Through the combined technology of multi-guide tunnel secret excavation method and support frame end-capping plate, the problem that the fresh air channel guide tunnel cannot form a loop at the turning position is solved, ensuring the improvement of structural support and construction efficiency.
Patent Information
- Application Number
- CN202420603119.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-03-27
AI Technical Summary
During the excavation process of the fresh air channel in the subway station, the part that was not connected to the side wall of the air shaft caused the guide tunnel to be unable to form a loop at the turning position and unable to support the upper structure, which affected the construction efficiency.
The multi-guide tunnel secret excavation method is adopted, which is divided into well pilot tunnels and station pilot tunnels, and support frames and end-capping plates are set at the turning positions. The well pilot tunnel is excavated from the starting point of the wind shaft, and the station pilot tunnel is excavated from the starting point of the station hall. Use the support frame and end-capping plate to ensure that the guide hole is looped to avoid the loss of support of the structure caused by the failure of the primary lining to loop.
It solves the difficulty of excavation of guide tunnels that cannot be connected to the wind shaft. The setting of support frames and end-capping plates ensures that the guide tunnels form a ring when excavation is turned, preventing the upper structure from losing support and improving construction efficiency and material utilization.
Smart Images

Figure CN221838326U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel lining, in particular to a primary lining system for wind duct diversion excavation. Background Art
[0002] The air duct of a subway station is a tunnel that provides fresh air to the subway and exhausts the internal air. It leads to the ground through the air shaft and includes a fresh air duct, an exhaust duct, and a piston air duct. There is often a safety passage inside it for evacuating people in the subway in an emergency.
[0003] One end of the subway air duct is connected to the subway station hall, and the other end leads to the ground through the air shaft. Usually, the tunnel part and the rest of the subway station are ventilated in different ways. The tunnel part is ventilated and exhausted by the piston wind effect when the subway train is running, while the rest of the station hall is ventilated and exhausted by fans. Among them, the air shaft / air duct for piston wind only needs at least one set at the entrance and exit ends, and the direction of air flow inside depends on the direction of subway train operation. The air shaft / air duct for fan ventilation is strictly distinguished according to the direction of air flow. Therefore, the fresh air channel and exhaust channel of the subway station specifically refer to the channels that are ventilated and exhausted by fans.
[0004] During construction, a common practice is to merge the exhaust duct into a piston duct, but separate it with partitions, and the fresh air duct is excavated separately. Since the piston air duct uses the piston wind effect to exhaust air, it must be set up along the running direction of the subway, that is, it needs to be perpendicular to the side wall of the subway station to connect to the subway station hall. Its excavation method also starts from the station hall to ensure that there is no deviation from the running route of the subway. The fresh air duct has relatively fewer restrictions (but there are some, such as the buried depth of the air duct and the buried depth of the connection between the air duct and the station hall, which cannot be adjusted at will), there is no clear restriction on its direction, and it does not need to be connected to a specific location on the subway station.
[0005] However, the fact that the fresh air duct has few restrictions means that it needs to be used to make way for other underground structures during construction. After the construction of other underground structures whose directions and positions cannot be changed at will is completed, it is built from the gaps between these underground structures. This leads to many variables in the direction of the subway's fresh air duct and the connection at both ends. Ideally, the fresh air duct should be connected to the side wall of the air shaft at one end and extend straight at the other end, connecting to the subway station hall without turning. During construction, excavation starts from the air shaft to avoid alignment of underground structures (if excavated from the subway station, the air duct is aligned with the air shaft with a smaller cross-section, and the excavation requirements are high). However, in actual construction, in order to bypass other underground structures whose directions and positions cannot be changed at will, the fresh air duct often needs to turn, and the connection positions at both ends also need to be adjusted. A typical situation is that in order to bypass the piston air duct, the depth of the air shaft of the fresh air duct is limited (the piston air duct is below the air shaft of the fresh air duct). Only a part of one end of the fresh air duct can be connected to the side wall of the air shaft. The excavation of the part that cannot be connected to the side wall of the air shaft is very difficult. This part of the earthwork cannot be directly transported into the air shaft and lifted out, but needs to be transferred to the upper part first, and then enter the air shaft from here, which significantly reduces the construction efficiency. The fresh air duct of Beitaipingzhuang Station of Beijing Subway Line 19, where the utility model is located, faces this difficulty. The construction party tried to change the air duct that could not be connected to the side wall of the air shaft to start excavation from the station hall of the subway station, but found that such excavation caused the primary lining of the guide tunnel to be unable to form a ring at the turning position and could not support the upper structure. Utility Model Content
[0006] The utility model provides a primary lining system for diverting excavation of an air duct.
