Mine underground goaf drift filling structure and filling equipment
Through the step-by-step filling structure and filter pipe drainage design, the problems of large filling volume and long solidification time in traditional filling methods are solved, the strength and construction efficiency of the filling layer are improved, and the risks in the mining process are reduced.
Patent Information
- Application Number
- CN202323370731.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-11
Smart Images

Figure CN221823869U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of underground mine goaf access filling, and in particular relates to an underground mine goaf access filling structure and filling equipment. Background Art
[0002] The mining process adopts the downward approach cementation filling mining method. In order to maintain a high production capacity, multiple middle sections, multiple plate areas and multiple approaches are required to be mined simultaneously, resulting in a complex underground tunnel network, many approaches to the void areas to be filled, long filling pipelines and more dispersed work sites.
[0003] The traditional filling method is one-time filling. The inventors found that due to the large volume of the filling body, if the filling is completed in one time, the filling body will take a long time to solidify, affecting the mining progress of the next approach; the excess water in the filling mortar cannot be discharged in time, resulting in insufficient strength of the filling body; the one-time filling volume is too large, which puts a lot of pressure on the filling wall, which is prone to collapse of the wall, blockage of small mouths, and slurry leakage accidents. Utility Model Content
[0004] The utility model aims to provide a filling structure and filling equipment for a goaf area in a mine underground. The filling structure has the advantages of short solidification time and better filling effect.
[0005] In order to achieve the above-mentioned purpose of the utility model, the technical solution adopted by the utility model is: on the one hand, the embodiment of the utility model provides a filling structure for the access to the goaf of an underground mine, including: a filling layer, a hanger, a mesh and a water filter. The filling layer includes a first filling layer and a second filling layer, the first filling layer is used to fill the bottom of the access, and the second filling layer is used to fill the space between the first filling layer and the top of the access. The hanger is arranged in the filling layer, and the hanger extends along the height direction of the access. The mesh is arranged in the filling layer, the mesh is laid flat, and the mesh is tied to the hanger. The water filter is arranged in the filling layer, and one end of the water filter is arranged outside the filling layer.
[0006] In some embodiments, the material of the filling layer includes cement mortar.
[0007] In some embodiments, the proportion of the first filling layer to the filling layer is M, satisfying 50%<M<70%.
[0008] In some embodiments, the hanger bars include a plurality of hanger bars arranged in a plurality of rows and columns, and the hanger bars are partially disposed in the first filling layer and partially disposed in the second filling layer.
[0009] In some embodiments, the mesh includes multiple meshes, and the multiple meshes are arranged at intervals along the height direction of the access path. Part of the multiple meshes are arranged in the first filling layer, and part of the multiple meshes are arranged in the second filling layer.
[0010] In some embodiments, the water filter pipes include a plurality of water filter pipes, which are arranged at intervals along the height direction of the inlet, and the plurality of water filter pipes are partially arranged in the first filling layer and partially arranged in the second filling layer.
[0011] In some embodiments, it also includes filling baffles, which are arranged at both ends of the extension direction of the passage and are used to form end faces of the filling layer along the extension direction of the passage.
[0012] In some embodiments, a water retaining wall is also included. The water retaining wall is arranged at one end of the filling layer along the extension direction of the access path. The water retaining wall and the filling layer cooperate to form a water storage space.
[0013] On the other hand, the embodiment of the utility model further provides a filling device for filling the filling structure in the above embodiment, comprising a main pipeline, a first branch pipeline and a second branch pipeline. The main pipeline is used to transport the filling medium, the first branch pipeline is connected to the main pipeline and is used to transport the filling medium, and the first branch pipeline is provided with a first valve. The second branch pipeline is connected to the main pipeline and is used to transport wastewater, and the second branch pipeline is provided with a second valve.
[0014] In some embodiments, the first branch pipeline includes a first portion and a second portion, the first portion is laid on the top wall of the pipeline, and the second portion is bent downward relative to the first portion.
[0015] The utility model has the following beneficial effects: the filling layers of the embodiment of the present application can be formed in steps. First, it is convenient to discharge the excess water in the first filling layer and the second filling layer, thereby improving the strength of the filling layer. Secondly, it reduces the risk of slurry leakage during filling. Furthermore, the second filling layer is filled after the first filling layer solidifies, thereby reducing the time required for the entire filling layer to solidify. Moreover, while waiting for the first filling layer of one access route to solidify, the filling layer of another access route can be constructed, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the filling structure of the utility model.
