Natural gas pipeline construction butt joint device
By designing the natural gas pipeline construction docking device, the adjustment component and the displacement component are used to drive the movement of the splint and the sliding plate, thereby realizing the precise docking of the pipeline, solving the problem of low docking efficiency, and improving the docking accuracy and efficiency.
Patent Information
- Application Number
- CN202420120976.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-18
AI Technical Summary
During the docking process of natural gas pipelines, the movement and support of the pipelines takes a long time, resulting in low docking efficiency and difficulty in accurate alignment.
A natural gas pipeline construction docking device is designed, including a base plate, a sliding plate, a displacement component, a driving gear, a driven gear and a threaded rod. The adjusting component and the displacement component drive the clamping plate and the sliding plate to move to achieve precise docking and alignment of the pipelines.
It improves the accuracy and efficiency of natural gas pipeline docking, reduces docking time, and simplifies the welding process.
Smart Images

Figure CN221849225U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of natural gas pipeline construction, in particular to a natural gas pipeline construction docking device. Background Art
[0002] The background technology of natural gas pipeline construction involves many aspects, including geological exploration, pipeline design, construction technology, material selection, safety monitoring, etc. The construction technology mainly consists of several steps such as pipeline transportation, docking installation, pipeline maintenance, etc. In the process of docking installation, we need to use a natural gas pipeline construction docking device.
[0003] At present, the operation method used for natural gas pipeline docking is that the staff first picks up the natural gas pipeline to be installed, then aligns one end of the pipeline with the installed pipeline, and then places a support block under the pipeline to be installed or supports it manually, and then uses a welding device to weld the two natural gas pipelines at the joint until the pipeline to be installed and the end face of the installed pipeline are welded together. However, a large part of the time for the entire pipeline docking operation is spent on the movement and support of the pipeline. Therefore, in order to improve the efficiency of pipeline docking and reduce the time spent on accurate alignment, it is essential. Therefore, we propose a natural gas pipeline construction docking device. Utility Model Content
[0004] The purpose of the utility model is to provide a natural gas pipeline construction docking device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a natural gas pipeline construction docking device, comprising a base plate, the top of the base plate is provided with a through groove and a guide groove, the top of the base plate is slidably connected with a sliding plate, the top of the base plate is provided with a displacement assembly, the displacement assembly is used to drive the sliding plate to move, the top of the sliding plate is fixedly connected with a U-shaped plate, the U-shaped plate and the sliding plate are rotatably connected with a driving gear, the top of the sliding plate is rotatably connected with a driven gear, the driving gear is meshed with the driven gear, the internal thread of the driven gear is connected with a second threaded rod, the bottom of the second threaded rod is rotatably connected with a movable upper clamping plate, the top of the base plate is fixedly connected with a fixed upper clamping plate, the bottoms of the movable upper clamping plate and the fixed upper clamping plate are both provided with a lower clamping plate, the movable upper clamping plate and the fixed upper clamping plate are all provided with an adjustment assembly between the movable upper clamping plate and the fixed upper clamping plate and the lower clamping plate, the adjustment assembly is used to drive the lower clamping plate to move.
[0006] As a further preferred embodiment of the present technical solution, the displacement assembly includes a mounting plate and a fixing plate, both of which are fixedly connected to the top of the base plate, a first threaded rod is rotatably connected between the mounting plate and the fixing plate, an outer side of the first threaded rod is threadedly connected to a connecting plate, the bottom of the connecting plate is fixedly connected to the sliding plate, a displacement motor is fixedly installed on one side of the mounting plate, and an output end of the displacement motor extends to the other side of the mounting plate and is fixedly connected to the first threaded rod.
[0007] As a further preferred embodiment of the present technical solution, the adjustment assembly includes two third threaded rods, the two third threaded rods are respectively fixedly connected to the bottom of the fixed upper clamp and the movable upper clamp, the outer sides of the third threaded rods are threadedly connected to the lower clamp, the bottom of the third threaded rods is fixedly connected with an adjustment handle, the bottoms of the fixed upper clamp and the movable upper clamp are both fixedly connected with a limiting rod, and the outer sides of the limiting rod are slidably connected to the lower clamp.
