Multidirectional transportation system of cantilever bridge girder erection machine
By designing a multi-directional transportation system in the cantilever bridge erecting machine, using the temporary connection of the anchor section track beam and the cantilever section track beam and the transverse bridge track system, the multi-directional movement of the lifting equipment is realized, and the overall horizontal movement of the support truss system is solved. This solves the problem of migration restrictions and improves construction efficiency and equipment transportation capabilities.
Patent Information
- Application Number
- CN202323141527.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-21
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-11-21
Smart Images

Figure CN221822759U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a multi-directional transport system of a cantilever bridge erecting machine, belonging to auxiliary equipment for bridge construction. Background Art
[0002] Chinese patent CN202211543500.0 discloses a piece-by-piece cantilever assembly aerial work platform for all-welded steel truss bridges and its construction method. The aerial work platform is a bridge construction equipment that implements the "front cantilever, rear beam feeding" construction method and is suitable for truss bridges that "cannot arrange temporary support or auxiliary ships and cross valleys and waterways". It combines the "hanging basket" used for cantilever construction and the "bridge erection machine" system used for simple support and continuous construction.
[0003] As a large-scale bridge construction equipment, its design stage needs to focus not only on the safety and functional efficiency of the equipment, but also on the convenience of equipment installation and removal. Domestic large-scale bridge erection machines that cross rivers and valleys either have large components and are installed using large-tonnage floating cranes, large-tonnage truck cranes or crawler cranes; or have small components and are installed using tower cranes or small-tonnage truck cranes.
[0004] On the one hand, in order to meet the target requirements of large cantilever (≥15m) and large load (≥100T), the aerial work platform often adopts a truss system as the support system. At the same time, in order to resist the (lateral) effect of wind load, a dense "cross support system" needs to be configured between the main supporting structures. Compared with the traditional bridge-building machine system, the height of the main supporting beam is greatly increased (from 1.5m to 5.0m). When it is impossible to configure an independent lateral restraint system, the cross support system between the main supporting beams is the only one, which leads to the limitation of the one-way movement of the winch.
[0005] On the other hand, when the aerial work platform adopts a "frame system" instead of a "truss system", the problem of "one-way transport channel limitation" of the winch can be solved, but there is "one price" and "one constraint". The price is that the deadweight of the cantilever bridge erection machine, the frame system is usually 2.5-4 times that of the truss system, and the support efficiency (hoisting weight / support system deadweight) is only 1 / 3 of the truss system - when the cantilever bridge erection machine is used for the cantilever assembly of the beam bridge, the deadweight of the construction equipment increases significantly, which will increase the burden on the main structure on the one hand, and even make it impossible to bear it; on the other hand, it will reduce the competitiveness of the construction equipment. For example, a 360° full-swing crane can also meet the needs of component hoisting (taking Yinzhou Avenue as an example, the steel truss bridge can only bear the capacity of 120 tons of construction machinery, and does not have a cantilever bridge erection machine and a full-swing crane of the rigid frame system). The constraint is that the range of movement of the winch is limited to the range of the supporting beam, and it cannot be reached outside the range of the supporting beam, that is, "two-way transportation" can only be achieved within the frame structure, and the winch cannot move outside the frame structure. Traditional bridge erection machines are achieved by lateral movement of the entire support system, and their temporary foundation is the main lower structure. Bridges constructed using the cantilever method rely only on the upper structure. Cantilever bridge erection machines can usually only rely on their webs (box sections) or main truss structures (truss systems) - the vertical bearing capacity or rigidity of other parts is too small to bear the load. This means that when there are cantilevers (located on the outside of the web or main truss structure) on the upper structure of the bridge, not only can the winches on the outside of the web or main truss structure not be transported to their locations, but even the hoisting of the web and main truss structure itself faces great difficulties. Utility Model Content
[0006] The utility model aims to provide a multi-directional transport system for a cantilever bridge erecting machine, so as to break through the limitation of the supporting truss system (the structural limitation of the supporting truss system itself prevents the overall transverse movement of the track beam along the bridge), so that the target components hoisted by the lifting equipment can be transported to the location as required, and the docking and assembly of the corresponding target components on the operating platform system are convenient.
[0007] In order to achieve the above technical objectives, the utility model will adopt the following technical solutions:
[0008] A cantilever bridge erection machine with an integrated multi-directional transport system comprises a machine body, wherein the machine body comprises a supporting truss system, an advancing-anchoring system, a beam transporting system and a multi-directional transporting system, wherein the advancing-anchoring system comprises a machine body travel driving device and a machine body anchoring device, wherein the machine body travel driving device is arranged at the bottom of the anchoring section of the supporting truss system, and the machine body anchoring device is installed between the anchoring section of the supporting truss system and the upper bridge deck in a detachable connection manner; the beam transporting system is arranged on the upper bridge deck and is located in an area surrounded by the bottom trusses of the supporting truss system; the multi-directional transporting system is arranged on the middle trusses of the supporting truss system, and the multi-directional transporting system comprises a lifting device, a track beam in the longitudinal direction of the bridge, a track system in the transverse direction of the bridge and a transverse direction of the bridge moving system; wherein:
[0009] The lifting equipment is movably mounted on the track beam along the bridge direction;
[0010] The track beam along the bridge includes an anchoring section track beam, a cantilever section track beam, and a temporary connection structure capable of splicing / separating the anchoring section track beam and the cantilever section track beam;
[0011] The anchoring section track beam is arranged in the anchoring area of the supporting truss system and is fixedly connected to the cross beam of the anchoring area of the supporting truss system; the cantilever section track beam is arranged in the cantilever area of the supporting truss system and is movably installed on the transverse connecting beam of the cantilever area of the supporting truss system through the transverse bridge track system and is connected to the power output end of the transverse bridge movable system;
[0012] The cantilever section track beam, when separated from the anchor section track beam, can be moved along the cross bridge to the track system through the power actuation of the cross bridge to the moving system.
