Hoisting device capable of being automatically separated from wind power tower drum
By designing a hoisting device that can automatically detach from the wind power tower, using the mechanical structure of the bending rod and the lifting component, and using the lifting and lowering of the crane hook to automatically detach from the wind power tower, the problems of manual disassembly that are time-consuming, laborious, and safety hazards in the existing technology have been solved. , improving work efficiency and safety.
Patent Information
- Application Number
- CN202420582924.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-25
AI Technical Summary
The existing wind power tower hoisting device cannot automatically separate from the wind power tower and requires manual disassembly, which is time-consuming and labor-intensive and poses safety risks.
An automatic detachment wind power tower hoisting device including a bent rod, a vertical rod, a support arm and a lifting component is designed. The lifting component is driven by the lifting and lowering of the crane hook to drive the bending rod and the abutting component to automatically detach from the tower, achieving automatic separation. .
It realizes that it can automatically detach from the wind power tower without manual operation, which improves work efficiency and reduces safety risks.
Smart Images

Figure CN221821690U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wind power tower installation, in particular to a hoisting device which can automatically detach from a wind power tower. Background Art
[0002] The wind turbine tower is an indispensable and important component of a wind turbine generator set. It is mainly used to support the wind turbine generator set and can also absorb the vibration of the set.
[0003] A wind turbine tower has multiple sections, which are connected by flange bolts. A lifting device is used to lift one section of the wind turbine tower at the construction site and install it on another section of the wind turbine tower below. After installing one section of the wind turbine tower, the lifting device needs to be separated from the wind turbine tower. However, the lifting device cannot be separated from the wind turbine tower automatically and needs to be manually disassembled, which is time-consuming and labor-intensive, and there are safety hazards during manual disassembly.
[0004] For example, the utility model patent with authorization announcement number CN 213894891 U discloses a wind power tower hoisting fixture, including a support frame, the support frame is annular, a plurality of folding rods are arranged on the outer wall of the support frame, the plurality of folding rods are distributed along the circumference of the support frame, the bending part of the folding rods is hinged to the support frame, both ends of the folding rods are inclined toward the axis direction of the support frame, one end of each folding rod located above the support frame is fixedly connected to a hoisting rope, and each folding rod is hinged to a tightening end at the bottom end of the support frame. The above patent, by setting a support frame, the support frame is hinged with a folding rod, when the staff pulls the hoisting rope through the crane, the lower end of the folding rod is moved toward the side wall of the tower, and the tower is tightened against the side wall from the circumference of the tower, thereby clamping the tower. However, after installing a section of the wind power tower, the staff needs to separate the hoisting fixture from the wind power tower, which is time-consuming and labor-intensive, and requires the staff to lean out of the wind power tower, which poses a safety hazard.
[0005] Therefore, it is necessary to develop a hoisting device that can automatically detach from the wind power tower to address the above defects. Utility Model Content
[0006] The utility model aims to provide a hoisting device that can automatically detach from a wind turbine tower, which can solve the defects that the hoisting device cannot be automatically separated from the wind turbine tower, needs to be manually disassembled, is time-consuming and labor-intensive, and has safety hazards during manual disassembly.
[0007] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0008] The utility model discloses a lifting device for automatically detaching from a wind power tower, comprising a bent rod, a vertical rod, a support arm and a lifting assembly, wherein a plurality of the support arms are evenly distributed in a radial circle with the axis of the vertical rod as the center and the ends are fixedly connected to the vertical rod, a plurality of the bent rods are arranged in a one-to-one correspondence with the plurality of the support arms, the back of the bent rod faces the vertical rod, the middle part of the bent rod is rotatably connected to the support arm and the rotation axis is perpendicular to the axis of the vertical rod, the top end of the bent rod is hinged to the lifting assembly, and the bottom end of the bent rod is provided with an abutment assembly for abutting against the inner wall of the tower; the lifting assembly is located above the support arm and is coaxially slidably connected to the vertical rod, the lifting assembly can be clamped with the vertical rod and drive the abutment assembly to detach from the tower; the bending angle of the bent rod is an obtuse angle.
