Collapsible loess deep humidifying structure

By arranging plum blossom-shaped humidification holes in the loess area and filling them with gravel backfill filter material, water is injected to achieve deep humidification of the loess, which solves the difficulty and long problem of deep humidification of collapsible loess, simplifies construction, and improves efficiency.

CN221822887UActive Publication Date: 2024-10-11兰州新区城建工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323332535.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-10-11
Estimated Expiration
2033-12-07

AI Technical Summary

Technical Problem

In loess areas, deep humidification of collapsible loess is difficult and takes a long time, affecting the stability and safety of buildings.

Method used

Design a structure that includes humidification holes, backfill filter material and humidification soil. The humidification holes are arranged in a plum blossom shape, with an inverted cone at the bottom. The inside is filled with 10mm-30mm gravel backfill filter material, and deep humidification is achieved through water injection. .

Benefits of technology

It achieves rapid humidification of deep layers of collapsible loess, simplifies the construction process, shortens time, and solves the problems of difficulty and long time in deep humidification in traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822887U_ABST
    Figure CN221822887U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of loess area building foundation construction, in particular to a collapsible loess deep humidifying structure which comprises humidifying holes, backfill filter materials, a humidifying soil body and a top ground, the humidifying soil body is arranged below the top ground, a plurality of humidifying holes distributed in the vertical direction are formed in the humidifying soil body, and the backfill filter materials are arranged in the humidifying holes. The upper ends of the humidifying holes extend to the top ground, and the inner sides of the humidifying holes are filled with backfill filter materials. The plurality of humidifying holes are arranged in a quincunx shape at intervals of 1m, and the aperture of each humidifying hole is 10cm; the humidifying holes are distributed in the deep collapsible loess, the backfill filter materials are filled in the humidifying holes, and water is injected into the humidifying holes filled with the backfill filter materials, so that the deep collapsible loess can be humidified, the structure is simple, and the humidifying effect can be achieved within a short time; the problems that according to an existing collapsible loess deep-layer humidifying structure, deep-layer humidifying is difficult, and long time is needed are solved, and the collapsible loess deep-layer humidifying structure is beneficial to humidifying the collapsible loess deep layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building foundation construction in loess areas, in particular to a deep-layer humidification structure for collapsible loess. Background Art

[0002] Loess has different degrees of collapsibility, which can affect the structure of buildings, causing them to tilt or collapse, and undermine the safety and stability of buildings. Common methods to eliminate the collapsibility of loess include strong tamping, replacement, water pre-soaking, compaction piles, etc. Since the Loess Plateau is located in an arid and semi-arid area with little annual precipitation, the natural moisture content of loess is low. When strong tamping, compaction piles, or using loess for foundation backfilling, in order to ensure compaction density, the loess must be humidified and adjusted to the optimal moisture content. However, traditional deep humidification is difficult and takes a long time. For this reason, we proposed a deep humidification structure for collapsible loess. Utility Model Content

[0003] The utility model provides a deep humidification structure for collapsible loess, which overcomes the deficiencies of the prior art and can effectively solve the problem that deep humidification in the prior collapsible loess deep humidification structure is difficult and takes a long time.

[0004] In order to solve the above problems, the utility model describes a deep humidification structure for collapsible loess, including humidification holes, backfill filter material, humidification soil body and top ground. There is a humidification soil body below the top ground. A plurality of humidification holes distributed vertically are provided in the humidification soil body, and the upper ends of the humidification holes extend to the top ground. The inner sides of the humidification holes are filled with backfill filter material. The plurality of humidification holes are arranged in a plum blossom shape at intervals of 1m, and the aperture of each humidification hole is 10cm. The selected backfill filter material is 10mm-30mm gravel.

[0005] The bottom of the humidification hole is in an inverted cone shape, and the hypotenuse of the cone forms an angle of 60 degrees with the horizontal ground.

[0006] The above also includes a cover plate, and each humidification hole is provided with a cover plate.

[0007] The utility model arranges humidification holes in the deep layer of collapsible loess, fills backfill filter material in the humidification holes, and injects water into the humidification holes filled with the backfill filter material, so as to complete the humidification of the deep layer of collapsible loess. The utility model has a simple structure, and the humidification effect can be achieved in a short time. The problem that the deep humidification of the existing deep layer humidification structure of collapsible loess is that the deep humidification is relatively difficult and takes a long time, and it is beneficial to humidify the deep layer of collapsible loess. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings.

