Sinking and floating type cofferdam device for canal slope repair
Through the design of the floating cofferdam device, the water-filled cavity structure is used to realize the rapid sinking and floating of the cofferdam, which solves the problem of low efficiency in the installation and removal of the cofferdam, and improves the repair efficiency and economic value of the canal slope lining board.
Patent Information
- Application Number
- CN202420146250.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-01-22
AI Technical Summary
Among the existing ditch slope lining board repair methods, the installation and removal of the cofferdam takes a long time, is inefficient and costly, making it difficult to achieve rapid location transfer and multiple repairs.
A sinking and floating cofferdam device is designed, which adopts an arched sealing cover and a water-filled chamber structure. By adjusting the amount of water in the water-filled chamber, the cofferdam sinks when filled with water or floats when drained, achieving rapid position transfer and multiple times of cofferdam repair.
It greatly saves the installation and dismantling process of the cofferdam, improves work efficiency, reduces construction costs, and enables rapid repair of multiple lining boards.
Smart Images

Figure CN221822939U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of special mechanical equipment for non-standard engineering, in particular to a sinking and floating cofferdam device for channel slope repair. Background Art
[0002] After years of operation, the channel for water diversion and transfer may partially damage the channel bottom plate and channel slope lining plate due to unfavorable factors such as uneven settlement and high groundwater, affecting the safe operation of the project and the water delivery guarantee capacity, and it is necessary to repair the damaged lining plate. For example, after a certain inter-basin water diversion project was built and operated for many years, the channel slope lining plate was partially damaged. Since the water diversion project has become the main water supply source for more than 40 large and medium-sized cities along the line, it does not have the conditions for water suspension maintenance, and the damaged channel lining plate can only be repaired without stopping the water supply.
[0003] There are currently two commonly used methods for repairing lining plates without stopping water: underwater repair by professional divers and dry land repair by cofferdams. Underwater repair requires divers to dive to the repair location and complete related construction work. The repair cost is high and the efficiency is low; the dry land repair method of cofferdams requires the use of cofferdams to block water and create a waterless repair operation environment. For the latter, in recent years, channel steel cofferdams with cross-section compensation functions, hydraulic self-stabilizing underwater construction cofferdams, semi-submersible cofferdams, assembled lock box cofferdams, floating box direct-lift gate steel cofferdams, etc. have been developed. They can more thoroughly complete the backfilling of the channel foundation, the bonding of damaged geotextiles, and the on-site pouring of lining plates, and completely restore the original function of the channel. However, no matter what kind of steel cofferdam structure, after completing one repair, it is necessary to dismantle the cofferdam at the maintenance station and move it to a new station for reinstallation. There are problems such as long construction period, low efficiency and high construction cost for the installation and removal of the cofferdam. Summary of the invention
[0004] In order to solve the above problems, the utility model provides a sinking and floating cofferdam device for channel slope repair, which can specifically adopt the following technical solutions:
[0005] The floating and sinking cofferdam device for channel slope repair described in the utility model comprises an arched sealing cover with one end sealed, a water-filled cavity is arranged at the arch seat inside the arched sealing cover, and a water-stopping structure in contact with the channel slope is arranged at the bottom of the arched sealing cover.
[0006] Traveling wheels are arranged on the outside of the arched sealing cover, and the traveling wheels are connected with the arched sealing cover through a lifting frame.
[0007] The arched sealing cover is a multi-section structure, comprising a plug section at the bottom and U-shaped sections sequentially connected thereto.
[0008] The arched outer side surface of the plug segment is a conical structure that gradually shrinks from top to bottom along the channel slope.
[0009] The arch height of the U-shaped segment is 1 / 3 to 1 / 2 of the channel water depth and is higher than 1.7 meters; the length of each U-shaped segment is 2 to 3 meters.
[0010] A water inlet valve, a water discharge valve and an emptying valve are arranged on the side wall of the water filling chamber, and a first pressure sensor and a vent pipe connected to the surface above the water are arranged in the water filling chamber.
[0011] The drain valve and the emptying valve are arranged inside the water-filled cavity, and the outlet ends thereof are located in a water intercepting ditch arranged outside the water-filled cavity. An inner water-stopping curtain is arranged at the bottom of the ditch wall of the water intercepting ditch.
[0012] The bottom of the water-filling chamber is a base steel plate, a water bag plate is arranged below the base steel plate, a rubber water-stopping pad is arranged between the water bag plate and the base steel plate, the rubber water-stopping pad, the water bag plate and the base steel plate are connected by fastening bolts, a second pressure sensor is arranged in the pressure regulating chamber formed by the rubber water-stopping pad, the water bag plate and the base steel plate, and a water-filling pressure regulating pipe connected to the water supply mechanism is arranged in the pressure regulating chamber.
