Battery thermal management system

By integrating the liquid-cooled energy storage converter cooling system and the fluorine pump system, and using the four-way valve mode switching and fluorine pump cooling technology, the problems of low cooling efficiency and high energy consumption of the traditional air-cooled battery thermal management system are solved, achieving Efficient battery thermal management, suitable for large-scale energy storage systems.

CN221805624UActive Publication Date: 2024-10-01常州恒创热管理系统股份有限公司
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420166080.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-10-01
Estimated Expiration
2034-01-23

AI Technical Summary

Technical Problem

The traditional air-cooled battery thermal management system has low cooling efficiency and poor temperature uniformity, making it difficult to adapt to the high energy conversion rate requirements of large-scale energy storage systems. Moreover, liquid cooling technology increases energy consumption under high energy conversion rates, and the thermal management system energy utilization rate Low.

Method used

A battery thermal management system is designed that integrates the cooling system of the liquid-cooled energy storage converter. Through the mode switching of the four-way valve, the circulation of the liquid-cooling circuit is realized without interfering with each other and in series. The thermal management system is used to recover the heat of the PCS system. Battery heating, combined with fluorine pump system cooling in low temperature conditions, improves energy utilization efficiency and integration.

Benefits of technology

It effectively reduces the operating cost and number of parts of the energy storage thermal management system, improves energy conversion efficiency, and achieves efficient thermal management. It is suitable for high energy conversion rates and large-scale energy storage systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221805624U_ABST
    Figure CN221805624U_ABST
Patent Text Reader

Abstract

The utility model provides a battery thermal management system which comprises a cooling loop and a refrigerating loop, the cooling loop comprises a first liquid pipeline, a second liquid pipeline and a first four-way valve, and the first liquid pipeline and the second liquid pipeline are both connected with the first four-way valve. A first heat exchanger, a liquid cooling plate, a first cooling liquid pump and a PTC heater are connected to the first liquid pipeline in series, a second cooling liquid pump, a liquid cooling energy storage converter and a radiator are connected to the second liquid pipeline in series, and the refrigerating circuit is connected with the first heat exchanger in series. According to the utility model, the first four-way valve is adopted to integrate the cooling system of the liquid-cooled energy storage converter and the battery heat management system, so that an independent radiator of the liquid-cooled energy storage converter system is omitted, heat generated when the liquid-cooled energy storage converter system works can be effectively recycled to heat the battery, and the energy utilization efficiency of the system is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of thermal management, in particular to a battery thermal management system. Background Art

[0002] In the existing technology, the electrochemical energy storage system is one of the important means to achieve peak shaving and valley filling, peak load regulation, and frequency modulation of the power grid, and to realize the consumption of renewable energy. The battery thermal management system is an important component of the electrochemical energy storage system, ensuring that the battery energy storage system operates efficiently and stably in a suitable temperature range. For large-scale battery energy storage systems, its energy conversion efficiency is a very important indicator. Therefore, the thermal management system should have a small energy consumption to ensure the high energy conversion efficiency of the battery energy storage system.

[0003] The traditional air-cooled battery thermal management system has low cooling efficiency and poor temperature uniformity, making it difficult to meet the cooling requirements under large charge and discharge rates, and consuming a lot of energy. When the battery needs to be heated, electric heating is used to heat the battery, which has low energy utilization. The air-cooled battery thermal management system is difficult to adapt to the requirements of increasing energy storage scale, increasing energy conversion efficiency, and increasing charge and discharge rates.

[0004] Liquid cooling technology has gradually replaced air cooling technology to become the mainstream solution for energy storage thermal management systems. As heat dissipation requirements increase, the thermal management system itself consumes more and more energy, while the energy storage system has higher and higher energy conversion efficiency. Therefore, reducing the energy consumption of the thermal management system is one of the keys to improving the energy conversion efficiency of the energy storage system.

[0005] In addition, the PCS system is one of the important components of the energy storage system. Its thermal management is currently generally equipped with a separate radiator and heat dissipation circuit inside the PCS. A large amount of heat will be generated during its operation. Under low temperature conditions, the heat will be wasted and cannot be used.

[0006] Therefore, it is necessary to provide a battery thermal management system to overcome the above-mentioned defects. Utility Model Content

[0007] The purpose of the utility model is to provide a battery thermal management system.

[0008] According to one aspect of the utility model, a battery thermal management system is provided, comprising:

[0009] A cooling circuit, the cooling circuit comprising a first liquid pipeline, a second liquid pipeline and a first four-way valve, the first liquid pipeline and the second liquid pipeline are both connected to the first four-way valve, the first liquid pipeline is connected in series with a first heat exchanger, a liquid cooling plate, a first coolant pump and a PTC heater, and the second liquid pipeline is connected in series with a second coolant pump, a liquid-cooled energy storage converter and a radiator;

[0010] A refrigeration circuit is connected in series with the first heat exchanger.

