Synchronous pouring device for shear walls on two sides of building deformation joint

By adding dismantling components and protective components to the synchronous pouring device of the shear walls on both sides of the building deformation joint, the problem of inconvenient formwork removal in the existing technology is solved, the formwork body is quickly dismantled and protected, work efficiency is improved, and the work efficiency is reduced. The template body is damaged.

CN221823378UActive Publication Date: 2024-10-11LIAOCHENG HAICHENG REAL ESTATE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323147590.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-22
Publication Date
2024-10-11
Estimated Expiration
2033-11-22

AI Technical Summary

Technical Problem

The synchronous pouring devices for the shear walls on both sides of the existing building's deformation joints are inconvenient to dismantle during the formwork removal process, resulting in difficulty in demoulding and affecting work efficiency.

Method used

A synchronous pouring device for shear walls on both sides of the building deformation joint is designed, which includes two sets of symmetrically arranged formwork bodies and a fixed formwork body. The dismantling components and protective components are added, and the pressure bars of the U-shaped structure and the pressing blocks of the right-angled trapezoidal structure are designed. , guide wheels, springs, air bags and other components to achieve rapid removal and protection of the formwork body.

Benefits of technology

It realizes the rapid dismantling of the formwork body, protects the formwork body and the concrete wall, improves the disassembly speed of the workers, and buffers the impact force of the formwork body and the ground through the protective components, avoiding damage to the formwork body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823378U_ABST
    Figure CN221823378U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of building construction, and particularly relates to a synchronous pouring device for shear walls on two sides of a building deformation joint, which comprises two groups of template bodies arranged symmetrically and a shaped template body arranged between the two groups of template bodies, the dismounting assembly is arranged on one side, far away from the shaping template main body, of the surface of the template body; the dismantling assembly comprises a pressing rod which is arranged on the side, away from the shaping formwork body, of the surface of the formwork body and is of a U-shaped structure, pressing blocks which are fixedly connected to the two ends of the pressing rod and are of a right trapezoid structure, and fixing blocks which are fixedly connected to the side, close to the pressing blocks, of the surface of the formwork body. And through the arranged dismantling assembly, dismantling of the formwork body can be completed, workers can conveniently and rapidly dismantle the formwork body, the formwork body and a concrete wall can be well protected, demolding is convenient, and the dismantling speed of the workers is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and in particular relates to a synchronous pouring device for shear walls on both sides of a building deformation joint. Background Art

[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said that it is the process of turning various lines on the design drawings into physical objects at designated locations. In the process of construction, high-rise buildings sometimes have a deformation joint set according to the structural characteristics to avoid deformation of the building under the influence of external factors, resulting in cracking or even damage.

[0003] After checking, the public (announcement) number: CN216616836U discloses a synchronous pouring device for shear walls on both sides of a building deformation joint. This technology discloses "including a first template and a second template parallel to each other, and a fixed template arranged in parallel between the first template and the second template; a support body is vertically arranged between the fixed template and the first template and the second template; a tension screw rod passes through the first template, the second template, and the fixed template, and the two ends of the tension screw rod are also fixed by fasteners, etc., which can meet the technical effects of pouring concrete between the first template and the fixed template, and between the second template and the fixed template at the same time";

[0004] Although the design can simultaneously cast concrete between the first formwork and the final formwork, and between the second formwork and the final formwork, in the process of demoulding the existing device, the staff usually use a crowbar to lift the formwork out until the formwork is separated from the concrete, which makes demoulding inconvenient;

[0005] Therefore, a synchronous casting device for shear walls on both sides of building deformation joints is designed to solve the above problems. Utility Model Content

[0006] To solve the problems raised in the above background technology. The utility model provides a synchronous casting device for shear walls on both sides of a building deformation joint, which can complete the removal of the formwork body, facilitate the staff to quickly remove the formwork body, can better protect the formwork body and the concrete wall, is more convenient to demould, and improves the disassembly speed of the staff.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a synchronous pouring device for shear walls on both sides of a building deformation joint, comprising two sets of symmetrically arranged formwork bodies and a fixed formwork body arranged between the two sets of the formwork bodies, and also comprising a removal component arranged on a side of the formwork body surface away from the fixed formwork body;

[0008] The dismantling assembly includes a pressure rod with a U-shaped structure arranged on the side of the template body surface away from the shaping template body, a pressing block with a right-angle trapezoidal structure fixedly connected to both ends of the pressure rod, and a fixed block fixedly connected to the side of the template body surface close to the pressing block, and the pressing block is parallel to the side adjacent to the fixed block surface.