[0013] The water-stop structure comprises conical water-stop rubber seats arranged at both ends of the base steel plate, and an outer water-stop curtain is also arranged on the outer side of the conical water-stop rubber seat away from the intercepting ditch.
[0014] The utility model sets a water-filled cavity at the arch seat inside the arch sealing cover, and the total buoyancy of the water-filled cavity is greater than the deadweight of the cofferdam, and the buoyancy distribution along the length direction of the device is close to the deadweight distribution, that is, the buoyancy is also large where the deadweight is large, and the buoyancy is also small where the deadweight is small. After the cofferdam is installed and slid into the canal slope inspection position, water is filled into the water-filled cavities on the left and right sides of the cofferdam, and the water in the enclosed area between the inner side of the cofferdam and the lining plate is pumped out to form a dry land working environment, and the repair of the canal slope lining plate is carried out. After the repair work is completed, the drain valve set on the water-filled cavity is opened, and after the water in the water-filled cavity is emptied, horizontal pressure is injected into the space formed between the inner side of the cofferdam and the canal slope. When the buoyancy is greater than the deadweight of the cofferdam, the cofferdam will slowly float to the water surface or suspend in the water, and a tugboat or onshore engineering machinery and other traction equipment are used to assist in towing it to the next working position, and water is filled into the water-filled cavity. After the buoyancy is less than the deadweight, the cofferdam slowly sinks into place, and a new round of repair is carried out. The water-filled cavity of this cofferdam sinks when water is filled and floats when water is drained. It only needs to be installed and dismantled once, and multiple lining panels can be repaired, which saves the installation and dismantling procedures during the turnover of the cofferdam and improves work efficiency.
[0015] The floating and sinking cofferdam device for channel slope repair provided by the utility model has a simple structure and is easy to use. By adjusting the water amount in the water filling chamber, the cofferdam can be made to sink when filled with water and float when drained. Therefore, when repairing channel slope lining plates at different positions, the position of the cofferdam can be conveniently transferred. The entire repair process only requires installation and removal of the cofferdam once, which greatly saves the construction period for disassembly and installation of the cofferdam, improves working efficiency, reduces comprehensive construction costs, and has great economic value. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the utility model.
[0017] Figure 2 yes Figure 1 Schematic diagram of the structure of the middle plug segment.
[0018] Figure 3 yes Figure 2 Cross-sectional view of .
[0019] Figure 4 It is a schematic diagram of the structure of the U-shaped segment in the figure.
[0020] Figure 5 yes Figure 4 Schematic diagram of the plan structure.
[0021] Figure 6 yes Figure 5 Schematic diagram of the structure of the water-filled cavity.
[0022] Figure 7 yes Figure 6 Schematic diagram of the structure of the steel plate part of the base of the water-filled cavity.
[0023] Figure 8 yes Figure 6 Schematic diagram of the structure of the middle intercepting ditch. DETAILED DESCRIPTION
[0024] The following is a detailed description of an embodiment of the utility model in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the utility model, and a detailed implementation method and a specific operation process are given, but the protection scope of the utility model is not limited to the following embodiment.
[0025] A water diversion project is the main water supply source for large and medium-sized cities along the northern line, and it delivers water all year round. The maximum design water depth of the channel is 7m. The channel slope lining plate is divided into 4m×4m blocks. The thickness of the lining plate is 8~10cm. It is a C20 plain concrete structure, and the bearing capacity of the foundation below the lining plate is about 150kpa. Because the groundwater pressure is greater than the water pressure in the channel, the lining plate is bulged, broken, and slipped. It is necessary to use various cofferdams to repair the damaged lining plate without stopping the water. At present, underwater repair by divers is the main method, and cofferdam repair is supplementary. The main reason for the low utilization rate of the cofferdam is that the installation and removal of the cofferdam takes up a long total repair period, and the disassembly and assembly of the cofferdam accounts for a high repair cost. In order to solve the above problems, we have developed the sinking and floating cofferdam device for channel slope repair described in this utility model.
