Integrated control device of logging test system

By integrating the control panel and equipment into the logging test system, the problem of safety accidents caused by coordinated operations by multiple people is solved, the system is simple to operate and the safety is improved, and at the same time it saves transportation costs and facilitates storage management.

CN221823784UActive Publication Date: 2024-10-11CANGZHOU DETAIKE DRILLING EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323393999.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-10-11
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

The work units with different functions of the equipment in the logging test system are equipped with independent operating consoles, which requires multiple people to coordinate operations when the system is running, which is prone to operational errors and leads to safety accidents.

Method used

An integrated control device for the well logging test system is designed. By integrating the control valves and pressure gauges on a panel, and distributing the equipment in a tailor-made skid, a highly integrated control panel is formed to achieve centralized operation. and device management.

Benefits of technology

It achieves a simple and clear operating system, reduces the possibility of operating errors, improves system security, saves costs through centralized assembly and transportation, and facilitates equipment storage and management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823784U_ABST
    Figure CN221823784U_ABST
Patent Text Reader

Abstract

The utility model discloses a logging test system integrated control device which comprises a dragging and prying assembly, shackles are installed at the four corners of the upper end of the dragging and prying assembly, an equipment cage frame is installed on the inner side of a pulley assembly, a prying tool box assembly is installed in the dragging and prying assembly, and the upper end of the dragging and prying assembly is connected with the equipment cage frame. The integrated control device of the logging test system comprises a panel, a control valve and a pressure gauge are integrated on the panel, a three-ram blowout preventer cage frame is installed on the inner side of the prying tool box assembly, and an air source prying device is installed on the inner side of the blowout prevention pipe assembly, according to the integrated control device of the logging test system, the control valve and the pressure gauge of equipment needed by the logging test system are integrated on the panel, and the control valve and the pressure gauge are integrated on the panel; control routes of different devices are clearly milled and engraved on the panel through reasonable planning and layout, and permanent identification is formed. Therefore, a highly integrated control panel is formed to realize simple and clear control of an operation system, so that the device can realize normal work of the logging test system through centralized operation of the integrated panel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field related to an integrated control device of a well logging test system, and specifically relates to an integrated control device of a well logging test system. Background Art

[0002] The logging test system is a key equipment for wellhead cable pressure operation, and is used for various pressure operations in high-pressure oil and gas wells in oil fields. The system is equipped with a full set of wellhead pressure control equipment and a power source for the system. The entire system includes wellhead pressure-bearing equipment, auxiliary equipment, grease injection equipment, gas source, etc. Multiple equipment work together to ensure the normal operation of the entire system.

[0003] The working units with different functions of the equipment in the system are equipped with independent operating tables. When the system is running, multiple people are required to coordinate and implement the logging test project. If the coordination is not proper, operational errors may easily occur, resulting in safety accidents. Utility Model Content

[0004] The purpose of the utility model is to provide an integrated control device for a well logging test system, so as to solve the problem that the working units with different functions of the equipment in the system proposed in the above background technology are provided with independent operating tables, and the operation of the system during operation requires multiple people to coordinate and implement the well logging test project. If the coordination is not proper, operational errors are likely to occur, resulting in safety accidents.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an integrated control device for a well logging test system, comprising a skid assembly, wherein shackles are installed at the four corners of the upper end of the skid assembly, a wellhead flange assembly is installed at the inner side of the skid assembly, a bracket assembly is installed at the right end of the wellhead flange assembly, a grease injection hydraulic control skid is supported at the inner side of the bracket assembly, an accumulator pressure relief valve is arranged at the right position of the lower part of the grease injection hydraulic control skid, the accumulator pressure relief valve is used to control the accumulator A at the upper end, a pneumatic oil pump is connected to the left side of the accumulator A, and the left side of the lower part of the grease injection hydraulic control skid is connected to the pneumatic oil pump. A grease injection hose A, a grease return hose, a blowout preventer grease injection hose and an air source hose are arranged at the position; the interior of the grease injection hydraulic control skid is arranged at the top position with upper and lower secondary cable packing box control hoses, upper and lower catcher control hoses, a blowout preventer upper control hose, a blowout preventer middle control hose and a blowout preventer lower control hose; a grease injection pump A is arranged at the top position of the grease injection hydraulic control skid, and the grease injection pump A is connected to the grease injection hydraulic control box at the side position; a waste grease three-way ball valve is arranged at the top position of the grease injection hydraulic control box, and the waste grease three-way ball valve is connected to a waste grease recovery pipe at the top position; a control panel is arranged at the inner side position of the grease injection hydraulic control skid;