[0009] As a preferred embodiment of the synchronous casting device of shear walls on both sides of a building deformation joint of the utility model, a rope is fixedly connected to the bottom surface of the pressure rod, a guide wheel is arranged below the pressure rod, and the guide wheel and the pressure rod are rotatably connected via a bearing, and one end of the rope away from the pressure rod is wrapped around the surface of the guide wheel.

[0010] As a preferred embodiment of the synchronous casting device of shear walls on both sides of a building deformation joint of the utility model, connecting plates are fixedly connected to both sides of the surfaces of the two groups of extended ends of the pressure rod, and a spring A is fixedly connected between each group of the connecting plates and the fixed blocks.

[0011] As a preferred embodiment of the utility model of a synchronous casting device for shear walls on both sides of a building deformation joint, a limit block with a T-shaped structure is fixedly connected to the surface of the pressure rod close to the template body, and a limit groove is provided inside the template body for the limit block to be slidably connected in the vertical direction.

[0012] As a preferred embodiment of the synchronous pouring device for shear walls on both sides of a building deformation joint of the utility model, it also includes a protection component arranged on the surface of the fixing block away from the template body;

[0013] The protection assembly includes a fixing seat fixedly connected to the surface of each group of fixing blocks away from the template body, a push block with a T-shaped structure arranged inside the fixing seat, and a spring B fixedly connected to the bottom surface of the push block and the bottom side of the inner wall of the fixing seat.

[0014] As a preferred embodiment of the synchronous casting device for shear walls on both sides of a building deformation joint of the utility model, a sliding groove is provided inside the fixing seat for the push block to slide in a vertical direction, and an air bag is fixedly connected to the top end of the push block.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows: a dismantling component is added to the present application, so that the dismantling of the formwork body can be completed, which is convenient for the staff to quickly dismantle the formwork body, can better protect the formwork body and the concrete wall, and demoulding is more convenient, which improves the disassembly speed of the staff. At the same time, a protective component is added to buffer the impact force between the formwork body and the ground, thereby preventing the formwork body from directly contacting the ground and causing the formwork body to be damaged by impact. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 It is a structural schematic diagram of the fixed block and the pressure rod in the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the guide wheel and the pressing block in the utility model;

[0020] Figure 4 It is a schematic diagram of the structure of the air bag and the push block in the utility model;

[0021] In the figure:

[0022] 1. Template body; 11. Finalized template body;

[0023] 2. Dismantling assembly; 21. Guide wheel; 22. Rope; 23. Pressure rod; 24. Fixing block; 25. Connecting plate; 26. Spring A; 27. Pressing block; 28. Limiting block;

[0024] 3. Protective assembly; 31. Airbag; 32. Push block; 33. Fixed seat; 34. Spring B. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] Example 1

[0027] like Figure 1 As shown:

[0028] A synchronous casting device for shear walls on both sides of a building deformation joint comprises two groups of formwork bodies 1 symmetrically arranged and a fixed formwork body 11 arranged between the two groups of formwork bodies 1.

[0029] In this embodiment: the existing synchronous casting device for shear walls on both sides of the building deformation joint {publication (announcement) number}: CN216616836U discloses a synchronous casting device for shear walls on both sides of the building deformation joint. This patent discloses the template body 1 and the fixed template body 11 proposed in the application document. The template body 1 and the fixed template body 11 in the application document adopt the same technical means in this prior art. This technical means is not repeated here one by one. Regarding this existing removal component 2, this application makes further improvements. For details, please refer to the disclosed technology below; to solve the technical problems existing in this prior art, as disclosed in the background technology above, "although the design can satisfy the simultaneous casting of concrete between the first template and the fixed template, and between the second template and the fixed template, but in the process of demolding the existing device, the staff usually uses a crowbar to lift the template out until the template is separated from the concrete, and demolding is inconvenient". In terms of combined use, this problem is obviously a real problem that exists and is difficult to solve. In view of this, in order to solve this technical problem, a removal component 2 and a protective component 3 are added on this basis.

[0030] It should be noted that: a plurality of support bodies (not shown in the figure) are arranged between each set of template bodies 1 and the shaping template body 11, fasteners (not shown in the figure) are installed inside the template bodies 1 and the shaping template body 11, a sleeve assembly (not shown in the figure) is arranged inside the shaping template body 11, and a tension screw (such as Figure 1 As shown), a pipe fitting (not shown in the figure) is sleeved between the shaping template body 11 and the template body 1, and the support body, fastener, sleeve assembly, tension screw and pipe fitting have been disclosed by publication number CN216616836U, and the use effect can refer to publication number CN216616836U.

