Three-dimensional visualization model for water gushing of main roadway extending through fault development

By designing a three-dimensional visualization model to simulate the seepage field and sand breakage process during the development of tunnels by coal mine faults, it solves the problem of difficulty in monitoring water inflow and sand breakage with existing technology, achieves accurate monitoring and evaluation of the impact of faults, and improves the prevention and control of coal mine water damage. The effect of technology.

CN221811956UActive Publication Date: 2024-10-08ZHANGCUN COAL MINE OF SHANXI LUAN ENVIRONMENTAL PROTECTION ENERGY DEV CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420335582.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-23
Publication Date
2024-10-08
Estimated Expiration
2034-02-23

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively simulate and monitor the seepage field and critical pressure value of water inrush and sand collapse during tunnel development due to faults under coal mine mining conditions, especially the shape and migration mechanism of the water slurry-rock fragment combination during the dynamic water inrush process.

Method used

A three-dimensional visualization model of water inflow in the main roadway that is developed and extended through faults is designed, including a closed box, a roadway simulation device, a fault simulation device and a pressure sensor. By simulating the seepage field and water inrush and sand bursting process of the fault during tunnel excavation, the fault is monitored. Impact on roadway development.

Benefits of technology

It realizes the monitoring of seepage field parameters and critical pressure values ​​during fault excavation, provides an evaluation basis for the impact of faults on tunnel development, and enhances the reference value of coal mine water damage prevention and control technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221811956U_ABST
    Figure CN221811956U_ABST
Patent Text Reader

Abstract

The utility model discloses a three-dimensional visualization model for water gushing of a main roadway through fault development and extension, which comprises a closed box body, and a lower stratum, a roadway simulation device and an overlying stratum are sequentially arranged in the box body from bottom to top; the roadway simulation device comprises a rectangular frame structure, the top surface of the rectangular frame structure is a water-permeable and sand-impermeable honeycomb plate, the upper end surface of the honeycomb plate is provided with a semi-arc sand-free concrete water-permeable top plate, and a quiet space is formed between the semi-arc sand-free concrete water-permeable top plate and the honeycomb plate; a fault simulation device for dividing the rectangular frame structure into a left part and a right part is arranged in the middle of the rectangular frame structure; a plurality of pressure sensors are arranged in the overlying stratum, the bottom plate of the box body and the upper end of the semi-arc-shaped sand-free concrete permeable top plate, and the lower stratum and the overlying stratum are connected with an external water conveying system; according to the system, seepage field parameters and critical pressure values can be monitored by a fault in the water and sand inrush process of roadway tunneling; successful related research can provide a basis for evaluating the influence of faults on roadway development and provide a reference for a coal mine water disaster prevention and control technology.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of coal mine water hazard control, and in particular to a three-dimensional visualization model of water gushing in a large tunnel for development and extension across a fault. Background Art

[0002] Fault water inrush is the main form of water inrush in my country's coal mines, especially large-scale, disastrous water inrush accidents. According to the spatial relationship between the water inrush point and the fault, the types of water inrush caused by mining faults can be divided into three types: water inrush when the fault cuts through the coal seam, water inrush when the fault is close to the coal seam, and water inrush when the fault is hidden and far away. The water conductivity of faults is related to the geostress field where the faults are located. It is generally believed that tensile faults have strong water conductivity, followed by shear faults, and compression faults are not easy to conduct water. However, in compression faults, some sections (fault strike bending zone, main fault and sub-fault junction zone) are affected by tensile stress and are also prone to water conduction. At the same time, the water conductivity of faults is also affected by the material composition of the fault zone. When there are more soft plastic materials in the fault zone, such as mudstone and clay, they have a certain water-blocking effect due to their ability to close gaps. Moreover, the water conductivity of different parts of the same fault is different in different directions of strike and dip. When the aquifers on both sides of the fault are butt joint, the fault is prone to lateral water conduction. When the rock layers on both sides of the fault are impermeable layers, the fault is water-blocking in the lateral direction.

