Rapid pouring device for building constructional column
By arranging a rotating baffle structure and a pull rope mechanism in the structural column pouring device, the problem of bell mouth protrusion in the traditional formwork is solved, rapid pouring and simplified disassembly are achieved, and operation efficiency is improved.
Patent Information
- Application Number
- CN202420318951.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-21
AI Technical Summary
In the traditional casting formwork device for structural columns, concrete protrusion is likely to occur at the bell mouth after casting, making removal difficult and increasing the workload of the operator.
A rapid pouring device including side fixing plates, front and rear fixing plates, limiting plates, support rods and driving parts is designed. By rotating the baffle structure and the pull rope mechanism, the baffle is ensured to be erected to prevent the formation of a bell mouth and is easy to operate. and support.
It effectively prevents the appearance of redundant bell mouths after pouring, simplifies the formwork removal process, reduces the workload of operators, and improves pouring efficiency.
Smart Images

Figure CN221823383U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pouring equipment, in particular to a rapid pouring device for building structural columns. Background Art
[0002] Structural columns refer to reinforced concrete structural columns that should be set in the walls of multi-story brick-concrete structures to enhance the integrity and stability of the building. They are connected to the ring beams of each floor to form a space frame that can resist bending and shearing. It is an effective measure to prevent the collapse of the building. Structural columns are set at the four corners of the exterior wall, the intersection of the horizontal wall and the exterior longitudinal wall at the staggered level, on both sides of larger openings, and at the intersection of the interior and exterior walls of large rooms.
[0003] In the traditional structural column casting formwork device, a bell-shaped mouth is set on the top of the formwork as a concrete feed inlet. When the formwork is removed later, there will be protruding concrete at the bell-shaped mouth of the structural column, which is inconvenient to chisel out and increases the workload of the operator.
[0004] In summary, the prior art obviously has inconveniences and defects in practical use, so it is necessary to improve it. Utility Model Content
[0005] In view of the above-mentioned defects, the purpose of the utility model is to provide a rapid pouring device for building structural columns, which can be equipped with a rotatable baffle structure to ensure that when the structural column is poured to the position of the pouring port, the baffle is erected to prevent the appearance of excess bell mouth after pouring. At the same time, a structure that is convenient for operating the baffle is provided to facilitate the control and support of the baffle.
[0006] In order to achieve the above-mentioned purpose, the utility model provides a rapid pouring device for building structural columns, comprising: two oppositely arranged side fixing plates; a front fixing plate and a rear fixing plate inserted between the two side fixing plates, the front fixing plate and the rear fixing plate cooperate with the side fixing plates to form a pouring space, the top of the front fixing plate is provided with a pouring port, the outer side of the pouring port is rotatably connected to a baffle, the top of the front fixing plate is rotatably connected to a driving shaft for controlling the angle of the baffle, a pull rope is wound around the driving shaft, one end of the pull rope is connected to the driving shaft, and the other end is fixed to the inner side of the baffle.
[0007] According to the rapid pouring device for building structural columns of the utility model, limiting plates are provided on both sides of the outer wall of the pouring port, and a limiting portion for limiting the rotation position of the baffle is provided inside the limiting plates. During pouring, the baffle rotates and fits closely to the top of the limiting portion.
[0008] According to the rapid casting device for building structural columns of the utility model, through holes are opened on the two limiting plates, and support rods are detachably inserted into the interior of the through holes. The support rods are spanned between the two limiting plates, and the support rods are tightly attached to the outer wall of the front fixing plate.
[0009] According to the rapid pouring device for building structural columns of the utility model, a slot is provided on the inner wall of the side fixing plate, and the front fixing plate and the rear fixing plate are inserted into the inside of the slot.
[0010] According to the rapid pouring device for building structural columns of the utility model, a mounting portion is provided on the top of the front fixing plate, the driving shaft is rotatably connected to the mounting portion, and a driving member for driving the driving shaft to rotate is provided on the mounting portion.
[0011] According to the rapid pouring device for building structural columns of the utility model, the driving member includes a driving gear and an operating handle, and the end of the rotating shaft is provided with a driven gear meshing with the driving gear, and the diameter of the driven gear is larger than the diameter of the driving gear.
