Open pit coal mine coal belt conveying system with inner dumping site

Through the combination of rockfill grouting technology and prefabricated reinforced concrete U-shaped pipes, a stable transportation channel is formed, which solves the foundation distortion and pressure problems of the open-pit coal mine belt transportation system during the internal dumpsite covering process, and achieves system safety and Improvement of production efficiency.

CN221823797UActive Publication Date: 2024-10-11CHINA UNIV OF MINING & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420023936.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-10-11
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

The belt transportation system in open-pit coal mines has foundation bottom distortion and pressure problems during the covering process of the internal dump site, resulting in system instability and high transportation costs, affecting production efficiency and economic benefits.

Method used

The rockfill grouting process is used to form the grouting bottom foundation and pipe shell. The prefabricated reinforced concrete U-shaped pipe is inverted to form a transportation channel to isolate the external environment. The rockfill is consolidated through the grouting process to form a stable transportation channel to resist settlement and pressure. , to ensure system security and stability.

Benefits of technology

It achieves long-term stability and safety of the belt transportation system, reduces transportation costs, reduces the need for equipment relocation, improves production efficiency, and broadens functions without affecting the existing system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823797U_ABST
    Figure CN221823797U_ABST
Patent Text Reader

Abstract

The utility model provides an open pit coal mine coal belt transportation system containing an inner dumping site, which comprises a pit bottom horizontal transportation section, an inner dumping site burying lifting transportation section, an inner dumping site upper part non-burying horizontal transportation section, an end slope surface lifting transportation section and an earth surface transportation section, a belt conveyor is arranged in the channel, and continuous transportation of coal from the pit bottom to the outside of the pit is achieved through the belt conveyor. A bottom foundation is poured and grouted at the transportation section of the inner dumping site so as to eliminate settlement of a rock-fill body at the bottom of the pipe shell; and the surface of the transportation section buried by the rockfill body and the surface of the transportation channel are wrapped with rockfill grouting pipe shells so as to bear the pressure which is continuously accumulated on the upper portion and transmitted from the rockfill, and the long-term stability and safety of the transportation system are guaranteed. In the production process, most equipment and facilities of the rock-fill grouting pipe shell coal transportation system do not need to be moved, only box-type pipelines need to be additionally laid when a working face and an inner row are pushed forwards, a rock-fill grouting pipe shell is formed through the grouting technology, and the horizontal transportation section of the pit bottom is prolonged. After the whole mine is mined, the lifting transportation section and the horizontal transportation section which are deeply buried underground do not need to be dismantled, and the method can be used for civil air defense engineering or underground engineering with other purposes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an open-pit coal mine coal transportation system, in particular to an open-pit coal mine coal belt transportation system with an inner dump. Background Art

[0002] Open-pit coal mining is to remove the covering on the top of the coal seam to obtain coal; underground mining is to dig tunnels to reach the working face to mine coal. The two are significantly different in the way of coal mining and transportation. Large open-pit coal mines directly use general excavators to mine and trucks to transport to the ground, while underground mining mainly involves digging tunnels and mining with roadheaders, and transporting coal along the tunnels through conveyor belts and lifting in vertical shafts to the ground.

[0003] Coal mined from open pits is transported to the surface from the open pit, usually by trucks from the bottom of the pit along the slope of the side. Due to the large slope of the side, trucks cannot reach the ground in a straight line from the bottom of the slope, but instead build a winding road or a return road to reduce the slope. This will increase the transportation distance and require more transportation equipment. Trucks have a high climbing height and a long transportation distance. Compared with the belt transportation of underground mines, the investment in the project and the operating costs during production are greatly increased, affecting the economic benefits of the enterprise. Compared with truck transportation, belt transportation has many advantages such as low cost and large capacity, and has been widely used in underground mines. How to apply the belt transportation system with low operating costs to coal transportation in open pit coal mines is a major problem that open pit mine enterprises urgently need to solve.

