Adhesive stone pavement
By designing diversion components and a hydrophobic layer on the adhesive stone pavement, the problem of pavement collapse caused by rainwater drainage is solved, the concentrated drainage of rainwater is achieved and the stones are firmly adhered, extending the service life of the pavement.
Patent Information
- Application Number
- CN202420358030.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-02-27
AI Technical Summary
When the existing adhesive stone pavement diverts rainwater, it is easy to cause erosion on both sides of the pavement, affecting its service life.
An adhesive stone pavement is designed that includes a concrete layer, increasing blocks, diversion components, hydrophobic layer and grid fixed plate. The diversion component concentrates drainage through the diversion shell and water collection tank system. The hydrophobic layer and grid fixed plate improve Rainwater diversion and stone adhesion firmness.
It effectively prevents rainwater erosion and extends the service life of adhesive stone pavement. Through the design of diversion components and hydrophobic layers, rainwater is discharged uniformly and concentratedly to avoid pavement collapse.
Smart Images

Figure CN221837346U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road engineering, in particular to a glued stone pavement. Background Art
[0002] Adhesive stone pavement is made by firmly bonding natural colored stones, polished colored stones, glass, crystal stones, etc. together through adhesives. This material is laid on a base layer such as concrete or permeable concrete, asphalt, etc. It has the characteristics of high efficiency and permeability, natural beauty, diverse colors and durability.
[0003] Patent document CN218233016U discloses a kind of adhesive stone pavement. "The adhesive stone pavement in the patent document drains water to both sides of the pavement through a waterproof layer, thereby improving the water permeability of the pavement. However, the rainwater drained to both sides will wash both sides of the pavement, making the pavement easy to collapse to both sides, thus affecting the service life of the pavement. Utility Model Content
[0004] One purpose of the present application is to provide a cemented stone pavement to solve the technical problem in the prior art that rainwater directed to both sides will wash both sides of the pavement, causing the pavement to collapse easily to both sides, thus affecting the service life of the pavement.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an adhesive stone pavement, comprising a concrete layer, with heightened blocks symmetrically installed on both sides of the concrete layer, a diversion component installed on the top of the heightened blocks, the diversion component is used to divert the collected water, the diversion component comprises a diversion shell, the diversion shell is fixed on the top of the heightened blocks, a first water collecting trough is opened on the inner side of the diversion shell, and a threaded water outlet is opened through the front of the first water collecting trough.
[0006] A second water collecting trough is provided on the inner side of the guide shell, a plurality of water leakage holes are provided on the bottom of the second water collecting trough, and the water leakage holes penetrate the top of the first water collecting trough.
[0007] A reflective strip is installed on the top of the guide shell.
[0008] A hydrophobic layer is installed on the top of the concrete layer, and two sides of the hydrophobic layer are located inside the first water collecting tank, and a hydrophobic groove is opened on the top of the hydrophobic layer.
[0009] A grid fixing plate is installed on the top of the hydrophobic layer.
[0010] A stone adhesive layer is laid on the top of the hydrophobic layer, and the stone adhesive layer is located on the inner side of the grid fixing plate.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] 1. In the utility model, when rainwater on the adhesive stone layer and the hydrophobic layer flows to both sides, they enter the guide assembly through the second water collecting trough and the first water collecting trough respectively. The rainwater in the second water collecting trough flows into the first water collecting trough through the leaking hole, and finally flows out through the threaded water outlet, so that the rainwater on the adhesive stone pavement can flow out uniformly and centrally, and the threaded water outlet can be connected with the pipe thread, so that the rainwater is discharged to the position of the original adhesive stone pavement, preventing the rainwater from flowing to both sides to cause scouring on both sides of the adhesive stone pavement, causing both sides of the adhesive stone pavement to collapse easily.
[0013] 2. In the utility model, the grid fixing plate contacts the larger stones in the stone bonding layer, so that the stones are adhered to the inner side of the grid fixing plate, and then a layer of smaller stones is laid to fill the gaps, and then the smaller stones are adhered by adhesive, so that the stone bonding layer is more firm and not easy to fall off. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional diagram of the utility model;
[0015] Figure 2 For the utility model Figure 1 Schematic diagram of the structure at A in the middle;
[0016] Figure 3 It is a cross-sectional view of the guide shell of the utility model;
[0017] Figure 4 It is a schematic diagram of the hydrophobic layer structure of the utility model.