[0026] like Figure 1-8 As shown, the cofferdam body described in the utility model is an arched sealing cover with one end sealed. The cofferdam can repair two lining plates at a time, and the net width inside the arched sealing cover is 9m, that is, the width of the two lining plates plus the surplus width of 0.5m on the left and right. The higher the cofferdam arc arch height, the smaller the water pressure on the top of the cofferdam, but the larger the water blocking area, the greater the flow velocity at the remaining flow section of the channel, the greater the water flow thrust on the water-facing surface, and the more difficult it is to stabilize the cofferdam; the smaller the cofferdam arc arch height, the greater the total water pressure on the top of the cofferdam, the larger the cross-section of the cofferdam main beam, the greater the deadweight, the greater the total pressure transmitted from the left and right arch seats of the cofferdam to the lining plate and the foundation, and the larger the area of the left and right arch seats without exceeding the bearing capacity of the foundation. After analyzing hundreds of cofferdam arch height and external width combination schemes by enumeration method, it is determined that the external arch height of the cofferdam is 3.2m, the main beam height is 0.6m, and the internal vertical channel slope net height is 2.6m, which meets the needs of the archer in the internal construction work space. The bearing capacity of the foundation is controlled to be no more than 140kpa. The width of the arch foot at the lower part of the cofferdam is calculated to be 2m, and the width of the arch foot at the top of the cofferdam is 1m. Therefore, the width of the arch foot on the outer side of the cofferdam is 13m.
[0027] When repairing the lining plate at a water depth of 7m and a channel slope of 1:2, the total length of the arched sealing cover along the channel slope is about 18m. Taking into account factors such as transportation, installation and water pressure at the bottom of the cofferdam, the cofferdam needs to be split into several sections. The control principle of segment splitting: the unit weight does not exceed 10t, the transportation width is not more than 3m, and it is easy to manufacture and install. According to this principle, the cofferdam is split into a bottom plug segment 1 and multiple U-shaped segments 2, among which the U-shaped segment 2 is divided into 3 2m segments and 4 3m segments along the channel slope.
[0028] like Figure 2 , 3As shown, the plug segment 1 is 1m thick, 13m wide and 3.2m high. The plug segment 1 consists of an inner panel 11, an outer panel 12, an internal transverse partition 13 and a longitudinal partition 14. The outer side of the arch is set as a conical structure 15 that gradually shrinks from top to bottom along the channel slope to reduce the water blocking area. The panel and the internal partition constitute a box-type water-retaining and force-bearing structure. A connecting flange 15 is set at the edge of the inner arch panel, and bolt holes with a spacing of 200mm are set on the flange plate, which is connected to the U-shaped segment 2 by bolts. The plug segment 1 is an integral sealing structure with a deadweight of about 8.6t and a total buoyancy of about 22t.
[0029] like Figure 4-7 As shown, the U-shaped segment 2 is composed of a main beam 21, a secondary beam 22, a panel 23, a base steel plate 24 and other components. The middle main beam 21 is an I-shaped beam, and the end main beam 21 is a [-shaped beam. The main beam 21 is welded by an upper flange, a web and a lower flange, and the panel 23 also serves as the upper flange of the main beam 21. Flange connecting plates 25 are provided at both ends of the outer side of the panel 23, and bolt holes are provided on the flange plate with a spacing of 200mm, which are connected to other segments by bolts. Figure 5 , 6 As shown, the base steel plates 24 all extend inward, and are welded with the vertical steel plates 26 extending upward and connected to the inner main beam, thereby forming a water-filled chamber 3 (i.e., a floating chamber and a counterweight chamber) sealed at the arch seat. The total buoyancy corresponding to the volume of the water-filled chamber 3 is greater than the deadweight of the cofferdam, and the buoyancy distribution is close to the deadweight distribution. After the sealed water-filled chamber 3 is filled with water, the deadweight of the cofferdam is greater than the buoyancy, and the cofferdam sinks into place; after the counterweight water in the sealed water-filled chamber 3 is discharged, the buoyancy is greater than the gravity, and the cofferdam floats up.