[0006] A grease injection unloading valve is installed at the front end of the control panel, a grease injection pump air pressure regulating valve is installed at the lower position of the grease injection unloading valve, a grease injection pump air source switch valve is installed at the lower position of the grease injection pump air pressure regulating valve, a grease injection pump grease pressure gauge for observing pressure is installed at the top position of the grease injection unloading valve, an air source pressure gauge is installed at the right side of the grease injection unloading valve, a grease return regulating valve is installed above the air source pressure gauge, a grease injection pump function conversion valve is installed at the right side of the grease injection unloading valve, a gate control valve is installed at the right side of the grease injection pump function conversion valve, a cable packing box hydraulic control pressure gauge is installed at the right side of the top of the control panel, a cable packing box control valve is installed below the cable packing box hydraulic control pressure gauge, and a manual oil pump is installed below the cable packing box control valve;

[0007] A pulley assembly is installed at the upper inner side of the skid assembly, an equipment cage is installed at the inner side of the pulley assembly, a skid toolbox assembly is installed at the inner side of the skid assembly, a three-gate blowout preventer cage is installed at the inner side of the skid toolbox assembly, a blowout preventer cage is installed at the upper end of the skid toolbox assembly, a blowout preventer assembly is installed at the inner side of the skid assembly, a grease injection head assembly is installed at the upper side of the blowout preventer assembly, and an air source skid is installed at the inner side of the blowout preventer assembly.

[0008] Preferably, the skid assembly is welded from a rectangular tube group, and all the equipment is integrated and installed at an inner position in the skid assembly. The skid assembly is provided with a plurality of partitions for managing the equipment.

[0009] Preferably, the control panel can adjust the pressure of the air pump after startup, the control panel can control the switch hydraulic pressure of the gate blowout preventer, and the control panel displays the hydraulic control pressure value.

[0010] Preferably, the grease injection hydraulic control skid provides high-pressure sealing grease to the grease injection head through a grease injection pump, and the grease injection hydraulic control skid establishes a circulation control wellhead pressure in the grease injection head flow blocking system.

[0011] Preferably, the blowout preventer in the three-gate blowout preventer cage is fixed on the blowout preventer cage, and the shackles are located at the four corners of the upper end of the cage.

[0012] Preferably, the blowout preventer in the three-gate blowout preventer cage can control the pressure at the wellhead, the blowout preventer in the three-gate blowout preventer cage can be remotely opened and closed by a control console, and the three-gate blowout preventer cage can be manually locked when it is closed for a long time.

[0013] Preferably, the control panel integrates all control valves and instruments of the system, and the control panel can operate all equipment. The grease injection pump A, the grease injection liquid control box and the waste grease recovery pipe can be rotated and extended to the external position of the drag skid assembly.

[0014] Preferably, normal grease injection can be carried out when the grease injection unloading valve is in the middle position, the grease injection pipeline is unloaded when the grease injection unloading valve is in the left valve position or the right valve position, the grease return regulating valve is a throttle valve that is closed by right rotation and opened by left rotation, and the grease return regulating valve can control the amount of returned grease.

[0015] Preferably, three cable packing box hydraulic control pressure gauges are provided, and the cable packing box hydraulic control pressure gauges are used to display the hydraulic control pressure value of the upper cable packing box, the hydraulic control pressure value of the lower cable packing box and the display system hydraulic control pressure value respectively.

[0016] Compared with the prior art, the utility model provides an integrated control device for a well logging test system, which has the following beneficial effects:

[0017] 1. This well logging test system integrated control device integrates the control valves and pressure gauges of the equipment required for the well logging test system on a panel, and the control routes of different equipment are clearly milled on the panel through reasonable planning and layout, forming a permanent mark. Thus, a highly integrated control panel is formed to realize simple and clear control of the operating system, so that the device can realize the normal operation of the well logging test system through the centralized operation of the integrated panel.

[0018] 2. This well logging test system integrated control device packs different equipment of the well logging test system in customized skids, and the neatly packed skids are finally packed into the final system skid. The well logging test system integrated control device thus forms an excellent system device that is convenient for transportation and saves costs. The equipment storage management is centralized and convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The utility model is a schematic diagram of the structure of an integrated control device for a well logging test system.

[0020] Figure 2 The utility model is a schematic diagram of the structure of a grease injection hydraulic control skid of an integrated control device for a well logging test system.

[0021] FIG3 is a schematic diagram of the working principle structure of an integrated control device for a well logging test system of the present invention.

[0022] Figure 4 The utility model is a schematic diagram of the structure of a control panel of an integrated control device for a well logging test system.

