Foundation post-grouting pipeline for final joint of immersed tube

Fixing the grouting pipes through trusses and optimizing the distribution of grouting holes, combined with the setting of spare grouting pipes, solves the problem of easy entanglement, knotting and blockage of grouting pipes in immersed pipe joints, and improves the uniformity of grouting and construction efficiency.

CN221822954UActive Publication Date: 2024-10-11CCCC FIRST HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420351401.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-10-11
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

In the existing post-grouting technology for the foundation of immersed pipe joints, the grouting pipes are easily entangled and knotted, which leads to reduced construction complexity and efficiency. They are also easily blocked when winds and waves are strong, and there is a lack of effective solutions.

Method used

A truss is used to fix the first grouting pipe and the second grouting pipe. By optimizing the distribution of grouting holes and the setting of spare grouting pipes, entanglement and knotting are avoided, and spare pipes are provided during the grouting process to prevent blockage and damage.

Benefits of technology

It effectively avoids the twisting and knotting of grouting pipes, improves the uniformity and coverage of grouting, reduces the occurrence of holes and crack defects, and ensures the smoothness and integrity of the grouting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822954U_ABST
    Figure CN221822954U_ABST
Patent Text Reader

Abstract

The utility model relates to an immersed tube final joint foundation post-grouting pipeline, which belongs to the technical field of immersed tube butt joint and comprises a truss, a first grouting pipe and a second grouting pipe. Wherein the truss comprises a plurality of truss units which are arranged in parallel, and the truss is horizontally arranged in a cavity of the final joint of the immersed tube and is perpendicular to the extension direction of the immersed tube; the first grouting pipe is fixed in the truss and extends in the length direction of the truss, and the length of the first grouting pipe extends to the midpoint of the truss from the first end of the truss; a first grouting hole is formed in the pipe wall of the first grouting pipe; the second grouting pipe is fixed in the truss and is parallel to the extension direction of the first grouting pipe, and the length of the second grouting pipe extends from the first end of the truss to the second end of the truss; and a second grouting hole is formed in the pipe wall of the second grouting pipe. According to the grouting pipeline, the first grouting pipe and the second grouting pipe can be fixed through the truss, the situation that a grouting hose used when the grouting pipe is connected with grouting equipment is wound and knotted can be effectively avoided, and the grouting quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of immersed tube butt joint, and in particular relates to a post-grouting pipeline for the final joint foundation of an immersed tube. Background Art

[0002] The final joint foundation post-grouting technology of the immersed tube tunnel refers to the cavity below the pushed-out section of the pipe section when the last section of the immersed tube tunnel is butt-jointed with the previous section, which needs to be grouted to improve the stability and bearing capacity of the section and reduce the settlement and deformation of the section.

[0003] In the prior art, Chinese invention patent CN107489161B provides a method for post-grouting of the foundation of a submerged pipe joint. This method arranges a grouting pipe capable of outputting a curable slurry in the ditch below the submerged pipe, and uses the grouting pipe for grouting. However, this method does not provide a structural form of the grouting pipe, and does not take into account problems such as clogging of the grouting pipe. Once the grouting pipe cannot be used, it will take manpower to physically clear or rework it. In the actual construction process, the grouting pipe needs to be coordinated with the stirring and pumping device on the ship. When the wind and waves are strong, it is easy to have an adverse effect on the grouting pipeline. If too many grouting pipelines are used, it is easy to cause the grouting hose to be partially entangled and knotted, making the underwater grouting construction more complicated, reducing the construction efficiency, and increasing the difficulty of construction.

[0004] Therefore, how to provide a simple and efficient thick grouting pipeline for immersed tube joint foundation is a technical problem that urgently needs to be solved. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides a grouting pipeline after the final joint foundation of a immersed tube, which fixes the first grouting pipe and the second grouting pipe by a truss, and can effectively prevent the grouting hose used when the grouting pipe is connected to the grouting equipment from being entangled and knotted.

[0006] The utility model provides a submerged tube final joint foundation post-grouting pipeline, comprising:

[0007] The truss comprises a plurality of truss units arranged in parallel, the truss being arranged horizontally at the cavity of the final joint of the immersed tube and being perpendicular to the extension direction of the immersed tube;

[0008] A first grouting pipe is fixed inside the truss and extends along the length direction of the truss, and the length of the first grouting pipe extends from the first end of the truss to the midpoint of the truss; a first grouting hole is opened on the pipe wall of the first grouting pipe, and the first grouting hole is located in the area between the first end of the truss and the midpoint of the truss;

[0009] The second grouting pipe is fixed inside the truss and parallel to the extension direction of the first grouting pipe. The length of the second grouting pipe extends from the first end of the truss to the second end of the truss. A second grouting hole is opened on the wall of the second grouting pipe, and the second grouting hole is located in the area from the midpoint of the truss to the second end of the truss.