[0013] Preferably, the transverse bridge track system includes a plurality of transverse track beams, each of which includes a transverse track beam section and transverse track cantilever sections symmetrically arranged on both sides of the transverse track beam section;
[0014] The rail flange of the transverse track crossbeam section is connected to the transverse connecting beam above it by a beveled penetration weld; the inner end of the transverse track cantilever section is connected to the cantilever lower chord of the supporting truss system through a stiffening steel plate, and the outer end is supported on the cantilever upper chord of the supporting truss system through a cantilever overhanging inclined beam; no constraints are set between the transverse track crossbeam section and the transverse track cantilever section; a parking structure A is set at the end of the transverse track cantilever section.
[0015] Preferably, the joints of the anchoring section track beam and the cantilever section track beam are located outside the lower vertical rod of the front support point of the supporting truss system, and the anchoring section track beam is arranged near the center of the crossbeam of the supporting truss system.
[0016] Preferably, corresponding vertical stiffening ribs A are configured in the supporting area of the bridge-direction track beam, and the vertical stiffening ribs A are set according to the full height of the bridge-direction track beam; a vertical stiffening rib B is set near the joint between the fixed-section track beam and the movable-section track beam, and the height of the vertical stiffening rib B is lower than the height of the bridge-direction track beam; and a full-length longitudinal stiffening rib is set between the outer edges of the vertical stiffening ribs A and B.
[0017] Preferably, horizontal parking stiffening ribs are provided at both ends of the track beam along the bridge; and removable temporary anti-collision structures are respectively provided at the joints of the movable section track beam and the fixed section track beam: when the movable section track beam and the fixed section track beam are in a separated state, the temporary anti-collision structure is installed; when the movable section track beam and the fixed section track beam are connected by a temporary connection structure and are in a spliced state, the temporary anti-collision structure is removed.
[0018] Preferably, the temporary connection structure includes a temporary assembly positioning code plate and a plurality of splicing bolts, one side of the temporary assembly positioning code plate has bolt holes A2 matching the bolt holes A1 at the splicing positions of the anchor section track beam, and the other side has bolt holes B2 matching the bolt holes B1 at the splicing positions of the cantilever section track beam.
[0019] Preferably, the transverse bridge movement system includes a transverse bridge rail carriage and two sets of closely arranged braking equipment, wherein: the transverse bridge rail carriage is movably installed on the transverse bridge rail beam, and the fixed part of the transverse bridge rail carriage is suspended on the cantilever section of the rail beam; each set of braking equipment includes a braking hand winch and a braking traction line, the braking hand winch is installed on the supporting truss system, one end of the braking traction line is connected to the power output end of the braking hand winch, and the other end is connected to the braking point provided on the transverse bridge rail carriage, and the braking traction line is arranged in an inverted U shape after being guided by the braking guide pulley group arranged on the supporting truss system.
[0020] Preferably, the braking guide pulley block has four in total, including a middle chord fixed pulley, an upper fixed pulley on the transverse track, a lower fixed pulley on the transverse track, and a middle fixed pulley on the transverse track, wherein:
[0021] The fixed pulley of the middle chord and the fixed pulley on the transverse track are located in the same vertical plane; the fixed pulley below the transverse track and the center of the brake stiffening steel plate of the bridge-direction track beam are located in the same vertical plane, the brake stiffening steel plate of the bridge-direction track beam is arranged on the cantilever track beam, and penetrates the brake stiffening steel plate of the bridge-direction track beam and the cantilever track beam to set the braking point; the fixed pulley in the transverse track is positioned in the middle of the upper and lower fixed pulleys in the transverse track in the bridge direction, and a steel connector is arranged on the side of the end of the transverse bridge-direction track beam, and the steel connector and the transverse bridge-direction track beam are connected by upper and lower flange welds.
[0022] Preferably, the fixed part of the transverse bridge track vehicle is suspended and installed with a cantilever section track beam through a bogie; the bogie includes a main distribution beam; the main distribution beam adopts a double-jointed channel steel structure, and the limbs are arranged oppositely; 3 stiffening ribs are arranged in the middle of each channel steel, which are respectively aligned with the web and longitudinal stiffening ribs of the longitudinal bridge track beam; the side of the stiffening rib is welded to the inner edge of the channel steel, and the bottom is welded to the longitudinal bridge track beam; a gusset plate is arranged on the upper and lower edges of both ends of the main distribution beam.
[0023] Through the above technical solution, compared with the prior art, the utility model has the following advantages:
[0024] 1. The utility model divides the track beam along the bridge into two parts, so that the anchoring section track beam is fixed to the anchoring section of the supporting truss system, and the cantilever section track beam is set to a laterally movable structure. Therefore, the limitation of the supporting truss system (the structural limitation of the supporting truss system itself prevents the track beam along the bridge from being moved laterally as a whole) is broken, so that the target components hoisted by the lifting equipment can be transported to the location as needed, which is convenient for the docking and assembly of the corresponding target components on the operating platform system.
[0025] 2. The transverse bridge transport system of the utility model only has two main braking points in the middle and driven points on both sides, which also takes the lateral stiffness problem into consideration. If the main braking points are located at both ends of the track beam along the bridge, it means that once the lateral support point is temporarily vacated, the track beam along the bridge will bear a large transverse bridge bending moment and will not be able to withstand it. Therefore, the spacing between the braking points should be small and located in the middle of the track beam.
[0026] 3. In addition to the bearing capacity, the key to lateral mobile equipment (transverse bridge transport system) is the control of moving speed. At present, the maximum rated bearing capacity of a single electric hoist rail vehicle commonly used in China is 10T. It is driven by a motor and has a normal travel speed of 20m / min, which means it travels 33.3cm per second. Even if a 4-fold deceleration coil is configured, the travel distance per second still reaches 8.3cm. If the travel speed is too fast, it will inevitably lead to a sharp increase in the difficulty of component positioning. Only by "instant start and stop" can a small displacement control be achieved. On the one hand, the lateral acceleration generated by "instant start and stop" is not small, which not only causes the hoisted components to sway laterally, but also affects the lateral deformation and stability of the cantilever bridge crane. On the other hand, the lateral displacement accuracy of "instant start and stop" is only at the cm level, which does not meet the mm level requirements for steel structure installation.