[0023] In the figure: 1. Drag skid assembly; 2. Wellhead flange assembly; 3. Grease injection hydraulic control skid; 301. Control panel; 101. Grease injection unloading valve; 102. Grease injection pump grease injection pressure gauge; 103. Air source pressure gauge; 104. Grease return regulating valve; 105. Grease injection pump function conversion valve; 106. Gate control valve; 107. Cable packing box hydraulic control pressure gauge; 108. Cable packing box control valve; 109. Grease injection pump air source switch valve; 110. Grease injection pump air pressure regulating valve; 111. Manual oil pump; 302. Grease injection pump A; 303. Grease injection hydraulic control box; 304. Waste grease recovery pipe; 305. Waste grease three-way ball valve; 306. Accumulator discharge pressure valve; 307, accumulator A; 308, pneumatic oil pump; 309, upper and lower secondary cable packing box control hose; 310, upper and lower catcher control hose; 311, upper control hose of blowout preventer; 312, middle control hose of blowout preventer; 313, lower control hose of blowout preventer; 314, grease injection hose A; 315, grease return hose; 316, grease injection hose of blowout preventer; 317, air source hose; 4, bracket assembly; 5, pulley assembly; 6, equipment cage; 7, three-gate blowout preventer cage; 8, skid tool box assembly; 9, blowout preventer cage; 10, blowout preventer assembly; 11, air source skid; 12, grease injection head assembly; 13, shackle. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] The utility model provides Figure 1-4The integrated control device of a logging test system shown in the figure comprises a skid assembly 1, wherein shackles 13 are installed at the four corners of the upper end of the skid assembly 1, a wellhead flange assembly 2 is installed at the inner side of the skid assembly 1, a bracket assembly 4 is installed at the right end of the wellhead flange assembly 2, a grease injection hydraulic control skid 3 is supported at the inner side of the bracket assembly 4, an accumulator pressure relief valve 306 is arranged at the right position of the lower inside of the grease injection hydraulic control skid 3, and the accumulator pressure relief valve 306 is used to control the accumulator A307 at the upper end position, and the accumulator A307 is connected to the left side of the pneumatic oil pump 308, and a grease injection hose A314, a grease return hose 315, a blowout preventer grease injection hose 316 and an air source hose 317 are arranged at the left position of the lower inside of the grease injection hydraulic control skid 3. 17. The interior of the grease injection hydraulic control skid 3 is arranged at the top position with upper and lower secondary cable packing box control hoses 309, upper and lower catcher control hoses 310, upper blowout preventer control hoses 311, middle blowout preventer control hoses 312 and lower blowout preventer control hoses 313. A grease injection pump A302 is arranged at the top position of the grease injection hydraulic control skid 3. The grease injection pump A302 is connected to the grease injection hydraulic control box 303 at the side position. A waste grease three-way ball valve 305 is arranged at the top position of the grease injection hydraulic control box 303. The waste grease three-way ball valve 305 is connected to the waste grease recovery pipe 304 at the top position. A control panel 301 is arranged at the inner side of the grease injection hydraulic control skid 3. A grease injection unloading valve 101 is installed at the front end of the control panel 301. A grease pump air pressure regulating valve 110 is installed at the lower position of the grease unloading valve 101, a grease pump air source switch valve 109 is installed at the lower position of the grease pump air pressure regulating valve 110, a grease pump grease pressure gauge 102 for observing the pressure is installed at the top position of the grease unloading valve 101, an air source pressure gauge 103 is installed at the right side of the grease unloading valve 101, a grease return regulating valve 104 is installed above the air source pressure gauge 103, a grease pump function conversion valve 105 is installed at the right side of the grease unloading valve 101, a gate control valve 106 is installed at the right side of the grease pump function conversion valve 105, and a cable packing box hydraulic control pressure gauge 107 is installed at the top right position of the control panel 301, and the cable packing box hydraulic pressure gauge 107 is installed at the top right position of the control panel 301. A cable packing box control valve 108 is installed at a lower position of the root box hydraulic control pressure gauge 107, a manual oil pump 111 is installed at a lower position of the cable packing box control valve 108, a pulley assembly 5 is installed at an upper position on the inner side of the skid assembly 1, an equipment cage 6 is installed at an inner position of the pulley assembly 5, a skid tool box assembly 8 is installed at an inner position of the skid assembly 1, a three-gate blowout preventer cage 7 is installed at an inner position of the skid tool box assembly 8, a blowout preventer cage 9 is installed at an upper end position of the skid tool box assembly 8, a blowout preventer assembly 10 is installed at an inner position of the skid assembly 1, a grease injection head assembly 12 is installed at an upper position of the blowout preventer assembly 10, and an air source skid 11 is installed at an inner position of the blowout preventer assembly 10.