[0007] The technical problem to be solved is: when the air duct that could not be connected to the side wall of the air shaft was changed to start excavation from the station hall of the subway station, the excavation process caused the primary lining of the guide tunnel to be unable to form a ring at the turning position and could not support the upper structure.
[0008] In order to solve the above technical problems, the utility model adopts the following technical solutions: a primary lining system for duct turning excavation, used for supporting the guide tunnel of the duct excavated by the multi-guide tunnel dark excavation method, the duct is the fresh air duct of the subway station, the side wall of the station hall of the subway station, the side wall connected with the duct is recorded as the connecting side wall, the duct is arranged parallel to the connecting side wall, and is connected to the station hall after bending 90°, and the channel formed by the duct bending and connecting to the station hall is recorded as the connecting section; when the duct is excavated, each layer of guide tunnels is excavated layer by layer from top to bottom, the guide tunnel that can be connected to the side wall of the air shaft is excavated with the air shaft as the starting point and is recorded as the shaft guide tunnel, and the remaining guide tunnels are excavated with the station hall as the starting point and are recorded as the station guide tunnel;
[0009] The primary lining system includes the lining of the well guide tunnel, the lining of the station guide tunnel, and the support frame and the end plate arranged at the turning position of the station guide tunnel. The lining of the station guide tunnel first extends from the station hall to the side wall position of the air duct away from the station hall, is blocked by the end plate at the side wall position of the air duct away from the station hall, and then turns and extends along the extension direction of the well guide tunnel with the breach on the lining side wall before turning as the starting point;
[0010] In the pilot tunnel of each layer station, the segment whose excavation direction is perpendicular to the connecting side wall and located in the air duct is recorded as a non-annular segment, and the support frame is arranged below the non-annular segment.
[0011] Furthermore, the station guide tunnel comprises two layers, and the support frame is a door-type support. The support frame in the upper station guide tunnel is arranged on the two side walls of the air duct close to the side walls of the station hall, and the support frame in the lower station guide tunnel is arranged against the broken side walls of the station guide tunnel, and the support frames in the two-layer station guide tunnel are arranged vertically.
[0012] Furthermore, in the connecting section, the portion outside the station guide tunnel is arranged side by side with the section starting from the station guide tunnel.
[0013] Furthermore, the side wall of the position where the air duct is connected to the portion other than the guide tunnel of the connecting section is a door-shaped support that does not need to be broken during access, and the gap between the door-shaped supports forms a reserved interface for access.
[0014] Furthermore, the flow cross-sectional area of the connecting section is not less than the flow cross-sectional area of the portion of the air duct through which the air flows.
[0015] Furthermore, the well guide tunnel is divided into three layers, and the support frame is a Ⅰ22a double-piece steel door-type support.