[0003] Since it is extremely difficult to monitor the seepage field of the top and bottom of the tunnel through field tests, and it is difficult to describe the morphology of the water-slurry-broken rock complex formed during the dynamic water-slurry process, indoor physical tests are used to simulate the tunnel development process. Physical tests of similar materials are a common method for simulating actual strata. Existing studies have studied the simulation of the seepage field during the water-slurry process, but there are very few studies on the water-slurry-broken rock complex formed under mining conditions during the dynamic water-slurry process through the tunnel fault, especially the mutual feedback mechanism of the fracture field, seepage field and slurry migration field during the tunnel water-slurry process under mining conditions. Utility Model Content

[0004] In view of the above-mentioned technical deficiencies, the purpose of the utility model is to provide a three-dimensional visualization model of water gushing in a large tunnel extended through a fault, which can monitor the seepage field parameters and critical pressure values ​​during the process of water inrush and sand burst caused by the fault during tunnel excavation; successful related research can provide a basis for evaluating the impact of faults on tunnel development and provide a reference for coal mine water hazard prevention and control technology.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0006] The utility model provides a three-dimensional visualization model of water gushing in a large tunnel through fault development and extension, comprising a sealed box, wherein the interior of the box is provided with a lower stratum, a tunnel simulation device, and an overlying stratum in sequence from bottom to top; the tunnel simulation device comprises a rectangular frame structure whose four sides are fitted with the inner wall of the box, the top surface of the rectangular frame structure is a honeycomb plate that is permeable to water but not permeable to sand, a semi-arc-shaped sandless concrete permeable top plate that covers the honeycomb plate and bulges upward is fixed on the upper end surface of the honeycomb plate, and a quiet space is formed between the semi-arc-shaped sandless concrete permeable top plate and the honeycomb plate; a fault simulation device is provided in the middle of the rectangular frame structure to divide it into left and right parts;

[0007] A plurality of pressure sensors are embedded in the overlying stratum, and the lower stratum and the overlying stratum are respectively connected to an external water supply system; a plurality of pressure sensors are also provided on the bottom plate of the box body and the upper end of the semi-arc-shaped sandless concrete permeable top plate, and the pressure sensors are electrically connected to an external data acquisition instrument, and the data acquisition instrument is electrically connected to an electronic computer.

[0008] Preferably, the fault simulation device comprises two sandless concrete permeable boards which are vertically inclined and arranged parallel to each other, and a plurality of pressure sensors are arranged on the sandless concrete permeable boards, and the pressure sensors are electrically connected to an external data acquisition instrument;

[0009] The four corners of the sandless concrete permeable board are each provided with a T-shaped block, and the four side lines of the rectangular frame structure are provided with a U-shaped track groove adapted to the T-shaped block, so as to ensure that the sandless concrete permeable board can slide along the four side lines of the rectangular frame structure, and a clamping bolt is threadedly connected on the T-shaped block, which passes through the T-shaped block and can clamp the bottom surface of the U-shaped track groove when tightened, thereby fixing the sandless concrete permeable board.

[0010] Preferably, the box is made of transparent acrylic plates with a thickness of 3-8 cm. The transparent acrylic plates are double-layer structures, and a number of monitoring points are arranged between the layers and wireless pressure sensors are installed to monitor the pressure during the experiment.

[0011] Preferably, the filler of the lower stratum is mudstone and quartz sand, and the mudstone is crushed mudstone particles with calcium carbonate and gypsum added in equal proportions as needed; in addition to mudstone and quartz sand, the filler of the overlying stratum is added with crushed stone to simulate the water-conducting fracture zone according to the actual water conduction conditions.

[0012] Preferably, the external water supply system comprises a water filling pipe connected to the lower stratum of the tunnel, and a water supply pipe connected to the overlying stratum. The water filling pipe and the water supply pipe are provided with valves and connected to a metering pump, and the metering pump is connected to a water tank.

[0013] The beneficial effects of the utility model are:

[0014] 1. The utility model uses river sand, fly ash and heavy calcium powder as aggregates, and uses river sand, gravel and clay as fillers in different proportions to make a similar material simulation model; by reserving water-filled pipes in the upper and lower strata in the closed box 1 to simulate the aquifer, the fault has achieved the disaster effect of water inrush and sand burst during tunnel excavation;

[0015] 2. The utility model is provided with a thin layer of static storage space, which is used to balance the water pressure on the upper part of the tunnel simulation device, ensure that the entire device is evenly pressurized, and improve the experimental accuracy and simulation familiarity;

[0016] 3. The utility model can monitor the water pressure and flow rate of the lower strata and the overlying strata of the tunnel through the flow sensor and the metering pump;

[0017] 4. The utility model monitors the critical pressure value of tunnel water inrush and sand burst caused by fault water inrush through a pressure sensor pre-buried in the overlying stratum;

[0018] 5. The fault simulation device of the utility model can simulate the process of water inrush, sand burst and mud migration caused by fault during the excavation of the large tunnel;

[0019] 6. The utility model can monitor the seepage field parameters and critical pressure values ​​of faults during the process of water inrush and sand burst in tunnel excavation; the successful relevant research can provide a basis for the evaluation of the impact of faults on tunnel development and provide a reference for coal mine water hazard prevention and control technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 A schematic structural diagram of a three-dimensional visualization model of water gushing in a large tunnel for development and extension across a fault provided by an embodiment of the utility model;

[0022] Figure 2 A structural schematic diagram (side view) of a three-dimensional visualization model of water gushing in a large tunnel for development and extension across a fault provided in an embodiment of the utility model.

