Geotechnical engineering investigation drilling and sampling device
By using a combination of a suction fan and an adsorption net in the geotechnical engineering survey drilling sampling device, the problem of excessive dust during drilling is solved, and the safety of the construction environment and the convenience of operation are improved.
Patent Information
- Application Number
- CN202420208594.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-29
AI Technical Summary
Geotechnical engineering survey drilling sampling devices are prone to produce a large amount of dust when used, causing discomfort to construction workers.
A device including a base, a fixed frame, a drilling mechanism, a collection box, a suction fan, an adsorption net and other components is designed. By starting the suction fan, dust is guided into the collection box and adsorbed by the adsorption net, thereby reducing dust exposure.
It effectively reduces the impact of dust on construction workers, making the drilling process more convenient and stable.
Smart Images

Figure CN221803441U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geotechnical engineering investigation drilling sampling devices, in particular to a geotechnical engineering investigation drilling sampling device. Background Art
[0002] Geotechnical engineering investigation and sampling refers to the process of continuing to extract and sample the underlying rock and soil for engineering construction. Geotechnical engineering investigation and sampling often uses drilling tools such as spiral drills, soil sampling tubes or suction tubes to obtain soil samples that will not have a significant impact on the determination of the mechanical properties of the soil. Geotechnical engineering investigation and sampling uses a drill bit to drill into the ground to extract rock and soil.
[0003] However, when most geotechnical engineering survey drilling sampling devices are in use, the drill bit easily generates a lot of dust when drilling, which makes the workers feel uncomfortable when using the geotechnical engineering survey drilling sampling device, making the geotechnical engineering survey drilling sampling device inconvenient to use. Summary of the invention
[0004] The utility model aims to provide a geotechnical engineering survey drilling sampling device to solve the problem that the geotechnical engineering survey drilling sampling device proposed in the above background technology is prone to generate large dust during use.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a geotechnical engineering survey drilling sampling device, comprising a base, a fixing frame and a drilling mechanism, a fixing frame is arranged above the base, a drilling mechanism is arranged on one side of the fixing frame, a collecting box is arranged on the side of the fixing frame away from the drilling mechanism, a suction port is arranged on one side of the collecting box, a suction fan is arranged on the side of the collecting box away from the suction port, a protective net is arranged on one side of the suction fan, an adsorption net is arranged below the suction fan, a mounting seat is arranged on one side of the adsorption net, and a spring block is arranged inside the mounting seat.
[0006] Preferably, the suction fans are symmetrically distributed on one side of the collecting box, and the spring blocks are symmetrically distributed inside the mounting seat.
[0007] Preferably, a fixing frame is provided on one side of the collecting box, and a driving motor is provided inside the fixing frame.
[0008] Preferably, the output end of the driving motor is connected to a rotating disk, and a side of the rotating disk away from the driving motor is connected to a connecting rod.
[0009] Preferably, one side of the connecting rod is connected to a connecting plate, and one side of the connecting plate is connected to a rotating shaft.
[0010] Preferably, a displacement rod is connected to a side of the rotating shaft away from the connecting plate, and a guide block is provided on the surface of the displacement rod.
[0011] Preferably, a guide seat is provided on one side of the bottom of the fixing frame close to the guide block.
[0012] Compared with the prior art, the beneficial effect of the utility model is that the geotechnical engineering investigation and drilling sampling device starts the suction fan so that the suction fan can guide the dust generated during the drilling mechanism processing, so that the dust can enter the collection box along the absorption port, and at the same time, the dust can be adsorbed by the adsorption net after entering the collection box, so that the geotechnical engineering investigation and drilling sampling device can avoid the large amount of dust causing physical discomfort to the construction personnel when it is in use, so that the geotechnical engineering investigation and drilling sampling device can solve the above-mentioned problem of easily causing large dust when it is in use.