[0011] Preferably, the refrigeration circuit includes a second four-way valve connected to the first heat exchanger, a second heat exchanger connected to the second four-way valve, a liquid storage tank connected to the second heat exchanger, and an electronic expansion valve connecting the liquid storage tank and the first heat exchanger.

[0012] Preferably, the first four-way valve includes two working modes and can switch back and forth between mode 1 and mode 2. When the first four-way valve is in mode 1, the circulation loop where the first liquid pipeline is located and the circulation loop where the second liquid pipeline is located are two circulation loops in which the liquid flow cycles do not interfere with each other; when the first four-way valve is in mode 2, the first liquid pipeline and the second liquid pipeline constitute a series circulation loop.

[0013] Preferably, the first four-way valve includes valve port a, valve port b, valve port c and valve port d, the two ends of the first liquid pipeline are respectively connected to the valve port a and valve port c of the four-way valve, and the two ends of the second liquid pipeline are respectively connected to the valve port b and valve port d of the four-way valve.

[0014] Preferably, when the first four-way valve is in mode 1, valve port a is communicated with valve port c, and valve port b is communicated with valve port d; when the first four-way valve is in mode 2, valve port a is communicated with valve port b, and valve port c is communicated with valve port d.

[0015] Preferably, the liquid cooling plate, the first coolant pump, the first four-way valve and the PTC heater are connected in series in sequence on the first liquid pipeline from the first heat exchanger along the flow direction of the coolant; the second coolant pump, the liquid-cooled energy storage inverter and the radiator are connected in series in sequence on the second liquid pipeline from the first four-way valve along the flow direction of the coolant.

[0016] Preferably, a fluorine pump is connected in parallel between the liquid storage tank and the first heat exchanger, and a first solenoid valve is provided between the fluorine pump and the first heat exchanger.

[0017] Preferably, the second four-way valve includes valve port a', valve port b', valve port c' and valve port d', and the second four-way valve is also connected to a compressor, the inlet end of the compressor is connected to the valve port a', the outlet end of the compressor is connected to the valve port d', the valve port b' of the second four-way valve is connected to the first heat exchanger, and the valve port c' of the second four-way valve is connected to the second heat exchanger.

[0018] Preferably, the working mode of the second four-way valve is as follows:

[0019] Mode 1: valve port a' is connected to valve port c', and valve port b' is connected to valve port d';

[0020] Mode 2: Valve port a' is connected to valve port b', and valve port c' is connected to valve port d'.

[0021] Preferably, a gas-liquid separator is provided between the compressor and the valve port d' of the second four-way valve, a second solenoid valve is provided between the compressor and the valve port a' of the second four-way valve, a third solenoid valve is connected in parallel between the valve port a' and the valve port d' of the second four-way valve, one end of the third solenoid valve is connected to the pipeline between the valve port a' and the second solenoid valve, and the other end of the third solenoid valve is connected to the pipeline between the valve port d' and the gas-liquid separator.

[0022] Compared with the prior art, the battery thermal management system provided by the utility model has the following beneficial effects:

[0023] Due to the adoption of the above technical scheme, the utility model has the advantages of simple structure, ingenious design and low cost. The first four-way valve is used to integrate the liquid-cooled energy storage inverter (PCS) cooling system with the battery thermal management system, and the separate radiator of the liquid-cooled energy storage inverter system is omitted. The heat generated by the liquid-cooled energy storage inverter system during operation can be effectively recovered to heat the battery, thereby improving the energy utilization efficiency of the system. At the same time, the thermal management system can also be used to cool the liquid-cooled energy storage inverter system, thereby improving the integration and reducing the operating cost and the number of components of the energy storage thermal management system. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The utility model is further described in detail below with reference to the accompanying drawings and specific embodiments:

[0025] Figure 1 It is a schematic diagram of the structure of the battery thermal management system of the utility model;

[0026] Figure 2 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 1;

[0027] Figure 3 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 2;

[0028] Figure 4 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 3;

[0029] Figure 5 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 4;

[0030] Figure 6 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 5;

[0031] Figure 7 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 6;

[0032] Figure 8 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 7;

[0033] Fig. 9 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 8;

[0034] Fig.10 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 9;

[0035] Fig.11 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 10;

[0036] Fig.12 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 11;

[0037] Fig.13 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 12;

[0038] Fig.14 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 13;

[0039] Fig.15 It is a schematic diagram of the structure of the battery thermal management system of the utility model in mode 14;

[0040] Among them, A. cooling circuit, A1. first liquid pipeline, A11. first heat exchanger, A12. liquid cooling plate, A13. first coolant pump, A14. PTC heater, A2. second liquid pipeline, A21. second coolant pump, A22. liquid-cooled energy storage inverter, A23. radiator, A24. radiator fan, A3. first four-way valve, B. refrigeration circuit, B1. second four-way valve, B2. second heat exchanger, B3. liquid storage tank, B4. electronic expansion valve, B5. fluorine pump, B6. first solenoid valve, B7. compressor, B8. gas-liquid separator, B9. second solenoid valve, B10. third solenoid valve, B11. heat exchanger fan. DETAILED DESCRIPTION

[0041] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0042] In order to simplify the drawings, only the parts related to the utility model are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically drawn or marked. In this article, "one" not only means "only one", but also means "more than one".