[0023] Description of reference numerals:

[0024] 1. Box; 2. Tunnel simulation device; 3. Overlying stratum; 4. Lower stratum; 5. Honeycomb panel; 6. Semi-arc sandless concrete permeable roof; 7. Rectangular frame structure; 8. Quiet space; 9. Water pipe; 10. Water filling pipe; 11. Metering pump; 12. Data acquisition instrument; 13. Electronic computer; 14. Water tank; 15. Fault simulation device. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] like Figure 1 to Figure 2 As shown, the utility model provides a three-dimensional visualization model of water gushing in a large tunnel through fault development and extension, comprising a closed box 1, wherein the box 1 is provided with a lower stratum 4, a tunnel simulation device 2, and an overlying stratum 3 in order from bottom to top; the tunnel simulation device 2 comprises a rectangular frame structure 7 with four sides fitted to the inner wall of the box 1, the top surface of the rectangular frame structure 7 is a water-permeable and sand-impermeable honeycomb panel 5, and a semi-arc-shaped sandless concrete permeable top plate 6 that covers the honeycomb panel 5 and bulges upward is fixed on the upper end surface of the honeycomb panel 5, and a quiet space 8 is formed between the semi-arc-shaped sandless concrete permeable top plate 6 and the honeycomb panel 5; a fault simulation device 15 that divides the rectangular frame structure 7 into left and right parts is provided in the middle of the rectangular frame structure 7;

[0027] A plurality of pressure sensors are embedded in the overlying stratum 3, and the lower stratum 4 and the overlying stratum 3 are respectively connected to an external water supply system; a plurality of pressure sensors are also provided on the bottom plate of the box body 1 and the upper end of the semi-arc-shaped sandless concrete permeable top plate 6, and the pressure sensors are electrically connected to an external data acquisition instrument 12, and the data acquisition instrument 12 is electrically connected to an electronic computer 13.

[0028] Preferably, the fault simulation device 15 comprises two sandless concrete permeable boards which are vertically inclined and arranged parallel to each other, and a plurality of pressure sensors are arranged on the sandless concrete permeable boards, and the pressure sensors are electrically connected to the external data acquisition instrument 12;

[0029] The four corners of the sandless concrete permeable board are each provided with a T-shaped block, and the four side lines of the rectangular frame structure 7 are provided with a U-shaped track groove adapted to the T-shaped block, so as to ensure that the sandless concrete permeable board can slide along the four side lines of the rectangular frame structure 7, and a clamping bolt is threadedly connected on the T-shaped block, which passes through the T-shaped block and can clamp the bottom surface of the U-shaped track groove when tightened, thereby fixing the sandless concrete permeable board.

[0030] Preferably, the box body 1 is made of transparent acrylic plates with a thickness of 3-8 cm. The transparent acrylic plates are double-layer structures, and a number of monitoring points are arranged between the layers and wireless pressure sensors are installed to monitor the pressure during the experiment.

[0031] Preferably, the filler of the lower stratum 4 is mudstone and quartz sand, and the mudstone is crushed mudstone particles with calcium carbonate and gypsum added in equal proportions as needed; in addition to mudstone and quartz sand, the filler of the overlying stratum 3 is added with crushed stone to simulate the water-conducting fracture zone according to the actual water conduction conditions.

[0032] Preferably, the external water supply system includes a water filling pipe 10 connected to the lower stratum 4 of the tunnel, and the overlying stratum 3 is connected to the water supply pipe 9. The water filling pipe 10 and the water supply pipe 9 are provided with valves and connected to a metering pump 11. The metering pump 11 is connected to a water tank 14.

[0033] In order to study the effect of faults on water inrush with mud and sand during excavation of large tunnels, this device takes actual mining conditions into consideration, and its working principle is as follows: a wireless pressure sensor is preset in the transparent acrylic plate interlayer, and after all the simulation materials are filled, the pressure value is measured to eliminate the influence of the self-weight pressure of the simulation materials on the simulation; the overlying stratum is filled with water to simulate the upper aquifer of the real tunnel, and as the pressure increases, the water flows downward through the simulation material, through the semi-arc sandless concrete permeable top plate 6, and gradually converges in the quiet space 8. Since the bottom of the quiet space 8 is a small-diameter honeycomb plate 5, its unique water-permeable but not sand-permeable property causes the water to converge here (due to the tension of the water, it will not penetrate downward in a short time) and spread evenly, so that the tunnel simulation device 2 is evenly pressurized.