[0004] For open-pit coal mines with internal dumps, if a belt conveyor system is used to transport coal in the mine, due to the continuous stripping and advancement of the working wall, the vertical lifting of the belt conveyor needs to be set along the side wall or end wall. If it is set along the side wall, as the working face advances and the internal dump is continuously covered, the vertical lifting system of the belt conveyor set along the side wall and the belt conveyor section arranged at the bottom of the pit need to be continuously moved with the advancement of the working face and the dump, the turning of the mining field, etc., and the relocation period is long and the cost is high, which seriously affects the production efficiency and greatly increases the production cost. If the vertical lifting system of the belt conveyor is set at the end wall, the vertical lifting system of the belt conveyor can be kept fixed during the production process, and it only needs to extend the horizontal belt conveyor section at the bottom of the pit with the advancement of the working face, and the problem of continuous relocation of belt conveyor equipment and facilities is solved. However, the belt conveyor needs to cross the inner dump between the end wall and the working wall. Due to the settlement of the dump rock over time, the foundation bottom of the belt conveyor system built above the dump will be twisted and deformed or even collapse. In addition, the belt conveyor system between the end wall and the working wall will gradually be buried by the newly generated inner dump rock, and the pressure of the rock pile accumulated on the upper part will also crush the buried belt conveyor system. Therefore, it is a very important international problem to set up a coal transportation system from the end wall and ensure the safety and stability of the belt conveyor system between the end wall and the working wall. Utility Model Content

[0005] In view of the problems existing in the above-mentioned prior art, the utility model provides a coal belt conveyor system for an open-pit coal mine containing an inner dump, which adopts a rockfill grouting process to consolidate the rockfill into a whole, forming a grouting bottom foundation and an upper pipe shell, and the grouting pipe shell forms a protection channel for the belt conveyor, which can bear the rockfill pressure that continuously accumulates on the upper part when the inner dump is continuously covered, and at the same time avoid twisting and deformation of the bottom of the system foundation, thereby protecting the entire belt conveyor system, ensuring the safety and stability of the belt conveyor system between the end side and the working side, and the transportation is not affected by weather and environment.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an open-pit coal mine coal belt conveyor system containing an inner dump, characterized in that the transportation system is divided into a pit bottom horizontal transportation section, an inner dump buried lifting transportation section, an upper non-buried horizontal transportation section of the inner dump, an end slope lifting transportation section and a surface transportation section from the bottom of the open-pit mine to the ground.

[0007] The horizontal transport section at the bottom of the pit is laid at the bottom of the pit, parallel to the side wall, and is formed by prefabricated reinforced concrete U-shaped pipes inverted on the bottom plate of the pit to form a transport channel.

[0008] The buried lifting and transporting section of the inner dumping yard and the upper non-buried horizontal transporting section of the inner dumping yard are laid on the slope of the inner dumping yard and the top plane of the inner dumping yard, respectively. Both of them include a grouting bottom foundation and a transport channel located on the grouting bottom foundation. The grouting bottom foundation is a supporting structure formed by grouting piles of rockfill and casting a rockfill grouting bottom plate. The prefabricated reinforced concrete U-shaped pipe is inverted on the rockfill grouting bottom plate to form a transport channel. The lower supporting structure formed by the grouting piles of the rockfill arranged at the bottom of the buried lifting and transporting section of the inner dumping yard and the upper non-buried horizontal transporting section of the inner dumping yard and the casting of the rockfill grouting bottom plate can resist the influence of the long-term settlement of the rockfill at the bottom of the shell on the transport pipeline.

[0009] The end slope lifting and transportation section and the surface transportation section are laid on the end slope and the ground surface respectively, and both are formed by prefabricated reinforced concrete U-shaped pipes that are inverted on the ground to form transportation channels.

[0010] The transport channels of the transport sections are connected in sequence and sealed, and the belt conveyor is continuously laid inside. The transport channel is made of prefabricated reinforced concrete inverted U-shaped pipes, which can isolate the external environment and eliminate the impact of harsh environmental factors such as winter and rainy season on belt transportation.

