Single bearing steel hoop device
By designing a single load-bearing steel hoop device, the problem of poor bracket stability during the construction of single-column pier cap beams was solved, achieving simple installation, strong overturning resistance, and high safety, simplifying the construction process and reducing costs.
Patent Information
- Application Number
- CN202420359846.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-26
AI Technical Summary
In the construction of single-column pier cap beams, there are problems such as bracket overhang, poor stability of the bracket itself, and high construction safety risks. In addition, the installation and positioning of double hoop brackets are difficult and the process is cumbersome.
A single load-bearing steel hoop device is designed, including an assembled hoop body, top beam, node plate, truss and platform. It is connected by high-strength bolts and equipped with stiffening plates and bracket systems. The overall stiffness is enhanced through welding and bolt connections. , using a rubber cushion to increase friction, and the height of the bracket system can be adjusted to adapt to different pier diameters.
A construction plan with simple installation and positioning, strong overturning resistance, high stability, and high safety has been achieved, which improves construction efficiency, reduces costs, simplifies processes, and enhances construction safety.
Smart Images

Figure CN221822718U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge construction, and in particular to a single-body load-bearing steel clamp device. Background Art
[0002] In the design of the bridge, some special parts are taken into consideration. In order to optimize the floor area of the bridge substructure, the pier is set as a single-column pier, and the cap beam adopts the cantilever method of the single-column pier. This design saves space, but it causes certain difficulties in the construction of the single-column pier cap beam. When constructing the single-column pier cap beam, the following three methods are often used: full-span bracket cast-in-place, steel rod method, and hoop bracket method. The full-span bracket cast-in-place process is complicated and expensive, and the original ground needs to be reinforced. It is not suitable for high piers and special environments with high ecological protection requirements. The steel rod method process is relatively simple, but it has high requirements on the cross-sectional size of the pier column. It is necessary to embed holes in the pier column, which is very easy to damage the main reinforcement of the pier column. The reserved holes need to be blocked later. This method will damage the cross-section of the single-column pier and is not suitable for small-diameter piers. In addition, due to the cantilever method of the single-column pier cap beam, the steel rod method bracket itself has weak anti-overturning ability, poor stability, and high construction safety risks. The clamp bracket method has a simple process, but ordinary clamp brackets are affected by the cantilever of the cap beam, have weak anti-overturning ability, poor stability, and high construction safety risks.
[0003] The Chinese patent application number "CN202123390449.8" and the name "A truss connection hoop suitable for construction" discloses a truss connection hoop suitable for construction. This double hoop device can improve the construction stability of the single-column pier cap beam, but it requires the installation of two layers of upper and lower steel hoops, which are difficult to install and position, and the construction process is cumbersome. Therefore, it is of great significance to provide a single load-bearing steel hoop device that can solve the problems of the cantilever of the single-column pier cap beam bracket, the stability of the bracket itself, the cumbersome process of the single-column pier double hoop bracket, and the difficulty of installation and positioning. Utility Model Content
[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to solve one or more problems in the prior art. For example, one of the purposes of the present invention is to provide a single-body load-bearing steel clamp device that is easy to install and position, has strong anti-overturning ability, good stability, and high safety.
[0005] In order to achieve the above-mentioned purpose, the utility model provides a single-body load-bearing steel hoop device, which may include a hoop body, a top crossbeam, a node plate and a truss, as well as a first platform and a second platform arranged along the outer side of the hoop body, wherein the hoop body is assembled from two half hoop bodies, and a space for accommodating piers is formed after assembly; the first platforms are symmetrically arranged at the notches of the two half hoop bodies, and the height is flush with the upper end of the hoop body; the second platforms are symmetrically arranged at the middle positions of the two half hoop bodies, and the height is flush with the upper end of the hoop body; the top crossbeam is arranged on the second platform, and the node plate is arranged below the second platform, and the height is flush with the lower end of the hoop body; the truss is located between the top crossbeam and the node plate to play a supporting role.
[0006] According to one or more exemplary embodiments of the present utility model, the half hoop body may have an arc-shaped inner surface corresponding to a portion of the pier.
[0007] According to one or more exemplary embodiments of the present utility model, the cross section of the half hoop body may be an arc shape corresponding to 1 / 2 of the circumference of the cross section of the pier.
[0008] According to one or more exemplary embodiments of the present utility model, the clamp device may further include a stiffening plate, and the stiffening plate is vertically arranged between the top cross beam and the node plate.
[0009] According to one or more exemplary embodiments of the present invention, on each half hoop body, the trusses may be symmetrically arranged with respect to the stiffening plates.
[0010] According to one or more exemplary embodiments of the present utility model, the clamp device may further include a connecting piece to connect the two half clamp bodies.
[0011] According to one or more exemplary embodiments of the present utility model, the connecting member may include a flange and bolts, wherein the flange is arranged below the first platform and the two half hoop bodies are connected by the bolts.