[0027] 4. The bridge-direction track of the cantilever section can be moved laterally, while the bridge-direction track of the anchor section is fixed. Since the cantilever bridge erection machine cannot be ensured to be always in a horizontal state, that is, there may be a longitudinal slope on the bridge-direction track, in order to ensure that the electric hoist does not lose control and slide off the track, the utility model sets permanent parking structures at both ends of the bridge-direction track beam. In addition, in order to prevent the electric hoist running on the cantilever section track beam from failing and sliding off the track, the utility model sets a temporary parking structure at the joint end of the cantilever section bridge-direction track beam, so that the electric hoist can smoothly return to the anchor section track beam after the subsequent cantilever section track beam and the anchor section track beam are spliced.
[0028] 5. In order to ensure that the cantilever section track beam and the anchor section track beam are aligned and to ensure that the electric hoist passes repeatedly, the utility model provides a temporary connection structure to splice the cantilever section track beam and the anchor section track beam into one or separate the two. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1It is a structural schematic diagram of the cantilever bridge erecting machine described in the utility model;
[0030] Figure 2 It is a layout diagram of the transverse bridge track system of the multi-directional transport system of the utility model on the main truss support system;
[0031] Figure 3 It is a structural schematic diagram of the bridge-oriented track system of the multi-directional transport system of the utility model;
[0032] Figure 4 It is the vertical connection structure diagram of the anchor section track beam in the multi-directional transportation system (along the bridge direction);
[0033] Figure 5 It is the vertical connection structure diagram (transverse to the bridge) of the anchorage section track beam in the multi-directional transportation system;
[0034] Figure 6 It is the vertical connection structure diagram of the cantilever track beam in the multi-directional transportation system (along the bridge direction);
[0035] Figure 7 It is the vertical connection structure diagram (transverse to the bridge) of the cantilever track beam in the multi-directional transportation system;
[0036] Figure 8 It is a structural schematic diagram of the cantilever section track beam and the anchor section track beam at the joint position;
[0037] Fig. 9 It is a structural schematic diagram (cross section) of the cantilever section track beam and the anchor section track beam at the joint position;
[0038] Fig.10 It is a schematic diagram of the lateral braking system (along the bridge direction) of the cantilever section track in the multi-directional transport system;
[0039] Fig.11 It is a schematic diagram of the lateral braking system (transverse to the bridge) of the cantilever section track in the multi-directional transport system;
[0040] Fig.12 It is a structural schematic diagram of the lifting equipment installed on the track beam along the bridge direction;
[0041] 1-1-1, first cantilever upper chord; 1-1-2, second cantilever upper chord; 1-1-3, first cantilever vertical rod; 1-1-4, second cantilever vertical rod; 1-1-5, first cantilever lower chord; 1-1-6, second cantilever lower chord; 1-1-7, first cantilever cantilevered oblique beam; 1-1-8, second cantilevered oblique beam; 1-1-9, transverse connecting beam; 1-1-10, left cantilever section of transverse track; 1-1-11, right cantilever section of transverse track; 1-1-12, transverse track crossbeam section; 1-1-13, upper support beam at cantilever end; 1-1-14, cantilevered crossbeam at cantilever end;
[0042] 1-2, track beam along the bridge; 1-2-1, track beam of anchoring section; 1-2-2, track beam of cantilever section; 1-2-3, connecting vertical rod of anchoring section cross beam; 1-2-4, cross beam of anchoring section; 1-2-5, cross beam of cantilever section; 1-2-7, transverse track trolley system; 1-2-8, stiffening rib of cross beam of anchoring section; 1-2-9, end anchor plate; 1-2-10, first stiffening plate; 1-2-11, longitudinal stiffening rib of first track beam; 1-2-12, vertical stiffening rib of first track beam; 1-2-13, connecting plate; 1-2-14, anchor bolt; 1-2-15, second stiffening plate; 1-2-16, distribution beam; 1-2-17, longitudinal stiffening rib of second track beam; 1-2-18, vertical stiffening rib of second track beam; 1-2-19 , distribution beam stiffening plate; 1-2-20, fixed beam anchor bolts; 1-2-21, fixed beam; 1-2-22, anti-slip bolts; 1-2-23, first brake winch; 1-2-24, second brake winch; 1-2-25, fixed pulley of left middle chord rod; 1-2-26, brake traction line; 1-2-27, fixed pulley of right middle chord rod; 1-2-28, fixed pulley on transverse track; 1-2-29, fixed pulley in transverse track; 1-2-30, steel connector; 1-2-31, fixed pulley under transverse track; 1-2-32, brake stiffening steel plate on the left side of bridge-to-track beam; 1-2-33, stiffening steel plate on bridge-to-track beam; 1-2-34, brake stiffening steel plate on the right side of bridge-to-track beam; 1-3, lifting equipment. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means any restriction on the utility model and its application or use. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Unless otherwise specified, the relative arrangement, expressions and numerical values of the components and steps described in these embodiments do not limit the scope of the utility model. The techniques, methods and equipment known to ordinary technicians in the relevant fields may not be discussed in detail, but in appropriate cases, the techniques, methods and equipment should be regarded as part of the specification. In all examples shown and discussed here, any specific value should be interpreted as merely exemplary, not as a limitation. Therefore, other examples of the exemplary embodiments may have different values.
[0044] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations).
