Water conservancy project drainage model experiment device
By introducing adjustable baffles and transmission mechanisms into the water conservancy engineering drainage model experimental device, the problem that the existing device cannot be applied to foundation pits of various volumes has been solved, enabling flexible matching of foundation pit volumes and improving the efficiency of drainage tests.
Patent Information
- Application Number
- CN202322815974.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-18
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing water conservancy engineering drainage model experimental device cannot be applied to foundation pits of various volumes, and cannot conduct drainage tests of various foundation pits.
A water conservancy engineering drainage model experimental device is designed. By setting adjustable baffles and transmission mechanisms in the model foundation pit, the volume of the model foundation pit is allowed to be adjusted. The electric push rod is used to drive the arc-shaped connecting rod and triangular plate structure to realize the foundation pit. Flexible matching of volumes.
The flexible adjustment of the model foundation pit volume is realized, which is suitable for foundation pit drainage tests of different sizes, improves the construction progress of water conservancy projects, and reduces the time and energy of making experimental models with different volumes.
Smart Images

Figure CN221822822U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy engineering experiments, in particular to a water conservancy engineering drainage model experimental device. Background Art
[0002] Projects built to eliminate water disasters and develop and utilize water resources are divided into flood control projects, farmland water conservancy projects, hydroelectric power generation projects, waterways, port projects, water supply, drainage projects, environmental water conservancy projects, and seashore reclamation projects according to their service objects. Water conservancy projects that can serve multiple goals such as flood control, water supply, irrigation, and power generation are called comprehensive utilization water conservancy projects.
[0003] During the construction of water conservancy projects, it is often necessary to drain the water in the foundation pit to prevent the water from affecting the construction. Before construction, it is necessary to use experiments to simulate the drainage conditions so that the drainage conditions of the foundation pit can be displayed intuitively. With existing experimental devices, the volume of most model foundation pits is fixed, and drainage tests can only be performed on foundation pits of a certain size, which cannot be applied to foundation pits of various volumes. Utility Model Content
[0004] 1. Technical issues to be solved
[0005] In view of the shortcomings of the prior art, the utility model provides a water conservancy project drainage model experimental device, which has the advantages of adjustable foundation pit capacity, etc., and solves the problem that the existing drainage test device can only perform drainage tests on foundation pits of a certain size and cannot be applied to drainage tests on foundation pits of various volumes.
[0006] (II) Technical solution
[0007] In order to achieve the purpose of the above-mentioned adjustable foundation pit capacity, the utility model provides the following technical solutions: a water conservancy project drainage model experimental device, comprising a water conservancy project model body, the upper surface of the water conservancy project model body is provided with a model foundation pit, characterized in that: both sides of the water conservancy project model body are fixedly connected with fixed blocks, the upper surfaces of the fixed blocks are fixedly connected with first fixed columns, and the outer surfaces of the first fixed columns are rotatably connected with rotating seats;
[0008] The upper surfaces of the two fixed blocks are fixedly connected with second fixed columns, and the outer surfaces of the second fixed columns are rotatably sleeved with triangular plates. A baffle for adjusting the water storage capacity of the foundation pit is slidably connected in the model foundation pit, and the baffle is an isosceles trapezoid;
[0009] Among them, a sealing strip is arranged between the inner wall of the model foundation pit and the baffle plate, the rear surface of the baffle plate is fixedly connected with a fixing seat, and the inside of the fixing seat is fixedly connected with the first rotating shaft.
[0010] Preferably, the outer surface of the first rotating shaft is rotatably connected to a first arc-shaped connecting rod for transmission, one end of the first arc-shaped connecting rod away from the fixed seat is fixedly connected to a second rotating shaft, and the second rotating shaft is rotatably connected to the obtuse angle position of the triangular plate.
[0011] Preferably, a third fixing column is fixedly connected to the upper surface of the triangular plate, the lower end of the third fixing column passes through the lower surface of the triangular plate, and the middle end of the first arc-shaped connecting rod is rotatably connected to the second arc-shaped connecting rod.