[0016] Compared with the prior art, the primary lining system for wind duct diversion excavation of the utility model has the following beneficial effects:
[0017] In the utility model, the fresh air channel is arranged parallel to the connecting side wall and connected to the station hall after being bent 90 degrees, and the guide hole of the fresh air channel is divided into two parts. The well guide hole connected to the side wall of the wind shaft is excavated according to the traditional method, and the station guide hole that cannot be connected to the side wall of the wind shaft is excavated from the station hall, and after digging below the well guide hole, it turns and excavates along the well guide hole. Thereby, the difficulty in excavating the guide hole that cannot be connected to the wind shaft is solved. At the same time, by setting the support frame and the end plate, when turning the excavation, the upper structure will not lose support because the lining cannot form a ring at one time. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the relative positions of the air shaft and the air duct, with arrows indicating the excavation direction;
[0019] Figure 2 This is the plan view of the well pilot tunnel when it is excavated;
[0020] Figure 3 This is the plan view of the station pilot tunnel during excavation;
[0021] In the figure, 1-air shaft, 2-air duct, 3-connecting section, 4-station hall, 5-support frame, 61-shaft guide tunnel, 62-station guide tunnel, 7-end plate, 8-reserved interface. DETAILED DESCRIPTION
[0022] Take the fresh air passage of Beitaipingzhuang Station of Beijing Subway Line 19 to which the present invention is applied as an example. Figure 1-3 As shown, a primary lining system for duct diversion excavation is used to support the guide tunnel of the duct 2 excavated by the multi-guide tunnel dark excavation method. In the side wall of the station hall 4 of the subway station, the side wall connected with the duct 2 is recorded as the connecting side wall, the duct 2 is arranged parallel to the connecting side wall, and is connected to the station hall 4 after bending 90 degrees. The channel formed by the duct 2 bending and connecting to the station hall 4 is recorded as the connecting section 3; when the duct 2 is excavated, each layer of guide tunnels is excavated layer by layer from top to bottom, and the guide tunnel that can be connected to the side wall of the air shaft 1 is excavated with the air shaft 1 as the starting point and is recorded as the shaft guide tunnel 61, and the remaining guide tunnels are excavated with the station hall 4 as the starting point and are recorded as the station guide tunnel 62;
[0023] In this embodiment, the air duct 2 is a fresh air passage of the subway station. Below the air shaft 1 of the fresh air passage is an exhaust passage perpendicular to the connecting side wall, which results in the limited depth of the air shaft 1. Only the upper layers of the guide tunnel of the air duct 2 can be connected to the air shaft 1. Therefore, when the air duct 2 is excavated, the guide tunnels of each layer are excavated layer by layer from top to bottom. The guide tunnels that can be connected to the side wall of the air shaft 1 are excavated starting from the air shaft 1 and recorded as the well guide tunnel 61. The remaining guide tunnels are excavated starting from the station hall 4 and recorded as the station guide tunnel 62. The earth excavated from the well guide tunnel 61 is loaded onto a truck and transported to the air shaft 1 for hoisting. The earth excavated from the station guide tunnel 62 is loaded onto a truck and transported to the station hall 4 for transportation.
[0024] The primary lining system includes the lining of the well guide tunnel 61, the lining of the station guide tunnel 62, and the support frame 5 and the end plate 7 arranged at the turning position of the station guide tunnel 62. The lining of the station guide tunnel 62 first extends from the station hall 4 to the side wall position of the air duct 2 away from the station hall 4, is blocked by the end plate 7 at the side wall position of the air duct 2 away from the station hall 4, and then turns and extends along the extension direction of the well guide tunnel 61 starting from the breach on the lining side wall before the turn;
[0025] The station guide tunnel 62 is first excavated perpendicularly to the connecting side wall to form a part of the connecting section 3. After digging to the side wall position of the air duct 2 away from the station hall 4, it is permanently sealed. Then the side wall of the station guide tunnel 62 blocking the excavation direction is broken and excavation is carried out along the extension direction of the air duct 2. The end sealing plate 7 is a part of the initial lining of the air duct 2 and can be constructed in the form of a thickened initial lining, and the grille or I-beam inside is arranged vertically.
[0026] In the pilot tunnel 62 of each floor station, the segment whose excavation direction is perpendicular to the connecting side wall and located in the air duct 2 is recorded as a non-annular segment, and the support frame 5 is arranged below the non-annular segment.