[0045] The utility model discloses a cantilever bridge erection machine with an integrated multi-directional transport system, comprising a machine body, the machine body comprising a supporting truss system, an advancing-anchoring system, a beam transporting system, a multi-directional transporting system and an operating platform system, the advancing-anchoring system comprising a machine body travel driving device and a machine body anchoring device, the machine body travel driving device is arranged at the bottom of the anchoring section of the supporting truss system, and the machine body anchoring device is installed between the anchoring section of the supporting truss system and the upper bridge deck by a detachable connection method; the beam transporting system is arranged on the upper bridge deck and is in the area surrounded by the bottom trusses of the supporting truss system; the multi-directional transporting system is arranged on the middle trusses of the supporting truss system, and the operating platform system is suspended and installed at the cantilever end of the supporting truss system. Wherein:
[0046] 1) The supporting truss system is the core force-bearing structural system of the machine body of the utility model; the advancing-anchoring system, the beam transporting system, the multi-directional transporting system and the operating platform system are all constructed through the supporting truss system.
[0047] 2) The forward-anchoring system provides the supporting truss system with the functions of "support (anchoring)" and "advancement". Specifically, at the preset position of the main bridge steel structure segment assembly, the supporting truss system is anchored on the main bridge deck through the machine anchoring device; after the current main bridge steel structure segment assembly is completed, the machine anchoring device installed between the main bridge deck and the supporting truss system is released, and then the machine is driven by the machine travel drive device to move to the preset position of the next main bridge steel structure segment assembly, and then the supporting truss system is anchored on the main bridge deck again through the machine anchoring device. This process is repeated until all the main bridge steel structure segments are assembled.
[0048] 3) Multi-directional transport system, mainly responsible for the lifting operation of the components of the main bridge steel structure segment from the beam transport system to the operating platform system, including lifting equipment, longitudinal track beams, transverse track system and transverse mobile system. The multi-directional transport system is set on the supporting truss system.
[0049] 4) The operating platform system is mainly responsible for assembling the components of the steel structure segments of the current main bridge hoisted by the multi-directional transportation system, and provides operating space for construction machinery and operators;
[0050] 5) The beam transport system is responsible for transporting the various components of the steel structure segments of the current main bridge, so as to transport the various components of the steel structure segments of the current main bridge lifted by crawler cranes or gantry cranes in the side span area to the loading area of the multi-directional transport system, including beam transport trolleys, beam transport tracks, etc.
[0051] The multi-directional transport system of the present invention will be described in detail below with reference to the accompanying drawings.
[0052] Multi-directional transport system design description:
[0053] like Figure 2 As shown, the multi-directional transport system is set in the supporting truss system, which generally includes two types of structures, namely the lifting track system and the lifting equipment. According to the overall functional requirements, the multi-directional transport system needs to have the following three functions:
[0054] 1) The maximum lifting weight of a single component shall not be less than 25 tons;
[0055] 2) The transport components must have the functions of "moving along the bridge" and "moving across the bridge" at the same time;
[0056] 3) The lifting rail system must have sufficient "vertical bearing capacity" and "vertical stiffness", and the transverse moving part of the bridge should also have sufficient "horizontal bearing capacity" and "horizontal stiffness".
[0057] To this end, the design of a multi-directional transportation system needs to include the following six aspects:
[0058] 1) The hoist rail system is arranged at the lower part of the middle chord of the main truss support system, and the vertical support of the hoist rail system matches the node of the supporting truss, which not only ensures the bearing capacity of the structural system, but also has sufficient operating space (vertical & horizontal);
[0059] 2) The track system is divided into two parts: the "anchor section" and the "cantilever section". The anchor section track system adopts a fixed type to reduce the difficulty of on-site operation; the cantilever section track system adopts a movable type to meet the requirements of lateral transportation of components;
[0060] 3) Both ends of a single track (track along the bridge and track across the bridge) must be equipped with a "parking" structure to prevent the track from sliding off;
[0061] 4) "Alignment and fixation" and "temporary parking" facilities should be provided between the fixed track of the anchoring section and the movable track of the cantilever section to accommodate the connection between the movable track and the fixed track;
[0062] 5) Electric hoists are used as the core components for lifting and transportation. On the one hand, their maximum rated lifting weight can meet the needs, and on the other hand, they have the dual functions of vertical lifting and horizontal movement.
[0063] 6) The lateral movement of the movable track relies on the "10T track crane" and "manual hoist" to avoid positioning difficulties caused by the excessive speed of the electric-driven track crane (20m / min).
[0064] Therefore, the multi-directional transportation system includes lifting equipment, track beams along the bridge, track system across the bridge and mobile system across the bridge.
[0065] Lifting equipment:
[0066] The maximum weight of each component of the main bridge steel structure segment is 25 tons. The current largest electric hoist is 16T, so two 16T electric hoists are configured. The type of electric hoist track depends on the track - if a rolled I-beam track is used, an inclined wheel is required; if an H-beam track is used, a flat wheel is used.
[0067] Considering the single point maximum vertical support reaction force limit of the movable section rail beam, the current maximum specification of rail vehicles is 10T, so two rail vehicles are used. Considering the short lateral moving distance, the electric drive system speed is too fast (driving speed 20m / min), and the control difficulty is relatively large, so a manual hoist is used to provide lateral moving force. In addition, the non-customized 10T rail vehicle is suitable for I36~I56 rolled I-beams and adopts an inclined wheel structure.
[0068] Fig.12 A structural schematic diagram of a lifting device 1-3 (electric hoist) installed on a track beam along the bridge is disclosed.
[0069] Cross-bridge track system:
[0070] The transverse track system is only configured in the cantilever section of the supporting truss system, including several transverse track beams, Figure 1 There are four transverse track beams in total.
