Hot melting butt joint device for connecting composite pipes
By designing an automated hot-melt docking device for connecting composite pipes and using clamping components and controllers to realize automatic docking of composite pipes, the problem of labor-intensive and error-prone manual operations is solved, and the connection accuracy and efficiency are improved.
Patent Information
- Application Number
- CN202420384040.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-02-28
AI Technical Summary
Existing hot-melt docking pipe fittings require manual operation with rubber sleeves, which consumes more human resources when hot-melt docking of multiple composite pipes and causes problems with connection quality errors.
Design a hot-melt docking device for composite pipe connection, including a mounting base, a driving component, a cutter component, a hot-melt component and a controller. Automatic docking is achieved through the clamping component and controller, reducing manual operations and improving connection accuracy.
It realizes the automatic connection of composite pipes, saves manpower, reduces errors caused by manual labor, and improves the accuracy and efficiency of hot-melt docking.
Smart Images

Figure CN221851215U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of composite pipe hot-melt butt welding, and in particular to a hot-melt butt welding device for composite pipe connection. Background Art
[0002] Hot-melt connection refers to a connection method between non-metal and non-metal after heating to the (liquid) melting point. It is widely used in the connection of new pipes and fittings such as PP-R pipes, PB pipes, PE-RT pipes, metal composite pipes, curved elastic vector aluminum alloy lined plastic composite pipeline systems. In steel structure projects, two metal steel bars are hot-melt connected through electric heating equipment. The connection points after metal hot-melt connection must be cooled at room temperature to achieve the tensile stress of the original metal material. Hot-melt connections must not be quenched to prevent the connection points from carbonizing and becoming brittle, and losing the tensile stress parameters of the original metal material. Hot-melt connections mainly include: hot-melt socket connection and hot-melt butt welding connection. Hot-melt connection has the advantages of simple connection, long service life, and non-corrosion.
[0003] The utility model patent with the authorization announcement number CN211105733U disclosed in the Chinese patent literature discloses "a hot-melt butt joint pipe fitting for connecting steel wire composite pipes", and specifically discloses a butt joint pipe body, a card slot is cut on one side surface of the butt joint pipe body, two card slots are provided, and a card plate is inserted on each of the card slots, and the shape of the card plate is the same as the shape of the card slot and the size is smaller than the size of the card slot. The beneficial effect is that the device is provided with a card plate and a card slot. When in use, the rubber sleeve is held, and the card plates at both ends of the C-shaped rod are inserted into the card slot, so that the spring drives the limit plate to expand naturally, thereby inserting it into the limit slot, so that the card plate and the card slot are fixedly connected. When the pipe fittings are hot-melt butt jointed, people can hold the rubber sleeve to operate. Compared with the traditional method of people directly holding the pipe fittings for hot-melt butt jointing, this design is safer and more labor-saving. At the same time, it also avoids the slipping of the pipe fittings and the human hand, which causes the pipe fittings to move during hot-melt butt jointing, resulting in a change in the inner diameter of the pipe fittings. The device is easy to disassemble and assemble, and can be removed after the hot-melt is completed.
[0004] However, the hot-melt butt joint fittings disclosed in the aforementioned prior art need to be operated manually by holding a rubber sleeve, which consumes a lot of human resources when hot-melt butt jointing multiple composite pipes. At the same time, manual operation will result in certain errors, which will have a certain impact on the connection quality.
[0005] The above information disclosed in the above Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not form the prior art that is already known to one of ordinary skill in the art. Utility Model Content
[0006] The main purpose of the present application is to provide a hot-melt butt joint device for connecting composite pipes, which can realize automatic connection of two composite pipes after placing the two composite pipes in the equipment, saving manpower and reducing errors caused by manual labor.
[0007] In order to solve the aforementioned technical problems, the present application provides a hot melt butt welding device for connecting composite pipes, comprising a mounting seat, a drive assembly, a cutter assembly, a hot melt assembly, a controller and at least one pair of clamping assemblies; two clamping assemblies in a pair of clamping assemblies are movably arranged on the mounting seat, and the clamping parts of the two clamping assemblies are coaxially arranged; the drive assembly is installed on the mounting seat, and the drive assembly is used to drive the two clamping assemblies to reciprocate along the axial direction of the clamping parts; the cutter assembly and the hot melt assembly are both rotatably installed on the mounting seat, and the cutter assembly and the hot melt assembly are respectively arranged on both sides of the extension direction of the composite pipe; the controller is electrically connected to the drive assembly, the cutter assembly and the hot melt assembly, respectively.
[0008] Optionally, in some embodiments of the utility model, the above-mentioned clamping assembly includes a first clamping plate, a second clamping plate and a slider; a sliding groove is arranged on the top of the mounting seat, one side of the slider is partially embedded in the sliding groove, the side of the slider away from the sliding groove is connected to the first clamping plate, and the side of the first clamping plate away from the slider is rotatably connected to the second clamping plate.