[0012] According to one or more exemplary embodiments of the present utility model, a rubber cushion layer may be installed on the inner side of the clamp body.
[0013] According to one or more exemplary embodiments of the present utility model, the single body load-bearing steel clamp device may further include a support system, which includes a landing frame, a longitudinal beam and a transverse distribution beam stacked in sequence along the height direction, the landing frame can be telescopic in the height direction, the longitudinal beam is arranged on the landing frame, and the transverse distribution beam is arranged above the landing frame.
[0014] According to one or more exemplary embodiments of the present utility model, the unloading rack may include: an upper beam, a lower beam, a left slider, a right slider and a distance adjustment unit, wherein the upper beam and the lower beam are symmetrical to each other and spaced apart, the two ends of the upper beam facing the lower beam on one side are formed into an inclined surface, the two ends of the lower beam facing the upper beam on one side are also formed into an inclined surface and the inclination direction is mirror-symmetrical with the inclined surface of the upper beam; the left slider and the right slider are symmetrical to each other and spaced apart, and the upper and lower ends of the left slider and the right slider are both formed with inclined surfaces that match the inclined surfaces of the upper beam and the lower beam; the distance adjustment unit is used to drive the left slider and the right slider to move in the horizontal direction, so as to adjust the distance between the left slider and the right slider, and the distance adjustment unit includes a screw rod and a nut, the screw rod is arranged in the horizontal direction and passes through the through holes formed on the left slider and the right slider, and the nut is sleeved on one end of the screw rod.
[0015] Compared with the prior art, the beneficial effects of the present invention include at least one of the following:
[0016] (1) The single load-bearing steel clamp device provided by the utility model is simple in design and manufacture, and is convenient to install and position. It can successfully replace the double clamp bracket and other types of clamp devices used in the construction of single-column pier cap beams.
[0017] (2) The single load-bearing steel clamp device provided by the utility model can solve the problems of weak anti-overturning ability, poor stability and high construction safety risk of the single-column pier cap beam support, effectively improve labor efficiency, save costs, speed up construction progress and meet on-site construction requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and other objects and / or features of the present invention will become more apparent through the following description in conjunction with the accompanying drawings, in which:
[0019] Figure 1 A schematic structural diagram of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown;
[0020] Figure 2 A plan view of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown;
[0021] Figure 3 A cross-sectional view of a single load-bearing steel clamp device in an exemplary embodiment of the utility model is shown;
[0022] Figure 4 A side view of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown;
[0023] Figure 5 A schematic diagram of the installation of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown;
[0024] Figure 6 A structural schematic diagram of a single load-bearing steel hoop device including a bracket system in an exemplary embodiment of the utility model is shown;
[0025] Figure 7 Another structural schematic diagram of a single load-bearing steel hoop device including a bracket system in an exemplary embodiment of the utility model is shown;
[0026] Figure 8 A schematic structural diagram of a discharge frame in a single load-bearing steel clamp device in an exemplary embodiment of the utility model is shown.
[0027] Description of reference numerals:
[0028] 1-hoop body, 2-first platform, 3-second platform, 41-flange, 42-bolt, 5-top cross beam, 6-truss, 7-stiffening plate, 8-node plate, 91-unloading frame, 911-upper beam, 912-lower beam, 913-left slider, 914-right slider, 9151-screw, 9152-nut, 92-longitudinal beam, 93-transverse distribution beam, 10-pier column. DETAILED DESCRIPTION
[0029] Hereinafter, a single-body load-bearing steel clamp device of the present invention will be described in detail in conjunction with the accompanying drawings and exemplary embodiments.
[0030] In the description of the present application, it should be understood that the terms "upper", "lower", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. The terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
[0031] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0032] One of the purposes of the utility model is to provide a single-body load-bearing steel clamp device with a built-in truss. The clamp has a connector for widening the support surface. Channel steels are welded in pairs. Two diagonal support channels are welded to the top channel steel to serve as the load-bearing truss of the load-bearing steel clamp device. After the two halves of the clamp are spliced, a truss clamp with a wide support surface and a large load-bearing weight is formed. When installing this single-body load-bearing steel clamp device with a built-in truss, only the left and right half clamp bodies need to be connected by bolts to form a whole. The installation and positioning are simple, the anti-overturning ability is strong, the stability is good, and the safety is high.