[0071] like Figure 2As shown, each transverse track beam includes a transverse track beam section and a transverse track cantilever section symmetrically arranged on both sides of the transverse track beam section. The two transverse track cantilever sections correspond to the transverse track left cantilever section and the transverse track right cantilever section. In order to ensure the safety of the track structure, the track flange of the transverse track beam section is connected to the transverse connecting beam above it by a beveled penetration weld. The inner end (adjacent to the bridge deck side) of the transverse track cantilever section is connected to the cantilever lower chord of the supporting truss system through a stiffening steel plate, and the outer end (adjacent to the cantilever side end) is supported at the cantilever upper chord of the supporting truss system through a cantilever cantilever beam. The cantilever cantilever beam is double-jointed
[20] . Considering the operability of the cantilever bridge erection machine installation and removal, no constraints are set between the transverse track beam section and the transverse track cantilever section.
[0072] According to the arrangement of the track beam in the transverse bridge direction, the load it bears is relatively small, so its specification is calculated according to the minimum specification matching the driving, which is I36. At the same time, in order to ensure the safety of track driving, a parking structure is set at the end of the transverse track cantilever section.
[0073] Along the bridge track beam:
[0074] The track beam along the bridge is divided into two parts, namely the anchoring section track beam (fixed track) and the cantilever section track beam (movable track). The anchoring section track beam and the cantilever section track beam are connected / separated by a temporary connection structure. The joint between the anchoring section track beam and the cantilever section track beam is located 206mm outside the lower vertical rod of the front support of the supporting truss system (500mm from the center of the front support), of which: the anchoring section track beam is 19m long and the cantilever section track beam is 15m long. Figure 1 As shown, the anchor section track beam is arranged near the center of the cross beam supporting the truss system.
[0075] The specifications of the track beam along the bridge must meet the following three requirements:
[0076] 1) Meet the vertical bearing capacity requirements. The maximum single span of the track beam along the bridge is 6.21m, the allowable stress [σ] is considered to be 140MPa, and the bending modulus W in the plane of the track beam along the bridge should not be less than 1464 cm 3 ;
[0077] 2) It should have greater lateral stiffness. On the one hand, it should meet the bearing capacity and stiffness requirements of the cantilever track beam when it moves lateraly. On the other hand, it should have a wider total flange width so that the supporting nodes and track supporting components have sufficient lateral bearing capacity and lateral stiffness.
[0078] 3) The flange must meet the needs of track wheel axle travel and have sufficient local bearing capacity.
[0079] The track beam along the bridge is made of HM390 steel and is equipped with a stiffening rib system based on functional requirements.
[0080] 1) Corresponding vertical stiffening ribs are configured in the supporting area of the track beam along the bridge, and according to the structural requirements of the "Steel Structure Design Standard" (GB50017-2019), the spacing between vertical stiffening ribs is not more than 1200mm. Such stiffening ribs are set according to the full height of the track beam and are 100mm wide (45mm is left on the outside as a channel for the electric hoist supporting the track vehicle);
[0081] 2) A vertical stiffening rib is set near the joints of the fixed track and the movable track. The width of the stiffening rib is consistent with that of other vertical ribs and the height is only 220mm, providing operating space for temporary splicing at the track joints;
[0082] 3) Longitudinal stiffeners are arranged between the outer edges of the vertical stiffeners to improve the local bearing capacity of the lower flange of the HM390 steel. Except for the full-height arrangement of the track support point area of the movable section, the height of the longitudinal stiffeners in the remaining sections is 200mm.
[0083] The vertical support area stiffeners are arranged as follows: Figure 7 As shown in the figure, the stiffening ribs near the joints of the fixed track beam and the movable track beam are as follows: Figure 8 As shown, the cross-sectional structure of a common track beam is shown in FIG5 .
[0084] In addition, to avoid the risk of the electric hoist slipping during operation, the following three structural measures need to be set along the bridge track beam:
[0085] 1) Fixed, permanent horizontal parking stiffeners are set at both ends of the track beam along the bridge (in the joint area of the non-fixed section and the movable section). The stiffener specification is -145×12, 358mm long, and double-sided fillet welds are used. The weld leg size is h f Not less than 8mm; see the attached Figure 2 .
[0086] 2) At the joint between the movable track beam and the fixed track beam along the bridge, two anti-slip bolts (M24×90) are installed on both sides of the joint as a temporary anti-collision structure to prevent the electric hoist from slipping. When the movable track beam and the fixed track beam are in a separated state, install the anti-slip bolts; when the movable track beam and the fixed track beam are in a connected state, remove the anti-slip bolts; see the attached for the specific structure. Figure 8 .
[0087] 3) Four Ф26 bolt holes are opened on the upper flanges of the fixed section rail beam and the movable section rail beam near the joints, and M24×60 bolts and [10 channel steel are configured as "temporary assembly positioning code plates". When the movable section rail beam and the fixed section rail beam are in a separated state, the [10 channel steel (fixed beam) is removed, and the movable section rail beam and the fixed section rail beam are independent of each other; when the movable section rail beam and the fixed section rail beam are aligned, the two fixed beams are connected and fixed with M24×60 bolts to avoid lateral misalignment between the movable section rail beam and the fixed section rail beam, ensuring the smooth passage of the electric hoist. For specific construction, please refer to the attached Figure 8-9 .
[0088] It can be seen that the temporary connection structure described in the utility model includes a temporary assembly positioning code plate and a plurality of splicing bolts. One side of the temporary assembly positioning code plate has bolt holes A2 that match the bolt holes A1 at the joint position of the anchoring section track beam, and the other side has bolt holes B2 that match the bolt holes B1 at the joint position of the cantilever section track beam. When splicing, align the joint end of the cantilever section track beam with the joint end of the anchoring section track beam, and then align the bolt holes A2 and B2 on the temporary assembly positioning code plate with the bolt holes A1 on the anchoring section track beam and the bolt holes B1 on the cantilever section track beam respectively, and finally tighten them with splicing bolts to complete the splicing of the two, so that the cantilever section track beam can be spliced with the anchoring section track beam into a complete bridge-oriented track beam, which is convenient for the lifting equipment to run from the cantilever section track beam to the anchoring section track beam or from the anchoring section track beam to the cantilever section track beam. When the lifting equipment moves from the anchoring section track beam to the cantilever section track beam and needs to move the cantilever section track beam laterally, the temporary connection structure can be dismantled to separate the cantilever section track beam from the anchoring section track beam.