[0043] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0044] In this article, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0045] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0046] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the specific implementation methods of the utility model will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.

[0047] See also Figure 1 This embodiment discloses a battery thermal management system, including a cooling circuit A and a refrigeration circuit B. A coolant flows in the cooling circuit A, and a refrigerant flows in the refrigeration circuit B. The cooling circuit A and the refrigeration circuit B are both connected in series with the first heat exchanger A11, and the refrigeration circuit B absorbs heat from the cooling circuit A through the first heat exchanger A11, or transfers heat to the cooling circuit A.

[0048] The cooling circuit A includes a first liquid pipeline, a first four-way valve A3, and a second liquid pipeline A2 connected to the first liquid pipeline through the first four-way valve A3. The first liquid pipeline is connected in series from the first heat exchanger A11 along the coolant flow direction with a liquid cooling plate A12, a first coolant pump A13, a first four-way valve A3, and a PTC heater A14; the second liquid pipeline A2 is connected in series from the first four-way valve A3 along the coolant flow direction with a second coolant pump A21, a liquid-cooled energy storage converter A22 (also known as PCS), and a radiator A23.

[0049] The first four-way valve A3 includes two working modes and can switch back and forth between mode 1 and mode 2. When the first four-way valve A3 is in mode 1, the circulation loop where the first liquid pipeline is located and the circulation loop where the second liquid pipeline A2 is located are two circulation loops in which the liquid flow cycles do not interfere with each other; when the first four-way valve A3 is in mode 2, the first liquid pipeline and the second liquid pipeline A2 form a series circulation loop.

[0050] The first four-way valve A3 includes valve port a, valve port b, valve port c and valve port d. The two ends of the first liquid pipeline are respectively connected to the valve port a and valve port c of the four-way valve. The two ends of the second liquid pipeline A2 are respectively connected to the valve port b and valve port d of the four-way valve. When the first four-way valve A3 is in mode 1, valve port a is connected to valve port c, and valve port b is connected to valve port d; when the first four-way valve A3 is in mode 2, valve port a is connected to valve port b, and valve port c is connected to valve port d.

[0051] The refrigeration circuit B includes a second four-way valve B1 connected to the first heat exchanger A11, a second heat exchanger B2 connected to the second four-way valve B1, a liquid storage tank B3 connected to the second heat exchanger B2, and an electronic expansion valve B4 connecting the liquid storage tank B3 and the first heat exchanger A11. The second heat exchanger can be used as an evaporator or a condenser for both heating and cooling. A fluorine pump B5 is connected in parallel between the liquid storage tank B3 and the first heat exchanger A11, and a first solenoid valve B6 is provided between the fluorine pump B5 and the first heat exchanger A11.

[0052] The second four-way valve B1 includes valve port a', valve port b', valve port c' and valve port d', and is also connected to a compressor B7. The inlet end of the compressor B7 is connected to the valve port a', and the outlet end of the compressor B7 is connected to the valve port d'. The valve port b' of the second four-way valve B1 is connected to the first heat exchanger A11, and the valve port c' of the second four-way valve B1 is connected to the second heat exchanger B2.

[0053] A gas-liquid separator B8 is provided between the compressor B7 and the valve port d' of the second four-way valve B1, and a second solenoid valve B9 is provided between the compressor B7 and the valve port a' of the second four-way valve B1. A third solenoid valve B10 is connected in parallel between the valve port a' and the valve port d' of the second four-way valve B1. One end of the third solenoid valve B10 is connected to the pipeline between the valve port a' and the second solenoid valve B9, and the other end of the third solenoid valve B10 is connected to the pipeline between the valve port d' and the gas-liquid separator B8. When the second four-way valve B1 is in mode 1, the valve port a' is communicated with the valve port c', and the valve port b' is communicated with the valve port d'; when the second four-way valve B1 is in mode 2, the valve port a' is communicated with the valve port b', and the valve port c' is communicated with the valve port d'.

[0054] The battery thermal management system proposed in this embodiment is integrated with the energy storage inverter cooling system. The thermal management system can be used to cool the PCS system and the heat of the PCS system can be recovered for battery heating. At the same time, the system can operate in the heat pump system mode and use a high-efficiency heat pump to heat the battery. In addition, when the external ambient temperature is low and the PCS and battery need to be cooled, the fluorine pump B5 can be started to use the low energy consumption characteristics of the fluorine pump B5 system to cool the PCS and battery. The operating energy consumption of the energy storage thermal management system can be further reduced, the integration level can be improved, and the operating cost of the energy storage thermal management system can be reduced.