[0010] The technical solution fixes the first grouting pipe and the second grouting pipe by a truss, which can effectively prevent the grouting hose used when the grouting pipe is connected to the grouting equipment from being entangled and knotted.

[0011] In some embodiments, the grouting pipeline after the final joint foundation of the immersed tube also includes a spare grouting pipe, which is fixed inside the truss and parallel to the extension direction of the first grouting pipe, and the length of the spare grouting pipe extends from the first end of the truss to the second end of the truss; the pipe wall of the spare grouting pipe is provided with a spare grouting hole, and the spare grouting hole is located in the area from the first end of the truss to the second end of the truss. This technical solution uses the spare grouting pipe as a supplement to the first grouting pipe and the second grouting pipe to prevent grouting failure or incompleteness due to blockage, damage or other reasons of the first grouting pipe or the second grouting pipe.

[0012] In some embodiments, a plurality of first grouting holes, second grouting holes, and spare grouting holes are provided; wherein the first grouting holes are evenly distributed in the area between the first end of the truss and the midpoint of the truss of the first grouting pipe, the second grouting holes are evenly distributed in the area between the midpoint of the truss and the second end of the truss of the second grouting pipe, and the spare grouting holes are evenly distributed in the area between the first end of the truss and the second end of the truss of the spare grouting pipe. This technical solution optimizes the distribution of grouting holes to achieve uniform distribution and effective diffusion of slurry, thereby improving the coverage and quality of grouting.

[0013] In some embodiments, the first ends of the first grouting pipe, the second grouting pipe, and the spare grouting pipe are all provided with a pipe joint for connecting to the grouting equipment, and the pipe joint extends out of the first end of the truss. The pipe joint of the technical solution can conveniently connect the first grouting pipe, the second grouting pipe, and the spare grouting pipe to the grouting equipment to realize the supply and control of grouting.

[0014] In some embodiments, a blind plate for blocking is provided at the open end of each pipe joint, and the blind plate is detachably connected to the pipe joint. The technical solution blocks the open end of the pipe joint before grouting by setting the blind plate, preventing cement slurry or other substances from leaking or entering from the pipe, and avoiding blockage of the grouting pipe.

[0015] In some embodiments, each connection between the pipe joint and the grouting equipment is provided with a one-way valve for controlling the flow of slurry. The technical solution controls the flow direction of the slurry through the provision of the one-way valve to prevent the slurry from rushing out or overflowing from the pipe.

[0016] In some embodiments, the truss unit includes a plurality of triangular frames and three cross beams perpendicular to the plane where the triangular frames are located, the triangular frames are arranged parallel to each other, and the three cross beams are arranged at the vertices of the triangular frames. This technical solution utilizes the stability and rigidity of the triangular frames to improve the bearing capacity and anti-deformation ability of the truss to adapt to structures with larger spans and prevent the grouting pipeline from bending or deformation.

[0017] In some embodiments, the first grouting pipe and the second grouting pipe are respectively fixedly connected to the bottom edge of the triangular frame, and the spare grouting pipe is fixedly connected to the vertex opposite to the bottom edge of the triangular frame; the triangular frame is also provided with a support rod, and the support rod is used to support the spare grouting pipe. This technical solution realizes effective support of the spare grouting pipe through the provision of the support rod, prevents the spare grouting pipe from bending or deformation, and ensures smooth grouting.

[0018] In some embodiments, an inclined beam for reinforcement is provided between each triangular frame. The technical solution achieves force balance and distribution of the triangular frame through the provision of the inclined beam, thereby improving the integrity and rigidity of the truss unit.

[0019] In some embodiments, the grouting pipeline after the final joint foundation of the immersed tube also includes a pressure gauge for monitoring the slurry pressure, and the pressure gauge is fixedly connected to the truss. This technical solution realizes real-time monitoring and adjustment of the grouting height through the setting of the pressure gauge to ensure the construction quality.

[0020] Based on the above scheme, the grouting pipeline after the final joint foundation of the immersed tube in the embodiment of the utility model can effectively avoid the entanglement and knotting of the grouting hose used when the grouting pipe is connected to the grouting equipment by fixing the first grouting pipe and the second grouting pipe through a truss; by making the length of the second grouting pipe longer than the first grouting pipe, grouting holes are opened on the second grouting pipe, and grouting holes are opened in the part where the first grouting pipe is longer than the second grouting pipe, so as to make the grouting more uniform and effectively reduce the defects such as holes and cracks in the grouting process; by using a spare grouting pipe as a supplement to the first grouting pipe and the second grouting pipe, grouting failure or incompleteness caused by blockage, damage or other reasons of the first grouting pipe or the second grouting pipe can be prevented. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0022] Figure 1 It is a structural schematic diagram of the truss in the embodiment of the post-grouting pipeline of the final joint foundation of the immersed tube of the utility model;