[0030] The volume and deadweight characteristics of the bottom plug segment 1, the 1-9 U-shaped segment 2 and the upper buoyancy cavity in this embodiment are as follows:
[0031]
[0032] like Figure 6As shown, a DC24V electric butterfly valve is provided in the water filling chamber 3 as a water inlet valve 31 and a drain valve 32, which are respectively located on the outer panel of the U-shaped segment 2 and the vertical steel plate 26 near the inner side. When the water in the water filling chamber 3 needs to be emptied during lifting or transportation, a gate valve is provided at the lowest point of the water filling chamber 3 as a drain valve 33, and the drain valve 33 is provided on the same side as the drain valve 32. In order to monitor the water filling amount, a first pressure sensor 34 is provided in the water filling chamber 3, and the water filling amount in the water filling chamber 3 is calculated by combining the pressure value of the first pressure sensor 34 and the spatial geometric dimensions of the water filling chamber 3. A vent pipe 35 (also serving as a cable threading pipe) is also provided in the water filling chamber 3, and its pipe mouth extends upward to above the water surface of the water diversion channel, and the signal cables of the above-mentioned valve and pressure sensor also pass through this pipe. When the water filling chamber 3 is filled or drained, the above-mentioned vent pipe 35 is used to exhaust or replenish air. During operation, after the water inlet valve 31 is opened, the external water of the channel enters the water filling chamber 3, the buoyancy of the water filling chamber 3 decreases, the cofferdam sinks, and the water in the space enclosed by the cofferdam and the lining plate is pumped out by a water pump, etc., and then the lining plate repair is carried out. After the damaged lining plate is repaired, the drain valve 32 is opened, and the counterweight water in the water filling chamber 3 is discharged to the inside of the cofferdam. The drain valve 32 is closed to use the liquid level difference to inject the water in the channel into the area enclosed by the cofferdam and the lining plate. After the water inside the cofferdam is horizontally compressed with the channel, the cofferdam floats. Use tugboats or onshore engineering machinery and other traction equipment to assist in towing to the next working position, fill the water filling chamber 3 with water, and after the buoyancy is less than its own weight, the cofferdam slowly sinks into place to carry out a new round of repairs.
[0033] Because the cofferdam is bent and deformed under the action of the external channel water load, especially in the deep water section of the bottom plate, the inner side of the arch foot is compressed and the outer side is tilted upward under the action of the bending moment, forming a height difference deformation of about 0.02mm between the inner and outer sides; at the same time, there will be errors or unevenness in the processing and manufacturing process of the steel structure cofferdam and the casting process of the channel bottom plate lining plate. If the cofferdam arch foot steel plate is in direct contact with the lining plate, there will inevitably be local contact and local non-contact states, and stress concentration will form at the contact point. After stress concentration, the 8-10cm plain concrete lining plate is at risk of being fractured, or the local foundation bearing capacity is insufficient after stress concentration, and the lining plate breaks after the foundation is sunken. Therefore, in order to ensure that the self-weight load and water load of the cofferdam can be evenly transferred to the lining plate of the maintenance channel, to avoid the local pressure of the cofferdam base exceeding the bearing capacity of the channel foundation, to ensure the safety of the original structure when the cofferdam is used to repair the channel lining plate, such as Figure 7 As shown, a water bag load transfer structure is provided at the bottom of the water-filled chamber 3. The details are as follows:
[0034] The water bag load transfer structure is composed of a base steel plate 24 at the bottom of the water-filled cavity 3, a bottom water bag plate 41, a rubber water-stopping cushion layer 42, a sealing pressure plate 43 with a groove, a fastening bolt 44, a second pressure sensor 45, a water-filled pressure regulating pipe 46 and other parts. The bottom water bag plate 41 is a rubber dam bag material or a high-pressure air bag material. According to the water pressure inside the water bag of each partition, the radial and latitudinal tensions of the water bag are calculated, and the water bag material and thickness are determined according to the tension. The water bag materials include but are not limited to rubber dam bags, dipped canvas, and polyester fibers, polyamide fibers, polypropylene fibers and other materials used to make high-pressure air bags. The rubber water-stopping cushion layer 42 is closely attached to the lower surface of the base steel plate 24 and the upper surface of the bottom water bag plate 41, and a sealed cavity (i.e., a pressure regulating cavity 40) with a certain thickness is formed between the base steel plate 24 and the bottom water bag plate 41. The cavity is filled with water to form the required pressure. The rubber water-stopping cushion layer 42 is an annular structure, and the cross-sectional shape includes but is not limited to rectangular, P-shaped, double P-shaped and other shapes. The sealing platen 43 with grooves is a steel plate with a certain thickness, and a groove is provided on the contact surface with the water bag to increase the compression and sealing effect. The sealing platen 43 is an annular structure, and bolt holes are drilled between the four sides and the base steel plate 24. The bolt holes are countersunk to ensure that the lower surface of the sealing platen 43 is flat. When the water bag is not pressurized during storage and transportation of the cofferdam, the deadweight load of the cofferdam is transmitted through the bottom sealing platen 43; after the water bag is pressurized, the lower surface of the water bag expands and contacts the lining plate, and the sealing platen 43 is not in contact or semi-contacts with the lining plate. The fastening bolts 44 are fasteners for sealing the water bag. The base steel plate 24, the water bag plate 34, the rubber water-stopping cushion layer 42, the sealing platen 43, etc. are compressed by the bolts to form a compressive water-stopping sealing structure. The bolts are countersunk bolts, and the countersunk ends are located on the sealing platen 43 side. The water-filled pressure regulating pipe 46 is a water-filling, pressurizing and pressure-regulating device for the pressure regulating chamber 40. It can fill water and pressurize the inside of the pressure regulating chamber 40 using a pressure pump and other equipment according to the pressure of the pressure regulating chamber 40 determined by calculation. The second pressure sensor 45 is a pressure monitoring device in the pressure regulating chamber 40. The second pressure sensor 45 is installed on the upper surface of the cofferdam base steel plate 24 through a through-hole threaded hole, and the pressure monitoring head extends into the pressure regulating chamber 40. The model line of the second pressure sensor 45 is connected to a digital display meter to monitor the pressure in the cofferdam pressure regulating chamber 40 in real time.