[0009] Optionally, in some embodiments of the present invention, the first clamping plate and the second clamping plate may be detachably provided with reinforcement members on the opposite sides thereof, and the reinforcement members abut against the outer side wall of the composite pipe.
[0010] Optionally, in some embodiments of the present invention, the reinforcing member includes a plurality of adjusting pieces, the cross section of the adjusting pieces is an arc structure, and the plurality of adjusting pieces are nested layer by layer from the inside to the outside.
[0011] Optionally, in some embodiments of the present invention, the driving assembly includes an electric telescopic rod, which is mounted on a mounting seat, and a telescopic end of the electric telescopic rod is connected to the clamping assembly.
[0012] Optionally, in some embodiments of the present invention, the cutter assembly comprises a first mounting frame and two blade racks, the two blade racks are rotatably mounted on both sides of the first mounting frame respectively; a plurality of spaced blades are mounted on one side of the blade rack away from the first mounting frame.
[0013] Optionally, in some embodiments of the present invention, the mounting seat is provided with a first drive motor, and a drive end of the first drive motor is transmission-connected to the first mounting frame.
[0014] Optionally, in some embodiments of the present invention, the hot melt assembly includes a second mounting frame and two electric heating plates, and the two electric heating plates are respectively mounted on both sides of the second mounting frame.
[0015] Optionally, in some embodiments of the present invention, the mounting seat is provided with a second drive motor, and a drive end of the second drive motor is transmission-connected to the second mounting bracket.
[0016] Optionally, in some embodiments of the present invention, a universal wheel is installed at the bottom of the mounting base.
[0017] The beneficial effects that can be achieved by this application.
[0018] A hot-melt butt-jointing device for connecting composite pipes proposed in an embodiment of the present application comprises a mounting seat, a drive assembly, a cutter assembly, a hot-melt assembly, a controller and at least one pair of clamping assemblies; two clamping assemblies in a pair of clamping assemblies are movably arranged on the mounting seat, and the clamping parts of the two clamping assemblies are coaxially arranged; the drive assembly is mounted on the mounting seat, and the drive assembly is used to drive the two clamping assemblies to reciprocate along the axial direction of the clamping parts; the cutter assembly and the hot-melt assembly are both rotatably mounted on the mounting seat, and the cutter assembly and the hot-melt assembly are respectively arranged on both sides of the extension direction of the composite pipe; the controller is electrically connected to the drive assembly, the cutter assembly and the hot-melt assembly, respectively.
[0019] In this solution, the setting of the clamping assembly, controller and drive assembly can replace the existing manual clamping and docking operations, and because the control of the controller can ensure accuracy, it can not only save manpower, but also improve the accuracy of hot melt docking and improve efficiency.
[0020] The specific usage is as follows: two composite tubes to be hot-melt connected are placed at intervals on the clamping assembly, and the two composite tubes are respectively located on both sides of the cutter assembly and the hot-melt assembly, and the cutter assembly is moved to a position coaxial with the two composite tubes, and the composite tubes are driven to move to the side close to each other by the driving assembly until both of them abut against the cutter assembly, and then the cutter assembly is started to grind and cut the side close to each other of the two composite tubes so that the two can be flush, and after the driving assembly drives the composite tube to reset, the cutter assembly is moved away from the composite tube, and the hot-melt assembly is moved to a position coaxial with the two composite tubes, and the two composite tubes are driven to move to the side close to each other until both of them abut against the hot-melt assembly, and after the hot-melt connection is completed, it is removed after being stable for a period of time, thereby realizing the hot-melt docking of the two composite tubes. Therefore, after the two composite tubes are placed in the equipment, the two composite tubes can be automatically connected, saving manpower and reducing errors caused by manual labor. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A front view of a hot-melt butt joint device for connecting composite pipes provided in an embodiment of the utility model;
[0022] Figure 2 A top view of a hot-melt butt joint device for connecting composite pipes provided in an embodiment of the utility model;
[0023] Figure 3 A schematic diagram of the structure of a clamping assembly provided in an embodiment of the utility model;
[0024] Figure 4 A schematic diagram of the structure of a cutter assembly provided in an embodiment of the utility model;
[0025] Figure 5 A schematic structural diagram of a hot melt assembly provided in an embodiment of the utility model.
[0026] Icons: 1-mounting seat, 11-slide slot, 12-universal wheel, 2-clamping assembly, 21-first clamping plate, 22-second clamping plate, 23-slider, 24-adjusting plate, 3-driving assembly, 4-cutter assembly, 41-first mounting frame, 42-blade holder, 43-first driving motor, 44-cutting blade, 5-hot melt assembly, 51-second mounting frame, 52-electric heating plate, 53-second driving motor, 6-composite tube.