[0033] Exemplary Embodiment 1
[0034] Figure 1 A schematic structural diagram of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown; Figure 2 A plan view of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown; Figure 3 A cross-sectional view of a single load-bearing steel clamp device in an exemplary embodiment of the utility model is shown; Figure 4 A side view of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown; Figure 5 A schematic diagram of the installation of a single load-bearing steel hoop device in an exemplary embodiment of the utility model is shown; Figure 6 A structural schematic diagram of a single load-bearing steel hoop device including a bracket system in an exemplary embodiment of the utility model is shown; Figure 7 Another structural schematic diagram of a single load-bearing steel hoop device including a bracket system in an exemplary embodiment of the utility model is shown;
[0035] Figure 8 A schematic structural diagram of a discharge frame in a single load-bearing steel clamp device in an exemplary embodiment of the utility model is shown.
[0036] This exemplary embodiment provides a single-body load-bearing steel clamp device.
[0037] like Figures 1 to 8 As shown in , the single body load-bearing steel hoop device may include a hoop body 1, a top cross beam 5, a node plate 8 and a truss 6, as well as a first platform 2 and a second platform 3 arranged along the outer side of the hoop body 1.
[0038] Among them, the hoop body 1 is assembled from two half hoop bodies, and after assembly, a space for accommodating the pier 10 is formed. The first platform 2 is symmetrically arranged at the notches of the two half hoop bodies, and the height is flush with the upper end of the hoop body 1. The second platform 3 is symmetrically arranged at the middle position of the two half hoop bodies, and the height is flush with the upper end of the hoop body 1. The top cross beam 5 is arranged on the second platform 3, and the node plate 8 is arranged below the second platform 3, and the height is flush with the lower end of the hoop body 1. The truss 6 is located between the top cross beam 5 and the node plate 8 to play a supporting role.
[0039] In this exemplary embodiment, the half hoop body may have an arc-shaped inner surface corresponding to a portion of the pier column, and the cross section of the half hoop body may be an arc corresponding to 1 / 2 of the circumference of the cross section of the pier column. The hoop device may also include a stiffening plate 7, which is vertically arranged between the top cross beam 5 and the node plate 8. On each half hoop body, the truss 6 may be symmetrically arranged about the stiffening plate 7.
[0040] In this exemplary embodiment, the clamp device may further include a connecting piece to connect the two half clamp bodies, and the connecting piece may include a flange 41 and a bolt 42, wherein the flange 41 is arranged below the first platform 2 and connects the two half clamp bodies through the bolt 42. Here, the bolt may include a high-strength bolt. In addition to the high-strength bolts used to connect the two half clamp bodies, the remaining components may be connected by welding, and the welding quality of each welding point is ensured to enhance the overall rigidity of the clamp device, and avoid deformation or damage to the clamp body itself caused by the clamp device bearing the cap beam construction load.
[0041] In this exemplary embodiment, a rubber cushion layer may be installed on the inner side of the hoop body 1 to enhance the friction between the hoop body and the single column concrete. The material used for the hoop device may include steel, and the surface may be sprayed with anti-rust paint. Here, each component may be made of Q235 ordinary steel plate or steel, and the hoop body may be rolled with ordinary steel plate according to the diameter of the pier column.
[0042] In this exemplary embodiment, the single body load-bearing steel clamp device may also include a support system, which includes a landing frame 91, a longitudinal beam 92 and a transverse distribution beam 93 stacked in sequence along the height direction. The landing frame 91 can be telescopic in the height direction, the longitudinal beam 92 is arranged on the landing frame 91, and the transverse distribution beam 93 is arranged above the landing frame 91.
[0043] In this exemplary embodiment, the unloading rack 91 may include: an upper beam 911, a lower beam 912, a left slider 913, a right slider 914, and a distance adjustment unit, wherein the upper beam 911 and the lower beam 912 are symmetrical to each other and are spaced apart, the two ends of the upper beam 911 and the side facing the lower beam 912 are formed into an inclined surface, and the two ends of the lower beam 912 and the side facing the upper beam 911 are also formed into an inclined surface, and the inclined direction is mirror-symmetrical with the inclined surface of the upper beam 911; the left slider 913 and the right slider 914 are symmetrical to each other and are spaced apart, The upper and lower ends of the left slider 913 and the right slider 914 are formed with inclined surfaces that match the inclined surfaces of the upper beam 911 and the lower beam 912; the distance adjustment unit is used to drive the left slider 913 and the right slider 914 to move in the horizontal direction, so as to adjust the distance between the left slider and the right slider. The distance adjustment unit includes a screw rod 9151 and a nut 9152. The screw rod 9151 is arranged in the horizontal direction and passes through the through holes formed on the left slider 913 and the right slider 914, and the nut 9152 is sleeved on one end of the screw rod 9151. Here, by adjusting the horizontal distance between the left and right sliders, the height between the upper and lower beams is adjusted.