[0035] The water bag load transfer structure forms a certain thickness after being filled with water. Under the action of the cofferdam's own weight and external water load, the water bag adaptively deforms between the lining plate and the cofferdam arch seat steel plate to form a load transfer interlayer. This structure can adapt to the unevenness, misalignment and bulge of the lining plate, as well as the processing error of the steel structure cofferdam and the deformation under the action of external force. The water in the water bag forms an intermediate interlayer with consistent pressure between the lining plate and the cofferdam arch seat. Because the water bag is filled with liquid, it will not be compressed like gas, so the volume of the water bag is easier to control.
[0036] The utility model also includes a water-stop structure arranged at the bottom of the arched sealing cover. Specifically, Figure 6-8 As shown, the water-stopping structure at the bottom of the U-shaped segment 2 is a composite type, consisting of an outer water-stopping curtain 51, an inner water-stopping curtain 52, and a conical water-stopping rubber seat 53 located at both ends of the base steel plate 24. Among them, the conical water-stopping rubber seat 53 is a hollow porous structure with a certain hardness and deformation height, and can adapt to the uneven lining plate structure. The outer water-stopping curtain 51 is composed of a thick water-stopping rubber, a thin water-stopping rubber, a pressure plate, bolts, etc. The thick and thin water-stopping rubbers can also be flexible silicone. The thick rubber is on the top and the thin rubber is on the bottom. The two layers of rubber contact the lining plate at the ends and at an acute angle. The thin rubber is tightly attached to the channel lining plate under the combined action of the elasticity of the thick rubber and the water pressure to form a water-stopping effect. The outer water-stopping curtain 51 is arranged on the outside of the outer conical water-stopping rubber seat 53, and the inner water-stopping curtain 52 is arranged on the outside of the bottom of the ditch wall 361 of the intercepting ditch 36. The ditch wall 361 of the intercepting ditch 36 is connected to the vertical steel plate 26, and the outlet ends of the drain valve 32 and the emptying valve 33 are both located in the intercepting ditch 36. A baffle support rib 362 is welded between the ditch wall 361 and the vertical steel plate 26, and an inner water-stopping curtain 52 and a pressure regulating plate 363 are sequentially arranged on the outer side of the ditch wall 361, and both are connected to the ditch wall 361 by bolts; at the same time, by vertically adjusting the pressure regulating plate 363, the inner water-stopping curtain 52 can be pressed against the lining plate, so that a small amount of seepage water enters the intercepting ditch 36, ensuring that a dry working environment is formed inside the cofferdam. The plug segment 1 is provided with a conical water-stopping rubber seat 53 at the bottom as a water retaining structure.
[0037] like Figure 4 As shown, in order to facilitate the installation and removal of the cofferdam along the channel slope, a walking wheel 6 is arranged on the outside of the arched sealing cover. The walking wheel 6 can be a standard solid tire, which is installed in the wheel frame. The wheel frame is a steel plate welded structure, which is welded by a flange plate and two webs into a [-shaped force-bearing structure. The wheel frame is also connected to the lifting frame, which consists of a hydraulic telescopic cylinder and four telescopic plunger guide rods. The rodless chamber of the hydraulic cylinder is pressurized and unloaded to achieve the extension or shortening of the piston rod. The telescopic plunger rod plays a guiding and positioning role to ensure that the hydraulic cylinder can only move along the axial direction of the cylinder body when it is extended or shortened, so that the walking wheel 6 can achieve the purpose of lifting. When the walking wheel 6 falls, it is convenient for the cofferdam to slide down; after the slide is in place, the contraction of the hydraulic cylinder enables the lifting frame to drive the walking wheel 6 to rise, thereby realizing the contact between the load transfer structure at the bottom of the cofferdam and the water-stop structure and the lining plate.