[0055] The battery thermal management system of this embodiment has 15 working modes, and the specific operation process is as follows:

[0056] See also Figure 2 Mode 1: When the external environment temperature is high or the battery temperature exceeds the limit value due to charging and discharging, heat dissipation is required, but the internal temperature of the PCS is suitable and does not require heat dissipation, the status of the main components is: compressor B7 is turned on, the second solenoid valve B9 is turned on, the third solenoid valve B10 is turned off, the heat exchanger fan B11 is turned on, the electronic expansion valve B4 is turned on, the fluorine pump B5 is turned off, the first solenoid valve B6 is turned off, and the second four-way valve B1 is in mode 1; the second coolant pump A21 is turned off, the radiator fan A24 is turned off, the first four-way valve A3 is in mode 1, the first coolant pump A13 is turned on, and the PTC heater A14 is turned off.

[0057] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas is condensed into a high-temperature and high-pressure liquid in the second heat exchanger B2 (condenser), passes through the liquid storage tank B3, and is throttled into a low-temperature and low-pressure two-phase state at the electronic expansion valve B4. It absorbs heat from the coolant in the first heat exchanger A11, and returns to the inlet of the compressor B7 through the second four-way valve B1 and the gas-liquid separator B8 to continue circulating; and after the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, it flows through the liquid cooling plate A12, takes away the heat from the battery to form a high-temperature liquid, passes through the first coolant pump A13, and then returns to the first heat exchanger A11 through the first four-way valve A3 to continue releasing heat, and the cycle repeats.

[0058] See also Figure 3 , Mode 2: When the external environment temperature is high, the battery temperature exceeds the limit value and needs to be cooled; at the same time, the PCS system temperature exceeds the limit and needs to be cooled, and the heat load is borne by the compressor B7 refrigeration system, the status of the main components is: compressor B7 is turned on, the second solenoid valve B9 is turned on, the third solenoid valve B10 is turned off, the heat exchanger fan B11 is turned on, the electronic expansion valve B4 is turned on, the fluorine pump B5 is turned off, the first solenoid valve B6 is turned off, and the second four-way valve B1 is in mode 1; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned on, the radiator fan A24 is turned off, and the first four-way valve A3 is in mode 2.

[0059] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas is condensed into a high-temperature and high-pressure liquid in the second heat exchanger B2 (condenser), passes through the liquid storage tank B3, and is throttled into a low-temperature and low-pressure two-phase state in the electronic expansion valve B4. It absorbs heat from the coolant in the first heat exchanger A11, and returns to the inlet of the compressor B7 through the second four-way valve B1 and the gas-liquid separator B8 to continue circulating; and after the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, it flows through the liquid cooling plate A12, takes away the heat from the battery, passes through the first coolant pump A13, and then passes through the first four-way valve A3 and the second coolant pump A21 to cool the liquid-cooled energy storage inverter A22, and finally returns to the first heat exchanger A11 to continue releasing heat, and the cycle repeats.

[0060] See also Figure 4 , Mode 3: When the external environment temperature is high, the battery temperature exceeds the limit value and needs to be cooled; at the same time, the PCS system temperature exceeds the limit and needs to be cooled, the battery heat load is borne by the compressor B7 refrigeration system, and the PCS heat dissipation is borne by the radiator A23. The status of the main components is: compressor B7 is turned on, the second solenoid valve B9 is turned on, the third solenoid valve B10 is turned off, the heat exchanger fan B11 is turned on, the electronic expansion valve B4 is turned on, the fluorine pump B5 is turned off, the first solenoid valve B6 is turned off, and the second four-way valve B1 is in mode 1; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned on, the radiator fan A24 is turned on, and the first four-way valve A3 is in mode 1.

[0061] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas is condensed into a high-temperature and high-pressure liquid in the second heat exchanger B2 (condenser), passes through the liquid storage tank B3, and is throttled into a low-temperature and low-pressure two-phase state in the electronic expansion valve B4. It absorbs heat from the coolant in the first heat exchanger A11, and returns to the inlet of the compressor B7 through the second four-way valve B1 and the gas-liquid separator B8 to continue circulating; and after the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, it flows through the liquid cooling plate A12, takes away the heat of the battery, passes through the first coolant pump A13, and then returns to the first heat exchanger A11 through the first four-way valve A3 to continue releasing heat, and the cycle repeats; and after the coolant in the PCS system absorbs heat to become a high-temperature liquid, it flows through the radiator A23, dissipates the heat to the external environment, and returns to the liquid-cooled energy storage inverter A22 system through the first four-way valve A3 and the second coolant pump A21 to continue absorbing heat, and the cycle repeats.