[0089] Active track beam:
[0090] The movable section track beam is installed with a transverse bridge to the track carriage through a conversion frame, and the transverse bridge to the track carriage is movably installed on the transverse track beam.
[0091] Considering the structural dimensions of the 10T rail vehicle, the support point spacing between the movable rail beam and the conversion frame configured for the 10T rail vehicle is 700mm, the minimum wheel-rail spacing is not less than 120mm and not more than 125mm, and the support pin diameter of the connecting steel plate of the 10T rail vehicle is 70mm. For specific structure, please refer to the attached Figure 6 .
[0092] The design of the conversion rack needs to consider the following 4 points:
[0093] 1) Have sufficient bending bearing capacity and bending stiffness (equivalent to simply supported beam);
[0094] 2) The supporting points have sufficient local pressure bearing capacity (reinforced steel plates can be added if necessary);
[0095] 3) It has large lateral stiffness and lateral bearing capacity (i.e. it bears the horizontal force along the bridge transmitted to the supporting point during the travel of the electric hoist);
[0096] 4) The connection node between the conversion frame and the track beam must be reliable to bear the necessary "horizontal force across the bridge" and "horizontal force along the bridge".
[0097] The conversion frame is designed according to the above requirements. The main distribution beam of the conversion frame is 1200mm long and adopts a double-jointed [25a channel steel structure. The limbs are arranged oppositely with a spacing of 80mm. The center of the pin is 80mm away from the upper flange of the channel steel (clearance 55mm), and a 20mm thick and 180mm side length steel plate is covered in the pin hole area. Both sides of the lower flange of each channel steel are connected to the track beam along the bridge through fillet welds, and the weld leg size is not less than 12mm; 3 stiffening ribs are set in the middle of each channel steel, with a spacing of 90mm, and are aligned with the web and longitudinal stiffening ribs of the track beam along the bridge. The side of the stiffening rib is welded to the inner edge of the channel steel, and the bottom is welded to the track beam along the bridge. In addition, a gusset plate is set on the upper and lower edges of both ends of the distribution beam to improve its integrity.
[0098] Fixed track beam:
[0099] HN400 steel is set between the fixed section track beam and the cross beam of the anchor section of the supporting truss system as the connecting vertical rod of the anchor section cross beam. Its lower end is connected to the track beam along the bridge as a whole through a weld. An end anchor plate (t=20mm) is set at the upper end. The end anchor plate is connected to the cross beam of the anchor section of the supporting truss system through 4 M24 bolts. Considering the installation accuracy, the bolt holes of the cross beam should be opened as "waist-round holes".
[0100] The long axis of the anchoring section cross beam connecting the vertical rod is arranged along the bridge direction, and the first stiffening plate is set at the intersection with the fixed section track beam to adapt to the horizontal action during the operation of the electric hoist. The short axis is arranged along the transverse bridge direction, on the one hand, corresponding to the vertical stiffening of the track beam along the bridge direction, and on the other hand, the anchoring section cross beam connecting the vertical rod mainly bears the axial pulling action and does not need to share the transverse bridge action.
[0101] The total height of the anchor section cross beam connecting the vertical rod is determined according to the support system of the movable section, including the following:
[0102] 1) Height of track beam in transverse direction of bridge: total height of I36 steel is 360mm;
[0103] 2) The height from the lower edge of the transverse bridge track beam to the top edge of the transfer frame depends on the transverse bridge track running, which is 160mm;
[0104] 3) The height of the conversion frame is double-jointed [25 channel steel height (250mm) according to 4.5.5.
[0105] Therefore, the total height of the fixed section track connection is 770mm. After deducting the 20mm end cover plate thickness, the total height of the anchor section crossbeam connecting the vertical rod is 750mm.
[0106] Cross-bridge mobile system
[0107] The movable section moves along the bridge track in the transverse direction by "manual braking" to avoid the problem of transverse positioning accuracy caused by excessive motor drive (20m / min). The transverse movement system design includes the following 6 points:
[0108] 1) Since the track along the bridge is a linear component, two braking points are set in one direction. The braking points are located near the two middle transverse track beams (two electric hoists are used to lift the components, ensuring that one of the fulcrums is equipped with a brake, or the braking point bears more than 80% of the lifting reaction force of a single segment) and avoid the cantilever vertical rod and the middle diagonal web rod, especially the node area, as shown in Figure 10-11;
[0109] 2) The braking point of the track beam along the bridge is located between the top of the upper flange and the stiffening rib of the distribution beam of the conversion frame. The center of the stiffening rib is 150mm away from the distribution beam and 97mm away from the outer edge of the stiffening rib (the maximum braking stiffening rib size that can be set). A single braking point is composed of 4 20mm thick steel plates. A Ф30 hole is opened on each of the two side steel plates. The center of the hole is 65mm away from the lower edge and 50mm away from the outer edge.
[0110] 3) The cumulative traction force in the transverse direction of the bridge shall not be less than 10% of the full load weight of the rail beam along the bridge. Taking into account the unevenness of the traction force, the traction force of a single device shall not be less than 6% of the full load weight of the rail beam along the bridge, and shall not be greater than 7.5% of the total weight of the traction components. ① The traction force of a single machine should not be too high to reduce the adverse effects of manual control errors on the supporting beam; ② The rated traction force of the hand chain hoist is selected based on the cumulative weight of the three (the maximum weight of a single segment of the main span, the weight of the movable segment rail beam, and the weight of the electric hoist and the rail vehicle). The utility model selects 20kN;
[0111] 4) The theoretical maximum single movement length of the track beam along the bridge is 11.7m (i.e. the distance between the two cantilever sections of the track beams stationed in the bridge), and the required single traction extension of the traction equipment is not less than 12m. Because the net distance of the straight web of the supporting truss is only 7.0m, which is less than 60% of the "total traction demand", a "manual winch" is used as the braking device, with a 2.0T equipment size.