[0023] Figure 2It is a structural schematic diagram of a truss unit in an embodiment of a post-grouting pipeline for a final joint foundation of an immersed tube of the utility model;

[0024] Figure 3 It is a structural schematic diagram of the supporting rod being parallel to the bottom edge of the triangular frame in the embodiment of the post-grouting pipeline of the final joint foundation of the immersed tube of the utility model;

[0025] Figure 4 It is a schematic diagram of the structure in which the support rod is perpendicular to the bottom edge of the triangular frame in the embodiment of the post-grouting pipeline of the final joint foundation of the immersed tube of the utility model;

[0026] Figure 5 This is a schematic diagram of the structure of the grouting pipeline after the final joint foundation of the immersed tube of the utility model;

[0027] Figure 6 for Figure 5 A magnified schematic diagram of part A;

[0028] Figure 7 It is a structural schematic diagram of the grouting pipeline being hoisted on the leveling layer in the embodiment of the method for post-grouting of the final joint foundation of the immersed tube of the present invention;

[0029] Figure 8 It is a schematic diagram of the installation of the grout-stopping airbag in the embodiment of the method for post-grouting of the final joint foundation of the immersed tube of the present invention;

[0030] Fig. 9 It is a structural schematic diagram of the grouting pipeline hoisting in the embodiment of the immersed tube final joint foundation post-grouting method of the present invention;

[0031] Fig.10 It is a structural schematic diagram of the grouting area blocking in the embodiment of the immersed tube final joint foundation post-grouting method of the present invention;

[0032] Fig.11 It is a structural schematic diagram of connecting grouting equipment in an embodiment of the method for post-grouting of the final joint foundation of the immersed tube of the present invention;

[0033] Fig.12 It is a structural schematic diagram of the pre-buried positions of two groups of grouting pipelines in Example 1;

[0034] Fig.13 Schematic diagram of the distribution of pressure gauges in Example 1;

[0035] Fig.14 is a layout diagram of the static level in the extension direction of the immersed tube in Example 1;

[0036] Fig.15 is a layout diagram of the static level in Example 1 along the cross section of the immersed tube;

[0037] Fig.16 Schematic diagram of the grouting sequence in Example 1.

[0038] In the figure:

[0039] 1. Truss unit; 2. First grouting pipe; 3. Second grouting pipe; 4. Spare grouting pipe; 5. Pipeline joint; 6. Pressure gauge;

[0040] 101. triangular frame; 102. cross beam; 103. support rod; 104. inclined beam. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0042] In the description of the present invention, it should be understood that the terms "midpoint", "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0043] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features.

[0044] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0045] The terms "system", "unit" and "module" used in this document are a method for distinguishing different components, elements, parts, portions or assemblies at different levels, and these terms may be replaced by other expressions that can achieve the same purpose.

[0046] like Figure 1-Figure 6As shown, in one embodiment of the utility model of the grouting pipeline after the final joint foundation of the immersed tube, the grouting pipeline after the final joint foundation of the immersed tube includes a truss, a first grouting pipe 2 and a second grouting pipe 3; wherein, as Figure 1 As shown, the truss includes a plurality of truss units 1 arranged in parallel. The truss is horizontally arranged at the cavity of the final joint of the immersed tube and is perpendicular to the extension direction of the immersed tube. The first grouting pipe 2 is fixed inside the truss and extends along the length direction of the truss. Figure 5 As shown, the length of the first grouting pipe 2 extends from the first end of the truss to the midpoint of the truss; the first grouting hole is opened in the wall of the first grouting pipe 2, and the first grouting hole is located in the area between the first end of the truss and the midpoint of the truss; the second grouting pipe 3 is fixed inside the truss and parallel to the extension direction of the first grouting pipe 2, as shown in FIG. Figure 5 As shown, the length of the second grouting pipe 3 extends from the first end of the truss to the second end of the truss; a second grouting hole is opened in the pipe wall of the second grouting pipe 3, and the second grouting hole is located in the area between the midpoint of the truss and the second end of the truss.

[0047] In the above-mentioned schematic embodiment, the grouting pipeline after the final joint of the immersed tube is fixed with the first grouting pipe 2 and the second grouting pipe 3 through a truss, which can effectively avoid the entanglement and knotting of the grouting hose used when the grouting pipe is connected to the grouting equipment; the length of the second grouting pipe 3 is longer than the first grouting pipe 2, and grouting holes are opened on the second grouting pipe 3, and grouting holes are opened in the part where the second grouting pipe 3 is longer than the first grouting pipe 2, so as to make the grouting more uniform and effectively reduce the defects such as holes and cracks in the grouting process; the truss can flexibly adjust the number and position of the truss unit 1 according to the cavity size of the final joint of the immersed tube, so that the grouting pipeline can adapt to different immersed tube joint working conditions.

