Middle shaft double-lifting structure for vertical ball mill

By adopting a central shaft double lifting structure in the vertical ball mill, the problems of high manual operation intensity and potential safety hazards during cleaning and maintenance of the existing vertical ball mill are solved, achieving more efficient and safer equipment operation and accessory replacement, and prolonging the service life of the vertical ball mill. service life.

CN221847373UActive Publication Date: 2024-10-18WUXI JINGCHENG POWDER MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420319436.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-18
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

The existing vertical ball mill requires manual operation when cleaning or replacing accessories, which is strong and unsafe. The single-sided lifting structure has problems such as tilt, wear and tear, and potential safety hazards.

Method used

It adopts a double lifting structure with a central axis, including a frame, a lifting motor reducer, a connecting rod, a right-angle converter, a vertical screw rod, a nut and a guide column, and realizes the lifting and lowering of the mixing shaft through a bilaterally symmetrical lifting structure. Reduce manual operations and improve safety and equipment life.

Benefits of technology

It reduces the labor intensity and safety hazards of manual operations, improves equipment maintenance and cleaning efficiency, extends the service life of screws and nuts, and achieves extension of replacement cycles and standardization of accessories.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221847373U_ABST
    Figure CN221847373U_ABST
Patent Text Reader

Abstract

The utility model relates to a center shaft double-lifting structure for a vertical ball mill, which is applied to the bottom of the vertical ball mill, drives a stirring shaft of the vertical ball mill to move, and comprises a rack, a lifting motor speed reducer, a connecting rod and a lifting motor, the connecting rod rotates in the horizontal plane of the bottom of the rack, the right-angle converter is installed at the two ends of the connecting rod in a transmission mode, the lead screw is installed at the output end of the right-angle converter and vertically arranged, the nut is arranged on the lead screw in a sleeving mode and drives the nut to longitudinally move when the lead screw rotates, the guide column is connected with the nut, the top of the guide column is connected with a top plate, and a stirring shaft of the vertical ball mill is connected with the top plate. According to the utility model, the labor intensity during maintenance, cleaning and replacement of accessories of the ball mill can be greatly reduced, potential safety hazards in a single lifting process are solved, and the defect that a single lifting structure inclines in the lifting process is overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ball mills, in particular to a central shaft double lifting structure for a vertical ball mill. Background Art

[0002] Vertical ball mill is the key equipment for fine grinding of slurry. This structure of ball mill is to load a certain weight of ball stone into its barrel as the ball grinding medium. It is widely used in chemical, ceramic, lithium battery, metal, glass, environmental protection, new materials and other industries to perform wet grinding of various slurries.

[0003] When the existing vertical ball mill needs to clean the inside of the barrel or replace the accessories inside the barrel, it is necessary to manually remove the stirring shaft first, and then replace the accessories or clean the barrel. This manual operation is very intensive, unsafe, and very inefficient, and cannot meet the company's normal maintenance, cleaning, and equipment maintenance needs.

[0004] There are currently unilateral lifting structures on the market, but unilateral lifting has the following problems:

[0005] 1. The top plate will tilt during the rising process;

[0006] 2. Because unilateral lifting is a biased lifting method, the lifting screw is greatly worn and needs frequent maintenance and replacement;

[0007] 3. The safety performance of unilateral lifting is not high, especially during frequent lifting. The screw rod not only has vertical downward pressure but also lateral traction, which makes the force direction of the screw rod biased to the vertical downward position, which can easily cause the screw rod to break and pose a great safety hazard. Utility Model Content

[0008] In view of the shortcomings in the above-mentioned existing production technology, the applicant provides a rationally structured central shaft double lifting structure for a vertical ball mill, which can greatly reduce the labor intensity during maintenance, cleaning and replacement of accessories of the ball mill, solve the safety hazards arising during a single lifting process, and solve the disadvantage of a single lifting structure tilting during the lifting process.