[0031] More specifically:

[0032] like Figures 1 to 4 As shown:

[0033] In combination with the above content: it also includes a dismantling component 2 arranged on the side of the template body 1 surface away from the shaping template body 11; the dismantling component 2 includes a pressure rod 23 with a U-shaped structure arranged on the side of the template body 1 surface away from the shaping template body 11, and a pressing block 27 with a right-angle trapezoidal structure fixedly connected to both ends of the pressure rod 23, and a fixed block 24 fixedly connected to the side of the template body 1 surface close to the pressing block 27, and the side adjacent to the surface of the pressing block 27 and the fixed block 24 are parallel to each other.

[0034] In this embodiment: when it is necessary to dismantle the two groups of formwork bodies 1, the pressure rod 23 moves downward, and the movement of the pressure rod 23 can drive the pressing block 27 to move downward. Since the pressing block 27 and the side close to the surface of the fixing block 24 are parallel to each other, the movement of the pressing block 27 can squeeze the fixing block 24, thereby separating the fixing block 24 from the shear wall, thereby completing the dismantling of the formwork body 1, making it convenient for the staff to quickly dismantle the formwork body 1, and can better protect the formwork body 1 and the concrete wall. The demoulding is more convenient, which improves the disassembly speed of the staff.

[0035] Going further:

[0036] In an optional embodiment, a rope 22 is fixedly connected to the bottom surface of the pressure rod 23, a guide wheel 21 is arranged below the pressure rod 23, and the guide wheel 21 and the pressure rod 23 are rotatably connected via a bearing, and one end of the rope 22 away from the pressure rod 23 is wrapped around the surface of the guide wheel 21.

[0037] In this example: when it is necessary to dismantle the two groups of formwork bodies 1, the rope 22 is pulled, and the guiding action of the guide wheel 21 can drive the pressure rod 23 to move downward. The pressure rod 23 moves downward, and the movement of the pressure rod 23 can drive the pressing block 27 to move downward. Since the pressing block 27 and the fixed block 24 are close to each other on one side and are parallel to each other, the movement of the pressing block 27 can squeeze the fixed block 24, thereby separating the fixed block 24 from the shear wall, thereby completing the dismantling of the formwork body 1.

[0038] Going further:

[0039] In an optional embodiment, connecting plates 25 are fixedly connected to both sides of the surfaces of the two groups of extending ends of the pressure rod 23, and a spring A26 is fixedly connected between each group of connecting plates 25 and the fixing block 24.

[0040] In this example, during the movement of the pressure rod 23, the movement of the pressure rod 23 can drive the connecting plate 25 to move downward, and the movement of the connecting plate 25 can squeeze the spring A26 so that the spring A26 is compressed and contracts to generate elastic force.

[0041] Going further:

[0042] In an optional embodiment, a T-shaped limit block 28 is fixedly connected to one side of the surface of the pressure rod 23 close to the template body 1 , and a limit groove for vertically sliding connection of the limit block 28 is provided inside the template body 1 .

[0043] In this example, during the movement of the pressure rod 23 , the movement of the pressure rod 23 can drive the limiting block 28 to move in the limiting groove provided inside the template body 1 .

[0044] Going further:

[0045] In an optional embodiment, it also includes a protective component 3 arranged on the side of the fixed block 24 away from the template body 1; the protective component 3 includes a fixed seat 33 fixedly connected to the side of the surface of each group of fixed blocks 24 away from the template body 1, and a push block 32 with a T-shaped structure arranged inside the fixed seat 33, and a spring B34 fixedly connected to the bottom surface of the push block 32 and the bottom side of the inner wall of the fixed seat 33.

[0046] In the present embodiment: after the formwork body 1 is separated from the concrete, the formwork body 1 tilts downward, and the push block 32 moves. The movement of the push block 32 can squeeze the spring B34 so that the spring B34 is compressed and contracts and generates elastic force, thereby being able to damp the shock of the formwork body 1 and preventing the formwork body 1 from directly impacting the ground and causing damage to the formwork body 1.

[0047] Going further:

[0048] In an optional embodiment, a slide groove is provided inside the fixing seat 33 for the push block 32 to slide vertically, and the top end of the push block 32 is fixedly connected to the airbag 31 .

[0049] In this example: after the formwork body 1 is separated from the concrete, the formwork body 1 tilts downward, and during this process, the airbag 31 first contacts the ground, and the airbag 31 collides with the ground. The airbag 31 can buffer the impact force between the formwork body 1 and the ground, thereby preventing the formwork body 1 from directly contacting the ground and causing the formwork body 1 to be damaged by the impact. The airbag 31 is hit by the ground and pushes the push block 32 to move. The movement of the push block 32 can squeeze the spring B34 so that the spring B34 is compressed and contracts and generates elastic force, thereby performing secondary shock absorption on the formwork body 1, further preventing the formwork body 1 from directly impacting the ground.