[0048] In some embodiments, Figure 5 As shown, the grouting pipeline after the final joint foundation of the immersed tube also includes a spare grouting pipe 4, which is fixed inside the truss and parallel to the extension direction of the first grouting pipe 2, and the length of the spare grouting pipe 4 extends from the first end of the truss to the second end of the truss; the pipe wall of the spare grouting pipe 4 is provided with a spare grouting hole, and the spare grouting hole is located in the area between the first end of the truss and the second end of the truss. The spare grouting pipe 4 is used as a supplement to the first grouting pipe 2 and the second grouting pipe 3 to prevent grouting failure or incompleteness due to blockage, damage or other reasons of the first grouting pipe 2 or the second grouting pipe 3.

[0049] Furthermore, a plurality of first grouting holes, second grouting holes and spare grouting holes are provided; wherein, the first grouting holes are evenly distributed in the area between the first grouting pipe 2 and the midpoint of the truss, the second grouting holes are evenly distributed in the area between the midpoint of the truss and the second end of the truss of the second grouting pipe 3, and the spare grouting holes are evenly distributed in the area between the first end of the truss and the second end of the truss of the spare grouting pipe 4. By optimizing the distribution of the grouting holes, the slurry is evenly distributed and effectively diffused, thereby improving the coverage and quality of grouting.

[0050] In some embodiments, Figure 5 As shown, the first ends of the first grouting pipe 2, the second grouting pipe 3, and the spare grouting pipe 4 are all provided with a pipe joint 5 for connecting the grouting equipment, and the pipe joint 5 extends out of the first end of the truss. The pipe joint 5 can conveniently connect the first grouting pipe 2, the second grouting pipe 3, and the spare grouting pipe 4 to the grouting equipment, realize the supply and control of grouting, and improve the convenience and flexibility of grouting.

[0051] In some embodiments, a blind plate for blocking is provided at the open end of each pipe joint 5, and the blind plate is detachably connected to the pipe joint. By setting the blind plate, the open end of the pipe joint 5 is blocked before grouting to prevent cement slurry or other substances from leaking or entering from the pipeline, and to avoid blockage of the grouting pipe. During grouting, the blind plate is removed for grouting.

[0052] In some embodiments, each connection point between the pipe joint 5 and the grouting equipment is provided with a one-way valve for controlling the flow of the slurry. By setting the one-way valve, the flow direction of the slurry is controlled to prevent the slurry from rushing out or overflowing from the pipeline.

[0053] In some embodiments, Figure 2 As shown, the truss unit 1 includes a plurality of triangular frames 101 and three cross beams 102 perpendicular to the plane where the triangular frames 101 are located. The triangular frames 101 are arranged parallel to each other, and the three cross beams 102 are arranged at the vertices of the triangular frames 101. This embodiment utilizes the stability and rigidity of the triangular frames 101 to improve the bearing capacity and anti-deformation capacity of the truss to adapt to structures with larger spans, prevent the grouting pipeline from bending or deformation, and ensure the construction quality.

[0054] In some embodiments, Figure 3 As shown, the first grouting pipe 2 and the second grouting pipe 3 are respectively fixedly connected to the bottom edge of the triangular frame 101, and the spare grouting pipe 4 is fixedly connected to the vertex opposite to the bottom edge of the triangular frame 101; the triangular frame 101 is also provided with a support rod 103, and the support rod 103 is used to support the spare grouting pipe 4. Through the arrangement of the support rod 103, the spare grouting pipe 4 is effectively supported, the spare grouting pipe 4 is prevented from bending or deformation, and the smooth grouting is ensured.

[0055] It should be noted that if Figure 3 As shown, the support rod 103 can be arranged parallel to the bottom edge of the triangular frame 101, as shown in FIG. Figure 4 As shown, the support rod 103 can also be arranged perpendicular to the bottom edge of the triangular frame 101 .

[0056] In some embodiments, Figure 2 As shown, a diagonal beam 104 for strengthening is also provided between each triangular frame 101. By providing the diagonal beam 104, the force balance and distribution of the triangular frame 101 are achieved, the stress concentration and deformation of the triangular frame 101 are reduced, and the integrity and rigidity of the truss unit 1 are improved.

[0057] In some embodiments, Figure 5 As shown, the grouting pipeline after the final joint foundation of the immersed tube also includes a pressure gauge 6 for monitoring the slurry pressure, and the pressure gauge 6 is fixedly connected to the truss. Through the setting of the pressure gauge 6, the real-time monitoring and adjustment of the grouting height is realized to ensure the construction quality.