[0027] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0030] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0031] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or a scheme that satisfies both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.
[0032] Reference Figure 1 The embodiment of the present application provides a hot-melt butt-jointing device for connecting composite pipes, comprising a mounting seat 1, a driving assembly 3, a cutter assembly 4, a hot-melt assembly 5, a controller and at least one pair of clamping assemblies 2; two clamping assemblies 2 in a pair of clamping assemblies 2 are movably arranged on the mounting seat 1, and the clamping parts of the two clamping assemblies 2 are coaxially arranged; the driving assembly 3 is installed on the mounting seat 1, and the driving assembly 3 is used to drive the two clamping assemblies 2 to reciprocate along the axial direction of the clamping part; the cutter assembly 4 and the hot-melt assembly 5 are both rotatably installed on the mounting seat 1, and the cutter assembly 4 and the hot-melt assembly 5 are respectively arranged on both sides of the extension direction of the composite pipe 6; the controller is electrically connected to the driving assembly 3, the cutter assembly 4 and the hot-melt assembly 5 respectively
[0033] The specific usage method is: place two composite tubes 6 that need to be hot-melt connected on the two clamping components 2 respectively, and the two composite tubes 6 are respectively on both sides of the cutter component 4 and the hot-melt component 5, move the cutter component 4 to a position coaxial with the two composite tubes 6, and drive the composite tube 6 to move to the side close to each other through the driving component 3 until both of them abut against the cutter component 4, then start the cutter component 4, grind the side of the two composite tubes 6 close to each other so that the two can be flush, after the driving component 3 drives the composite tube 6 to reset, move the cutter component 4 away from the composite tube 6, and move the hot-melt component 5 to a position coaxial with the two composite tubes 6, drive the two composite tubes 6 to move to the side close to each other, until both of them abut against the hot-melt component 5, start the hot-melt component 5 to melt the side of the two composite tubes 6 close to each other, after melting for a certain period of time, remove the hot-melt component 5 and connect the two composite tubes 6, and remove it after it is stable for a period of time, thereby realizing the hot-melt docking of the two composite tubes 6.
[0034] Optionally, the drive assembly 3, the cutter assembly 4 and the hot melt assembly 5 of this embodiment are all electrically connected to a controller. By presetting an existing control program in the controller, the drive time and direction of the drive assembly 3 and the time of cutting and hot melting are controlled, thereby realizing the automatic operation of the hot melt butt joint device for connecting the composite pipe. The controller of this embodiment can use the AT89S51 chip. AT89S51 is a low-power, high-performance CMOS 8-bit processor. The chip integrates a general-purpose 8-bit central processing unit and an ISP Flash storage unit, which can process the received information in a timely and effective manner. It should be noted that the controller can be an integrated circuit chip with signal processing capabilities. The controller can be a general-purpose processor, including a central processing unit, a network processor, etc.; it can also be a digital signal processor, an application-specific integrated circuit, a field programmable gate array or other programmable logic device, a discrete gate or transistor logic device, or a discrete hardware component.
[0035] Among them, the mounting base 1 of this embodiment can be a rectangular structure with a hollow interior. A slide groove 11 is arranged on the top of the mounting base 1. The cutter assembly 4 and the hot melt assembly 5 are respectively arranged on both sides of the center position of the slide groove 11. The clamping assembly 2 is slidably arranged along the slide groove 11. The four corners at the bottom of the mounting base 1 are provided with universal wheels 12 with brakes to facilitate the movement of the hot melt butt joint device for connecting the composite pipe.
[0036] In this embodiment, the interior of the clamping part of the clamping assembly 2 is an annular structure, which can just allow the composite tube 6 to pass through, thereby playing the role of clamping the composite tube 6;
[0037] Specifically, the clamping assembly 2 includes a first clamping plate 21, a second clamping plate 22 and a slider 23; the slider 23 is partially embedded in the slide groove 11, so that the clamping assembly 2 can slide relative to the slide groove 11, the bottom of the first clamping plate 21 is fixedly connected to the slider 23, and the first clamping plate 21 is rotatably connected to the second clamping plate 22. When the first clamping plate 21 and the second clamping plate 22 are locked, they form a circular ring structure, which can just fix the composite pipe 6;
[0038] Since the composite pipe 6 has different sizes, reinforcing members of different sizes are arranged in the annular structure formed by the first clamping plate 21 and the second clamping plate 22 according to the size requirements, so as to meet the requirements of more types of composite pipes 6. The reinforcing member and the first clamping plate 21 and the reinforcing member and the second clamping plate 22 can be detachably connected by bolts.
[0039] The reinforcement may include a plurality of adjustment plates 24 , the cross section of the adjustment plates 24 is an arc structure, the plurality of adjustment plates are nested layer by layer from the inside to the outside, and two adjacent adjustment plates 24 are detachably connected by bolts.
