treatment pool 3 to carry out construction. Before the workers enter the sewage treatment pool 3, the blower 1 is started in advance, and the blower 1 sends the outside air into the diversion pipe 5 through the ventilation pipe 2, and finally discharges it from the exhaust hole, so as to achieve the purpose of ventilating the inside of the treatment pool.
[0034] Part of the air is blown out to the construction area of the workers through the second hose 8 of the blowing structure, which can provide sufficient oxygen for the workers, ensuring that the workers can work inside the sewage treatment tank 3 for a long time, avoiding physical discomfort due to lack of oxygen, and ensuring the normal progress of the entire construction process.
[0035] The above embodiments are only used to illustrate the technical method of the utility model rather than to limit it. Although the utility model is described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical method of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the utility model.
Claims
1. A ventilation device for an underground sewage treatment pool, characterized in that: include: A sewage treatment tank (3) and a blower (1), wherein a ventilation pipe (2) is fixedly connected to the side of the blower (1), a connecting pipe (4) is fixedly connected to the middle of the ventilation pipe (2), a blowing structure is connected to the side of the connecting pipe (4), a shunt pipe (5) is symmetrically fixedly connected to the lower end of the ventilation pipe (2), and an exhaust hole is provided on the shunt pipe (5); The blowing structure comprises a connecting head (6), a first hose (7), and a second hose (8); the connecting pipe (4) is in communication with the connecting head (6); the first hose (7) is fixedly connected to the connecting head (6); the outer side of the first hose (7) is slidably connected to the second hose (8); an adjusting component (9) is fixedly arranged on the side of the second hose (8); the adjusting component (9) comprises a mounting sleeve (91); a supporting component (11) is inserted into the interior of the mounting sleeve (91).
2. The underground sewage treatment pool ventilation device according to claim 1, characterized in that: A blower (1) is fixedly arranged at the upper end and close to one side of the sewage treatment tank (3), and the ventilation pipe (2) is fixedly arranged inside the sewage treatment tank (3).
3. The underground sewage treatment pool ventilation device according to claim 1, characterized in that: The first hose (7) and the second hose (8) are hollow inside.
4. The underground sewage treatment pool ventilation device according to claim 1, characterized in that: A fixing screw (92) is threadedly connected to the side wall of the installation sleeve (91), and a connecting seat (93) is fixedly connected to the outer side of the installation sleeve (91). A through hole (94) is formed on the connecting seat (93), and the inner wall of the through hole (94) is fixedly connected to the outer side wall of the second hose (8).
5. The underground sewage treatment pool ventilation device according to claim 1, characterized in that: The support assembly (11) comprises a support rod (1101), the upper end of the support rod (1101) is provided with a threaded groove (1103), the lower end of the support rod (1101) is fixedly connected to a threaded joint (1102), and the lower end of the threaded joint (1102) is threadedly connected to a base plate (10).