[0012] Preferably, an arc-shaped sliding groove for limiting is provided on the outer surface of the second arc-shaped connecting rod, the inner wall of the sliding groove is slidably connected to the lower end of the third fixed column, and a transparent plate is fixedly connected to the front surface of the hydraulic engineering model body.
[0013] Preferably, a drainage valve is provided on the lower surface of the water conservancy project model body, and the drainage valve extends into the bottom wall of the model foundation pit. A top block seat is rotatably sleeved on the outer surface of the third fixed column, and an electric push rod is fixedly connected between the corresponding top block seat and the rotating seat.
[0014] (III) Beneficial effects
[0015] Compared with the prior art, the utility model provides a water conservancy project drainage model experimental device, which has the following beneficial effects:
[0016] 1. In the drainage model experimental device for water conservancy projects, the two first arc-shaped connecting rods can drive the fixed seat and the baffle to move backward together through the first rotating shaft thereon, so as to achieve the purpose of controlling the volume lift in the model foundation pit. Through the operation of the above structure, the volume in the model foundation pit can be adjusted to a certain extent, so that the volume in the model foundation pit can match the volume of the actual foundation pit, avoiding the time and effort caused by the need to make experimental models of different volumes when conducting various foundation pit drainage tests, and also making it possible to play a role in subsequent drainage tests on foundation pits of different sizes.
[0017] 2. The drainage model experimental device for the water conservancy project adjusts the volume of the model foundation pit to be consistent with the size ratio of the actual building foundation pit, and then injects water into the model foundation pit. When the water is injected to a certain level, the experimenter can open the drainage valve and start the drainage test. The experimenter can use a stopwatch or other timer to record the time it takes for the water to be drained, and then the actual time and speed of the engineering foundation pit drainage can be obtained by converting the ratio, which greatly improves the construction progress of the water conservancy project and enables the foundation pit drainage of the water conservancy project to proceed smoothly. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0019] Figure 2This is a schematic diagram of the transmission mechanism structure of the utility model;
[0020] Figure 3 For this utility model Figure 1 Schematic diagram of the structure at point A in the middle.
[0021] In the figure: 1. main body of the water conservancy project model; 2. model foundation pit; 3. fixed block; 4. first fixed column; 5. rotating seat; 6. second fixed column; 7. triangular plate; 8. baffle; 9. sealing strip; 10. fixed seat; 11. first rotating shaft; 12. first arc-shaped connecting rod; 13. second rotating shaft; 14. third fixed column; 15. top block seat; 16. electric push rod; 17. transparent plate; 18. drainage valve; 19. second arc-shaped connecting rod; 20. slide groove. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0023] See also Figure 1-3The utility model provides a new technical solution: a water conservancy project drainage model experimental device, including a water conservancy project model body 1, a model foundation pit 2 is opened on the upper surface of the water conservancy project model body 1, both sides of the water conservancy project model body 1 are fixedly connected with fixed blocks 3, the upper surface of the fixed block 3 is fixedly connected with a first fixed column 4, the outer surface of the first fixed column 4 is rotatably connected with a rotating seat 5, the upper surfaces of the two fixed blocks 3 are fixedly connected with a second fixed column 6, the outer surface of the second fixed column 6 is rotatably sleeved with a triangular plate 7, a baffle 8 for adjusting the water storage capacity of the foundation pit is slidably connected in the model foundation pit 2, the baffle 8 is an isosceles trapezoid, a sealing strip 9 is arranged between the inner wall of the model foundation pit 2 and the baffle 8, and the rear surface of the baffle 8 is fixedly connected with a fixed The first rotating shaft 11 is fixedly connected to the fixed seat 10, and the outer surface