[0112] 5) The brake equipment is fixed to the supporting truss crossbeam through an I36 cushion beam to ensure that the equipment base is higher than the bottom surface of the middle chord operating platform. The edge of the rolled I-beam is 20mm away from the edge of the crossbeam to ensure effective fixed connection. Considering that the shaft length of the "manual winch" is 350mm, and considering the synchronous operation of two machines, the transverse distance between the bridge is 800mm, so the length of a single cushion beam is 1.2m. The cushion beam is located between the vertical stiffening ribs of the supporting truss crossbeam.
[0113] 6) A Ф22 steel wire rope is used as the traction line to connect the "manual winch" and the "lateral anchor point of the track beam along the bridge direction". A two-way traction route is set in the transverse direction of the bridge, that is, a single set of manual winch is only responsible for one-way braking and traction. To facilitate on-site operations, two sets of braking equipment are arranged closely in the transverse direction of the bridge, and a single set of braking routes is arranged in an inverted U shape, and four pulley blocks are set to adjust the traction line.
[0114] In order to avoid the diagonal rods, main truss vertical rods, etc., and the single-section offset angle of the traction line is calculated as "no more than 3°", the layout principles of each fixed pulley are as follows:
[0115] a) The fixed pulley of the middle chord and the fixed pulley on the transverse track are located in the same vertical plane, the pulley center is 120mm away from the center of the transverse track, 115mm away from the edge of the cantilever vertical rod, and 37mm away from the edge of the inclined rod of the transverse track beam, ensuring that the traction line avoids the supporting truss structure;
[0116] b) The fixed pulley under the transverse track and the center of the brake stiffening steel plate of the track beam along the bridge are located in the same vertical plane, and the center of the pulley is 150mm away from the center of the transverse track;
[0117] c) The distance between the upper and lower fixed pulleys of the transverse track along the bridge direction is 30mm, so the fixed pulley in the transverse track is positioned between them along the bridge direction, and the center of the pulley is 135mm away from the center of the transverse track;
[0118] d) To provide a fixed position for the fixed pulley, a 30cm long steel connector of the same specification is added to the side of the end of the transverse bridge track beam. The connector and the transverse bridge track are connected by upper and lower flange welds. The upper and lower fixed pulleys of the transverse track are respectively set at both ends of the steel connector, and their edges are 20mm away from the edge of the steel connector; the fixed pulley in the transverse track is set in the middle of the web of the steel connector and fixed by 2 [12.6 channel steels, among which the fixed pulley base is 50mm away from the end of the steel connector to ensure that the traction line avoids the connector.
[0119] The fixed pulley arrangement structure is as follows Fig.11As shown. Among them, the length of the single-section traction line between the pulleys at the end of the rail beam in the transverse direction is 304mm, the lateral deviation is 15mm, and the deviation angle is 2.824°, which meets the requirements. The transverse deviation between the center of the brake equipment and the fixed pulley of the middle chord is 58mm, the length of the traction line on one side is 2719mm, the length of the traction line on the other side is 3711mm, and the maximum deviation angle is 1.222°, which meets the requirements.
[0120] 7) Affected by the traction, the transverse track beam changes from a "pure bending member" to a "compression bending member". Considering its small lateral stiffness, an inclined brace is added at its end. The inclined brace is made of I14 rolled I-beam, and a 20mm steel plate is added to the side of the transverse track beam for leveling to adapt to the height difference of the mother plates on both sides.
[0121] Based on the above multi-directional transportation system, the continuous transportation of the components of the main bridge steel structure segment can be achieved, which specifically includes the following steps:
[0122] Step 1: At the starting point, hoist the target component by means of a lifting device. The target component is any component of the steel structure segment of the main bridge;
[0123] Step 2: Start the lifting equipment, so that the lifting equipment carries the target component and moves along the anchoring section track beam, until the lifting equipment carries the target component and moves out of the anchoring section track beam, moves into the cantilever section track beam, and moves to a preset position along the cantilever section track beam;
[0124] Step 3: Release the temporary connection structure at the joint position of the anchor section track beam and the cantilever section track beam, so that the anchor section track beam and the cantilever section track beam are independent of each other;
[0125] In this step, after the separation of the anchor section track beam and the cantilever section track beam is completed, anti-slip bolts need to be installed near the joints of the cantilever section track beam and the cantilever section track beam to prevent the lifting equipment from slipping on the cantilever section track beam.
[0126] Step 4: Start the transverse bridge movement system to move the cantilever section track beam along the transverse bridge track beam until the target component carried by the lifting equipment suspended at the lower end of the cantilever section track beam moves laterally to the target position;
[0127] Step 5: Start the lifting equipment until the hoisted target component is lowered to the target position, and then retract the hook of the lifting equipment;
[0128] Step 6: Reversely start the transverse bridge movement system, so that the cantilever section track beam moves in the opposite direction along the transverse bridge track beam to reset, until the joint end of the cantilever section track beam is aligned with the joint end of the anchor section track beam;
[0129] Step 7: At the joint position between the anchor section rail beam and the cantilever section rail beam, a temporary connection structure is used to splice the anchor section rail beam and the cantilever section rail beam into a complete full-length bridge-oriented rail beam;
[0130] Before splicing the anchor section track beam and the cantilever section track beam, the anti-slip bolts installed in step three need to be removed first.
[0131] Step 8: Start the lifting equipment in reverse, so that the lifting equipment moves along the bridge toward the track beam, until the lifting equipment returns to the position of the target component on the anchoring section track beam to prepare for the lifting of the next target component.