[0038] The height adjustment principle of the running wheel 6 is as follows: after water is injected into the rodless cavity of the hydraulic cylinder, the piston rod is extended, and after the pressure is released, the piston rod is shortened. A high-pressure hydraulic pipe is provided in the rodless cavity to lead out of the water surface, and water is injected into the hydraulic pipe through a pressurized water pump. After the water pressure in the rodless cavity increases, the piston rod of the hydraulic cylinder is extended to lift up the cofferdam. After the lifting height reaches the design value, the valve set at the pump port near the high-pressure hydraulic oil pipe is closed. At this time, the cofferdam is lifted up, and the bottom water bag plate 41 and the bottom water stop rubber of the cofferdam are separated from the lining plate. After the cofferdam is installed in place, the valves of all high-pressure oil pipes are opened. After the pressure of the rodless cavity of the hydraulic cylinder is unloaded, the cofferdam is lowered, and the bottom water bag plate 41 and the bottom water stop rubber are in contact with the lining plate again. The rodless cavity of the hydraulic cylinder on the running wheel 6 is connected in series through a high-pressure oil pipe. After the lining plate is slightly up and down after the series connection, the pressure in the rodless cavity can be automatically adjusted to ensure that the pressure of each rodless cavity of the hydraulic cylinder is the same, and then ensure that the pressure between each running wheel 6 and the lining plate is the same.
[0039] The installation, displacement and removal process of the utility model is as follows:
[0040] After the dry land environment is formed inside the cofferdam, the thrust in the direction perpendicular to the water flow is relatively large. In this case, the horizontal thrust reaches 318.5t. The sum of the friction force generated by the pressure in the direction perpendicular to the channel slope decomposed by the cofferdam's own weight and the water load on the top and the component force decomposed to the channel slope is less than the horizontal thrust. In order to ensure the stability of the cofferdam, a floating chamber and a counterweight chamber (i.e., a water-filled chamber 3) is set. Except for the first U-shaped segment 2, which has a large water load on the top and the pressure transmitted to the lining plate by the cofferdam is about 140kpa, counterweight water cannot be added. Counterweight water can be added to other segments. By filling water into the floating chamber, the deadweight in the direction perpendicular to the lining plate and the component force along the channel slope are increased, so that the resultant force is greater than the horizontal water pressure, ensuring that the cofferdam can be stable when the cofferdam is dewatered to form a dry land environment.
[0041] S1, installation of the first U-shaped segment 2 of the cofferdam. The cofferdam is installed on the channel top maintenance road with a 40t crawler crane and a gravity anchor winch using the sliding slope method. Workers cooperate with the crane to complete the assembly of the plug segment 1 and the first U-shaped segment 2 at the bottom of the cofferdam on the channel top maintenance road surface. The crane lifts the assembled assembly and slowly places it on the channel slope exposed above the water surface. The wire rope of the towing winch arranged on the channel top pulls the assembly from the inside of the cofferdam along the channel slope. At the same time, the stabilization winches arranged on the left and right banks of the installation position pull the cofferdam from the outside to ensure the stability of the cofferdam after entering the water under dynamic water. After the winch towing along the channel slope is stressed, the first U-shaped segment 2 of the cofferdam and the plug segment 1 are combined and stabilized on the channel slope exposed above the water surface. The crane cooperates and slowly slides down 2m along the channel slope. The vertical lifting device of the crane is released, and the installation of the first U-shaped segment 2 is completed.
[0042] S2, installation of the second U-shaped segment 2 of the cofferdam. The crane lifts the second U-shaped segment 2, and with the cooperation of the workers, adjusts the inclination angle, slowly moves to the top of the installed first U-shaped segment 2, and descends to the slope of the channel, adjusts the height of the walking wheel to make it equal to the first U-shaped segment 2, installs the water-stop rubber between the first and second U-shaped segments 2, connects the bolts, and completes the connection between the first and second U-shaped segments 2. The winch used for the cofferdam installation slowly releases the rope to make the cofferdam go down 2m along the channel slope, releases the vertical lifting equipment of the crane, and the installation of the second U-shaped segment 2 is completed. Fill the water filling chamber 3 of the second U-shaped segment 2 with water to ensure that the deadweight of the cofferdam is greater than the buoyancy. When filling water, the gate valve opening command set on the outer panel of the cofferdam of the second U-shaped segment 2 is executed through the operating console integrated on the top of the channel, and the water in the channel enters the water filling chamber 3.