[0058] Example 1

[0059] Combine the following Figure 1-Figure 16 The specific structure and construction method of embodiment 1 of the utility model of the grouting pipeline after the final joint foundation of the immersed tube are described as follows:

[0060] In this embodiment, the immersed tube sections are arranged in a north-south direction. For the convenience of description, the last section of the immersed tube is named as E24 section, and the second to last section is named as E23 section. The final joint of the immersed tube is the joint between E23 section and E24 section. The cross-sectional width at the joint is 46m. In order to facilitate the prefabrication and transportation of the grouting pipeline, Fig.12 As shown, two sets of symmetrical grouting pipelines are used for grouting. The following are the construction steps of Example 1:

[0061] 1) Prefabrication of grouting pipeline

[0062] like Figure 1 As shown, a truss 1 is made by welding a plurality of triangular frames 101 and three cross beams 102 to form a set of trusses 1; wherein the plurality of triangular frames 101 are arranged parallel to each other, and the three cross beams 102 are arranged at the vertices of the triangular frames 101; a support rod 103 for fixing the spare grouting pipe 44 is welded in the triangular frame 101; and an inclined beam 104 for strengthening the structure is welded between each triangular frame 101;

[0063] like Figure 5As shown, the first grouting pipe 22, the second grouting pipe 33 and the spare grouting pipe 44 are respectively fixed in the same truss 1, and the first grouting pipe 22, the second grouting pipe 33 and the spare grouting pipe 44 are respectively arranged in parallel; wherein, the length of the first grouting pipe 22 extends from the first end of the truss 1 to the midpoint of the truss 1, and the first grouting pipe 22 is used for grouting the area between the first end of the truss 1 and the midpoint of the truss 1; the length of the second grouting pipe 33 extends from the first end of the truss 1 to the second end of the truss 1, and the second grouting pipe 33 is used for grouting the area between the midpoint of the truss 1 and the second end of the truss 1; the length of the spare grouting pipe 44 extends from the first end of the truss 1 to the second end of the truss 1, and is used for grouting the area between the first end of the truss 1 and the second end of the truss 1;

[0064] The first grouting pipe 22 has a first grouting hole formed in its wall, and the first grouting hole is located in the area between the first end of the truss 1 and the midpoint of the truss 1; the second grouting pipe 33 has a second grouting hole formed in its wall, and the second grouting hole is located in the area between the midpoint of the truss 1 and the second end of the truss 1; the standby grouting pipe 44 has a standby grouting hole formed in its wall, and the standby grouting hole is located in the area between the first end of the truss 1 and the second end of the truss 1;

[0065] A plurality of first grouting holes, second grouting holes and spare grouting holes are provided; wherein the first grouting holes are evenly distributed in the area between the first grouting pipe 22 and the first end of the truss 1 to the midpoint of the truss 1, the second grouting holes are evenly distributed in the area between the second grouting pipe 33 and the midpoint of the truss 1 to the second end of the truss 1, and the spare grouting holes are evenly distributed in the area between the spare grouting pipe 44 and the first end of the truss 1 to the second end of the truss 1;

[0066] like Figure 5 As shown, the pressure gauge 66 is welded to the truss 1 according to the designed monitoring point, and the cable of the pressure gauge 66 is fixed in the truss 1 together, so as to be pre-buried at the bottom of the grouting area together with the grouting pipeline;

[0067] The truss 1 in this embodiment is 22m long and 0.35m high; the first grouting pipe 22, the second grouting pipe 33, and the spare grouting pipe 44 are all made of DN80 seamless steel pipes with a wall thickness of 5mm; the first grouting pipe 22 is 11m long, and the second grouting pipe 33 is 22m long; the first grouting hole, the second grouting hole, and the spare grouting hole are opened at a spacing of 3m, and the hole diameter is 8cm×3cm. The above-mentioned grouting pipelines are prefabricated in two groups, such as Fig.12 As shown, two sets of symmetrical grouting pipelines are used for grouting; the distribution of pressure gauges 66 is as shown in Fig.13 shown.

[0068] 2) Preparation before grouting

[0069] like Figure 7As shown in FIG. 1 , a crushed stone cushion is laid at the final joint of the immersed tube to form a ditch, and a leveling layer is added in the cavity at the bottom of the final joint of the immersed tube, and a grout-stopping airbag is arranged in the ditch formed by the crushed stone cushion; multiple static levels are arranged in the immersed tube on one side of the final joint of the immersed tube, and the multiple static levels are connected through a connecting water pipe. The arrangement diagram of the static levels along the extension direction of the immersed tube is shown in FIG. Fig.14 The layout of the static level along the submerged tube cross section is shown in Fig.15 As shown;

[0070] In the above steps, according to the S09 standard gravel cushion paving construction process, the gravel base bed is arranged in an S shape as a whole;