[0011] Further optimization plan: the transportation channels of the horizontal transportation section at the bottom of the pit and the lifting transportation section of the inner dump will be gradually covered by the rockfill of the inner dump as the working face and the inner dump advance. After covering to a certain height, it is necessary to perform gap grouting filling on the upper part and the rockfill bodies on both sides of the inverted prefabricated reinforced concrete U-shaped pipe, and consolidate the rockfill bodies around the transportation channel into an integral structure - the rockfill grouting pipe shell, which is wrapped on the surface of the transportation pipeline to bear the pressure from the continuously accumulated rockfill on the upper part, thereby ensuring the long-term stability and safety of the transportation system.

[0012] Furthermore, the direction conversion and connection of the transport passages are realized by setting up bunkers between the adjacent transport sections. The bunkers are hollow spheres cast with reinforced concrete, connecting the transport passages of the adjacent transport sections.

[0013] Furthermore, the starting end of the horizontal transport section at the bottom of the pit is connected to the crushing station at the bottom of the pit.

[0014] Furthermore, the horizontal transport section at the bottom of the pit is extended as the working face advances. Therefore, when the working face and the inner row advance, most of the equipment and facilities do not need to be moved, and only box-type prefabricated reinforced concrete U-shaped pipes need to be added and rockfill grouting pipe shells need to be formed through grouting technology to extend the horizontal transport section.

[0015] The rockfill grouting piles are formed by leveling the surface of the inner spoil dump on the transportation line, drilling holes evenly on the leveled surface to form two rows of vertical holes, arranging auxiliary conduits with dense hemp holes in the holes, inserting the grouting pipes into the auxiliary conduits during grouting, and the grouting materials flow into the gaps of the stripping rockfill through the dense hemp holes of the auxiliary conduits to consolidate the rockfill into a whole.

[0016] The rockfill grouting base plate is formed by evenly drilling holes on the surface of the leveled inner spoil field, arranging auxiliary conduits with dense hemp holes in the holes, inserting grouting pipes into the auxiliary conduits, and allowing grouting materials to flow into the gaps between the stripped rockfill through the dense hemp holes of the auxiliary conduits, thereby consolidating the rockfill into a whole.

[0017] The rockfill grouting pipe shell refers to a rockfill grouting pipe shell formed by leveling the surface of the inner dump after the stripping material covers the lifting box-type pipeline and reaches a certain height, drilling holes evenly on the leveled surface, arranging auxiliary conduits with dense hemp holes in the holes, inserting the grouting pipe into the auxiliary conduit during grouting, and the grouting material flows into the gaps between the stripping material and the rockfill through the dense hemp holes of the auxiliary conduit, thereby consolidating the rockfill into a whole.

[0018] Compared with the prior art, the utility model realizes the continuous transportation of coal or stripping materials from the bottom of the pit to the outside of the pit, and changes the transportation tool from trucks to belt conveyors, which not only reduces the interference between the coal transportation system and ground facilities and ground operations, making it easier to manage, but also changes the fuel from oil to electricity, reducing transportation costs and reducing pollution; the belt conveyor is arranged in a box-type pipeline, isolated from the external environment, eliminating the impact of harsh environmental factors such as winter and rainy season on belt transportation; through the grouting process of the utility model, the inner dump is consolidated into a whole, reducing the settlement at the bottom of the box-type pipeline and the pressure on the upper part, greatly increasing The stability and safety of the transportation system are enhanced; the utility model is arranged in the existing production system of the open-pit mine, without the need for additional construction, and has little impact on the original system of the mine area, and can even expand the function of the original system; most of the equipment and facilities of the utility model do not need to be relocated, and when the working face and the inner row are pushed forward, it is only necessary to add box-type pipes and extend the horizontal transportation section and the pit bottom transportation section; the construction technology is mature and the cost is controllable. After the entire mine is mined, the lifting and horizontal transportation sections are buried deep underground and do not need to be dismantled. They can be used as civil air defense tunnels, used in civil air defense projects, or underground projects for other purposes. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a top view of the overall structure of an open-pit coal mine including an internal dump;

[0020] Figure 2 It is a top view of the plan layout of the open-pit coal mine coal belt transportation system with an internal dumping ground of the utility model;

[0021] Figure 3 for Figure 2 Schematic diagram of the coal transportation system construction process in section AA;

[0022] Figure 4 for Figure 2 Schematic diagram of the coal transportation system construction process in section BB;

[0023] Figure 5 It is a partial schematic diagram of the rockfill grouting process of the utility model.