[0043] S3, installation of the remaining segments of the cofferdam. The remaining segments are installed in sequence according to the installation method of the second U-shaped segment 2. When installing other segments, the amount of water injected into the water-filled cavity 3 is about 1 / 3 of the volume of the water-filled cavity 3.
[0044] S4, the height of the cofferdam running wheel 6 is lowered. The gate valve on the high-pressure water pipe of the running wheel 6 on the console integrated on the top of the channel is opened to unload the pressure of the hydraulic cylinder, reduce the height of the running wheel 6, and lower the cofferdam. The drain valve 33 is opened in the order of water depth from shallow to deep to avoid the concentration of deadweight load on the middle running wheel 6.
[0045] S5, pressurizing the water bag load transfer structure of the cofferdam arch seat. Use a pressure pump to pressurize through the water-filled pressure regulating pipe 46 of the cofferdam. When pressurizing, pay attention to the number of the second pressure sensor 45, and the pressurization value reaches the design value.
[0046] S6, lowering the water level in the area enclosed by the cofferdam and the lining plate. After the cofferdam is lowered, the water-stop rubber contacts the lining plate, and a high-power water pump is used to pump the water in the area enclosed by the cofferdam and the lining plate into the channel. During the pumping process, water is filled into the water filling chamber 3 from top to bottom. For example, when the water surface line inside the cofferdam drops to the 8th section, the water filling chamber 3 of the 9th section is filled with water; when the water surface line drops to the 7th section, the water filling chamber 3 of the 8th section is filled with water, and so on.
[0047] S7, lining plate repair construction. After the internal dewatering of the cofferdam is completed, the workers install the technical requirements and complete the repair of the lower foundation of the lining plate, the repair of the geotextile and the lining plate.
[0048] S8, the cofferdam is filled with water and floated. After all maintenance work is completed and the tools and other debris inside the cofferdam are cleaned, water is injected into the cofferdam and lining plate enclosed area. The two drain valves 33 of the top section of the cofferdam can be opened to directly inject the water from the channel into the cofferdam, or the water from the channel can be introduced into the cofferdam through a water pipe. When the water in the cofferdam is about to flood the drain valve 33 inside the second section, open the drain valve 33 inside the cofferdam of the second section, drain the water in the water filling chamber 3 and close the drain valve 33; when the water in the cofferdam is about to flood the drain valve 33 inside the third section, open the drain valve 33 inside the cofferdam of the third section, drain the water in the water filling chamber 3 and close the drain valve 33. When the water in the cofferdam is filled to 1 / 2 of the channel water depth, the water in the water filling chamber 3 of the remaining sections can be drained and the valves closed. The water in the water filling chamber 3 must not be emptied in advance to avoid excessive horizontal thrust on the outside of the channel, which pushes the cofferdam to slide along the channel slope. When the water in the area enclosed by the cofferdam and the liner reaches a depth close to the channel water depth, the cofferdam will slowly rise to float on the water surface. When the cofferdam has a tendency to float, the winch that stabilizes the cofferdam is ready to reel in the rope at any time to ensure that the cofferdam is not pushed by the passive water flow.
[0049] S9, cofferdam displacement. After the cofferdam floats on the water, two large engineering machines or engineering vehicles are deployed on the left and right banks. The cofferdam floating on the water is pulled by steel wire ropes to move the cofferdam along the water flow to the downstream side to be repaired. At the same time, the cofferdam is transferred to a suitable position in the area to be repaired by a winch.
[0050] S10, sinking of the cofferdam. After the cofferdam is moved to the position to be repaired, a winch is installed to stabilize the cofferdam, and the tensioning wire is fixed, so as to prepare for releasing the wire rope when the cofferdam sinks. The drain valve 33 in the water filling chamber 3 of the cofferdam is opened, and water is filled into the water filling chamber 3 of the cofferdam. After the buoyancy is reduced, the cofferdam slowly sinks, and the winch wire rope is simultaneously released to maintain the stability of the cofferdam until the cofferdam sinks to the cofferdam lining board in the area to be repaired.
[0051] S11, dewatering the area enclosed by the cofferdam and the lining plate. After the cofferdam is lowered into place, the drain valves 33 in all water-filled chambers 3 are closed, and the water in the area enclosed by the cofferdam and the lining plate is pumped out by a water pump, so that a dry working environment is formed inside the cofferdam.