[0071] Before laying the airbag, divers need to sort out the gravel in the ditch and spread out the ditch blocking position on one side in advance to ensure that the interface is exposed to the bottom of the pipe after the airbag is laid. After completing the paving work at both ends of the ditch, divers need to check the depth of the entire ditch, clean and spread the gravel at the shallower depth to prevent the airbag from exceeding the gravel ridge surface after laying, affecting the installation of the pipe section;

[0072] In order to prevent the airbag from being damaged by gravel and iron chain when the airbag is inflated, a layer of geotextile is laid in the ridge after the gravel ridge is processed and before the airbag is laid. Before laying the geotextile, the geotextile and iron chain need to be connected together in advance on land. The iron chain is used to fix the geotextile and the airbag.

[0073] When laying geotextiles and iron chains, the submersible mother ship is used as a positioning ship. One side of the submersible ship is positioned just above the ditch where the airbags need to be laid. One end of the iron chain is lifted by a crane and lowered along the side of the submersible mother ship. It is then slowly lowered to one end of the gravel ditch according to the instructions of the underwater divers. Then the divers lay the iron chain and geotextile along the ditch. During this process, the crane needs to cooperate to slowly lower the iron chain along the side of the ship.

[0074] Airbags need to be laid throughout the ridge ditch. An airbag is set on each side of the axis of the gravel ridge. The length of a single airbag is temporarily set at 27m. The two airbags in the north and south overlap by 1m to ensure that they form a tight blocking wall with the bottom of the pipe after inflation. The same method as the chain laying is used when laying the airbags. The underwater laying is completed by cranes and divers. After the airbags are laid, divers will fix the airbags and chains at a certain distance to prevent the airbags from floating up and affecting the installation. At the same time, if Figure 8 As shown, the two ends of the airbag are fixed with fixing rings, and protective measures are taken for the airbag joints to prevent the joints from being damaged and unable to be inflated;

[0075] After the airbags are laid, the gravel ridges at the airbag locations are inspected. The inspection is divided into two methods: Diver exploration: Divers explore the airbag laying locations. The exploration method is that divers hold a horizontal bar (the length of the horizontal bar is about 1.5m) and move from one end of the gravel ridge to the other end along the gravel ridge ditch where the airbags are laid to check whether the airbags are beyond the ditch. If so, the beyond position needs to be re-fixed with the iron chain; Multi-beam scanning: Multi-beam scanning is used to scan the gravel in the airbag laying area to check whether there are abnormalities such as damage and high points on the gravel ridge surface;

[0076] To prevent siltation from burying the airbag joint, after the installation of the submerged tube is completed and before the integrated ship is evacuated, use the diving equipment on the integrated ship to choose an opportunity to complete the connection of the reserved airbag pipeline.

[0077] 3) Grouting pipeline hoisting

[0078] The grouting pipeline is hoisted to the final joint of the immersed tube and is set perpendicular to the extension direction of the immersed tube; at the same time, traction ropes are set at both ends of the truss 1, and the posture of the truss 1 is adjusted with the assistance of the traction ropes, and the grouting pipeline is hoisted to the top surface of the leveling layer; the bottom edges of several triangular frames 101 in the truss 1 are placed on the leveling layer, and the distance between the truss 1 and the immersed tubes on both sides is kept not less than 2.0m;

[0079] In this embodiment, Fig. 9 As shown in the figure, the grouting pipeline is hoisted by four-point hoisting. It should be noted that the grouting pipeline should be lowered to the position close to the implantation position and the diver should dive into the water to the side of the steel frame, direct the steel frame to adjust its position and assist in placing it on the top surface of the leveling layer, and check the flatness of the grouting pipe. Figure 7 As shown, the grouting pipeline installation is completed.

[0080] 4) Sealing of grouting area

[0081] Before plugging, one end of the first grouting pipe 22, the second grouting pipe 33, and the spare grouting pipe 44 in the two groups of grouting pipes is installed with a pipe joint 55 for connecting the grouting equipment, and a detachable blind plate is set at the opening of each pipe joint 55 for temporary plugging;

[0082] Subsequently, siltation monitoring and silt removal are carried out. Divers regularly go into the water to detect and confirm the siltation on both sides of the immersed tube in the grouting area. If the siltation is large, the air lift method or artificial disturbance by divers can be used to clean it;

[0083] like Fig.10As shown in the figure, when the open areas on both sides of the cavity are sealed with gravel, the north and south sides of the grouting area are open spaces, and they need to be sealed with a combination of geotextile, bagged gravel and backfilled gravel before grouting. Geotextile is used to block and enclose the grouting area on the inside, and then bagged gravel is used to squeeze and fix the geotextile on the side wall of the immersed tube. Bagged gravel can protect the vertical steel pipe. Finally, the backfill ship cooperates to backfill and seal the middle area of ​​the grouting airbag at the bottom of the E23 pipe section and the 24 pipe section with gravel. The backfill height is 2.5m above the final joint bottom plate, the north-south backfill width is not less than 6m, and the longitudinal backfill range needs to exceed the grouting airbag by about 5m.