[0009] The technical solution adopted by the utility model is as follows:

[0010] A central shaft double lifting structure for a vertical ball mill is applied to the bottom of the vertical ball mill. The double lifting structure drives the stirring shaft of the vertical ball mill to move.

[0011] The double lifting structure includes:

[0012] The rack, as a reference for motion,

[0013] The lifting motor reducer is installed at the bottom of the frame.

[0014] The connecting rod is driven by the lifting motor reducer and rotates in the horizontal plane at the bottom of the frame.

[0015] Right angle converter, the transmission is installed at both ends of the connecting rod,

[0016] The screw is installed at the output end of the right-angle converter, and the screw is set vertically.

[0017] The nut is mounted on the screw. When the screw rotates, it drives the nut to move longitudinally.

[0018] The guide column is connected with the nut, the top of the guide column is connected with a top plate, and the stirring shaft of the vertical ball mill is connected with the top plate.

[0019] As a further improvement of the above technical solution:

[0020] The outer coaxial sleeve of the guide post is provided with a guide sleeve, and the guide sleeve and the guide post move relative to each other.

[0021] A guide sleeve is respectively arranged at both ends of the same guide column, and the relative position between the guide sleeve and the frame is kept constant.

[0022] A bearing is arranged in a guide sleeve at the bottom of the same guide column, an outer wall of the bearing is connected to the guide sleeve, and an inner wall of the bearing is connected to the lead screw.

[0023] The end of the bottom guide sleeve facing the ground is a closed structure.

[0024] The bottom end of the guide column is fixedly connected with the nut, and the nut and the guide sleeve are clearance-matched.

[0025] A connecting flange is arranged on the top of the guide column and is connected to the top plate via the connecting flange.

[0026] In the initial state, the edge of the top plate falls on the top of the frame; the longitudinal height of the screw rod is lower than or equal to the height of the frame.

[0027] The double lifting structure is based on the vertical ball mill and is symmetrically arranged in at least one group.

[0028] The beneficial effects of the utility model are as follows:

[0029] The utility model has a compact and reasonable structure and is easy to operate, and solves the problems of actual production needs such as high manual labor intensity, low work efficiency and high safety hazards.

[0030] In the utility model, the lifting structure symmetrically arranged on both sides has the advantages of symmetrical force application on both sides and uniform force on the top plate, compared with the traditional vertical ball mill without a lifting structure or with a lifting device with only a single-side lifting structure.

[0031] The utility model realizes the function of raising and lowering the stirring shaft and the top plate through double lifting. When the structure in the barrel needs to be cleaned, there is no need to disassemble the ball mill or manually enter the barrel. It only needs to start the lifting structure to drive the stirring shaft to rise and leave the space in the barrel to achieve the cleaning work. It is easy to operate, simple to maintain, and has no safety hazards. The screw rod and copper nut have little wear and tear, and the replacement cycle is long. All accessories are standard parts, which are convenient for processing and assembly.

[0032] Guide sleeves are respectively arranged at both ends of the screw rod in the utility model. The guide sleeves serve as movement guides for the guide column. On the one hand, they limit the verticality of the lifting path, and on the other hand, they protect the screw rod and the guide column.

[0033] The transmission member in the utility model is a nut, which falls into a guide sleeve with a closed bottom in an initial state, and the relative position of the guide sleeve remains unchanged. When the nut rises, the guide column is driven to rise, and the contact area is increased by using the guide column and the connecting flange, thereby improving the overall lifting stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic diagram of the initial state of the lifting structure of the utility model.

[0035] Figure 2 It is a structural schematic diagram of the lifting structure of the utility model in a lifting state.

[0036] Figure 3 This is a schematic diagram of the initial state of the lifting structure of the utility model applied to a vertical ball mill.

[0037] Figure 4 It is a schematic diagram of the lifting state of the lifting structure of the utility model applied to a vertical ball mill.

[0038] Among them: 1. stirring shaft; 2. frame; 3. lifting motor reducer; 4. connecting rod; 5. right-angle converter; 6. screw rod; 7. nut; 8. guide column; 9. top plate; 10. guide sleeve; 11. bearing; 12. connecting flange. DETAILED DESCRIPTION

[0039] The specific implementation of the present utility model is described below in conjunction with the accompanying drawings.