[0009] Figure 1 This is a schematic diagram of the front cross-sectional structure of Example 1 of the utility model.

[0010] Figure 2 For attachment Figure 1 Top view of the .

[0011] In the figure: 1-humidification hole, 2-backfill filter material, 3-humidification soil, 4-top ground. DETAILED DESCRIPTION

[0012] The present invention is not limited by the following embodiments, and specific implementation methods can be determined according to the technical solution of the present invention and actual conditions.

[0013] In the present invention, for the convenience of description, the relative position relationship of each component is described according to the attached manual. Figure 1 The layout is described in detail, such as the positional relationship of front, back, top, bottom, left, right, etc., which is based on the attached manual. Figure 1 It is determined by the layout direction.

[0014] The present invention is further described below in conjunction with the embodiments and drawings:

[0015] Embodiment 1: A deep humidification structure for collapsible loess: comprising humidification holes 1, backfill filter material 2, humidification soil body 3 and top ground 4, wherein the humidification soil body 3 is provided below the top ground 4, wherein the humidification soil body 3 is provided with a plurality of humidification holes 1 distributed vertically, and the upper ends of the humidification holes 1 extend to the top ground 4, and the inner sides of the humidification holes 1 are filled with backfill filter material 2; the plurality of humidification holes 1 are arranged in a plum blossom shape at intervals of 1m, and the aperture of each humidification hole 1 is 10cm; the backfill filter material 2 is 10mm-30mm gravel.

[0016] The bottom of the humidifying hole 1 is in an inverted cone shape, and the hypotenuse of the cone forms an angle of 60 degrees with the horizontal ground.

[0017] The above also includes a cover plate, and each humidification hole 1 is provided with a cover plate, so as to cover the hole opening when the humidification hole 1 is not filled with the backfill filter material 2, so as to prevent debris from falling into the humidification hole 1 and affecting the subsequent construction.

[0018] The backfill filter material 2 is 10mm-30mm gravel, which is backfilled in layers, with 3-5 shovels of filling each time, and tamped at least 5 times. The backfilling process must not be interrupted; prevent miscellaneous soil from entering to form a water-proof layer.

[0019] After the above-mentioned humidification hole 1 is arranged, its humidification effect is tested by sampling by manually digging a test well. One point is taken in the middle of the sampling location area, two points are taken at the edge, and the moisture content of the soil layer at any depth and the bottom of the hole is randomly tested.

[0020] Embodiment 2: A construction process of a deep-layer humidification structure for collapsible loess, comprising the following steps:

[0021] Step 1: Construction site leveling measurement

[0022] (1) All weeds, construction waste and other debris within the construction area, i.e. on the top ground 4, shall be removed. The surface humus soil shall be removed to a depth of no less than 30 cm, and the clean soil shall be transported to the designated waste soil area for storage; the site shall be leveled according to the designed elevation to facilitate the construction of the pile driver and subsequent watering;

[0023] (2) Before construction, manually measure the original ground elevation and calculate the depth of humidification hole 1 based on the bottom elevation of humidification hole 1. The depth of humidification hole 1 is the impact depth of strong compaction or the length of compaction pile minus 1m;

[0024] Step 2: Humidification hole 1 layout and hole forming

[0025] (1) The diameter of humidification hole 1 is 10 cm. To facilitate hole drilling and reduce the impact of adjacent hole construction, the holes are arranged in a 1m*1m plum blossom shape;

[0026] (2) The distance between the pile centers is 1m. First, the control line of each row of piles is divided on the edge of the construction area. The position of each pile is determined by a 50m steel ruler, and bamboo sticks are inserted as marks. Each pile is numbered. After the positioning is completed, the position and number of the piles are checked to see if they are consistent with the construction pile position soil. After verification, drilling can begin.