Claims
1. A multi-directional transport system of a cantilever bridge erecting machine, arranged on the middle truss of a supporting truss system, characterized in that: The multi-directional transport system includes lifting equipment, track beams along the bridge, track systems across the bridge and mobile systems across the bridge; among them: The lifting equipment is movably mounted on the track beam along the bridge direction; The track beam along the bridge includes an anchoring section track beam, a cantilever section track beam, and a temporary connection structure capable of splicing / separating the anchoring section track beam and the cantilever section track beam; The anchoring section track beam is arranged in the anchoring area of the supporting truss system and is fixedly connected to the cross beam of the anchoring area of the supporting truss system; the cantilever section track beam is arranged in the cantilever area of the supporting truss system and is movably installed on the transverse connecting beam of the cantilever area of the supporting truss system through the transverse bridge track system and is connected to the power output end of the transverse bridge movable system; The cantilever section track beam, when separated from the anchor section track beam, can be moved along the cross bridge to the track system through the power actuation of the cross bridge to the moving system.
2. The multi-directional transport system of the cantilever bridge erecting machine according to claim 1 is characterized in that: The transverse bridge track system includes a plurality of transverse track beams, each of which includes a transverse track beam section and transverse track cantilever sections symmetrically arranged on both sides of the transverse track beam section; The rail flange of the transverse track crossbeam section is connected to the transverse connecting beam above it by a beveled penetration weld; the inner end of the transverse track cantilever section is connected to the cantilever lower chord of the supporting truss system through a stiffening steel plate, and the outer end is supported on the cantilever upper chord of the supporting truss system through a cantilever overhanging inclined beam; no constraints are set between the transverse track crossbeam section and the transverse track cantilever section; a parking structure A is set at the end of the transverse track cantilever section.
3. The multi-directional transport system of the cantilever bridge erecting machine according to claim 2 is characterized in that: The joints of the anchoring section track beam and the cantilever section track beam are located outside the lower vertical rod of the front support point of the supporting truss system, and the anchoring section track beam is arranged near the center of the crossbeam of the supporting truss system.
4. The multi-directional transport system of the cantilever bridge erecting machine according to claim 2 is characterized in that: Corresponding vertical stiffening ribs A are configured in the supporting area of the track beam along the bridge, and the vertical stiffening ribs A are set according to the full height of the track beam along the bridge; a vertical stiffening rib B is set near the joint between the fixed section track beam and the movable section track beam, and the height of the vertical stiffening rib B is lower than the height of the track beam along the bridge; a full-length longitudinal stiffening rib is set between the outer edges of the vertical stiffening ribs A and B.
5. The multi-directional transport system of the cantilever bridge erecting machine according to claim 2 is characterized in that: Horizontal parking stiffening ribs are arranged at both ends of the track beam along the bridge; removable temporary anti-collision structures are respectively arranged at the joints of the movable section track beam and the fixed section track beam; when the movable section track beam and the fixed section track beam are in a separated state, the temporary anti-collision structure is installed, and when the movable section track beam and the fixed section track beam are connected by the temporary connection structure and are in a spliced state, the temporary anti-collision structure is removed.
6. The multi-directional transport system of the cantilever bridge erecting machine according to claim 2 is characterized in that: The temporary connection structure includes a temporary assembly positioning code plate and a plurality of splicing bolts. One side of the temporary assembly positioning code plate has bolt holes A2 matching the bolt holes A1 at the joint position of the anchor section track beam, and the other side has bolt holes B2 matching the bolt holes B1 at the joint position of the cantilever section track beam.
7. The multi-directional transport system of the cantilever bridge erecting machine according to claim 2 is characterized in that: The transverse bridge movement system includes a transverse bridge rail carriage and two sets of closely arranged braking equipment, wherein: the transverse bridge rail carriage is movably installed on the transverse bridge rail beam, and the fixed part of the transverse bridge rail carriage is suspended on the cantilever section of the rail beam; each set of braking equipment includes a braking hand winch and a braking traction line, the braking hand winch is installed on the supporting truss system, one end of the braking traction line is connected to the power output end of the braking hand winch, and the other end is connected to the braking point set on the transverse bridge rail carriage, and the braking traction line is guided by the braking guide pulley group arranged on the supporting truss system and then arranged in an inverted U shape.
8. The multi-directional transport system of the cantilever bridge erecting machine according to claim 7 is characterized in that: The brake guide pulley group has four in total, including a fixed pulley on the middle chord rod, a fixed pulley on the transverse track, a fixed pulley on the lower transverse track, and a fixed pulley in the middle transverse track, wherein: The fixed pulley of the middle chord and the fixed pulley on the transverse track are located in the same vertical plane; the fixed pulley below the transverse track and the center of the brake stiffening steel plate of the bridge-direction track beam are located in the same vertical plane, the brake stiffening steel plate of the bridge-direction track beam is arranged on the cantilever track beam, and penetrates the brake stiffening steel plate of the bridge-direction track beam and the cantilever track beam to set the braking point; the fixed pulley in the transverse track is positioned in the middle of the upper and lower fixed pulleys in the transverse track in the bridge direction, and a steel connector is arranged on the side of the end of the transverse bridge-direction track beam, and the steel connector and the transverse bridge-direction track beam are connected by upper and lower flange welds.
9. The multi-directional transport system of the cantilever bridge erecting machine according to claim 1, characterized in that: The fixed part of the transverse bridge track vehicle is installed with a cantilever section track beam through a bogie suspension; the bogie includes a main distribution beam; the main distribution beam adopts a double-jointed [25a channel steel structure, with the limbs and backs arranged oppositely; 3 stiffening ribs are arranged in the middle of each channel steel, which are respectively aligned with the web plate and longitudinal stiffening ribs of the longitudinal bridge track beam; the side of the stiffening rib is welded to the inner edge of the channel steel, and the bottom is welded to the longitudinal bridge track beam; a gusset plate is arranged on the upper and lower edges of both ends of the main distribution beam.