[0052] S12, cofferdam removal. After all lining plates in a certain section are repaired, the cofferdam needs to be removed. The order of cofferdam removal is opposite to the order of cofferdam installation. First release water into the enclosed area of the cofferdam and the lining plate. When the internal water level is close to the drain valve 33 of the second section, open the drain valve 33 to discharge 2 / 3 of the water, and retain 1 / 3 of the water as a counterweight; when the internal water level is close to the drain valve 33 of the third section, open the drain valve 33 to discharge 2 / 3 of the water, and retain 1 / 3 of the water as a counterweight; the same applies to other sections. After the enclosed area of the cofferdam and the lining plate is horizontally pressurized with the channel, the rodless chamber of the hydraulic cylinder of the walking wheel is pressurized from top to bottom in turn through the hydraulic pump. The hydraulic cylinder extends and lifts the cofferdam, so that the water-stop rubber and the like are separated from the lining plate, and the deadweight of the cofferdam is transferred to the walking wheel 6 and transmitted to the lining plate. The installation traction winch arranged at the top of the channel pulls the cofferdam upward along the channel slope. After the top segment emerges from the water surface, the vent valve 33 is opened to drain the counterweight water in the cofferdam buoyancy chamber, and the connecting bolts between the top segment and the next segment are removed. The top segment is lifted out of the slope by a crane arranged on the maintenance road at the top of the channel. The installation traction winch pulls the remaining cofferdams further upward along the channel slope to make the next segment emerge from the water surface, and the remaining segments are removed in sequence using the same method as that of removing the top segment.
[0053] It should be noted that, in the description of the present invention, terms indicating orientation or positional relationships, such as "front", "rear", "left", "right", "vertical", "horizontal", "inside", "outside", etc., are based on the orientation or positional relationships shown in the drawings and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
Claims
1. A sinking and floating cofferdam device for channel slope repair, characterized in that: It comprises an arched sealing cover with one end sealed, a water-filled cavity is arranged at the arch seat inside the arched sealing cover, and a water-stopping structure in contact with the channel slope is arranged at the bottom of the arched sealing cover.
2. The sinking and floating cofferdam device for channel slope repair according to claim 1 is characterized in that: Traveling wheels are arranged on the outside of the arched sealing cover, and the traveling wheels are connected with the arched sealing cover through a lifting frame.
3. The floating and sinking cofferdam device for channel slope repair according to claim 1 or 2, characterized in that: The arched sealing cover is a multi-section structure, comprising a plug section at the bottom and U-shaped sections sequentially connected thereto.
4. The floating and sinking cofferdam device for channel slope repair according to claim 3 is characterized in that: The arched outer side surface of the plug segment is a conical structure that gradually shrinks from top to bottom along the channel slope.
5. The sinking and floating cofferdam device for channel slope repair according to claim 3 is characterized in that: The arch height of the U-shaped segment is 1 / 3 to 1 / 2 of the channel water depth and is higher than 1.7 meters; the length of each U-shaped segment is 2 to 3 meters.
6. The sinking and floating cofferdam device for channel slope repair according to claim 3 is characterized in that: A water inlet valve, a water discharge valve and an emptying valve are arranged on the side wall of the water filling chamber, and a first pressure sensor and a vent pipe connected to the surface above the water are arranged in the water filling chamber.
7. The sinking and floating cofferdam device for channel slope repair according to claim 6, characterized in that: The drain valve and the emptying valve are arranged inside the water-filled cavity, and the outlet ends thereof are located in a water intercepting ditch arranged outside the water-filled cavity. An inner water-stopping curtain is arranged at the bottom of the ditch wall of the water intercepting ditch.
8. The sinking and floating cofferdam device for channel slope repair according to claim 7, characterized in that: The bottom of the water-filling chamber is a base steel plate, a water bag plate is arranged below the base steel plate, a rubber water-stopping pad is arranged between the water bag plate and the base steel plate, the rubber water-stopping pad, the water bag plate and the base steel plate are connected by fastening bolts, a second pressure sensor is arranged in the pressure regulating chamber formed by the rubber water-stopping pad, the water bag plate and the base steel plate, and a water-filling pressure regulating pipe connected to the water supply mechanism is arranged in the pressure regulating chamber.
9. The sinking and floating cofferdam device for channel slope repair according to claim 8, characterized in that: The water-stop structure comprises conical water-stop rubber seats arranged at both ends of the base steel plate, and an outer water-stop curtain is also arranged on the outer side of the conical water-stop rubber seat away from the intercepting ditch.