[0008] As a further preferred embodiment of the present technical solution, an adjusting motor is fixedly mounted on the bottom of the U-shaped plate, and an output end of the adjusting motor extends to the inside of the U-shaped plate and is fixedly connected to the driving gear.
[0009] As a further preferred embodiment of the present technical solution, a guide rod is fixedly connected to the top of the movable upper clamping plate, and the outer portion of the guide rod is slidably connected to the inner wall of the guide groove.
[0010] As a further preferred embodiment of the present technical solution, the top of the second threaded rod is fixedly connected to a limiting plate.
[0011] The utility model provides a natural gas pipeline construction docking device, which has the following beneficial effects:
[0012] (1) The utility model drives the lower clamping plate to move through the adjustment component, and cooperates with the fixed upper clamping plate and the movable upper clamping plate to clamp and fix the installed pipe and the pipe to be installed. Then, the active gear drives the driven gear to rotate, so that the second threaded rod threadedly connected to the driven gear drives the movable upper clamping plate and the pipe to be installed in the clamping to move upward together until they are aligned with the installed pipe, so that the ports of the two pipes correspond to each other, thereby realizing the positioning of the pipe to be installed and further ensuring the accuracy of the natural gas pipeline docking.
[0013] (2) The utility model drives the sliding plate to move on the top of the bottom plate through the displacement assembly, and further slides inside the through groove through the second threaded rod, so that the pipeline to be installed moves simultaneously with the sliding plate until the end face of the pipeline to be installed contacts the end face of the installed pipeline, thereby facilitating the workers to weld the joints of the two pipelines, thereby improving the joint efficiency of the natural gas pipeline. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0015] Figure 2 It is a schematic diagram of a half-section structure of the utility model;
[0016] Figure 3 This is a schematic diagram of the pipe clamping structure of the utility model;
[0017] Figure 4 For the utility model Figure 2 The enlarged view of point A in the middle;
[0018] In the figure: 1. bottom plate; 2. guide rod; 3. through groove; 4. guide groove; 5. mounting plate; 6. fixed plate; 7. first threaded rod; 8. sliding plate; 9. connecting plate; 10. U-shaped plate; 11. displacement motor; 12. adjustment motor; 13. limit rod; 14. second threaded rod; 15. limit plate; 16. driving gear; 17. driven gear; 18. fixed upper clamping plate; 19. movable upper clamping plate; 20. third threaded rod; 21. adjustment handle; 22. lower clamping plate. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0020] The utility model provides a technical solution: Figure 1-Figure 4 As shown, in this embodiment, a natural gas pipeline construction docking device includes a bottom plate 1, a through groove 3 and a guide groove 4 are opened on the top of the bottom plate 1, a sliding plate 8 is slidably connected to the top of the bottom plate 1, a displacement assembly is arranged on the top of the bottom plate 1, the displacement assembly is used to drive the sliding plate 8 to move, a U-shaped plate 10 is fixedly connected to the top of the sliding plate 8, a driving gear 16 is rotatably connected between the U-shaped plate 10 and the sliding plate 8, a driven gear 17 is rotatably connected to the top of the sliding plate 8, the driving gear 16 is meshed with the driven gear 17, and the internal thread of the driven gear 17 is connected to the second threaded rod 14, The bottom of the second threaded rod 14 is rotatably connected to a movable upper clamping plate 19, the top of the bottom plate 1 is fixedly connected to a fixed upper clamping plate 18, the bottom of the movable upper clamping plate 19 and the fixed upper clamping plate 18 are both provided with a lower clamping plate 22, and an adjustment component is provided between the movable upper clamping plate 19 and the fixed upper clamping plate 18 and the lower clamping plate 22, and the adjustment component is used to drive the lower clamping plate 22 to move, and an adjustment motor 12 is fixedly installed at the bottom of the U-shaped plate 10, and the output end of the adjustment motor 12 extends to the interior of the U-shaped plate 10 and is fixedly connected to the driving gear 16, and the top of the second threaded rod 14 is fixedly connected to a limiting plate 15.