[0009] Furthermore, the lifting assembly includes a pull rod, a sliding sleeve, a crescent hook and a cone, the sliding sleeve is coaxially slidably connected to the vertical rod, a plurality of crescent hooks are evenly distributed around the circumference and the top ends are connected to the circumferential wall of the sliding sleeve by a pin support, the rotation axis of the crescent hook is perpendicular to the axis of the vertical rod, the hook tip of the crescent hook faces the vertical rod and contacts it, the cone is located between the support arm and the sliding sleeve, the cone is coaxially fixedly connected to the vertical rod, the small diameter end of the cone is equal to the diameter of the vertical rod and faces the sliding sleeve, a plurality of pull rods are arranged in a one-to-one correspondence with a plurality of bent rods and the top ends are connected to the circumferential wall of the sliding sleeve by a pin support ear, the bottom end of the pull rod is hinged to the top end of the bent rod, the pull rod and the crescent hooks are staggered and avoided; two connecting plates are symmetrically fixed on the top of the sliding sleeve, and horizontal bars are fixed on the two connecting plates.
[0010] Furthermore, the abutment assembly includes a U-shaped plate, a plurality of the U-shaped plates are arranged in one-to-one correspondence with a plurality of the bent rods, two side plates of the U-shaped plate are hinged to the bottom end of the bent rod, and the rotation axis of the U-shaped plate is parallel to the rotation axis of the corresponding bent rod; a rubber pad is bonded to the bottom surface of the U-shaped plate.
[0011] Furthermore, a through hole is provided on the support arm, a bolt is inserted into the through hole, the bolt rotates and passes through the middle part of the bent rod, the nut of the bolt contacts one side of the support arm, the end of the bolt protrudes from the other side of the support arm and is provided with a thread, and the end of the bolt is threadedly connected to a nut.
[0012] Furthermore, a plurality of the through holes are provided, and the plurality of the through holes are arranged at intervals along the length direction of the support arm.
[0013] Compared with the prior art, the beneficial technical effects of the utility model are:
[0014] The utility model discloses a hoisting device which automatically detaches from a wind power tower, wherein the lifting assembly is lowered by lowering a crane hook, the lifting assembly drives the bent rod to swing, the bottom end of the bent rod drives the abutment assembly away from the inner wall of the tower, the interval between the abutment assemblies is reduced, and then the lifting assembly is raised by rising of the crane hook, the lifting assembly drives the vertical rod to rise, the vertical rod drives the support arm to rise, the support arm drives the bent rod to rise, and the bent rod drives the abutment assembly to rise and detach from the tower, the above process can be completed only by lifting and lowering the crane hook, thereby solving the problem that the lifting device cannot be automatically separated from the wind power tower, manual disassembly is required, which is time-consuming and labor-intensive, and there is a safety hazard during manual disassembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The utility model will be further described below in conjunction with the accompanying drawings.
[0016] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model when it is separated from the tower;
[0017] Figure 2 This is a schematic diagram of the assembly structure of the vertical rod and other components of the utility model;
[0018] Figure 3 It is a schematic diagram of the three-dimensional structure of the sliding sleeve of the utility model;
[0019] Figure 4 This is a schematic diagram of the main structure of the crescent hook of the utility model;
[0020] Figure 5 It is a three-dimensional structural schematic diagram of another state of the utility model.
[0021] Explanation of the reference numerals: 1. bent rod; 2. vertical rod; 3. support arm; 4. tower; 5. pull rod; 6. sliding sleeve; 601. horizontal bar; 7. crescent hook; 8. cone; 9. U-shaped plate; 901. rubber pad; 10. through hole. DETAILED DESCRIPTION
[0022] The core of the utility model is to provide a hoisting device that can automatically detach from the wind turbine tower, which can solve the defects that the hoisting device cannot be automatically separated from the wind turbine tower, needs to be manually disassembled, is time-consuming and labor-intensive, and has safety hazards during manual disassembly.