[0027] The support frame 5 here is the cost of turning the station guide tunnel 62 to excavate. Since the excavation direction has changed by 90°, after breaking the side wall of the station guide tunnel 62 that blocks the excavation direction, the initial lining of the air duct 2 at the corner position cannot form a ring in any direction and cannot support the structure above, so an additional support frame 5 is required. But this cost is negative overall, because although it causes some additional components and workload in the excavation stage of the air duct 2, the material consumption and workload of the subsequent connection section 3 construction are reduced. The construction of a part of the connection section 3 is completed directly here, and this part does not need to be excavated later, nor does it need to perform complex force conversion, which saves the components and workload of the subsequent force conversion. At the same time, since the cross-section of the remaining part of the connection section 3 becomes smaller, the difficulty of the force conversion of the remaining part is also greatly reduced.
[0028] The station guide hole 62 includes two layers, and the support frame 5 is a door-shaped support. The support frame 5 in the upper station guide hole 62 is arranged on the two side walls of the air duct 2 close to the side walls of the station hall 4, and the support frame 5 in the lower station guide hole 62 is arranged against the broken side walls of the station guide hole 62. The support frames 5 in the two-layer station guide holes 62 are arranged vertically.
[0029] The function of the gate-type support here is to complete the primary lining that does not form a ring segment so that it can form a ring. The gate-type support itself will not block the excavation direction and will not affect subsequent construction. Since the pure steel structure of the gate-type support is not as rigid as the reinforced concrete structure, and its connection with the primary lining is also difficult to be reliable, if it is used to form a ring, the position of the gate-type support is a position with poor rigidity and loose connection. If the gate-type supports of the upper and lower station guide tunnels 62 are set at the same position, this disadvantage will be further amplified. Therefore, it is necessary to make the gate-type supports of the upper and lower station guide tunnels 62 perpendicular to each other so that the primary linings of the upper and lower station guide tunnels 62 form rings in different directions. In this embodiment, the station guide tunnel 62 includes two layers. If there are more than two layers, according to this rule, the gate-type supports of the upper and lower station guide tunnels 62 are set at the above two different positions and perpendicular to each other.
[0030] In the connecting section 3, the part outside the station guide hole 62 is arranged side by side with the section starting from the station guide hole 62. The side wall of the position where the air duct 2 is connected by the part outside the station guide hole 62 in the connecting section 3 is a gate-shaped support that does not need to be broken when connected, and the gap between the gate-shaped supports forms a reserved interface 8 for access.
[0031] That is to say, when the air duct 2 is being constructed, the position where the side wall needs to be connected to the connecting section 3 is replaced in advance with a gate-type support instead of a reinforced concrete primary lining. This can ensure that the primary lining forms a ring and avoid demolition during the subsequent construction of the connecting section 3.
[0032] The flow cross-sectional area of the connecting section 3 is not less than the flow cross-sectional area of the portion of the air duct 2 through which the air flows.
[0033] The air duct 2 itself often has other functions, and its flow cross-sectional area is not necessarily used entirely for ventilation. Therefore, the flow cross-sectional area of the connecting section 3 here only needs to be no less than the flow cross-sectional area of the part of the air duct 2 through which air flows.
[0034] The well guide tunnel 61 is divided into three layers, and the support frame 5 is a Ⅰ22a double-piece steel door-type support.
[0035] In this embodiment, the well guide tunnel 61 is divided into three layers, and together with the station guide tunnel 62, it is five layers, which can cope with the excavation of most of the air ducts 2. The support frame 5 is a Ⅰ22a double-piece steel door-type support, so as to meet the needs of installing the support frame 5 section by section while excavating.