[0024] In the figure:

[0025] 1. Open-pit mine surface, 2. Open-pit mine end wall, 3. Open-pit mine side wall, 4. Open-pit mine working wall, 5. Internal dumping ground, 6. Pit bottom, 7. Coal transportation system preset route, 8. Middle bridge, 9. Coal seam, 10. Auxiliary guide pipe, 11. Pockhole, 12. Rockfill grouting pile, 13. Rockfill grouting bottom plate, 14. Box pipeline (transportation channel), 15. Belt conveyor, 16. Crushing station, 17. Rockfill grouting shell, 18. Bunker, 19. Horizontal transportation section at the bottom of the pit, 20. Buried and hoisted transportation section of the internal dumping ground, 21. Non-buried horizontal transportation section on the upper part of the internal dumping ground, 22. Lifting transportation section on the end slope, 23. Surface transportation section, 24. Sealed connecting wall. DETAILED DESCRIPTION

[0026] The technical solution of the utility model is further described in detail below in conjunction with the embodiments and drawings.

[0027] like Figure 2 As shown, the utility model contains an open-pit coal mine coal belt transport system with an inner dump. The transport system is divided into five transport sections from the pit bottom to the ground, namely, a pit bottom horizontal transport section 19, an inner dump buried lifting transport section 20, an upper non-buried horizontal transport section 21 of the inner dump, an end slope lifting transport section 22 and a surface transport section 23. Adjacent transport sections are connected by setting up bunkers 18 to realize the conversion and connection of transport pipelines, and pipelines are laid in each transport section to form a transportation passage.

[0028] The pit bottom horizontal transport section 19 is laid on the pit bottom 6, parallel to the side wall 3, and is formed by a prefabricated reinforced concrete U-shaped pipe inverted on the pit bottom plate to form a transport channel (box-type pipeline).

[0029] The buried lifting and transporting section 20 of the inner dumping yard and the upper non-buried horizontal transporting section 21 of the inner dumping yard are laid on the slope of the inner dumping yard 5 and the top plane of the inner dumping yard, respectively, and both include a grouting bottom foundation (12, 13) and a transport channel 14 located on the grouting bottom foundation, wherein the grouting bottom foundation is a supporting structure formed by a rockfill grouting pile 12 and a cast rockfill grouting bottom plate 13, and a prefabricated reinforced concrete U-shaped pipe is inverted on the rockfill grouting bottom plate to form the transport channel 14. The lower supporting structure formed by the rockfill grouting pile and the cast rockfill grouting bottom plate arranged at the lower part of the buried lifting and transporting section 20 of the inner dumping yard and the upper non-buried horizontal transporting section 21 of the inner dumping yard can resist the influence of the long-term settlement of the rockfill body at the bottom of the pipe shell on the transport pipeline.

[0030] The end slope lifting and transport section 22 and the surface transport section 23 are laid on the end slope and the ground surface respectively, and both are formed by prefabricated reinforced concrete U-shaped pipes that are inverted on the ground to form transport channels.

[0031] The transport channels of the transport sections are connected in sequence and sealed, and the belt conveyor 15 is continuously laid inside. The transport channel is made of prefabricated reinforced concrete inverted U-shaped pipes, which can isolate the external environment and eliminate the impact of harsh environmental factors such as winter and rainy season on belt transportation.