[0021] When docking the natural gas pipeline, firstly, the installed pipeline is clamped and fixed between the fixed upper clamping plate 18 and the lower clamping plate 22 by adjusting the assembly, and then the pipeline to be installed is clamped and fixed between the movable upper clamping plate 19 and the lower clamping plate 22, and then the driving gear 16 is driven to rotate inside the U-shaped plate 10 by adjusting the motor 12. Since the driving gear 16 and the driven gear 17 are meshed with each other, the driven gear 17 rotates on the top of the sliding plate 8, and further drives the second threaded rod 14 to rotate, so that the movable upper clamping plate 19 carries the pipeline to be installed within the limit of the guide rod 2. The device moves under certain conditions, so that the pipeline to be installed and the installed pipeline are positioned and worked, and finally the displacement component is used to drive the pipeline to be installed after positioning to move toward the end face of the installed pipeline, so that the two pipeline end faces are butted together, so as to facilitate the staff to carry out subsequent welding work. In summary, the device fixes the pipeline by adjusting the component, and uses the driving gear 16, the driven gear 17 and the second threaded rod 14 to achieve the positioning of the pipeline. Finally, the two pipelines are butted through the displacement component, which further improves the accuracy and efficiency of natural gas pipe butt jointing.
[0022] like Figure 1-Figure 4 As shown, the displacement assembly includes a mounting plate 5 and a fixing plate 6, both of which are fixedly connected to the top of the base plate 1, a first threaded rod 7 is rotatably connected between the mounting plate 5 and the fixing plate 6, a connecting plate 9 is threadedly connected to the outer side of the first threaded rod 7, the bottom of the connecting plate 9 is fixedly connected to the sliding plate 8, a displacement motor 11 is fixedly installed on one side of the mounting plate 5, and the output end of the displacement motor 11 extends to the other side of the mounting plate 5 and is fixedly connected to the first threaded rod 7.
[0023] The first threaded rod 7 is driven by the displacement motor 11 to rotate between the mounting plate 5 and the fixed plate 6, and the connecting plate 9 is connected through the outer thread of the first threaded rod 7, so that when the first threaded rod 7 rotates, the sliding plate 8 can slide on the top of the base plate 1, and the sliding plate 8 is further moved to make the movable upper clamping plate 19 at the bottom of the second threaded rod 14 move together with the pipeline to be installed, thereby further facilitating the improvement of the docking efficiency of the natural gas pipe.
[0024] like Figure 1-Figure 4 As shown, the adjustment assembly includes two third threaded rods 20, and the two third threaded rods 20 are respectively fixedly connected to the bottom of the fixed upper clamp 18 and the movable upper clamp 19, the outer side of the third threaded rod 20 is threadedly connected to the lower clamp 22, and the bottom of the third threaded rod 20 is fixedly connected with an adjustment handle 21, the bottom of the fixed upper clamp 18 and the movable upper clamp 19 are both fixedly connected with a limit rod 13, the outer side of the limit rod 13 is slidably connected to the lower clamp 22, and the top of the movable upper clamp 19 is fixedly connected with a guide rod 2, and the outer side of the guide rod 2 is slidably connected to the inner wall of the guide groove 4.
[0025] By rotating the adjusting handle 21 , the third threaded rod 20 is driven to rotate, so that the lower clamping plate 22 moves under the action of the limiting rod 13 , and the natural gas pipeline is further clamped and fixed by the movement of the lower clamping plate 22 .