[0017] Figure numbers: 1-filling layer, 2-second filling layer, 3-first filling layer, 4-inlet, 5-hanging rod, 6-mesh, 7-water filter pipe, 8-filling baffle, 9-main pipeline, 10-first branch pipeline, 11-first valve, 12-second branch pipeline, 13-second valve, 14-first part, 15-second part, 16-retaining wall. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Unless otherwise specified, the technical means used in the embodiments are conventional means well known to those skilled in the art.
[0019] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention / invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention / invention.
[0020] On the one hand, an embodiment of the utility model provides a filling structure for a mine goaf underground, comprising: a filling layer 1, a hanger 5, a mesh 6 and a water filter pipe 7. The filling layer 1 comprises a first filling layer 3 and a second filling layer 2, the first filling layer 3 is used to fill the bottom of the access 4, and the second filling layer 2 is used to fill the space between the first filling layer 3 and the top of the access 4. The hanger 5 is arranged on the filling layer 1, and the hanger 5 extends along the height direction of the access 4. The mesh 6 is arranged on the filling layer 1, the mesh 6 is laid flat, and the mesh 6 is tied to the hanger 5. The water filter pipe 7 is arranged on the filling layer 1, and one end thereof is arranged outside the filling layer 1.
[0021] The filling layer 1 is used to fill the goaf to protect the surface of the mining area.
[0022] The filling layer 1 comprises a first filling layer 3 and a second filling layer 2 respectively, so that the filling layer 1 can be formed in steps. The first filling layer 3 can be formed before the second filling layer 2, that is, it is first filled in the access path 4 once to form the first filling layer 3. When the first filling layer 3 is solidified, it is filled for a second time to form the second filling layer 2.
[0023] The cooperation between the hanger bars 5 and the mesh 6 increases the tensile strength and stability of the filling layer 1 and reduces the risk of cracking of the filling layer 1 .
[0024] The water filter pipe 7 is used to discharge excess water in the medium of the filling layer 1, thereby reducing the risk of reducing the strength of the filling layer 1 due to the failure to discharge the excess water in the medium in time.
[0025] The filling layer 1 of the embodiment of the present application can be formed in steps. First, it is convenient to discharge the excess water in the first filling layer 3 and the second filling layer 2, thereby improving the strength of the filling layer 1. Secondly, it reduces the risk of slurry leakage during filling. Furthermore, the second filling layer 2 is filled after the first filling layer 3 solidifies, which reduces the time required for the entire filling layer 1 to solidify. While waiting for the first filling layer 3 of one access 4 to solidify, the filling layer 1 of another access 4 can be constructed, thereby improving construction efficiency.
[0026] In some embodiments, the material of the filling layer 1 includes cement mortar.
[0027] After drying, cement mortar becomes very hard, with high strength and durability, which improves the filling effect of the goaf.
[0028] In some embodiments, the ratio of the first filling layer 3 to the filling layer 1 is M, which satisfies 50%<M<70%.
[0029] The value of M can be 55%, 60% or 65%.
[0030] The first filling layer 3 accounts for a larger proportion of the entire filling layer 1. On the one hand, when the second filling layer 2 is subsequently filled, the first filling layer 3 can better support the first filling layer 3. On the other hand, the initial support effect of the first filling layer 3 on the access 4 is improved.
[0031] In some embodiments, the hanger 5 includes a plurality of hanger ribs 5 , which are arranged in a plurality of rows and columns. The hanger ribs 5 are partially disposed in the first filling layer 3 , and partially disposed in the second filling layer 2 .
[0032] The hanger bar 5 can be a steel bar with a diameter of ≥14 mm.
[0033] The plurality of hangers 5 can be arranged in a plurality of rows at intervals of one meter, with four hangers 5 arranged in each row, which not only ensures the reinforcing effect of the plurality of hangers 5 on the filling layer 1 , but also makes the number of the hangers 5 more reasonable, thus saving costs.
[0034] The top wall surface of the access passage 4 may be pre-arranged with a hanging ring, and the end of the hanging rod 5 may be provided with a ring structure so that the hanging rod 5 can be hung on the hanging ring.
[0035] The plurality of hanger bars 5 enhances the reinforcing effect of the hanger bars 5 on the strength of the filling layer 1 .
[0036] In some embodiments, the mesh 6 includes multiple meshes 6, and the multiple meshes 6 are arranged at intervals along the height direction of the access path 4. The multiple meshes 6 are partially arranged in the first filling layer 3 and partially arranged in the second filling layer 2.