[0026] The system uses a diesel air compressor unit to provide power gas source for the entire device. The hydraulic control grease injection unit provides hydraulic source for the wellhead pressure-bearing equipment through the pneumatic oil pump 308, and performs corresponding operations on the wellhead pressure-bearing equipment through the integrated control panel 301. At the same time, the pneumatic grease injection pump injects high-pressure sealing grease into the flow-blocking part of the grease injection head to establish a pressure cycle to control the wellhead pressure.

[0027] like Figure 1 and Figure 3 As shown, the skid assembly 1 is welded by a rectangular tube group. The skid assembly 1 integrates all the equipment and installs them at the inner position. The skid assembly 1 is provided with multiple partitions for managing the equipment. The control panel 301 can adjust the pressure of the air pump after startup. The control panel 301 can control the switch hydraulic pressure of the gate blowout preventer. The control panel 301 displays the hydraulic control pressure value. The grease injection hydraulic control skid 3 provides high-pressure sealing grease to the grease injection head through the grease injection pump. The grease injection hydraulic control skid 3 establishes a circulation control wellhead pressure in the grease injection head blocking system. The blowout preventer in the three-gate blowout preventer cage 7 is fixed on the blowout preventer cage. The shackle 13 is located at the four corners of the upper end of the cage. The blowout preventer in the three-gate blowout preventer cage 7 can control the pressure of the wellhead. The blowout preventer of the three-gate blowout preventer cage 7 can be remotely opened and closed by the console. When the cage frame 7 is closed for a long time, it can be manually locked. The control panel 301 integrates all the control valves and instruments of the system. The control panel 301 can control all the equipment. The grease pump A302, the grease hydraulic control box 303 and the waste grease recovery pipe 304 can be rotated and extended to the external position of the drag skid assembly 1. Normal grease injection can be carried out when the grease unloading valve 101 is in the middle position. When the grease unloading valve 101 is in the left valve position or the right valve position, the grease injection pipeline is unloaded. The grease return regulating valve 104 is a throttle valve that is closed by right rotation and opened by left rotation. The grease return regulating valve 104 can control the amount of returned grease. Three cable packing box hydraulic control pressure gauges 107 are provided. The cable packing box hydraulic control pressure gauges 107 are used to display the hydraulic control pressure value of the upper cable packing box, the hydraulic control pressure value of the lower cable packing box and the display system hydraulic control pressure value respectively.

[0028] The grease injection hydraulic control skid 3 is the control unit of the whole system, including the control panel 301 which integrates all the control valves and instruments of the system. All the operations of the equipment are performed on the control panel 301. The pressure gauges of the grease injection and hydraulic control systems are all located on the top of the control panel 301 and can be easily disassembled separately to facilitate the replacement and calibration of the pressure gauges. The control wiring diagram of the system is etched on the control panel 301 to facilitate user identification. The grease injection pump grease injection hydraulic control box 303 and the waste grease recovery pipe 304 can be rotated and extended out of the skid. By switching the waste grease three-way ball valve 305 on the root riser, the cable sealing grease returned from the grease return pipeline can be directly returned to the grease box or connected to the waste grease barrel.