[0050] Working principle: After the shear walls on both sides of the building deformation joint are cast synchronously, when the two sets of formwork bodies 1 need to be removed, the rope 22 is pulled at this time, and the guiding effect of the guide wheel 21 can drive the pressure rod 23 to move downward, and the movement of the pressure rod 23 can drive the limit block 28 to move in the limit groove opened inside the formwork body 1, and the movement of the pressure rod 23 can drive the connecting plate 25 to move downward, and the movement of the connecting plate 25 can squeeze the spring A26 so that the spring A26 is compressed and shrinks and generates elastic force, and the movement of the pressure rod 23 can drive the pressing block 27 to move downward. Since the pressing block 27 and the fixed block 24 are parallel to each other, the movement of the pressing block 27 can squeeze the fixed block 24, thereby separating the fixed block 24 from the shear wall, thereby completing the removal of the formwork body 1. In addition, it is convenient for the staff to quickly dismantle the formwork body 1, and can better protect the formwork body 1 and the concrete wall. The demoulding is relatively convenient, which improves the disassembly speed of the staff. After the formwork body 1 is separated from the concrete, the formwork body 1 tilts downward. In this process, the airbag 31 first contacts the ground, and the airbag 31 collides with the ground. The airbag 31 can buffer the impact force between the formwork body 1 and the ground, thereby preventing the formwork body 1 from directly contacting the ground and causing the formwork body 1 to be damaged by impact. The airbag 31 is hit by the ground and will push the push block 32 to move. The movement of the push block 32 can squeeze the spring B34 so that the spring B34 is compressed and contracts and generates elastic force, thereby performing secondary shock absorption on the formwork body 1, further preventing the formwork body 1 from directly impacting the ground and causing damage to the formwork body 1.

[0051] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A synchronous casting device for shear walls on both sides of a building deformation joint, comprising two sets of symmetrically arranged formwork bodies (1) and a fixed formwork body (11) arranged between the two sets of the formwork bodies (1), characterized in that: It also includes a removal component (2) arranged on a side of the surface of the template body (1) away from the shaping template body (11); The dismantling assembly (2) comprises a U-shaped pressure rod (23) arranged on the side of the surface of the template body (1) away from the shaping template body (11), a pressing block (27) with a right-angle trapezoidal structure fixedly connected to both ends of the pressure rod (23), and a fixing block (24) fixedly connected to the side of the surface of the template body (1) close to the pressing block (27), and the side of the pressing block (27) adjacent to the surface of the fixing block (24) is parallel to each other.

2. The synchronous pouring device for shear walls on both sides of a building deformation joint according to claim 1 is characterized in that: The bottom surface of the pressure rod (23) is fixedly connected with a rope (22), a guide wheel (21) is arranged below the pressure rod (23), and the guide wheel (21) and the pressure rod (23) are rotatably connected via a bearing, and one end of the rope (22) away from the pressure rod (23) is wound around the surface of the guide wheel (21).

3. The synchronous pouring device for shear walls on both sides of a building deformation joint according to claim 2 is characterized in that: Connecting plates (25) are fixedly connected to both sides of the surfaces of the two groups of extended ends of the pressure rod (23), and a spring A (26) is fixedly connected between each group of the connecting plates (25) and the fixed block (24).

4. The synchronous pouring device for shear walls on both sides of a building deformation joint according to claim 3 is characterized in that: A T-shaped limit block (28) is fixedly connected to one side of the surface of the pressure rod (23) close to the template body (1), and a limit groove is provided inside the template body (1) for the limit block (28) to be slidably connected in the vertical direction.

5. The synchronous pouring device for shear walls on both sides of a building deformation joint according to claim 4 is characterized in that: It also includes a protection component (3) arranged on a side of the surface of the fixing block (24) away from the template body (1); The protection component (3) comprises a fixing seat (33) fixedly connected to the surface of each group of fixing blocks (24) on the side away from the template body (1), a pushing block (32) with a T-shaped structure arranged inside the fixing seat (33), and a spring B (34) fixedly connected to the bottom surface of the pushing block (32) and the bottom side of the inner wall of the fixing seat (33).

6. The synchronous pouring device for shear walls on both sides of a building deformation joint according to claim 5 is characterized in that: A sliding groove is provided inside the fixing seat (33) for the push block (32) to slide in a vertical direction, and the top end of the push block (32) is fixedly connected to an air bag (31).