[0062] See also Figure 5 , Mode 4: When the external environment temperature is high and the battery temperature exceeds the limit value, heat dissipation is required; at the same time, the PCS system temperature exceeds the limit and needs to be dissipated, and the total heat dissipation demand is shared by the compressor B7 refrigeration system and the radiator A23, the status of the main components is: compressor B7 is turned on, the second solenoid valve B9 is turned on, the third solenoid valve B10 is turned off, the heat exchanger fan B11 is turned on, the electronic expansion valve B4 is turned on, the fluorine pump B5 is turned off, the first solenoid valve B6 is turned off, and the second four-way valve B1 is in mode 1; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned on, the radiator fan A24 is turned on, and the first four-way valve A32 is in mode 2.

[0063] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas is condensed into a high-temperature and high-pressure liquid in the second heat exchanger B2 (condenser), passes through the liquid storage tank B3, and is throttled into a low-temperature and low-pressure two-phase state in the electronic expansion valve B4. It absorbs heat from the coolant in the first heat exchanger A11, and returns to the inlet of the compressor B7 through the second four-way valve B1 and the gas-liquid separator B8 to continue circulating; and after the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, it flows through the liquid cooling plate A12, takes away the heat of the battery, passes through the first coolant pump A13, and then passes through the first four-way valve A3 and the second coolant pump A21 to cool the liquid-cooled energy storage inverter A22, and then flows through the radiator A23 to dissipate part of the heat to the external environment, and finally returns to the first heat exchanger A11 through the first four-way valve A3 to continue releasing heat, and the cycle repeats.

[0064] See also Figure 6Mode 5: When the battery does not need to dissipate heat or be heated, but needs to be evenly heated, and the PCS system needs to dissipate heat, the status of the main components is: the compressor B7 is closed, the second solenoid valve B9 is closed, the third solenoid valve B10 is closed, the heat exchanger fan B11 is closed, the electronic expansion valve B4 is closed, the fluorine pump B5 is closed, and the first solenoid valve B6 is closed; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned on, the radiator fan A24 is turned on, and the first four-way valve A3 is in mode 1.

[0065] At this time, driven by the first coolant pump A13, the coolant flows through the liquid cooling plate A12, takes away the heat from the higher temperature area in the battery, and returns to the inlet of the liquid cooling plate A12 to continue circulating after passing through the first coolant pump A13, the four-way valve and the first heat exchanger A11; and after the coolant in the liquid-cooled energy storage inverter A22 system absorbs heat and becomes a high-temperature liquid, it flows through the radiator A23, dissipates the heat to the external environment, and returns to the liquid-cooled energy storage inverter A22 system through the first four-way valve A3 and the second coolant pump A21 to continue absorbing heat, and the cycle repeats.

[0066] See also Figure 7 Mode 6: When the battery does not need heat dissipation or heating but needs temperature equalization, and the PCS system 7 does not need heat dissipation, the status of the main components is: the compressor B7 is closed, the second solenoid valve B9 is closed, the third solenoid valve B10 is closed, the heat exchanger fan B11 is closed, the electronic expansion valve B4 is closed, the fluorine pump B5 is closed, and the first solenoid valve B6 is closed; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned off, the radiator fan A24 is turned off, and the first four-way valve A3 is in mode 1.

[0067] At this time, driven by the first coolant pump A13, the coolant flows through the liquid cooling plate A12, takes away the heat from the higher temperature area in the battery, and returns to the inlet of the liquid cooling plate A12 to continue circulating after passing through the first coolant pump A13, the first four-way valve A3 and the first heat exchanger A11.

[0068] See also Figure 8 Mode 7: When the battery needs to be heated, and the PCS system is not working or the workload is low and there is no waste heat, the heat pump system is used to heat the battery. The status of the main components is: compressor B7 is open, the second solenoid valve B9 is open, the third solenoid valve B10 is closed, the heat exchanger fan B11 is open, the electronic expansion valve B4 is open, the fluorine pump B5 is closed, the first solenoid valve B6 is closed, and the second four-way valve B1 is in mode 2; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned off, the radiator fan A24 is turned off, and the first four-way valve A3 is in mode 1.

[0069] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas releases heat to the coolant in the first heat exchanger A11 to condense. The formed high-temperature and high-pressure refrigerant liquid is throttled by the electronic expansion valve B4 into a low-temperature and low-pressure two-phase state, absorbs heat from the external environment in the second heat exchanger B2 (evaporator), and returns to the inlet of the compressor B7 through the second four-way valve B1 and the gas-liquid separator B8 to continue circulation; and the coolant in the first heat exchanger A11 absorbs heat to become a high-temperature liquid, flows through the liquid cooling plate A12, heats the battery and forms a low-temperature liquid, passes through the first coolant pump A13, and then returns to the first heat exchanger A11 through the first four-way valve A3 to continue absorbing heat, and the cycle repeats.