[0032] The transport passages of the pit bottom horizontal transport section 19 and the inner dump lifting transport section 20 will be gradually covered by the inner dump rock pile as the working face and the inner dump advance. After covering to a certain height, it is necessary to perform grouting filling on the gaps of the rock pile bodies on the upper part and both sides of the inverted prefabricated reinforced concrete U-shaped pipe, and consolidate the rock pile bodies around the transport passage into an integral structure, namely, the rock pile grouting pipe shell 17, which is wrapped around the surface of the transport pipe to bear the pressure from the rock pile constantly accumulated on the upper part, thereby ensuring the long-term stability and safety of the transport system.

[0033] The direction conversion and connection of the transport passages are realized by setting up bunkers 18 between the adjacent transport sections. The bunkers are hollow spheres cast with reinforced concrete and connect the transport passages of the adjacent transport sections.

[0034] The starting end of the pit bottom horizontal transport section 19 is connected to the pit bottom crushing station 16. The pit bottom horizontal transport section 19 is extended as the working face advances. Therefore, when the working face and the inner row advance forward, most of the equipment and facilities do not need to be moved. It is only necessary to lay a box-type prefabricated reinforced concrete U-shaped pipe and form a rockfill grouting pipe shell through the grouting process to extend the horizontal transport section.

[0035] The rockfill grouting pile 12 is formed by leveling the surface of the inner spoil dump on the transportation line, drilling holes evenly on the leveled surface to form two rows of vertical holes, arranging an auxiliary conduit with dense hemp holes in the holes, inserting the grouting pipe into the auxiliary conduit during grouting, and the grouting material flows into the gaps of the stripping rockfill through the dense hemp holes of the auxiliary conduit, thereby consolidating the rockfill into a whole to form a rockfill grouting pile.

[0036] The rockfill grouting base plate 13 is formed by drilling holes uniformly on the surface of the leveled inner spoil field, arranging auxiliary conduits with dense hemp holes in the holes, inserting grouting pipes into the auxiliary conduits, and allowing grouting materials to flow into the gaps between the stripped rockfill through the dense hemp holes of the auxiliary conduits, thereby consolidating the rockfill into a whole.

[0037] The rockfill grouting pipe shell 17 is formed by leveling the surface of the inner dump after the stripping material covers the lifting box pipe and reaches a certain height, drilling holes evenly on the leveled surface, and arranging auxiliary guide tubes 10 with dense hemp holes 11 in the holes. During grouting, the grouting pipe is inserted into the auxiliary guide tube, and the grouting material flows into the gaps of the stripping material rockfill through the dense hemp holes of the auxiliary guide tube, so as to consolidate the rockfill into a whole.

[0038] like Figure 3 As shown in steps (1) to (3) of FIG4 , firstly, the surface of the inner dump 5 on the route of the transportation system is leveled, holes are evenly drilled on the leveled surface, and auxiliary guide tubes 10 with dense hemp holes 11 are arranged in the holes. During grouting, the grouting pipe 25 is inserted into the auxiliary guide tube 10, and the grouting material flows into the gaps of the stripping rockfill through the dense hemp holes 11 of the auxiliary guide tube 10, thereby consolidating the rockfill into a whole to form the rockfill grouting piles 12 and the rockfill grouting bottom plate 13.

[0039] like Figure 3 As shown in step (4) of step 4, two rows of concrete lifting sealing connection walls 24 with serrations are cast above the rockfill grouting bottom plate 13, and a box-type pipe 13 is hoisted above the rockfill grouting bottom plate 13. The bottom end of the box-type pipe 12 is serrations and meshes with the lifting sealing connection wall 23. The box-type pipe 14 is prefabricated with concrete, and the pipe cross-section is an inverted U-shape with an open bottom. The wall thickness is the same as that of the lifting sealing connection wall 24. The pipe wall at the bottom opening of the box-type pipe 14 is set to be serrations protruding at intervals and is matched with the aforementioned sealing connection wall 24, and a waterproof and fireproof interlayer is installed at the joint.