[0084] 5) Grouting equipment connection

[0085] After removing the blind plates at each pipe joint, Fig.11 As shown, the grouting equipment is connected to the first grouting pipe 22, the second grouting pipe 33, and the spare grouting pipe 44 respectively, and the grouting equipment is connected to each grouting pipe through a grouting hose; and a one-way valve is set at the connection.

[0086] In order to meet the grouting needs, two sets of grouting equipment are used in this embodiment to meet the simultaneous grouting on the north and south sides. A total of 2 grouting pumps, 4 mixers, and 2 spare mixers are used.

[0087] 6) Grouting

[0088] The second grouting pipe 33 and the first grouting pipe 22 are alternately used for grouting, and the grouting is stopped when it is judged that the grouting is full;

[0089] In this embodiment, two sets of grouting pipelines are used for grouting at the same time. Before grouting, fresh water is pumped for a period of time to lubricate the pipes, and then grouting is started slowly. After the grouting starts, divers need to be arranged to go into the water to check whether there is leakage at the joint position along the grouting pipeline. After the pumping is smooth, the grouting speed can be appropriately increased according to the stirring speed of the grouting material; then the grouting is carried out in a layered grouting manner. The height of the first layer of grouting is from the top of the crushed stone cushion layer to 20 cm above the crushed stone cushion layer. Fig.16 As shown, the grouting sequence is to give priority to the grouting of the axis of the immersed tube, and then proceed to both sides. During the grouting process, the grouting height is determined according to the slurry pressure change monitored by the soil pressure gauge 66. The pressure monitoring change should basically conform to formula (1), where the slurry density needs to be measured on site. The expression of formula (1) is:

[0090]

[0091] In formula (1), h is the grouting height, P is the grouting pressure, ρ is the grouting density, and g is the gravitational acceleration.

[0092] According to the test summary, the pressure change of the first layer of grouting should be 15.1Kpa; in order to obtain the real-time pressure time curve during the grouting process, 50Hz dynamic monitoring is used, and after the grouting is completed, static (2 times / h) is used to collect subsequent pressure changes until the pressure is stable;

[0093] After the first layer of grouting is completed, observe whether the slurry pressure changes significantly, and arrange divers to go into the water every 6 hours to check whether there is obvious slurry seepage from the gravel on the north and south sides; wait for 19 hours, and the second layer of grouting will be carried out after the first layer of slurry becomes slightly viscous; the second layer of grouting height is from 20cm above the gravel cushion to the height of the top of the immersed tube, and the overall grouting sequence of the second layer is similar to that of the first layer. Since only the geotextiles on both sides are the only drainage channels during the second layer of grouting, the grouting speed should be slowed down when the slurry approaches the top, and the two grouting pipes should be used alternately for grouting. The slurry flow range is determined according to the pressure changes of the earth pressure gauge 66, ensuring that the axis position is filled first, and the two sides are filled last, to avoid the situation where some water remains in the middle after both sides are filled.

[0094] During the grouting process, the elevation change of the pipe segment is measured by multiple static levels to detect the posture of the submerged pipe segment. When the elevation of the pipe segment rises to 5mm, the grouting is stopped. 50Hz dynamic monitoring is used during the grouting process, and static monitoring is used twice / h after the grouting is completed.

[0095] In view of possible situations, the control methods during the grouting process include the following three points:

[0096] a. When any abnormality occurs in any link of the pressure gauge 66 monitoring or the static level monitoring, the grouting should be stopped immediately, the cause of the abnormality should be analyzed, and the grouting should be carried out again after the monitoring data returns to normal until the grouting is full;

[0097] b. After stopping the pump, if the slurry pressure drops, it means that there is slurry seepage. Divers need to go into the water to confirm that there is no obvious seepage point and then re-inject until the bottom pressure of the pipe changes suddenly and the pressure change is close to 30.9Kpa;

[0098] c. Stop grouting after stopping the pump and observe whether the slurry pressure drops. If not, wait for 2 hours and then re-inject. If the slurry pressure does not increase during re-injection, it is confirmed that the slurry is full.