[0040] like Figure 1-Figure 4 As shown, the central shaft double lifting structure of the vertical ball mill of this embodiment is applied to the bottom of the vertical ball mill. The double lifting structure drives the stirring shaft 1 of the vertical ball mill to move.

[0041] The double lifting structure includes:

[0042] Rack 2, as the motion reference,

[0043] The lifting motor reducer 3 is installed at the bottom of the frame 2.

[0044] The connecting rod 4 is driven by the lifting motor reducer 3 to rotate in the horizontal plane at the bottom of the frame 2.

[0045] The right angle converter 5 is installed at both ends of the connecting rod 4.

[0046] The screw rod 6 is installed at the output end of the right angle converter 5, and the screw rod 6 is arranged vertically.

[0047] The nut 7 is sleeved on the screw rod 6. When the screw rod 6 rotates, the nut 7 is driven to move longitudinally.

[0048] The guide column 8 is connected to the nut 7 , the top of the guide column 8 is connected to a top plate 9 , and the stirring shaft 1 of the vertical ball mill is connected to the top plate 9 .

[0049] A guide sleeve 10 is coaxially sleeved outside the guide post 8 , and the guide sleeve 10 and the guide post 8 move relative to each other.

[0050] A guide sleeve 10 is provided at each end of the same guide column 8, and the relative position between the guide sleeve 10 and the frame 2 remains constant.

[0051] A bearing 11 is arranged in a guide sleeve 10 at the bottom of the same guide column 8 , an outer wall of the bearing 11 is connected to the guide sleeve 10 , and an inner wall of the bearing 11 is connected to the screw rod 6 .

[0052] The end of the bottom guide sleeve 10 facing the ground is a closed structure.

[0053] The bottom end of the guide column 8 is fixedly connected to the nut 7 , and there is a clearance fit between the nut 7 and the guide sleeve 10 .

[0054] A connecting flange 12 is provided at the top end of the guide column 8 , and the guide column 8 is connected to the top plate 9 via the connecting flange 12 .

[0055] In the initial state, the edge of the top plate 9 falls on the top of the frame 2 ; the longitudinal height of the screw rod 6 is lower than or equal to the height of the frame 2 .

[0056] The double lifting structure is based on the vertical ball mill and is symmetrically arranged in at least one group.

[0057] The specific structure and working principle of the utility model are as follows:

[0058] The specific structure and working principle of the utility model are as follows:

[0059] like Figure 1As shown, it is a schematic diagram of the overall structure of the utility model, including a frame 2. The frame 2 is placed on the ground as a motion reference, and a lifting motor reducer is installed at the bottom of the frame 2. The output end of the lifting motor reducer drives a connecting rod 4, and a right-angle converter 5 is respectively arranged at both ends of the connecting rod 4. The internal working principle of the right-angle converter 5 can be a bevel gear pair, which is used to convert the rotation in the horizontal plane into the rotation in the vertical direction. The rotation in the vertical direction is realized by a screw 6.

[0060] The vertical rotation is mainly for lifting and lowering the top plate 9. Figure 2 Two connecting flanges 12 are welded on the left and right sides of the top plate 9, and the two connecting flanges 12 are respectively connected to the two lifting guide pillars 8. A copper nut 7 is installed at the bottom of each guide pillar 8, and the copper nut 7 is connected to the bottom end of the screw rod 6. Two guide sleeves 10 are respectively penetrated at both ends of a guide pillar 8, and the guide sleeves 10 are respectively welded to the station plate of the rack 2, and the station plate is fixed to the equipment rack 2 with screws.

[0061] The bottom of the screw rod 6 is driven by the right-angle converter 5 to achieve rotation.