[0013] 1. The geotechnical engineering survey drilling sampling device, when the geotechnical engineering survey drilling sampling device is in use, usually generates a lot of dust during use. By starting the suction fan, the suction fan can guide the dust generated during the drilling mechanism processing, so that the dust can enter the collection box along the absorption port, and at the same time, the dust can be adsorbed by the adsorption net after entering the collection box, so that the geotechnical engineering survey drilling sampling device can avoid the large amount of dust causing physical discomfort to the construction personnel during use;
[0014] 2. The geotechnical engineering survey drilling sampling device is usually prone to shaking when in use, which makes the geotechnical engineering survey drilling sampling device inconvenient to use. By starting the drive motor, the drive motor can rotate the rotating disk connected to the output end, so that the rotating disk can rotate the connecting rod connected to the surface when rotating, so that the connecting rod can move the connecting plate set on one side when rotating, and the connecting plate can drive the displacement rod set below to move when moving, so that the displacement rod can quickly contact the ground, so that the geotechnical engineering survey drilling sampling device can avoid shaking when in use, and the geotechnical engineering survey drilling sampling device can be more stable when in use. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the main cutaway structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the main structure of the utility model;
[0017] Figure 3 It is a schematic diagram of the top view of the cross-section structure of the collection box of the utility model;
[0018] Figure 4 This is a schematic diagram of the main cutaway structure of the mounting seat of the utility model;
[0019] Figure 5 This is a schematic diagram of the main cutaway structure of the fixed frame of the utility model;
[0020] Figure 6 It is a schematic diagram of the top view and cutaway structure of the fixing frame of the utility model.
[0021] In the figure: 1. base; 2. fixing frame; 3. drilling mechanism; 4. collecting box; 5. suction port; 6. suction fan; 7. protection net; 8. adsorption net; 9. mounting seat; 10. spring block; 11. fixing frame; 12. driving motor; 13. rotating disk; 14. connecting rod; 15. connecting plate; 16. rotating shaft; 17. displacement rod; 18. guide block; 19. guide seat. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1 , Figure 2 , Figure 3 and Figure 4 The utility model provides a technical solution: a drilling sampling device for geotechnical engineering investigation, comprising a base 1, a fixing frame 2 and a drilling mechanism 3, wherein the fixing frame 2 is arranged above the base 1, the drilling mechanism 3 is arranged on one side of the fixing frame 2, a collecting box 4 is arranged on the side of the fixing frame 2 away from the drilling mechanism 3, a suction port 5 is arranged on one side of the collecting box 4, a suction fan 6 is arranged on the side of the collecting box 4 away from the suction port 5, a protective net 7 is arranged on one side of the suction fan 6, an adsorption net 8 is arranged below the suction fan 6, a mounting seat 9 is arranged on one side of the adsorption net 8, a spring block 10 is arranged inside the mounting seat 9, the suction fan 6 is symmetrically distributed on one side of the collecting box 4, and the spring block 10 is symmetrically distributed inside the mounting seat 9.
[0024] When it comes to specific implementation,
[0025] See also Figure 1 , Figure 2 , Figure 3 and Figure 4It can be known that when the geotechnical engineering investigation and drilling sampling device is in use, it is usually easy to generate a lot of dust during use. By starting the suction fan 6, the suction fan 6 can guide the dust generated during the processing of the drilling mechanism 3, and then the dust can enter the collection box 4 along the absorption port 5. At the same time, after the dust enters the collection box 4, it can be adsorbed by the adsorption net 8, so that the geotechnical engineering investigation and drilling sampling device can avoid the large amount of dust causing physical discomfort to the construction personnel when it is in use.
[0026] A fixed frame 11 is provided on one side of the collecting box 4, a driving motor 12 is provided inside the fixed frame 11, a rotating disk 13 is connected to the output end of the driving motor 12, a connecting rod 14 is connected to the side of the rotating disk 13 away from the driving motor 12, a connecting plate 15 is connected to one side of the connecting rod 14, a rotating shaft 16 is connected to one side of the connecting plate 15, a displacement rod 17 is connected to the side of the rotating shaft 16 away from the connecting plate 15, a guide block 18 is provided on the surface of the displacement rod 17, and a guide seat 19 is provided on the bottom of the fixed frame 11 near the guide block 18.