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", "middle", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0025] In a specific embodiment of the present invention, Figures 1 to 5 As shown, it includes a bent rod 1, a vertical rod 2, a support arm 3 and a lifting assembly. A plurality of support arms 3 are evenly distributed in a radial circle with the axis of the vertical rod 2 as the center and the ends are fixedly connected to the vertical rod 2. A plurality of bent rods 1 are arranged one by one with a plurality of support arms 3. The back of the bent rod 1 faces the vertical rod 2. The middle part of the bent rod 1 is rotatably connected to the support arm 3 and the rotation axis is perpendicular to the axis of the vertical rod 2. The top of the bent rod 1 is hinged to the lifting assembly, and the bottom of the bent rod 1 is provided with an abutment assembly for abutting the inner wall of the tower 4; the lifting assembly is located above the support arm 3 and is coaxially slidably connected to the vertical rod 2. The lifting assembly can be engaged with the vertical rod 2 and drive the abutment assembly out of the tower 4; the bending angle of the bent rod 1 is an obtuse angle. Specifically, 3, 4, 5 or more support arms 3 can be provided. The bending angle of the bent rod 1 is between 100° and 140°. When in use, the supporting arm 3 is supported on the top opening of the tower 4, and the hook of the crane is connected to the lifting assembly. When the tower 4 is installed, the hook of the crane drops, and the lifting assembly drops under the action of its own gravity. The lifting assembly drives the bent rod 1 to swing, and the bent rod 1 drives the abutment assembly to swing toward the vertical rod 2. The intervals between multiple abutment assemblies gradually decrease and reach a level that can pass through the top flange of the tower 4. At the same time, the lifting assembly is engaged with the vertical rod 2, and then the hook of the crane rises and drives the lifting assembly to rise, the lifting assembly drives the vertical rod 2 to rise, the vertical rod 2 drives the supporting arm 3 to rise, the supporting arm 3 drives the bent rod 1 to rise, and the bent rod 1 drives the abutment assembly to rise and escape from the tower 4.
[0026] The lifting assembly includes a pull rod 5, a sleeve 6, a crescent hook 7 and a cone 8. The sleeve 6 is coaxially slidably connected with the vertical rod 2. A plurality of crescent hooks 7 are evenly distributed around the circumference and the top end is connected to the circumferential wall of the sleeve 6 through a pin support. The rotation axis of the crescent hook 7 is perpendicular to the axis of the vertical rod 2. The hook tip of the crescent hook 7 faces the vertical rod 2 and contacts it. The cone 8 is located between the support arm 3 and the sleeve 6. The cone 8 is coaxially fixedly connected with the vertical rod 2. The small diameter end of the cone 8 is equal to the diameter of the vertical rod 2 and faces the sleeve 6. A plurality of pull rods 5 are arranged one by one with a plurality of curved rods 1 and the top end is connected to the circumferential wall of the sleeve 6 through a pin support ear. The bottom end of the pull rod 5 is hinged with the top end of the curved rod 1. The pull rod 5 and the crescent hook 7 are staggered and avoided. Two connecting plates are symmetrically fixed on the top of the sleeve 6, and a cross bar 601 is fixedly mounted on the two connecting plates. Specifically, the cross bar 601 is used to be connected with the hook of the crane. When the tower 4 is installed, the hook of the crane descends, and the sliding sleeve 6 slides downward under its own gravity. The crescent hook 7 descends with the sliding sleeve 6. The hook tip of the crescent hook 7 first slides in contact with the vertical rod 2, and then slides in contact with the conical surface of the frustum 8. At this time, the bottom end of the crescent hook 7 swings away from the vertical rod 2. At the same time, the pull rod 5 pushes the bent rod 1 to rotate, and the bottom end of the bent rod 1 swings in the direction close to the vertical rod 2. The intervals between the multiple abutment components are gradually reduced and can be passed through the flange at the top of the tower 4. When the hook tip slides down to the lower part of the cone 8, the bottom end of the crescent hook 7 swings toward the vertical bar 2, and then the hook of the crane rises, the sleeve 6 rises with the hook, the crescent hook 7 rises and hooks the bottom surface of the cone 8, the cone 8 rises with the crescent hook 7, the vertical bar 2 rises synchronously, the support arm 3 rises with the vertical bar 2, the bent rod 1 rises with the support arm 3, the abutment assembly rises with the bent rod 1, and finally the abutment assembly escapes from the tower 4.