[0029] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A well logging test system integrated control device, characterized in that: The invention comprises a skid assembly (1), wherein shackles (13) are installed at the four corners of the upper end of the skid assembly (1), a wellhead flange assembly (2) is installed at the inner side of the skid assembly (1), a bracket assembly (4) is installed at the right end of the wellhead flange assembly (2), a grease injection hydraulic control skid (3) is supported at the inner side of the bracket assembly (4), an accumulator pressure relief valve (306) is arranged at the right side of the lower inside of the grease injection hydraulic control skid (3), the accumulator pressure relief valve (306) is used to control an accumulator A (307) at the upper end, the accumulator A (307) is connected to a pneumatic oil pump (308) at the left side, and a grease injection hose A (314), a grease return hose (315), a blowout preventer grease injection hose (316) and a grease return hose (317) are arranged at the left side of the lower inside of the grease injection hydraulic control skid (3). 16) and an air source hose (317), the interior of the grease injection hydraulic control skid (3) is arranged at the top position with upper and lower secondary cable packing box control hoses (309), upper and lower catcher control hoses (310), blowout preventer upper control hoses (311), blowout preventer middle control hoses (312) and blowout preventer lower control hoses (313), a grease injection pump A (302) is arranged at the top position of the grease injection hydraulic control skid (3), the grease injection pump A (302) is connected to the grease injection hydraulic control box (303) at the side position, a waste grease three-way ball valve (305) is arranged at the top position of the grease injection hydraulic control box (303), the waste grease three-way ball valve (305) is connected to the waste grease recovery pipe (304) at the top position, and a control panel (301) is arranged at the inner side position of the grease injection hydraulic control skid (3); A grease injection unloading valve (101) is installed at the front end of the control panel (301), a grease injection pump air pressure regulating valve (110) is installed below the grease injection unloading valve (101), a grease injection pump air source switch valve (109) is installed below the grease injection pump air pressure regulating valve (110), a grease injection pump grease injection pressure gauge (102) for observing pressure is installed at the top of the grease injection unloading valve (101), an air source pressure gauge (103) is installed at the right side of the grease injection unloading valve (101), and a grease injection pump air source switch valve (109) is installed above the air source pressure gauge (103). a grease return regulating valve (104); a grease injection pump function conversion valve (105) is installed at the right side of the grease injection unloading valve (101); a gate control valve (106) is installed at the right side of the grease injection pump function conversion valve (105); a cable packing box hydraulic control pressure gauge (107) is installed at the top right side of the control panel (301); a cable packing box control valve (108) is installed at the bottom of the cable packing box hydraulic control pressure gauge (107); and a manual oil pump (111) is installed at the bottom of the cable packing box control valve (108); A pulley assembly (5) is installed at an upper position on the inner side of the skid assembly (1); an equipment cage (6) is installed at an inner position of the pulley assembly (5); a skid toolbox assembly (8) is installed at an inner position of the skid assembly (1); a three-gate blowout preventer cage (7) is installed at an inner position of the skid toolbox assembly (8); a blowout preventer cage (9) is installed at an upper end position of the skid toolbox assembly (8); a blowout preventer assembly (10) is installed at an inner position of the skid assembly (1); a grease injection head assembly (12) is installed at an upper position of the blowout preventer assembly (10); and an air source skid (11) is installed at an inner position of the blowout preventer assembly (10).

2. The integrated control device for a well logging test system according to claim 1, characterized in that: The skid assembly (1) is welded from a rectangular tube group. The skid assembly (1) integrates all equipment and installs them at an inner position. The skid assembly (1) is provided with a plurality of partitions that can be used to manage the equipment.

3. The integrated control device for a well logging test system according to claim 1, characterized in that: The control panel (301) can adjust the pressure of the air pump after startup, the control panel (301) can control the on / off hydraulic pressure of the ram blowout preventer, and the control panel (301) displays the hydraulic control pressure value.

4. The integrated control device for a well logging test system according to claim 1, characterized in that: The grease injection hydraulic control skid (3) provides high-pressure sealing grease to the grease injection head through a grease injection pump, and the grease injection hydraulic control skid (3) establishes a circulation control wellhead pressure in the grease injection head flow blocking system.

5. The integrated control device for a well logging test system according to claim 1, characterized in that: The blowout preventer in the three-gate blowout preventer cage (7) is fixed on the blowout preventer cage, and the shackles (13) are located at the four corners of the upper end of the cage.

6. The integrated control device for a well logging test system according to claim 5, characterized in that: The blowout preventer in the three-gate blowout preventer cage (7) can control the pressure at the wellhead, the blowout preventer in the three-gate blowout preventer cage (7) can be remotely opened and closed by a control console, and the three-gate blowout preventer cage (7) can be manually locked when it is closed for a long time.

7. The integrated control device for a well logging test system according to claim 1, characterized in that: The control panel (301) integrates all control valves and instruments of the system. The control panel (301) can control all equipment. The grease injection pump A (302), the grease injection liquid control box (303) and the waste grease recovery pipe (304) can be rotated and extended to the outside position of the sled assembly (1).

8. The integrated control device for a well logging test system according to claim 1, characterized in that: When the grease injection unloading valve (101) is in the middle position, normal grease injection can be performed. When the grease injection unloading valve (101) is in the left valve position or the right valve position, the grease injection pipeline is unloaded. The grease return regulating valve (104) is a throttle valve that is closed when turned right and opened when turned left. The grease return regulating valve (104) can control the amount of returned grease.

9. The integrated control device for a well logging test system according to claim 1, characterized in that: The cable packing box hydraulic control pressure gauges (107) are provided with three, and the cable packing box hydraulic control pressure gauges (107) are used to display the hydraulic control pressure value of the upper cable packing box, the hydraulic control pressure value of the lower cable packing box and the display system hydraulic control pressure value respectively.