[0070] See also Fig. 9 , Mode 8: When the battery needs to be heated, but the PCS system is not working or the workload is low and there is no waste heat to be used, the heat pump system cannot meet the demand for battery heating, and PTC heating is turned on;

[0071] The status of the main components are: compressor B7 is on, the second solenoid valve B9 is on, the third solenoid valve B10 is off, the heat exchanger fan B11 is on, the electronic expansion valve B4 is on, the fluorine pump B5 is off, the first solenoid valve B6 is off, and the second four-way valve B1 is in mode 2; the first coolant pump A13 is on, and the PTC heater A14 is on; the second coolant pump A21 is off, the radiator fan A24 is off, and the first four-way valve A3 is in mode 1;

[0072] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas releases heat to the coolant in the first heat exchanger A11 to condense. The formed high-temperature and high-pressure refrigerant liquid is throttled by the electronic expansion valve B4 into a low-temperature and low-pressure two-phase state, absorbs heat from the external environment in the second heat exchanger B2, and returns to the inlet of the compressor B7 through the second four-way valve B1 and the gas-liquid separator B8 to continue circulating; and the coolant in the first heat exchanger A11 absorbs heat to become a high-temperature liquid, flows through the liquid cooling plate A12, heats the battery and forms a low-temperature liquid, passes through the first coolant pump A13 and the first four-way valve A3, and then is heated by the PTC heater A14, and finally returns to the first heat exchanger A11 to continue absorbing heat, and the cycle repeats.

[0073] See also Fig.10 , Mode 9: When the battery needs to be heated and the PCS system workload is high, there is waste heat that can be used to recover PCS heat, the status of the main components is: compressor B7 is closed, the second solenoid valve B9 is closed, the third solenoid valve B10 is closed, the heat exchanger fan B11 is closed, the electronic expansion valve B4 is closed, the fluorine pump B5 is closed, and the first solenoid valve B6 is closed; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned on, the radiator fan A24 is closed, and the first four-way valve A3 is in mode 2.

[0074] At this time, after the coolant in the liquid-cooled energy storage inverter A22 system absorbs heat and becomes high-temperature liquid, it passes through the first four-way valve A3 and the first heat exchanger A11, flows through the liquid cooling plate A12 to heat the battery, and the formed low-temperature liquid passes through the first coolant pump A13, the first four-way valve A3 and the second pump back to the liquid-cooled energy storage inverter A22 system to continue absorbing heat, and the cycle repeats.

[0075] See also Fig.11 , Mode 10: When the battery needs to be heated and the PCS system has a high workload, there is waste heat that can be used. The heat pump system is used to heat the battery and recover PCS heat. The status of the main components is: compressor B7 is turned on, the second solenoid valve B9 is turned on, the third solenoid valve B10 is turned off, the heat exchanger fan B11 is turned on, the electronic expansion valve B4 is turned on, the fluorine pump B5 is turned off, the first solenoid valve B6 is turned off, and the second four-way valve B1 is in mode 2; the first coolant pump A13 is turned on, and the PTC heater A14 is turned off; the second coolant pump A21 is turned on, the radiator fan A24 is turned off, and the first four-way valve A3 is in mode 2.

[0076] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas releases heat to the coolant in the first heat exchanger A11 to condense. The formed high-temperature and high-pressure refrigerant liquid is throttled by the electronic expansion valve B4 into a low-temperature and low-pressure two-phase state, absorbs heat from the external environment in the second heat exchanger B2 (evaporator), and returns to the compressor B7 inlet through the second four-way valve B1 and the gas-liquid separator B8 to continue circulation; and the coolant in the first heat exchanger A11 absorbs heat to become a high-temperature liquid, flows through the liquid cooling plate A12, heats the battery and forms a low-temperature liquid, passes through the first coolant pump A13, and then passes through the first four-way valve A3 and the second coolant pump A21 to recover heat in the PCS system, and finally returns to the first heat exchanger A11 through the first four-way valve A3 to continue absorbing heat, and the cycle repeats.

[0077] See also Fig.12 , Mode 11: When the battery needs to be heated, and the PCS system workload is high, there is available waste heat, but the total heat demand cannot meet the battery heating demand, the heat pump system is used to heat the battery and recover PCS heat, and the PTC heater A14 is turned on. At this time, the status of the main components is: compressor B7 is turned on, the second solenoid valve B9 is turned on, the third solenoid valve B10 is closed, the heat exchanger fan B11 is turned on, the electronic expansion valve B4 is turned on, the fluorine pump B5 is closed, the first solenoid valve B6 is closed, and the second four-way valve B1 is in mode 2; the first coolant pump A13 is turned on, and the PTC heater A14 is turned on; the second coolant pump A21 is turned on, the radiator fan A24 is closed, and the first four-way valve A3 is in mode 2.