of the first rotating shaft 11 is rotatably connected to a first arc-shaped connecting rod 12 for transmission. The end of the first arc-shaped connecting rod 12 away from the fixed seat 10 is fixedly connected to a second rotating shaft 13, and the second rotating shaft 13 is rotatably connected to the obtuse angle position of the triangular plate 7. The upper surface of the triangular plate 7 is fixedly connected to a third fixed column 14, and the lower end of the third fixed column 14 passes through the lower surface of the triangular plate 7. The middle end of the first arc-shaped connecting rod 12 is rotatably connected to the second arc-shaped connecting rod 19, and the outer surface of the second arc-shaped connecting rod 19 is provided with an arc-shaped slide groove 20 for limiting, and the inner wall of the slide groove 20 is slidably connected to the lower end of the third fixed column 14. The front surface of the hydraulic engineering model body 1 is fixedly connected to a transparent plate 17. A drainage valve 18 is provided on the lower surface of the model body 1, and the drainage valve 18 extends into the bottom wall of the model foundation pit 2. A top block seat 15 is rotatably sleeved on the outer surface of the third fixed column 14, and an electric push rod 16 is fixedly connected between the corresponding top block seat 15 and the rotating seat 5. When in use, by starting the two electric push rods 16, the output ends of the two electric push rods 16 begin to stretch, and the two electric push rods 16 drive the third fixed column 14 and the triangular plate 7 thereon through the top block seat 15 on the output end thereof, and can rotate with the axis of the second fixed column 6 as the center of the circle. When the triangular plate 7 rotates with the axis of the second fixed column 6, the second rotating shaft 13 thereon applies a force to rotate forward to the first arc-shaped connecting rod 12, thereby A rotating shaft 11 can drive the fixed seat 10 and the baffle 8 to move forward together. The volume in the model pit 2 can be controlled to become smaller by moving the baffle 8 forward in the model pit 2. When the two electric push rods 16 are started in reverse, the output ends of the two electric push rods 16 shrink, thereby driving the third fixed column 14 to shrink and move through the top block seat 15 on its output end. At the same time, the third fixed column 14 will drive the triangular plate 7 thereon to rotate with the axis of the second fixed column 6 as the center of the circle, and then the third fixed column 14 located in the second arc-shaped connecting rod 19 will slide to the end, thereby driving the triangular plate 7 to rotate backward with the axis of the second fixed column 6. When the triangular plate 7 rotates backward, it slides in the slide groove 20 to the end of the second arc-shaped connecting rod 19 through the third fixed column 14 thereon.Then, the middle end of the first arc-shaped connecting rod 12 is driven to move backward through the slide groove 20, so that the two first arc-shaped connecting rods 12 can drive the fixing seat 10 and the baffle plate 8 to move backward together through the first rotating shaft 11 thereon, thereby achieving the purpose of controlling the volume increase in the model foundation pit 2. Through the operation of the above structure, the volume in the model foundation pit 2 can be adjusted to a certain extent, so that the volume in the model foundation pit 2 can match the volume of the actual foundation pit, avoiding the time-consuming process of making experimental models of different volumes when conducting various foundation pit drainage tests. It is laborious and also makes it possible to play a role in subsequent drainage tests on foundation pits of different sizes. After the volume of the model foundation pit 2 is adjusted to be consistent with the size ratio of the actual building foundation pit, water is poured into the model foundation pit 2. When the water is poured to a certain extent, the test personnel can open the drainage valve 18 and start the drainage test. The experimenter can use a stopwatch or other timer to record the time it takes for the water to be drained out, and then the actual time and speed of the engineering foundation pit drainage can be obtained by converting the ratio, which greatly improves the construction progress of the water conservancy project and enables the foundation pit drainage of the water conservancy project to proceed smoothly.