[0027] (3) A 1.5-2.0t diesel pile driver is selected as the hole-making machine. According to the designed pile length, the depth control mark is painted on the pile frame or steel pipe before construction, or a steel pipe equal to the pile length is directly selected. The pile driver drives a steel pipe with the same diameter as the pile hole into the soil and pulls out the pipe to form a hole. A pile cap is installed on the top of the pile pipe, and a 60° conical active pointed pile is made at the bottom;

[0028] (4) After the hole is formed by pulling the pipe, a dedicated person shall check the quality of the pile hole and observe whether the hole diameter and depth meet the requirements. If shrinkage, siltation, etc. are found, the pile can be expanded to the design value with a Luoyang shovel. After passing the test, the next process can be carried out or the hole opening can be covered with a cover plate to prevent debris from falling in;

[0029] Step 3: Fill the humidification hole 1 with filter material 2

[0030] The backfill filter material 2 is made of gravel with a particle size of 10mm~30mm, and must not contain mud; the electric clamp-type rammer is used for tamping, and the rammer weight should not be less than 150Kg; the loader on the construction site is used to manually fill the backfill filter material 2, and the filling is tamped layer by layer according to the determined layered backfill thickness and the number of tampings. Each time, 3-5 shovels are filled, and at least 5 tampings are performed. The backfilling process must not be interrupted to prevent the entry of miscellaneous soil and the like to form a water-proof layer;

[0031] Step 4: Add water to increase humidity

[0032] (1) After all the humidification holes 1 in an area are drilled and backfilled with filter material 2, a loader is used to build a cofferdam around the construction area. The width of the bottom of the cofferdam is not less than 1m, and the width of the top of the cofferdam is not less than 0.5m. During the loader piling process, a bucket must be used for compaction, and the surrounding inner and outer slopes must have a certain slope;

[0033] (2) Calculate the total water injection volume of the cofferdam area. The water injection volume is calculated according to Formula 7.5.3 in the Technical Specification for Building Foundation Treatment JGJ79-2012: Q = υρd(ωop—ω)k. ​​The construction water is drawn by a water truck. Each water truck has a fixed water volume to facilitate the control of the total water consumption. When injecting water, keep the water level 20 to 30 cm above the orifice. Add water to the cofferdam every 2 to 4 hours.

[0034] (3) After the water injection of a cofferdam area is completed, it is left to stand for 4 to 6 days until the water injection is evenly distributed before proceeding to the next process;

[0035] Step 5: Humidification effect test

[0036] 4-6 days after the water injection is completed, take 1 point in the middle of the humidification area and 2 points at the edge, and use drilling rigs or manually excavated exploration wells to take samples. Randomly take soil layers at any depth and bottom of the hole to test the moisture content in order to detect the water infiltration situation.

[0037] The above-mentioned effect test is carried out by taking original soil samples from the exploration well to detect whether the parameters such as the moisture content of the treated foundation soil meet the design requirements; if the moisture content has not reached the optimal moisture content, wetting can be continued; if the optimal moisture content is reached, there is no need to continue wetting, and subsequent compaction pile or dynamic compaction construction can be carried out.

[0038] In summary, the utility model can complete the humidification of the deep layer of collapsible loess by arranging humidification holes 1 in the deep layer of collapsible loess, filling backfill filter material 2 in the humidification holes 1, and injecting water into the humidification holes 1 filled with the backfill filter material 2. The structure is simple, and the humidification effect can be achieved in a short time. The problem that deep humidification is difficult and time-consuming in the existing deep humidification structure of collapsible loess is solved, and it is beneficial to humidify the deep layer of collapsible loess.

Claims

1. A deep humidification structure for collapsible loess, characterized by: It includes humidification holes, backfill filter material, humidification soil and top ground. There is humidification soil under the top ground. A plurality of humidification holes distributed vertically are arranged in the humidification soil, and the upper ends of the humidification holes extend to the top ground. The inner sides of the humidification holes are filled with backfill filter material. The plurality of humidification holes are arranged in a plum blossom shape at a spacing of 1m, and the aperture of each humidification hole is 10cm. The selected backfill filter material is 10mm-30mm gravel. The bottom of the humidifying hole is in an inverted cone shape, and the hypotenuse of the cone forms an angle of 60 degrees with the horizontal ground.

2. The deep humidification structure for collapsible loess according to claim 1 is characterized in that: The utility model also comprises a cover plate, and each humidification hole is provided with a cover plate.