[0078] At this time, the refrigerant is compressed by the compressor B7, and the high-temperature and high-pressure gas releases heat to the coolant in the first heat exchanger A11 to condense. The high-temperature and high-pressure refrigerant liquid is throttled to a low-temperature and low-pressure two-phase state by the electronic expansion valve B4, absorbs heat from the external environment in the second heat exchanger B2, and returns to the compressor B7 inlet through the second four-way valve B1 and the gas-liquid separator B8 to continue circulating. After the coolant in the first heat exchanger A11 absorbs heat to become a high-temperature liquid, it flows through the liquid cooling plate A12, heats the battery and forms a low-temperature liquid. After the first cooling liquid pump, it passes through the first four-way valve A3 and the second cooling liquid pump A21, recovers heat in the liquid-cooled energy storage inverter A22 system, passes through the first four-way valve A3, and is heated by the PTC heater A14, and finally returns to the first heat exchanger A11 to continue absorbing heat, and the cycle repeats.

[0079] See also Fig.13 Mode 12: When the ambient temperature is low but the battery needs to be cooled, the PCS workload is low and does not require cooling. When the fluorine pump B5 and the first heat exchanger A11 are used to dissipate heat for the battery, the status of the main components is: the compressor B7 is closed, the second solenoid valve B9 is closed, the third solenoid valve B10 is opened, the heat exchanger fan B11 is opened, the electronic expansion valve B4 is closed, the fluorine pump B5 is opened, the first solenoid valve B6 is opened, and the second four-way valve B1 is in mode 1; the first coolant pump A13 is opened, and the PTC heater A14 is closed; the second coolant pump A21 is closed, the radiator fan A24 is closed, and the first four-way valve A3 is in mode 1.

[0080] At this time, the refrigerant gas formed after absorbing heat in the first heat exchanger A11 flows into the second heat exchanger B2 (condenser) through the second four-way valve B1, dissipates heat to the external environment, condenses into refrigerant liquid, passes through the liquid storage tank B3 and the fluorine pump B5, and returns to the first heat exchanger A11 to continue circulating; and the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, flows through the liquid cooling plate A12, takes away the heat of the battery to form a high-temperature liquid, passes through the first coolant pump A13, and then returns to the first heat exchanger A11 through the first four-way valve A3 to continue releasing heat, and the cycle repeats.

[0081] See also Fig.14 , Mode 13: When the ambient temperature is low but the battery needs to be cooled, the PCS workload is low, and the fluorine pump B5 and the first heat exchanger A11 cannot completely dissipate heat for the battery. At this time, the radiator A23 also bears the heat dissipation of the battery. The status of the main components is: the compressor B7 is closed, the second solenoid valve B9 is closed, the third solenoid valve B10 is opened, the heat exchanger fan B11 is opened, the electronic expansion valve B4 is closed, the fluorine pump B5 is opened, the first solenoid valve B6 is opened, and the second four-way valve B1 is in mode 1; the first coolant pump A13 is opened, and the PTC heater A14 is closed; the second coolant pump A21 is opened, the radiator fan A24 is opened, and the first four-way valve A3 is in mode 2;

[0082] At this time, the refrigerant gas formed after absorbing heat in the first heat exchanger A11 flows into the second heat exchanger B2 through the second four-way valve B1, dissipates heat to the external environment, condenses into refrigerant liquid, passes through the liquid storage tank B3 and the fluorine pump B5, and returns to the first heat exchanger A11 to continue circulating; and the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, flows through the liquid cooling plate A12, takes away the heat of the battery to form a high-temperature liquid, passes through the first coolant pump A13, and then passes through the first four-way valve A3 and the second coolant pump A21, flows through the radiator A23, dissipates heat to the external environment, and finally returns to the first heat exchanger A11 through the first four-way valve A3 to continue releasing heat, and the cycle repeats.

[0083] See also Fig.15 Mode 14: When the ambient temperature is low but the battery needs to be cooled, the PCS also needs to dissipate heat. The fluorine pump B5 and the first heat exchanger A11 are used to dissipate heat for the battery, and the radiator A23 is used to dissipate heat for the PCS. The states of the main components are: the compressor B7 is closed, the second solenoid valve B9 is closed, the third solenoid valve B10 is opened, the heat exchanger fan B11 is opened, the electronic expansion valve B4 is closed, the fluorine pump B5 is opened, the first solenoid valve B6 is opened, and the second four-way valve B1 is in mode 1; the first coolant pump A13 is opened, and the PTC heater A14 is closed; the second coolant pump A21 is opened, the radiator fan A24 is opened, and the first four-way valve A3 is in mode 1.

[0084] At this time, the refrigerant gas formed after absorbing heat in the first heat exchanger A11 flows into the second heat exchanger B2 through the second four-way valve B1, dissipates heat to the external environment, condenses into refrigerant liquid, passes through the liquid storage tank B3 and the fluorine pump B5, and returns to the first heat exchanger A11 to continue circulating; and the coolant in the first heat exchanger A11 releases heat to become a low-temperature liquid, flows through the liquid cold plate A12, takes away the heat of the battery to form a high-temperature liquid, passes through the first coolant pump A13, and returns to the first heat exchanger A11 through the first four-way valve A3 to continue releasing heat, and the cycle repeats; and the coolant in the liquid-cooled energy storage inverter A22 system absorbs heat to become a high-temperature liquid, flows through the radiator A23, dissipates heat to the external environment, and returns to the liquid-cooled energy storage inverter A22 system through the first four-way valve A3 and the second coolant pump A21 to continue absorbing heat, and the cycle repeats.