[0036] The method for excavating and lining the air duct 2 in this embodiment includes the following steps:
[0037] Step 1: Open a gate on the side wall of the ventilation shaft 1, and excavate the well guide tunnel 61 layer by layer starting from the ventilation shaft 1;
[0038] Step 2: Open a horse head door on the connecting side wall, excavate the upper station guide hole 62, and when the space in the primary lining at the non-loop position is enough to place the entire support frame 5, install the support frame 5, and then continue to excavate. After digging to the side wall position of the air duct 2 away from the station hall 4, permanently seal the end, and then break the side wall of the station guide hole 62 blocking the excavation direction and excavate along the extension direction of the air duct 2;
[0039] Step 3: Open a horse head door on the connecting side wall, excavate the lower station guide hole 62, and when the space in the primary lining at the non-annular position is sufficient to place a section of support frame 5, install a section of support frame 5, and then continue to excavate and install the support frame 5 section by section at the same time. After digging to the side wall position of the air duct 2 away from the station hall 4, permanently seal the end, and then break the side wall of the station guide hole 62 blocking the excavation direction and excavate along the extension direction of the air duct 2.
[0040] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A primary lining system for duct diversion excavation, used for supporting the guide tunnel of an air duct (2) excavated by a multi-guide tunnel dark excavation method, wherein the air duct (2) is a fresh air passage of a subway station, and the side wall of the station hall (4) of the subway station, which is connected to the air duct (2) is recorded as a connecting side wall, and the air duct (2) is arranged parallel to the connecting side wall and is connected to the station hall (4) after being bent by 90 degrees, and the channel formed by the air duct (2) bending and connecting to the station hall (4) is recorded as a connecting section (3); when the air duct (2) is excavated, each layer of guide tunnels is excavated layer by layer from top to bottom, and the guide tunnel that can be connected to the side wall of the air shaft (1) is excavated with the air shaft (1) as the starting point and is recorded as a shaft guide tunnel (61), and the remaining guide tunnels are excavated with the station hall (4) as the starting point and are recorded as station guide tunnels (62); Features: The primary lining system comprises a lining of a well guide tunnel (61), a lining of a station guide tunnel (62), and a support frame (5) and an end plate (7) arranged at a turning position of the station guide tunnel (62); the lining of the station guide tunnel (62) first extends from the station hall (4) to a side wall position of the air duct (2) away from the station hall (4), is blocked by the end plate (7) at the side wall position of the air duct (2) away from the station hall (4), and then turns and extends along the extension direction of the well guide tunnel (61) with the breach on the lining side wall before the turn as the starting point; In the pilot tunnel (62) of each layer station, the segment whose excavation direction is perpendicular to the connecting side wall and located in the air duct (2) is recorded as a non-ring segment, and the support frame (5) is arranged below the non-ring segment.
2. A primary lining system for wind duct diversion excavation according to claim 1, Features: The station guide hole (62) comprises two layers, the support frame (5) is a door-shaped support, the support frame (5) in the station guide hole (62) of the upper layer is arranged at the side wall position of the two side walls of the air duct (2) close to the station hall (4), and the support frame (5) in the station guide hole (62) of the lower layer is arranged close to the side wall of the station guide hole (62) that is broken, and the support frames (5) in the two layers of the station guide holes (62) are arranged vertically.
3. A primary lining system for wind duct diversion excavation according to claim 1, Features: In the connecting section (3), the portion outside the station guide tunnel (62) is arranged side by side with the section starting from the station guide tunnel (62).
4. A primary lining system for wind duct diversion excavation according to claim 1, Features: The side wall of the air duct (2) at the position where the portion other than the guide hole (62) in the connecting section (3) is connected is a door-shaped support that does not need to be broken when connected, and the gap between the door-shaped supports forms a reserved interface (8) for access.
5. A primary lining system for wind duct diversion excavation according to claim 1, Features: The flow cross-sectional area of the connecting section (3) is not less than the flow cross-sectional area of the portion of the air duct (2) through which air flows.
6. A primary lining system for wind duct diversion excavation according to claim 1, Features: The well guide tunnel (61) is divided into three layers, and the support frame (5) is a Ⅰ22a double-piece steel door-shaped support.