[0027] In a specific embodiment, the abutment assembly includes a U-shaped plate 9, a plurality of U-shaped plates 9 are arranged one by one corresponding to a plurality of bent rods 1, two side plates of the U-shaped plate 9 are hinged to the bottom end of the bent rod 1, and the rotation axis of the U-shaped plate 9 is parallel to the rotation axis of the corresponding bent rod 1; a rubber pad 901 is bonded to the bottom surface of the U-shaped plate 9. Specifically, the rubber pad 901 prevents the U-shaped plate 9 from directly contacting the inner wall of the tower 4, thereby preventing the U-shaped plate 9 from scratching the inner wall of the tower 4.
[0028] In a specific embodiment, a through hole 10 is formed on the support arm 3, and a bolt is inserted into the through hole 10. The bolt rotates and passes through the middle of the bent rod 1. The nut of the bolt contacts one side of the support arm 3, and the end of the bolt protrudes from the other side of the support arm 3 and is provided with a thread. The end of the bolt is threadedly connected with a nut. Specifically, the support arm 3 and the pull rod 5 can be configured as follows: Figure 1 In the form shown, the support arm 3 is U-shaped, the bent rod 1 is arranged between the two side plates of the U-shaped support arm 3, and both ends of the pull rod 5 are U-shaped. This arrangement balances the forces on the support arm 3 and the pull rod 5 to avoid distortion.
[0029] There are multiple through holes 10, which are arranged at intervals along the length direction of the support arm 3. Specifically, the connection position of the bent rod 1 and the support arm 3 can be flexibly adjusted according to the inner diameter of the tower 4 and / or the inner diameter of the top flange of the tower 4, ensuring that the abutment assembly can smoothly pass through the top flange of the tower 4, with high adaptability.
[0030] The working principle of the utility model of a hoisting device that automatically detaches from a wind power tower:
[0031] Disengagement principle: when the tower 4 is installed, the hook of the crane drops, and the sliding sleeve 6 slides downward under its own gravity. The crescent hook 7 drops with the sliding sleeve 6. The hook tip of the crescent hook 7 first slides in contact with the vertical rod 2, and then slides in contact with the conical surface of the frustum 8. At this time, the bottom end of the crescent hook 7 swings away from the vertical rod 2. At the same time, the pull rod 5 pushes the bent rod 1 to rotate, and the bottom end of the bent rod 1 swings in the direction close to the vertical rod 2. The intervals between the multiple abutment components gradually narrow and reach a point that can be disengaged from the top of the tower 4. As the flange passes, the sleeve 6 continues to descend, and the interval between the abutment components continues to narrow. When the hook tip slides down below the cone 8, the bottom end of the crescent hook 7 swings toward the direction close to the vertical rod 2, and then the hook of the crane rises, the sleeve 6 rises with the hook, the crescent hook 7 rises and hooks the bottom surface of the cone 8, the cone 8 rises with the crescent hook 7, and the vertical rod 2 rises synchronously, the support arm 3 rises with the vertical rod 2, the bent rod 1 rises with the support arm 3, and the abutment component rises with the bent rod 1, and finally the abutment component escapes from the tower 4.
[0032] Installation principle: before installing the utility model, the tower 4 can be adjusted to Figure 5 The tilted state or flat state shown is recommended to be adjusted to a tilted state, which is convenient for installing the utility model. The crane hook is connected to the horizontal bar 601, and then the support arm 3 is in contact with the edge of the top opening of the tower 4, that is, a screw is set, and the screw rod of the screw passes between the two side plates of the support arm 3 and through the flange bolt hole of the tower 4, and then the nut is threaded. Be careful not to lock the nut to ensure that the screw is in an active state. The crescent hook 7 and the cone 8 are in a separated state. At this time, the sliding sleeve 6 can slide in the direction away from the tower 4, the sliding sleeve 6 drives the pull rod 5 away from the tower 4, the pull rod 5 drives the bent rod 1 to swing, and the bottom end of the bent rod 1 drives the U-shaped plate 9 to move toward the inner wall of the tower 4 and resist the inner wall of the tower 4, and then remove the screw to complete the installation. Obviously, in the actual installation process, the staff can use other methods to make the support arm 3 contact the edge of the top opening of the tower 4 according to the specific situation, such as magnetic attraction, hand support, tying a rope on the vertical rod 2, and the staff pulling the rope in the tower 4.