[0034] As the upper pressure gradually increases, water and sand bursts occur in the overlying strata, causing water and sand to flow into the quiet space 8. The pressure of the pre-buried pressure sensor in the overlying strata is measured at this time, and the pressure value and time are recorded;

[0035] When the pressure gradually increases, it will cause water inrush in the tunnel simulation device. According to the positional relationship between the water inrush point and the fault, the influence of the fault on the water inrush and sand in the development tunnel is determined, and various pressure value indicators during water inrush are measured. (Due to the existence of the honeycomb plate on the roof, the sand will not flow down with the water, but the pressure at the water inrush point will change significantly). After repeated simulations, the temporal and spatial evolution law of faults and water inrush and sand in the tunnel is finally determined.

[0036] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A three-dimensional visualization model of water inrush in a large tunnel developed and extended across a fault, characterized by: The invention comprises a sealed box (1), wherein the box (1) is provided with a lower stratum (4), a tunnel simulation device (2), and an overlying stratum (3) in order from bottom to top; the tunnel simulation device (2) comprises a rectangular frame structure (7) with four sides in contact with the inner wall of the box (1); the top surface of the rectangular frame structure (7) is a water-permeable but sand-impermeable honeycomb panel (5); a semi-arc-shaped sand-free concrete permeable top panel (6) covering the honeycomb panel (5) and protruding upward is fixed to the upper end surface of the honeycomb panel (5); a quiet space (8) is formed between the semi-arc-shaped sand-free concrete permeable top panel (6) and the honeycomb panel (5); a fault simulation device (15) is provided in the middle of the rectangular frame structure (7) to divide the rectangular frame structure into left and right parts; A plurality of pressure sensors are pre-buried in the overlying stratum (3); the lower stratum (4) and the overlying stratum (3) are respectively connected to an external water supply system; a plurality of pressure sensors are also provided on the bottom plate of the box body (1) and the upper end of the semi-arc-shaped sand-free concrete permeable top plate (6); the pressure sensors are electrically connected to an external data acquisition instrument (12), and the data acquisition instrument (12) is electrically connected to an electronic computer (13).

2. A three-dimensional visualization model of water gushing in a large tunnel developed and extended across a fault as claimed in claim 1, characterized in that: The fault simulation device (15) comprises two sandless concrete water-permeable boards which are vertically inclined and arranged parallel to each other, and a plurality of pressure sensors are arranged on the sandless concrete water-permeable boards. The pressure sensors are electrically connected to an external data acquisition instrument (12); The four corners of the sandless concrete water-permeable board are each provided with a T-shaped block, and the four side lines of the rectangular frame structure (7) are provided with a U-shaped track groove adapted to the T-shaped block, so as to ensure that the sandless concrete water-permeable board can slide along the four side lines of the rectangular frame structure (7), and a clamping bolt is threadedly connected to the T-shaped block, which passes through the T-shaped block and can clamp the bottom surface of the U-shaped track groove when tightened, thereby fixing the sandless concrete water-permeable board.

3. A three-dimensional visualization model of water gushing in a large tunnel through fault development and extension as claimed in claim 2, characterized in that: The box (1) is made of transparent acrylic plates spliced ​​together. The transparent acrylic plates have a thickness of 3-8 cm. The transparent acrylic plates have a double-layer structure. Several monitoring points are arranged between the layers and wireless pressure sensors are installed to monitor the pressure during the experiment.

4. A three-dimensional visualization model of water gushing in a large tunnel developed and extended across a fault as claimed in claim 3, characterized in that: The filler of the lower stratum (4) is mudstone and quartz sand, and the mudstone is made of crushed mudstone particles with calcium carbonate and gypsum added in equal proportions as required; in addition to mudstone and quartz sand, the filler of the overlying stratum (3) is added with crushed stone to simulate a water-conducting fracture zone according to the actual water conduction conditions.

5. A three-dimensional visualization model of water gushing in a large tunnel developed and extended across a fault as claimed in claim 4, characterized in that: The external water supply system comprises a water filling pipe (10) connected to the lower stratum (4) of the tunnel, and the overlying stratum (3) is connected to a water supply pipe (9). The water filling pipe (10) and the water supply pipe (9) are provided with valves and connected to a metering pump (11). The metering pump (11) is connected to a water tank (14).