[0027] When it comes to specific implementation,
[0028] See also Figure 1 , Figure 2 , Figure 5 and Figure 6 It can be known that when the geotechnical engineering investigation and drilling sampling device is in use, it is usually easy to shake during use, which makes the geotechnical engineering investigation and drilling sampling device inconvenient to use. By starting the drive motor 12, the drive motor 12 can rotate the rotating disk 13 connected to the output end, and the rotating disk 13 can rotate the connecting rod 14 connected to the surface when rotating, so that the connecting rod 14 can move the connecting plate 15 set on one side when rotating, and the connecting plate 15 can drive the displacement rod 17 set below to move when moving, so that the displacement rod 17 can quickly contact the ground, so that the geotechnical engineering investigation and drilling sampling device can avoid shaking during use, and the geotechnical engineering investigation and drilling sampling device can be more stable when in use.
[0029] To sum up, geotechnical engineering investigation and sampling refers to the process of sampling and studying the underlying rock and soil for engineering construction. Geotechnical engineering investigation and sampling usually uses drilling tools such as spiral drills, soil sampling tubes or suction tubes. By starting the suction fan 6, the suction fan 6 can guide the dust generated during the drilling mechanism 3, so that the dust can enter the collection box 4 along the absorption port 5. At the same time, after the dust enters the collection box 4, it can be adsorbed by the adsorption net 8, so that the geotechnical engineering investigation and drilling sampling device can avoid the large amount of dust causing physical discomfort to construction personnel during use. The content not described in detail in this description belongs to the existing technology known to professional and technical personnel in this field.
[0030] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A drilling sampling device for geotechnical engineering investigation, comprising a base (1), a fixing frame (2) and a drilling mechanism (3), characterized in that: A fixing frame (2) is arranged above the base (1), a drilling mechanism (3) is arranged on one side of the fixing frame (2), a collecting box (4) is arranged on a side of the fixing frame (2) away from the drilling mechanism (3), a suction port (5) is arranged on one side of the collecting box (4), a suction fan (6) is arranged on a side of the collecting box (4) away from the suction port (5), a protective net (7) is arranged on one side of the suction fan (6), an adsorption net (8) is arranged below the suction fan (6), a mounting seat (9) is arranged on one side of the adsorption net (8), and a spring block (10) is arranged inside the mounting seat (9).
2. A geotechnical engineering survey drilling sampling device according to claim 1, characterized in that: The suction fans (6) are symmetrically distributed on one side of the collection box (4), and the spring clamps (10) are symmetrically distributed inside the mounting seat (9).
3. A geotechnical engineering survey drilling sampling device according to claim 1, characterized in that: A fixing frame (11) is provided on one side of the collection box (4), and a driving motor (12) is provided inside the fixing frame (11).
4. A geotechnical engineering survey drilling sampling device according to claim 3, characterized in that: The output end of the driving motor (12) is connected to a rotating disk (13), and the side of the rotating disk (13) away from the driving motor (12) is connected to a connecting rod (14).
5. A geotechnical engineering survey drilling sampling device according to claim 4, characterized in that: One side of the connecting rod (14) is connected to a connecting plate (15), and one side of the connecting plate (15) is connected to a rotating shaft (16).
6. A geotechnical engineering survey drilling sampling device according to claim 5, characterized in that: A displacement rod (17) is connected to the side of the rotating shaft (16) away from the connecting plate (15), and a guide block (18) is provided on the surface of the displacement rod (17).
7. A geotechnical engineering survey drilling sampling device according to claim 3, characterized in that: A guide seat (19) is provided on one side of the bottom of the fixed frame (11) close to the guide block (18).