[0026] The utility model provides a natural gas pipeline construction docking device, and the specific working principle is as follows: when the natural gas pipeline is docked, first, by rotating the adjustment handle 21, the third threaded rod 20 is driven to rotate, so that the lower clamping plate 22 moves under the action of the limit rod 13, so that the fixed upper clamping plate 18 and the lower clamping plate 22 clamp and fix the installed pipeline, and then the pipeline to be installed is clamped and fixed between the movable upper clamping plate 19 and the lower clamping plate 22 in the same way, and then the driving gear 16 is driven by the adjustment motor 12 to rotate inside the U-shaped plate 10, because the driving gear 16 and the driven gear 17 are meshed with each other, so that the driven gear 17 is on the sliding plate 8. The top rotates, further driving the second threaded rod 14 to rotate, so that the movable upper clamping plate 19 moves with the pipe to be installed under the limited conditions of the guide rod 2, so that the pipe to be installed and the installed pipe are positioned to work, and finally the displacement motor 11 is used to drive the first threaded rod 7 to rotate between the mounting plate 5 and the fixed plate 6, and the connecting plate 9 is connected through the outer thread of the first threaded rod 7, so that when the first threaded rod 7 rotates, the sliding plate 8 can slide on the top of the bottom plate 1, and further through the movement of the sliding plate 8, the movable upper clamping plate 19 at the bottom of the second threaded rod 14 moves together with the pipe to be installed toward the installed pipe end face, so that the two pipe end faces are butted together.
[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A natural gas pipeline construction docking device, comprising a base plate (1), characterized in that: The top of the bottom plate (1) is provided with a through groove (3) and a guide groove (4); the top of the bottom plate (1) is slidably connected to a sliding plate (8); a displacement assembly is provided on the top of the bottom plate (1); the displacement assembly is used to drive the sliding plate (8) to move; the top of the sliding plate (8) is fixedly connected to a U-shaped plate (10); a driving gear (16) is rotatably connected between the U-shaped plate (10) and the sliding plate (8); the top of the sliding plate (8) is rotatably connected to a driven gear (17); the driving gear (16) and the driven gear (17) are rotatably connected to each other. 7) are meshed with each other, the internal thread of the driven gear (17) is connected to a second threaded rod (14), the bottom of the second threaded rod (14) is rotatably connected to a movable upper clamping plate (19), the top of the base plate (1) is fixedly connected to a fixed upper clamping plate (18), the bottoms of the movable upper clamping plate (19) and the fixed upper clamping plate (18) are both provided with a lower clamping plate (22), and adjustment components are provided between the movable upper clamping plate (19) and the fixed upper clamping plate (18) and the lower clamping plate (22), and the adjustment components are used to drive the lower clamping plate (22) to move.
2. A natural gas pipeline construction docking device according to claim 1, characterized in that: The displacement assembly comprises a mounting plate (5) and a fixing plate (6), wherein the mounting plate (5) and the fixing plate (6) are both fixedly connected to the top of the base plate (1), a first threaded rod (7) is rotatably connected between the mounting plate (5) and the fixing plate (6), a connecting plate (9) is threadedly connected to the outer side of the first threaded rod (7), the bottom of the connecting plate (9) is fixedly connected to the sliding plate (8), a displacement motor (11) is fixedly mounted on one side of the mounting plate (5), and an output end of the displacement motor (11) extends to the other side of the mounting plate (5) and is fixedly connected to the first threaded rod (7).
3. A natural gas pipeline construction docking device according to claim 1, characterized in that: The adjustment assembly includes two third threaded rods (20), and the two third threaded rods (20) are respectively fixedly connected to the bottom of the fixed upper clamping plate (18) and the movable upper clamping plate (19), the outer side of the third threaded rod (20) is threadedly connected to the lower clamping plate (22), and the bottom of the third threaded rod (20) is fixedly connected with an adjustment handle (21), and the bottom of the fixed upper clamping plate (18) and the movable upper clamping plate (19) are both fixedly connected to the limit rod (13), and the outer side of the limit rod (13) is slidably connected to the lower clamping plate (22).
4. A natural gas pipeline construction docking device according to claim 1, characterized in that: An adjusting motor (12) is fixedly mounted on the bottom of the U-shaped plate (10), and an output end of the adjusting motor (12) extends into the interior of the U-shaped plate (10) and is fixedly connected to a driving gear (16).
5. A natural gas pipeline construction docking device according to claim 1, characterized in that: The top of the movable upper clamping plate (19) is fixedly connected with a guide rod (2), and the outer portion of the guide rod (2) is slidably connected with the inner wall of the guide groove (4).
6. A natural gas pipeline construction docking device according to claim 1, characterized in that: The top of the second threaded rod (14) is fixedly connected to a limiting plate (15).
Citation Information
Cited By
Natural gas pipeline construction butt joint device
CN223685199U