[0099] Through the description of multiple embodiments of the utility model of the grouting pipeline after the final joint foundation of the immersed tube, it can be seen that the utility model of the utility model of the grouting pipeline after the final joint foundation of the immersed tube has at least one or more of the following advantages:

[0100] 1. The utility model provides a grouting pipeline after the final joint foundation of the immersed pipe, which fixes the first grouting pipe 2 and the second grouting pipe 3 by a truss, and can effectively avoid the grouting hose used when the grouting pipe is connected to the grouting equipment from being entangled and knotted;

[0101] 2. The utility model provides a post-grouting pipeline for the final joint foundation of the immersed pipe, by making the second grouting pipe 3 longer than the first grouting pipe 2, opening grouting holes on the second grouting pipe 3, and opening grouting holes in the part where the first grouting pipe 2 is longer than the second grouting pipe 3, so as to make the grouting more uniform and effectively reduce the defects such as holes and cracks in the grouting process;

[0102] 3. The utility model provides a grouting pipeline after the final joint foundation of the immersed tube, which uses a spare grouting pipe 4 as a supplement to the first grouting pipe 2 and the second grouting pipe 3 to prevent grouting failure or incompleteness due to blockage, damage or other reasons of the first grouting pipe 2 or the second grouting pipe 3.

[0103] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0104] The above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model is described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the utility model can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the utility model, which should be included in the scope of the technical solution for which protection is requested in the utility model.

Claims

1. Grouting pipeline after the final joint foundation of the immersed tube, characterized in that: include: A truss, comprising a plurality of truss units arranged in parallel, wherein the truss is horizontally arranged at the cavity of the final joint of the immersed tube and is perpendicular to the extension direction of the immersed tube; A first grouting pipe, which is fixed inside the truss and extends along the length direction of the truss, and the length of the first grouting pipe extends from the first end of the truss to the midpoint of the truss; a first grouting hole is opened on the wall of the first grouting pipe, and the first grouting hole is located in the area between the first end of the truss and the midpoint of the truss; A second grouting pipe is fixed inside the truss and parallel to the extension direction of the first grouting pipe, and the length of the second grouting pipe extends from the first end of the truss to the second end of the truss; a second grouting hole is opened on the wall of the second grouting pipe, and the second grouting hole is located in the area from the midpoint of the truss to the second end of the truss.

2. The immersed tube final joint foundation post-grouting pipeline according to claim 1, characterized in that: The grouting pipeline after the final joint foundation of the immersed tube also includes a spare grouting pipe, which is fixed inside the truss and parallel to the extension direction of the first grouting pipe, and the length of the spare grouting pipe extends from the first end of the truss to the second end of the truss; the pipe wall of the spare grouting pipe is provided with a spare grouting hole, and the spare grouting hole is located in the area between the first end of the truss and the second end of the truss.

3. The immersed tube final joint foundation post-grouting pipeline according to claim 2, characterized in that: The first grouting holes, the second grouting holes and the spare grouting holes are each provided in plurality; wherein the first grouting holes are evenly distributed in the area between the first grouting pipe from the first end of the truss to the midpoint of the truss, the second grouting holes are evenly distributed in the area between the second grouting pipe from the midpoint of the truss to the second end of the truss, and the spare grouting holes are evenly distributed in the area between the spare grouting pipe from the first end of the truss to the second end of the truss.

4. The immersed tube final joint foundation post-grouting pipeline according to claim 2, characterized in that: The first ends of the first grouting pipe, the second grouting pipe and the spare grouting pipe are all provided with a pipe joint for connecting to grouting equipment, and the pipe joint extends out of the first end of the truss.

5. The immersed tube final joint foundation post-grouting pipeline according to claim 4, characterized in that: The open end of each pipe joint is provided with a blind plate for blocking, and the blind plate is detachably connected to the pipe joint.

6. The immersed tube final joint foundation post-grouting pipeline according to claim 4 or 5, characterized in that: A one-way valve for controlling the flow of slurry is provided at the connection between each pipe joint and the grouting equipment.

7. The immersed tube final joint foundation post-grouting pipeline according to claim 2, characterized in that: The truss unit comprises a plurality of triangular frames and three cross beams perpendicular to the plane where the triangular frames are located. The triangular frames are arranged parallel to each other, and the three cross beams are arranged at the vertices of the triangular frames.

8. The immersed tube final joint foundation post-grouting pipeline according to claim 7, characterized in that: The first grouting pipe and the second grouting pipe are respectively fixedly connected to the bottom edge of the triangular frame, and the spare grouting pipe is fixedly connected to the vertex opposite to the bottom edge of the triangular frame; the triangular frame is also provided with a support rod, and the support rod is used to support the spare grouting pipe.

9. The immersed tube final joint foundation post-grouting pipeline according to claim 7, characterized in that: An inclined beam for reinforcement is also provided between each of the triangular frames.

10. The immersed tube final joint foundation post-grouting pipeline according to claim 1 or 7, characterized in that: The immersed tube final joint foundation post-grouting pipeline also includes a pressure gauge for monitoring slurry pressure, and the pressure gauge is fixedly connected to the truss.