[0085] Mode 15: The battery and PCS do not need to be cooled or heated, and are in standby mode.

[0086] The startup status of each component in each mode is summarized as follows:

[0087]

[0088] on: turn on, off- turn off.

[0089] It will be apparent to those skilled in the art that various modifications and variations can be made to the above exemplary embodiments of the present invention without departing from the spirit and scope of the present invention. Therefore, it is intended that the present invention covers modifications and variations of the present invention that fall within the scope of the appended claims and their equivalent technical solutions.

Claims

1. A battery thermal management system, characterized in that: include: A cooling circuit, the cooling circuit comprising a first liquid pipeline, a second liquid pipeline and a first four-way valve, the first liquid pipeline and the second liquid pipeline are both connected to the first four-way valve, the first liquid pipeline is connected in series with a first heat exchanger, a liquid cooling plate, a first coolant pump and a PTC heater, and the second liquid pipeline is connected in series with a second coolant pump, a liquid-cooled energy storage converter and a radiator; A refrigeration circuit is connected in series with the first heat exchanger.

2. The battery thermal management system according to claim 1, characterized in that: The refrigeration circuit includes a second four-way valve connected to the first heat exchanger, a second heat exchanger connected to the second four-way valve, a liquid storage tank connected to the second heat exchanger, and an electronic expansion valve connecting the liquid storage tank and the first heat exchanger.

3. The battery thermal management system according to claim 2, characterized in that: The first four-way valve includes two working modes and can switch back and forth between mode 1 and mode 2. When the first four-way valve is in mode 1, the circulation loop where the first liquid pipeline is located and the circulation loop where the second liquid pipeline is located are two circulation loops in which the liquid flow cycles do not interfere with each other; when the first four-way valve is in mode 2, the first liquid pipeline and the second liquid pipeline form a series circulation loop.

4. The battery thermal management system according to claim 3, characterized in that: The first four-way valve includes valve port a, valve port b, valve port c and valve port d, the two ends of the first liquid pipeline are respectively connected to the valve port a and valve port c of the four-way valve, and the two ends of the second liquid pipeline are respectively connected to the valve port b and valve port d of the four-way valve.

5. The battery thermal management system according to claim 4, characterized in that: When the first four-way valve is in mode 1, valve port a is connected to valve port c, and valve port b is connected to valve port d; when the first four-way valve is in mode 2, valve port a is connected to valve port b, and valve port c is connected to valve port d.

6. The battery thermal management system according to claim 1, characterized in that: The liquid cooling plate, the first coolant pump, the first four-way valve and the PTC heater are connected in series in sequence from the first heat exchanger along the coolant flow direction on the first liquid pipeline; the second coolant pump, the liquid-cooled energy storage inverter and the radiator are connected in series in sequence from the first four-way valve along the coolant flow direction on the second liquid pipeline.

7. The battery thermal management system according to claim 2, characterized in that: A fluorine pump is connected in parallel between the liquid storage tank and the first heat exchanger, and a first solenoid valve is provided between the fluorine pump and the first heat exchanger.

8. The battery thermal management system according to claim 7, characterized in that: The second four-way valve includes valve port a', valve port b', valve port c' and valve port d'. The second four-way valve is also connected to a compressor. The inlet end of the compressor is connected to the valve port a', and the outlet end of the compressor is connected to the valve port d'. The valve port b' of the second four-way valve is connected to the first heat exchanger, and the valve port c' of the second four-way valve is connected to the second heat exchanger.

9. The battery thermal management system according to claim 8, characterized in that: The working mode of the second four-way valve is as follows: Mode 1: valve port a' is connected to valve port c', and valve port b' is connected to valve port d'; Mode 2: Valve port a' is connected to valve port b', and valve port c' is connected to valve port d'.

10. The battery thermal management system according to claim 9, characterized in that: A gas-liquid separator is provided between the compressor and the valve port d' of the second four-way valve, a second solenoid valve is provided between the compressor and the valve port a' of the second four-way valve, a third solenoid valve is connected in parallel between the valve port a' and the valve port d' of the second four-way valve, one end of the third solenoid valve is connected to the pipeline between the valve port a' and the second solenoid valve, and the other end of the third solenoid valve is connected to the pipeline between the valve port d' and the gas-liquid separator.

Citation Information

Cited By

  • Double-liquid energy storage heat management system

    CN119222827A

  • Thermal management system, energy storage system and control method

    CN120914402A