[0037] The plane specification of the mesh 6 can be 2.15m*4.8m.
[0038] Among the plurality of mesh sheets 6 , the number arranged in the first filling layer 3 is greater than the number arranged in the second filling layer 2 . For example, two mesh sheets 6 may be arranged in the first filling layer 3 , and one mesh sheet 6 may be arranged in the second filling layer 2 .
[0039] The plurality of meshes 6 improves the reinforcing effect of the meshes 6 on the strength of the filling layer 1 .
[0040] In some embodiments, the water filter pipe 7 includes multiple water filter pipes 7, and the multiple water filter pipes 7 are arranged at intervals along the height direction of the inlet 4. The multiple water filter pipes 7 are partially arranged in the first filling layer 3 and partially arranged in the second filling layer 2.
[0041] Among the multiple water filter tubes 7 , the number arranged in the first filling layer 3 is greater than the number arranged in the second filling layer 2 . For example, two water filter tubes 7 can be arranged in the first filling layer 3 , and one water filter tube 7 can be arranged in the second filling layer 2 .
[0042] By providing a plurality of water filter pipes 7, the drainage effect is improved.
[0043] Furthermore, a water inlet hole may be provided on the side wall of the portion of the water filter tube 7 located in the filling layer 1 to facilitate the entry of excess water into the water filter tube 7 .
[0044] In some embodiments, a filling baffle 8 is also included, which is arranged at both ends of the extension direction of the passage 4 to form the end surface of the filling layer 1 along the extension direction of the passage 4.
[0045] The filling baffle 8 can be formed in one piece, or can be formed by building up multiple parts.
[0046] The filling baffle 8 may be a curved surface structure, with its concave surface facing toward the filling layer 1 and its convex surface facing away from the filling layer 1 , so as to enhance the strength of the filling baffle 8 .
[0047] In the embodiment where the water filter pipe 7 is provided in the filling layer 1, the distance that the end of the water filter pipe 7 located outside the filling layer 1 extends out of the filling baffle 8 may be ≥200 mm, so as to facilitate the discharge of excess water.
[0048] The end of the filling layer 1 is blocked by the filling baffle 8, thereby ensuring the forming of the filling layer 1.
[0049] In some embodiments, a water retaining wall 16 is further included. The water retaining wall 16 is disposed at one end of the filling layer 1 along the extending direction of the access road 4. The water retaining wall 16 and the filling layer 1 cooperate to form a water storage space.
[0050] The water retaining wall 16 and the filling layer 1 may enclose the water storage space, or the water retaining wall 16, the end surface of the filling layer 1 and the inner wall surface of the inlet 4 may enclose the water storage space.
[0051] The water storage space can be used to store waste water, such as seepage water of the filling layer 1 .
[0052] The retaining wall 16 may be a board wall structure constructed of fly ash bricks.
[0053] The retaining wall 16 has a height of ≥2m and a width of ≥4.5mm, thereby increasing the water storage capacity of the water storage space.
[0054] The thickness of the water retaining wall 16 is ≥600 mm, which ensures the strength of the water retaining wall 16 .
[0055] Wastewater is collected through the water storage space so that it can be discharged later through a water pump.
[0056] On the other hand, the embodiment of the utility model further provides a filling device for filling the filling structure in the above embodiment, including a main pipeline 9, a first branch pipeline 10 and a second branch pipeline 12. The main pipeline 9 is used to transport the filling medium, the first branch pipeline 10 is connected to the main pipeline 9, and is used to transport the filling medium, and the first branch pipeline 10 is provided with a first valve 11. The second branch pipeline 12 is connected to the main pipeline 9, and is used to transport wastewater, and the second branch pipeline 12 is provided with a second valve 13.
[0057] The second branch pipeline 12 can be used to clean the main pipeline 9. That is, after the main pipeline 9 has transported the filling medium, the main pipeline 9 needs to be cleaned to discharge the remaining filling medium therein to reduce the risk of clogging the main pipeline 9 after the filling medium solidifies.
[0058] The filling device may include two states, the first being a state of conveying the medium, in which the second valve 13 is closed, the first valve 11 is opened, and the filling medium is conveyed from the main pipeline 9 to the first branch pipeline 10. The second being a state of cleaning, in which the first valve 11 is closed, the second valve 13 is opened, and the cleaning medium enters the second branch pipeline 12 after entering the main pipeline 9, thereby preventing the cleaning medium from entering the first branch pipeline 10. If the cleaning medium is discharged from the first branch pipeline 10, the discharged cleaning medium may cause excessive water accumulation in the filling layer 1, and the proportion of the filling medium may change, thereby reducing the strength of the filling layer 1.