[0040] Inside the box-type pipeline 14, a belt conveyor 15 is provided on the rockfill grouting bottom plate 13, which passes through the surface 1 of the open-pit mine and the pit bottom 6. The belt conveyor 15 is located at one end of the pit bottom 6 and is connected to the crushing station 16. In order to maximize the function, multiple belt conveyors 15 can be installed in parallel to transport different materials at the same time, or used as backup systems for each other.

[0041] like Figure 3 , as shown in steps (5) to (7) of FIG. 4 , after the stripping material covers the box-type pipe 14 and reaches a certain height, the surface of the inner dump 5 is leveled, holes are evenly drilled on the leveled surface, and auxiliary guide tubes 10 with dense hemp holes 11 are arranged in the holes. During grouting, the grouting pipe 25 is inserted into the auxiliary guide tube 10, and the grouting material flows into the gaps between the stripping material and the rockfill through the dense hemp holes 11 of the auxiliary guide tube 10, thereby consolidating the rockfill into a whole to form a rockfill grouting pipe shell 17.

[0042] like Figure 3 As shown in step (8) of FIG4 , after the open-pit mine starts to discharge internally or continues to discharge internally, the stripping material can be directly covered on the rockfill grouting pipe shell 17. When covering, it should be noted that both sides of the pipe shell should be bulldozed at the same time to prevent lateral displacement; as the coal mining working face advances, the horizontal transportation section at the bottom of the pit also continuously extends in the advancing direction.

Claims

1. A coal belt conveyor system for an open-pit coal mine with an internal dump, characterized in that: The transportation system is divided into the horizontal transportation section at the bottom of the open pit to the ground, the buried lifting transportation section in the inner dump, the non-buried horizontal transportation section on the upper part of the inner dump, the lifting transportation section on the end slope and the surface transportation section. The horizontal transport section at the bottom of the pit is laid at the bottom of the pit, parallel to the sidewall, and is formed by prefabricated reinforced concrete U-shaped pipes that are inverted on the bottom plate of the pit to form a transport channel; The buried lifting and transport section of the inner dumping yard and the non-buried horizontal transport section at the upper part of the inner dumping yard are laid on the slope of the inner dumping yard and the top plane of the inner dumping yard respectively, and both include a grouting bottom foundation and a transport channel located on the grouting bottom foundation. The grouting bottom foundation is a supporting structure formed by grouting piles of the rockfill body and casting a rockfill grouting bottom plate, and a prefabricated reinforced concrete U-shaped pipe is inverted on the rockfill grouting bottom plate to form a transport channel; The end slope lifting and transportation section and the surface transportation section are laid on the end slope and the surface respectively, and both are formed by prefabricated reinforced concrete U-shaped pipes that are inverted on the ground to form a transportation channel; The transport passages of the transport sections are connected in sequence in a closed manner, and belt conveyors are continuously laid inside.

2. The open-pit coal mine coal belt conveyor system with an internal dump according to claim 1, characterized in that: The surfaces of the transport passages of the pit bottom horizontal transport section and the inner spoil dump lifting transport section are covered by rockfill grouting pipe shells.

3. The open-pit coal mine coal belt conveyor system with an internal dump according to claim 1, characterized in that: The direction conversion and connection of the transport channel are achieved by setting up bunkers between the adjacent transport sections.

4. The open-pit coal mine coal belt conveyor system with an internal dump as claimed in claim 3 is characterized by: The bunker is a hollow sphere made of reinforced concrete and is connected to a transport passage of adjacent transport sections.

5. The open-pit coal mine coal belt conveyor system with an internal dump according to claim 1, characterized in that: The starting end of the pit bottom horizontal transport section is connected to the pit bottom crushing station.

6. The open-pit coal mine belt conveyor system with an internal dump according to claim 1, characterized in that: The horizontal transport section at the bottom of the pit is extended as the working face advances.

7. The open-pit coal mine coal belt conveyor system with an internal dump as claimed in claim 2, characterized in that: The rockfill grouting pipe shell is formed by consolidating the rockfill into a whole.