[0012] The utility model provides a rapid pouring device for building structural columns, comprising: two side fixing plates arranged opposite to each other, ensuring that the side fixing plates are in contact and fixed with the wall; a front fixing plate and a rear fixing plate inserted between the two side fixing plates, the front fixing plate and the rear fixing plate cooperate with the side fixing plates to form a pouring space, and when in use, pouring is performed into the inside of the pouring space to form a structural column, a pouring port is provided on the top of the front fixing plate, a baffle is rotatably connected to the outer side of the pouring port, a driving shaft for controlling the angle of the baffle is rotatably connected to the top of the front fixing plate, and a drive shaft is wound around the driving shaft A pull rope is provided, one end of the pull rope is connected to the driving shaft, and the other end is fixedly arranged on the inner side of the baffle. The driving shaft is rotated so that the pull rope is wound around the driving shaft. At this time, the baffle rotates under the action of the pull rope, so that the angle of the baffle is controlled by the pull rope, which facilitates the control of the position of the baffle. In summary, the technical effect produced by the utility model is that a baffle structure that can be rotated is set to ensure that when the structural column is poured to the position of the pouring port, the baffle is erected to prevent the appearance of excess bell mouth after pouring. At the same time, a structure that is convenient for operating the baffle is provided, so that the baffle can be controlled and supported. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0014] Figure 2 yes Figure 1 The enlarged structural diagram of part A in the middle;
[0015] Figure 3 It is a schematic diagram of the three-dimensional structure of the side fixing plate of the utility model;
[0016] Figure 4 It is a schematic diagram of the three-dimensional structure of the front fixing plate of the utility model;
[0017] Figure 5 It is a three-dimensional structural schematic diagram of the driving member of the utility model;
[0018] Figure 6 It is a schematic diagram of the three-dimensional structure of the baffle of the utility model;
[0019] In the figure, 1-rear fixing plate, 2-side fixing plate, 21-slot, 3-front fixing plate, 31-installing part, 32-limiting part, 33-limiting plate, 34-through hole, 35-pouring mouth, 4-support rod, 5-driving shaft, 51-driven gear, 6-driving member, 61-handle, 62-driving gear, 7-baffle, 71-pull rope. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0021] See also Figure 1 to Figure 6 The utility model provides a rapid pouring device for a building structural column, which comprises two side fixing plates 2 arranged opposite to each other, ensuring that the side fixing plates 2 are in contact and fixed with the wall; a front fixing plate 3 and a rear fixing plate 1 inserted between the two side fixing plates 2, wherein the front fixing plate 3 and the rear fixing plate 1 cooperate with the side fixing plates 2 to form a pouring space, and pouring is performed inside the pouring space during use, and then a structural column is formed, a pouring port 35 is provided at the top of the front fixing plate 3, a baffle 7 is rotatably connected to the outer side of the pouring port 35, a driving shaft 5 for controlling the angle of the baffle 7 is rotatably connected to the top of the front fixing plate 3, a pull rope 71 is wound around the driving shaft 5, one end of the pull rope 71 is connected to the driving shaft 5, and the other end is fixed to the inner side of the baffle 7, and the driving shaft 5 is rotated so that the pull rope 71 is wound around the driving shaft 5, and the baffle 7 is rotated under the action of the pull rope 71, so that the angle of the baffle 7 is controlled by the pull rope 71, so as to facilitate the control of the position of the baffle 7.
[0022] Preferably, limit plates 33 are provided on both sides of the outer wall of the pouring port 35 of the utility model, and a limit portion 32 for limiting the rotation position of the baffle 7 is provided inside the limit plate 33. During pouring, the baffle 7 rotates to fit closely to the top of the limit portion 32. At this time, the baffle 7 cooperates with the limit plate 33 to form a trumpet mouth under the action of the limit portion 32. A through hole 34 is provided on the two limit plates 33, and a support rod 4 is detachably inserted inside the through hole 34. The support rod 4 spans between the two limit plates 33, and the support rod 4 is tightly attached to the outer wall of the front fixing plate 3, so that when the baffle 7 rotates to coincide with the outer wall of the front fixing plate 3, the support rod 4 is inserted into the through hole 34, and the baffle 7 is supported by the support rod 4.
[0023] In addition, a slot 21 is provided on the inner wall of the side fixing plate 2 of the utility model, and the front fixing plate 3 and the rear fixing plate 1 are inserted into the inside of the slot 21 to ensure the cooperation between the front fixing plate 3 and the rear fixing plate 1 and the side baffle 7 to prevent concrete from leaking from the side wall and affecting the casting effect of the structural column. A mounting portion 31 is provided on the top of the front fixing plate 3, and the drive shaft 5 is rotatably connected to the mounting portion 31. A driving member 6 for driving the drive shaft 5 to rotate is provided on the mounting portion 31. The drive shaft 5 is driven to rotate by the rotation of the driving member 6, thereby ensuring the control effect of the pull rope 71 on the baffle 7.