[0018] In the figure: 1. Concrete layer; 2. Drain layer; 3. Drain groove; 4. Grid fixing plate; 5. Stone bonding layer; 6. Heightening block; 7. Diversion shell; 8. First water collecting groove; 9. Second water collecting groove; 10. Leakage hole; 11. Reflective strip; 12. Threaded water outlet. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0021] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] See also Figure 1 , Figure 2 and Figure 3 , the utility model provides an embodiment: a glued stone pavement;
[0023] It includes a concrete layer 1 and a diversion component. Heightening blocks 6 are symmetrically installed on both sides of the concrete layer 1. A diversion component is installed on the top of the heightening block 6. The diversion component is used to divert the collected water. The diversion component includes a diversion shell 7. The diversion shell 7 is fixed on the top of the heightening block 6. A first water collecting trough 8 is opened on the inner side of the diversion shell 7. A threaded water outlet 12 is opened through the front of the first water collecting trough 8. A second water collecting trough 9 is opened on the inner side of the diversion shell 7. A plurality of leakage holes 10 are opened at the bottom of the second water collecting trough 9, and the leakage holes 10 penetrate the top of the first water collecting trough 8. A reflective strip 11 is installed on the top of the diversion shell 7.
[0024] The concrete layer 1 provides a location for the installation of the adhesive stone pavement and is an installation base for the adhesive stone pavement. A diversion component is installed on both sides of the adhesive stone pavement through the heightening blocks 6. The diversion component diverts rainwater flowing out of the adhesive stone pavement. When the rainwater on the adhesive stone layer 5 and the hydrophobic layer 2 flows to both sides, it enters the diversion component through the second water collecting trough 9 and the first water collecting trough 8 respectively. The rainwater in the second water collecting trough 9 flows into the first water collecting trough 8 through the leakage hole 10, and finally flows out through the threaded water outlet 12, so that the rainwater on the adhesive stone pavement can flow out uniformly and centrally, and the threaded water outlet 12 can be connected to the pipe thread, so that the rainwater is discharged to the position of the original adhesive stone pavement, preventing the rainwater from flowing to both sides and causing scouring of the two sides of the adhesive stone pavement, causing the two sides of the adhesive stone pavement to collapse easily, and at the same time, the reflective strip 11 serves to remind the width of the adhesive stone pavement.
[0025] See also Figure 1 and Figure 4 , the utility model provides an embodiment: a glued stone pavement;
[0026] It includes a hydrophobic layer 2 and a grid fixing plate 4, the hydrophobic layer 2 is installed on the top of the concrete layer 1, and the two sides of the hydrophobic layer 2 are located inside the first water collecting tank 8, a hydrophobic groove 3 is opened on the top of the hydrophobic layer 2, a grid fixing plate 4 is installed on the top of the hydrophobic layer 2, and a stone adhesive layer 5 is laid on the top of the hydrophobic layer 2, and the stone adhesive layer 5 is located on the inner side of the grid fixing plate 4;
[0027] The hydrophobic layer 2 is used to guide the rainwater that penetrates under the stone layer 5, so that the rainwater enters the diversion component through the hydrophobic groove 3. The grid fixing plate 4 contacts the larger stones in the stone layer 5, so that the stones adhere to the inner side of the grid fixing plate 4, and then a layer of smaller stones is laid to fill the gaps, and then the smaller stones are adhered by adhesive, so that the stone layer 5 is more firm and not easy to fall off. Working principle: Before using the adhesive stone pavement, you should first check whether there are any problems that affect the use of the adhesive stone pavement. First, when paving the adhesive stone pavement, the stones of the stone layer 5 are first fixed on the top of the concrete layer 1 through the grid fixing plate 4, and then the gaps are filled with stones. When rainwater appears on the adhesive stone pavement, the rainwater flows to both sides and enters the diversion component, and the rainwater is discharged from the place where the adhesive stone pavement is located through the diversion component.
[0028] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.
Claims
1. A cemented stone pavement, comprising a concrete layer (1), characterized in that: The concrete layer (1) is symmetrically provided with heightened blocks (6), the top of the heightened blocks (6) is provided with a diversion assembly, the diversion assembly is used to divert the collected water, the diversion assembly comprises a diversion shell (7), the diversion shell (7) is fixed on the top of the heightened blocks (6), a first water collecting trough (8) is provided on the inner side of the diversion shell (7), and a threaded water outlet (12) is provided through the front side of the first water collecting trough (8).
2. The adhesive stone pavement according to claim 1, characterized in that: A second water collecting trough (9) is provided on the inner side of the guide shell (7), a plurality of water leakage holes (10) are provided on the bottom of the second water collecting trough (9), and the water leakage holes (10) penetrate the top of the first water collecting trough (8).
3. The adhesive stone pavement according to claim 2, characterized in that: A reflective strip (11) is installed on the top of the guide shell (7).
4. The adhesive stone pavement according to claim 1, characterized in that: A hydrophobic layer (2) is installed on the top of the concrete layer (1), and both sides of the hydrophobic layer (2) are located inside the first water collecting tank (8), and a hydrophobic groove (3) is opened on the top of the hydrophobic layer (2).
5. The adhesive stone pavement according to claim 4, characterized in that: A grid fixing plate (4) is installed on the top of the hydrophobic layer (2).
6. The adhesive stone pavement according to claim 5, characterized in that: A stone adhesive layer (5) is laid on the top of the hydrophobic layer (2), and the stone adhesive layer (5) is located on the inner side of the grid fixing plate (4).