[0024] Working principle: When in use, by starting the two electric push rods 16, the output ends of the two electric push rods 16 begin to stretch, and the two electric push rods 16 drive the third fixed column 14 and the triangular plate 7 thereon through the top block seat 15 on the output end thereof, and can rotate with the axis of the second fixed column 6 as the center of the circle. When the triangular plate 7 rotates with the axis of the second fixed column 6, the second rotating shaft 13 thereon applies a force to rotate forward to the first arc-shaped connecting rod 12, so that the first rotating shaft 11 at the other end of the first arc-shaped connecting rod 12 can drive the fixed seat 10 and the baffle 8 to move forward together. The volume of the model foundation pit 2 can be controlled to become smaller by moving the baffle plate 8 forward in the model foundation pit 2. When the two electric push rods 16 are started in the reverse direction, the output ends of the two electric push rods 16 shrink, thereby driving the third fixed column 14 to shrink and move through the top block seat 15 on the output end. At the same time, the third fixed column 14 drives the triangular plate 7 thereon to rotate with the axis of the second fixed column 6 as the center of the circle, and then the third fixed column 14 located in the second arc-shaped connecting rod 19 slides to the end, thereby driving the triangular plate 7 to rotate backward with the axis of the second fixed column 6, and the triangular plate 7 moves to the When rotating backward, the third fixed column 14 thereon slides in the slide groove 20 to the end of the second arc-shaped connecting rod 19, and then drives the middle end of the first arc-shaped connecting rod 12 to move backward through the slide groove 20, so that the two first arc-shaped connecting rods 12 can drive the fixed seat 10 and the baffle 8 to move backward together through the first rotating shaft 11 thereon, thereby achieving the purpose of controlling the volume lifting in the model foundation pit 2. Through the operation of the above structure, the volume in the model foundation pit 2 can be adjusted to a certain extent, so that the volume in the model foundation pit 2 can match the volume of the actual foundation pit. It avoids the time and effort caused by the need to make experimental models of different volumes when conducting various foundation pit drainage tests, and also makes it possible to play a role in subsequent drainage tests on foundation pits of different sizes. After the volume of the model foundation pit 2 is adjusted to be consistent with the size ratio of the actual building foundation pit, water is poured into the model foundation pit 2. When the water is poured to a certain level, the experimenter can open the drainage valve 18 to start the drainage test. The experimenter can use a stopwatch or other timer to record the time it takes for the water to be drained, and then the actual time and speed of the engineering foundation pit drainage can be obtained by converting the ratio.
[0025] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A hydraulic engineering drainage model experimental device, comprising a hydraulic engineering model body (1), wherein a model foundation pit (2) is provided on the upper surface of the hydraulic engineering model body (1), and characterized in that: Both sides of the water conservancy project model body (1) are fixedly connected with fixed blocks (3), the upper surfaces of the fixed blocks (3) are fixedly connected with first fixed columns (4), and the outer surfaces of the first fixed columns (4) are rotatably connected with rotating seats (5); The upper surfaces of the two fixed blocks (3) are fixedly connected to second fixed columns (6), the outer surfaces of the second fixed columns (6) are rotatably sleeved with triangular plates (7), and a baffle (8) for adjusting the water storage capacity of the foundation pit is slidably connected in the model foundation pit (2), and the baffle (8) is an isosceles trapezoid; A sealing strip (9) is provided between the inner wall of the model foundation pit (2) and the baffle (8), a fixing seat (10) is fixedly connected to the rear surface of the baffle (8), and the inside of the fixing seat (10) is fixedly connected to the first rotating shaft (11).
2. A water conservancy project drainage model experimental device according to claim 1, characterized in that: The outer surface of the first rotating shaft (11) is rotatably connected to a first arc-shaped connecting rod (12) for transmission, and one end of the first arc-shaped connecting rod (12) away from the fixed seat (10) is fixedly connected to a second rotating shaft (13), and the second rotating shaft (13) is rotatably connected to the obtuse angle position of the triangular plate (7).
3. A water conservancy project drainage model experimental device according to claim 2, characterized in that: The upper surface of the triangular plate (7) is fixedly connected to a third fixing column (14), the lower end of the third fixing column (14) passes through the lower surface of the triangular plate (7), and the middle end of the first arc-shaped connecting rod (12) is rotatably connected to a second arc-shaped connecting rod (19).
4. A water conservancy project drainage model experimental device according to claim 3, characterized in that: The outer surface of the second arc-shaped connecting rod (19) is provided with an arc-shaped sliding groove (20) for limiting, the inner wall of the sliding groove (20) is slidably connected to the lower end of the third fixed column (14), and the front surface of the hydraulic engineering model body (1) is fixedly connected with a transparent plate (17).
5. The water conservancy engineering drainage model experimental device according to claim 3, characterized in that: The lower surface of the water conservancy project model body (1) is provided with a drainage valve (18), and the drainage valve (18) extends into the bottom wall of the model foundation pit (2). The outer surface of the third fixed column (14) is rotatably sleeved with a top block seat (15), and an electric push rod (16) is fixedly connected between the corresponding top block seat (15) and the rotating seat (5).