[0024] Furthermore, the driving member 6 of the utility model includes a driving gear 62 and an operating handle 61. The end of the rotating shaft is provided with a driven gear 51 meshing with the driving gear 62. The diameter of the driven gear 51 is larger than the diameter of the driving gear 62, ensuring that the driving member 6 drives the driving shaft 5 to rotate in a labor-saving manner.
[0025] In this embodiment, during use, when pouring is required, the handle 61 is rotated, and the baffle 7 at this time abuts against the limit portion 32 under the action of gravity, forming a bell-shaped injection structure. After the injection is completed, the driving shaft 5 is driven to rotate by rotating the driving member 6, so that the pull rope 71 is wound around the driving shaft 5, and the baffle 7 is further pulled to rotate in the vertical direction until it is parallel to the front fixed plate 3. At this time, the support rod 4 is inserted into the inside of the through hole 34 to fix the baffle 7 at this position. There is no redundant part of the pouring port 35, and the rapid pouring of the structural column is completed.
[0026] In summary, the utility model provides a rapid pouring device for building structural columns, comprising: two side fixing plates arranged opposite to each other, ensuring that the side fixing plates are in contact and fixed with the wall; a front fixing plate and a rear fixing plate inserted between the two side fixing plates, the front fixing plate and the rear fixing plate cooperate with the side fixing plates to form a pouring space, and when in use, pouring is performed into the inside of the pouring space to form a structural column, a pouring port is provided on the top of the front fixing plate, a baffle is rotatably connected to the outer side of the pouring port, a driving shaft for controlling the angle of the baffle is rotatably connected to the top of the front fixing plate, and the driving shaft for controlling the angle of the baffle is rotatably connected to the top of the front fixing plate A pull rope is wound around the shaft, one end of the pull rope is connected to the driving shaft, and the other end is fixed to the inner side of the baffle. The driving shaft is rotated to make the pull rope wound around the driving shaft. At this time, the baffle rotates under the action of the pull rope, so that the angle of the baffle is controlled by the pull rope, which facilitates the position of the baffle to be controlled. In summary, the technical effect produced by the utility model is that a rotatable baffle structure is set up to ensure that when the structural column is poured to the position of the pouring port, the baffle is erected to prevent the appearance of excess bell mouth after pouring. At the same time, a structure that is convenient for operating the baffle is set up, so that the baffle can be controlled and supported.
[0027] Of course, the present invention may have many other embodiments. Without departing from the spirit and essence of the present invention, technicians familiar with the field can make various corresponding changes and deformations based on the present invention, but these corresponding changes and deformations should all fall within the scope of protection of the claims attached to the present invention.
[0028] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.
Claims
1. A rapid pouring device for building structural columns, characterized in that: include: Two oppositely disposed side fixing plates; A front fixing plate and a rear fixing plate are inserted between the two side fixing plates, and the front fixing plate and the rear fixing plate cooperate with the side fixing plates to form a casting space. A casting port is provided on the top of the front fixing plate, and a baffle is rotatably connected to the outer side of the casting port. The top of the front fixing plate is rotatably connected to a driving shaft for controlling the angle of the baffle, and a pull rope is wound around the driving shaft, one end of the pull rope is connected to the driving shaft, and the other end is fixed to the inner side of the baffle.
2. The rapid pouring device for building structural columns according to claim 1 is characterized in that: Limiting plates are provided on both sides of the outer wall of the pouring port, and a limiting portion for limiting the rotation position of the baffle is provided inside the limiting plates. During pouring, the baffle rotates and is close to the top of the limiting portion.
3. The rapid pouring device for building structural columns according to claim 2 is characterized in that: The two limiting plates are provided with through holes, and a support rod is detachably inserted into the through hole. The support rod is spanned between the two limiting plates and is closely attached to the outer side wall of the front fixing plate.
4. The rapid pouring device for building structural columns according to any one of claims 1 to 3, characterized in that: The inner wall of the side fixing plate is provided with a slot, and the front fixing plate and the rear fixing plate are inserted into the slot.
5. The rapid pouring device for building structural columns according to claim 4 is characterized in that: A mounting portion is provided on the top of the front fixing plate, the driving shaft is rotatably connected to the mounting portion, and a driving member for driving the driving shaft to rotate is provided on the mounting portion.
6. The rapid pouring device for building structural columns according to claim 5, characterized in that: The driving member comprises a driving gear and an operating handle. The end of the driving shaft is provided with a driven gear meshing with the driving gear. The diameter of the driven gear is greater than the diameter of the driving gear.