[0059] In the embodiment where the water retaining wall 16 is provided, the second branch pipe 12 can discharge the cleaning medium into the water storage space.
[0060] The first valve 11 and the second valve 13 can be electric valves for easy control.
[0061] In some embodiments, the first branch pipeline 10 includes a first portion 14 and a second portion 15 . The first portion 14 is laid on the top wall of the inlet 4 , and the second portion 15 is bent downward relative to the first portion 14 .
[0062] The first portion 14 is laid on the top wall of the inlet 4, which facilitates the laying of the first branch pipeline 10 on the one hand, and facilitates the discharge of the filling medium from top to bottom on the other hand.
[0063] The second portion 15 is bent downward to facilitate accurate discharge of the filling medium.
[0064] The above embodiments are only descriptions of the preferred methods of the utility model / invention, and are not intended to limit the scope of the utility model / invention. Without departing from the design spirit of the utility model / invention, various deformations, modifications, and substitutions made to the technical solutions of the present invention / utility model by ordinary technicians in this field should all fall within the scope of protection determined by the claims of the utility model / invention.
Claims
1. A filling structure for the goaf in underground mines. It is characterized in that include: The filling layer (1) comprises a first filling layer (3) and a second filling layer (2), wherein the first filling layer (3) is used to fill the bottom of the access path (4), and the second filling layer (2) is used to fill the space between the first filling layer (3) and the top of the access path (4); A suspension bar (5) is arranged on the filling layer (1), and the suspension bar (5) extends along the height direction of the access passage (4); A mesh (6) is arranged on the filling layer (1), the mesh (6) is laid flat, and the mesh (6) is tied to the suspension rod (5); A water filter pipe (7) is arranged in the filling layer (1), and one end of the water filter pipe is arranged outside the filling layer (1).
2. The underground mine goaf filling structure according to claim 1, It is characterized in that The proportion of the first filling layer (3) to the filling layer (1) is M, which satisfies 50%<M<70%.
3. The underground mine goaf filling structure according to claim 1, It is characterized in that The suspension ribs (5) include a plurality of suspension ribs (5), which are arranged in a plurality of rows and columns. Part of the suspension ribs (5) are disposed in the first filling layer (3), and part of the suspension ribs (5) are disposed in the second filling layer (2).
4. The underground mine goaf filling structure according to claim 1, It is characterized in that The mesh sheets (6) include a plurality of mesh sheets (6), the plurality of mesh sheets (6) are arranged at intervals along the height direction of the passage (4), and the plurality of mesh sheets (6) are partially arranged in the first filling layer (3) and partially arranged in the second filling layer (2).
5. The underground mine goaf filling structure according to claim 1, It is characterized in that The water filter pipes (7) include a plurality of water filter pipes (7), which are arranged at intervals along the height direction of the inlet (4), and the plurality of water filter pipes (7) are partially arranged in the first filling layer (3) and partially arranged in the second filling layer (2).
6. The underground mine goaf filling structure according to claim 1, It is characterized in that It also comprises filling baffles (8) which are arranged at both ends of the extending direction of the inlet (4) and are used to form the end faces of the filling layer (1) along the extending direction of the inlet (4).
7. The underground mine goaf filling structure according to claim 1, It is characterized in that It also comprises a water retaining wall (16), wherein the water retaining wall (16) is arranged at one end of the filling layer (1) along the extension direction of the access road (4), and the water retaining wall (16) and the filling layer (1) cooperate to form a water storage space.
8. A filling device for filling a filling structure according to any one of claims 1 to 7, It is characterized in that include: A main pipeline (9) for conveying a filling medium; a first branch pipeline (10), which is in communication with the main pipeline (9) and is used for conveying a filling medium, wherein the first branch pipeline (10) is provided with a first valve (11); The second branch pipeline (12) is in communication with the main pipeline (9) and is used for conveying waste water. The second branch pipeline (12) is provided with a second valve (13).
9. The filling device according to claim 8, It is characterized in that The first branch pipeline (10) comprises a first portion (14) and a second portion (15); the first portion (14) is laid on the top wall surface of the inlet (4); and the second portion (15) is bent downward relative to the first portion (14).
Citation Information
Cited By
Precious metal mine underground filling structure and filling construction method
CN119801632A
Underground filling structure and filling construction method for precious metal mines
CN119801632B
Metal mine underground high-concentration continuous filling device
CN120667189A