[0033] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other, and the embodiments can be combined with each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0034] The above embodiments are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.
Claims
1. A hoisting device that automatically detaches from a wind power tower, characterized in that: The invention comprises a bent rod (1), a vertical rod (2), a support arm (3) and a lifting assembly. A plurality of the support arms (3) are evenly distributed in a radial circle with the axis of the vertical rod (2) as the center and the ends are fixedly connected to the vertical rod (2). A plurality of the bent rods (1) are arranged in a one-to-one correspondence with a plurality of the support arms (3). The back of the bent rod (1) faces the vertical rod (2). The middle part of the bent rod (1) is rotatably connected to the support arm (3) and the rotation axis is perpendicular to the axis of the vertical rod (2). The top end of the bent rod (1) is hinged to the lifting assembly. The bottom end of the bent rod (1) is provided with an abutment assembly for abutting against the inner wall of a tower (4). The lifting assembly is located above the support arm (3) and is coaxially slidably connected to the vertical rod (2). The lifting assembly can be clamped with the vertical rod (2) and drive the abutment assembly to escape from the tower (4). The bending angle of the bent rod (1) is an obtuse angle.
2. The hoisting device for automatically detaching from a wind power tower according to claim 1 is characterized in that: The lifting assembly comprises a pull rod (5), a sliding sleeve (6), a crescent hook (7) and a frustum (8); the sliding sleeve (6) is coaxially slidably connected to the vertical rod (2); a plurality of the crescent hooks (7) are evenly distributed around the circumference and the top ends are connected to the circumferential wall of the sliding sleeve (6) via a pin support; the rotation axis of the crescent hook (7) is perpendicular to the axis of the vertical rod (2); the hook tip of the crescent hook (7) faces the vertical rod (2) and contacts the vertical rod (2); the frustum (8) is located between the support arm (3) and the sliding sleeve (6); the frustum (8) 8) is coaxially fixedly connected with the vertical rod (2), the small diameter end of the cone (8) is equal to the diameter of the vertical rod (2) and faces the sliding sleeve (6), the multiple pull rods (5) and the multiple bent rods (1) are arranged one by one and the top ends are connected to the circumferential wall of the sliding sleeve (6) through pin support ears, the bottom end of the pull rod (5) is hinged to the top end of the bent rod (1), and the pull rod (5) and the crescent hook (7) are staggered and avoided; two connecting plates are symmetrically fixed to the top of the sliding sleeve (6), and a horizontal bar (601) is fixed on the two connecting plates.
3. The hoisting device for automatically detaching from a wind power tower according to claim 1 is characterized in that: The abutment assembly comprises a U-shaped plate (9), a plurality of the U-shaped plates (9) being arranged in one-to-one correspondence with a plurality of the bent rods (1), two side plates of the U-shaped plate (9) being hinged to the bottom ends of the bent rods (1), and a rotation axis of the U-shaped plate (9) being parallel to the rotation axis of the corresponding bent rods (1); and a rubber pad (901) is bonded to the bottom surface of the U-shaped plate (9).
4. The hoisting device for automatically detaching from a wind power tower according to any one of claims 1 to 3, characterized in that: The support arm (3) is provided with a through hole (10), a bolt is inserted into the through hole (10), the bolt is rotated to pass through the middle of the bent rod (1), the nut of the bolt is in contact with one side of the support arm (3), the end of the bolt protrudes from the other side of the support arm (3) and is provided with a thread, and the end of the bolt is threadedly connected to a nut.