[0062] When lifting is required, Figure 3 and Figure 4 As shown, the lifting motor reducer 3 is turned on to drive the connecting rod 4 to rotate, the connecting rod 4 drives the right-angle converter 5 to rotate, the right-angle converter 5 drives the screw rod 6 to rotate, the nut 7 rises along the screw rod 6, and at the same time, the nut 7 pushes the guide column 8 to rise slowly upward, and the guide columns 8 on both sides rise synchronously to lift the top plate 9, and the top plate 9 lifts the stirring shaft 1 out of the barrel.

[0063] When the top plate 9 needs to be lowered, the reducer 3 of the lifting motor is reversed, driving the connecting rod 4 and the screw rod 6 to reverse, and the nut 7 is lowered, driving the guide column 8, the top plate 9 and the stirring shaft 1 to descend, thereby achieving reset.

[0064] The utility model realizes the function of rising and falling of the stirring shaft 1 and the top plate 9 through double lifting, thereby achieving the technical purpose of convenient cleaning, simple maintenance and no safety hazards; the screw rod 6 and the copper nut 7 used have little wear and tear and a long replacement cycle; and all accessories are standard parts, which are convenient for processing and assembly, and have broad application prospects.

[0065] The above description is an explanation of the utility model, not a limitation of the utility model. The scope of the utility model is defined by the claims. Any form of modification can be made within the protection scope of the utility model.

Claims

1. A central shaft double lifting structure for a vertical ball mill, characterized in that: Applied to the bottom of a vertical ball mill, the double lifting structure drives the stirring shaft (1) of the vertical ball mill to move. The double lifting structure includes: The frame (2), as a reference for movement, The lifting motor reducer (3) is installed at the bottom of the frame (2). The connecting rod (4) is driven by the lifting motor reducer (3) to rotate in the horizontal plane at the bottom of the frame (2). The right-angle converter (5) is installed at both ends of the connecting rod (4). The screw rod (6) is installed at the output end of the right angle converter (5), and the screw rod (6) is arranged vertically. The nut (7) is sleeved on the screw rod (6). When the screw rod (6) rotates, the nut (7) is driven to move longitudinally. The guide column (8) is connected to the nut (7), the top of the guide column (8) is connected to a top plate (9), and the stirring shaft (1) of the vertical ball mill is connected to the top plate (9).

2. The central shaft double lifting structure for a vertical ball mill according to claim 1, characterized in that: A guide sleeve (10) is coaxially sleeved outside the guide post (8), and the guide sleeve (10) and the guide post (8) move relative to each other.

3. The central shaft double lifting structure for a vertical ball mill according to claim 2, characterized in that: A guide sleeve (10) is respectively provided at both ends of the same guide column (8), and the relative position between the guide sleeve (10) and the frame (2) is kept constant.

4. The central shaft double lifting structure for a vertical ball mill according to claim 2, characterized in that: A bearing (11) is arranged in a guide sleeve (10) at the bottom of the same guide column (8), an outer wall of the bearing (11) is connected to the guide sleeve (10), and an inner wall of the bearing (11) is connected to the screw rod (6).

5. The central shaft double lifting structure for a vertical ball mill according to claim 4, characterized in that: The end of the bottom guide sleeve (10) facing the ground is a closed structure.

6. The central shaft double lifting structure for a vertical ball mill according to claim 1, characterized in that: The bottom end of the guide column (8) is fixedly connected to the nut (7), and a clearance fit is formed between the nut (7) and the guide sleeve (10).

7. The central shaft double lifting structure for a vertical ball mill according to claim 1, characterized in that: A connecting flange (12) is arranged at the top end of the guide column (8), and the guide column (8) is connected to the top plate (9) via the connecting flange (12).

8. The central shaft double lifting structure for a vertical ball mill according to claim 1, characterized in that: In the initial state, the edge of the top plate (9) falls on the top of the frame (2); the longitudinal height of the screw rod (6) is lower than or equal to the height of the frame (2).

9. The central shaft double lifting structure for a vertical ball mill according to claim 1, characterized in that: The double lifting structure is based on the vertical ball mill and is symmetrically arranged in at least one group.