[0044] In this exemplary embodiment, this single-body load-bearing steel clamp device with a self-contained truss is manufactured in the factory, pre-assembled and matched, and then transported to the construction site for assembly. Before assembly, the height of the single-body load-bearing steel clamp bracket of the entire self-contained truss needs to be calculated, the specific installation position mark should be made on the pier column in advance, and a rubber pad should be installed inside the clamp body to enhance the anti-slip effect of the clamp body. When assembling the clamp body, a car crane is used to lift the half-side clamp body, and one end of the chain hoist is used to connect the clamp body and the other end is hung on the embedded steel bars of the pier column. The half-side clamp body is temporarily pulled and fixed on the half side of the pier column. After the temporary fixation of the single-side clamp body is completed, the other side of the clamp body is lifted, the two half-side clamp bodies are aligned and closed, and high-strength bolts are installed. The high-strength bolts are tightened with a torque wrench. After the first installation of the single-body load-bearing steel clamp is completed, the monitoring point mark should be made, and pre-compression observation should be carried out to verify the safety performance of this single-body load-bearing steel clamp device with a self-contained truss. After the installation of the clamp device is completed, the bracket system is installed. The bracket system mainly includes the unloading frame, longitudinal beam and transverse distribution beam. During installation, according to the elevation of the bottom formwork of the cap beam, the middle inclined surfaces of the two sliders of the unloading frame are slid towards each other, the height of the unloading frame is adjusted in advance, and then the longitudinal beam and transverse distribution beam are installed in sequence to complete the installation of the single-body load-bearing steel clamp bracket system with a self-contained truss.
[0045] Although a single-body load-bearing steel clamp device of the present invention has been described above in combination with exemplary embodiments, those skilled in the art should be aware that various modifications and changes may be made to the exemplary embodiments of the present invention without departing from the spirit and scope defined by the claims.
Claims
1. A single load-bearing steel clamp device, characterized in that: The hoop device comprises a hoop body, a top crossbeam, a node plate and a truss, and a first platform and a second platform arranged along the outer side of the hoop body, wherein: The hoop body is assembled from two half hoop bodies, and after assembly, a space for accommodating the pier column is formed; The first platform is symmetrically arranged at the notches of the two half hoop bodies, and its height is flush with the upper end of the hoop body; The second platforms are symmetrically arranged at the middle positions of the two half hoop bodies, and their heights are flush with the upper ends of the hoop bodies; The top cross beam is arranged on the second platform, and the node plate is arranged below the second platform, and its height is flush with the lower end of the hoop body; The truss is located between the top beam and the node plate and plays a supporting role.
2. The single load-bearing steel clamp device according to claim 1 is characterized in that: The half hoop body has an arc-shaped inner surface corresponding to a portion of the pier column.
3. The single-body load-bearing steel clamp device according to claim 1 is characterized in that: The cross section of the half hoop body is an arc corresponding to 1 / 2 of the circumference of the cross section of the pier column.
4. The single-body load-bearing steel clamp device according to claim 1, characterized in that: The clamp device also includes a stiffening plate, which is vertically arranged between the top cross beam and the node plate.
5. The single-body load-bearing steel clamp device according to claim 4 is characterized in that: On each half hoop body, the trusses are symmetrically arranged about the stiffening plates.
6. The single-body load-bearing steel clamp device according to claim 1, characterized in that: The clamp device also includes a connecting piece to connect the two half clamp bodies.
7. The single-body load-bearing steel clamp device according to claim 6, characterized in that: The connecting member comprises a flange and bolts. The flange is arranged below the first platform and the two half hoop bodies are connected by the bolts.
8. The single-body load-bearing steel clamp device according to claim 1, characterized in that: A rubber cushion layer is installed on the inner side of the hoop body.
9. The single-body load-bearing steel clamp device according to claim 1, characterized in that: The single load-bearing steel clamp device also includes a support system, which includes a discharge frame, a longitudinal beam and a transverse distribution beam stacked in sequence along the height direction. The discharge frame can be extended and retracted in the height direction. The longitudinal beam is arranged on the discharge frame, and the transverse distribution beam is arranged above the discharge frame.
10. The single load-bearing steel clamp device according to claim 9, characterized in that: The unloading rack includes: an upper beam, a lower beam, a left slider, a right slider and a distance adjustment unit, wherein the upper beam and the lower beam are symmetrical to each other and spaced apart, the two ends of the upper beam facing the lower beam on one side are formed into an inclined surface, the two ends of the lower beam facing the upper beam on one side are also formed into an inclined surface and the inclination direction is mirror-symmetrical with the inclined surface of the upper beam; the left slider and the right slider are symmetrical to each other and spaced apart, and the upper and lower ends of the left slider and the right slider are both formed with inclined surfaces that match the inclined surfaces of the upper beam and the lower beam; the distance adjustment unit is used to drive the left slider and the right slider to move in the horizontal direction, so as to adjust the distance between the left slider and the right slider, and the distance adjustment unit includes a screw rod and a nut, the screw rod is arranged in the horizontal direction and passes through the through holes formed on the left slider and the right slider, and the nut is sleeved on one end of the screw rod.