[0040] Optionally, the driving component 3 of the present embodiment may use an electric telescopic rod, which is mounted on a mounting seat, and the telescopic end of the electric telescopic rod is connected to the clamping component 2 .
[0041] Optionally, the cutter assembly 4 of the present embodiment includes a first mounting frame 41 and two blade frames 42, and the two blade frames 42 are rotatably mounted on both sides of the first mounting frame 41; a plurality of spaced cutting blades 44 are mounted on one side of the blade frame 42 away from the first mounting frame 41; the mounting seat 1 is provided with a first drive motor 43, and the drive end of the first drive motor 43 is transmission-connected to the first mounting frame 41.
[0042] The blade holder 42 and the first mounting frame 41 can be detachably connected by bolts, and the first mounting frame 41 is provided with a rotating motor for driving the two blade holders 42 to rotate, and the rotating motor and the blade holder 42 are connected by a gear set. A plurality of cutting blades 44 are arranged along the circumference of the blade holder 42, and the blade direction of the cutting blade 44 faces the rotation direction of the rotating blade holder 42, and the blade surfaces of the plurality of cutting blades 44 are located in the same plane.
[0043] Optionally, the hot melt assembly 5 of this embodiment includes a second mounting frame 51 and two electric heating plates 52, and the two electric heating plates 52 are respectively installed on both sides of the second mounting frame 51; the mounting seat is provided with a second drive motor 53, and the drive end of the second drive motor 53 is transmission-connected to the second mounting frame 51.
[0044] Among them, the cutter assembly 4 and the hot melt assembly 5 can be symmetrically arranged along the axes of the two composite tubes 6, and the cutting surface of the cutter assembly 4 and the hot melt surface of the hot melt assembly 5 are arranged perpendicular to the axes of the two composite tubes 6. The connecting line between the cutter assembly 4 and the hot melt assembly 5 is preferably able to coincide with the midpoint of the connecting line of the two composite tubes 6.
[0045] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. It is obvious to those skilled in the art that the present application is not limited to the details of the above exemplary embodiments and that the present application can be implemented in other specific forms without departing from the spirit or basic features of the present application.
Claims
1. A hot melt butt welding device for connecting composite pipes, characterized in that: It includes a mounting seat, a driving assembly, a cutter assembly, a hot melt assembly, a controller and at least one pair of clamping assemblies; Two of the pair of clamping assemblies are movably disposed on the mounting seat, and the clamping parts of the two clamping assemblies are coaxially disposed; The driving assembly is mounted on the mounting seat, and the driving assembly is used to drive the two clamping assemblies to reciprocate along the axial direction of the clamping portion; The cutter assembly and the hot melt assembly are both rotatably mounted on the mounting seat, and the cutter assembly and the hot melt assembly are respectively arranged on both sides of the extending direction of the composite pipe; The controller is electrically connected to the driving assembly, the cutter assembly and the hot melt assembly respectively.
2. The hot-melt butt-jointing device for composite pipe connection according to claim 1, characterized in that: The clamping assembly includes a first clamping plate, a second clamping plate and a slider; A slide groove is provided on the top of the mounting seat, one side of the slider is partially embedded in the slide groove, the side of the slider away from the slide groove is connected to the first clamping plate, and the side of the first clamping plate away from the slider is rotatably connected to the second clamping plate; the first clamping plate and the second clamping plate constitute the clamping part.
3. The hot-melt butt-melting device for connecting composite pipes according to claim 2, characterized in that: The first clamping plate and the second clamping plate are detachably provided with reinforcing members on their opposite sides, and the reinforcing members abut against the outer side wall of the composite pipe.
4. The hot-melt butt-jointing device for composite pipe connection according to claim 3, characterized in that: The reinforcement member comprises a plurality of adjustment plates, the cross section of the adjustment plates is an arc structure, and the plurality of adjustment plates are nested layer by layer from the inside to the outside.
5. The hot-melt butt-melting device for connecting composite pipes according to claim 1, characterized in that: The driving assembly comprises an electric telescopic rod, which is mounted on the mounting seat, and the telescopic end of the electric telescopic rod is connected to the clamping assembly.
6. The hot-melt butt-jointing device for composite pipe connection according to claim 1, characterized in that: The cutter assembly comprises a first mounting frame and two blade racks, and the two blade racks are rotatably mounted on both sides of the first mounting frame respectively; A plurality of cutting blades arranged at intervals are installed on a side of the blade holder away from the first mounting frame.
7. The hot-melt butt-jointing device for composite pipe connection according to claim 6, characterized in that: The mounting seat is provided with a first driving motor, and a driving end of the first driving motor is drivingly connected to the first mounting bracket.
8. The hot-melt butt-jointing device for composite pipe connection according to claim 1, characterized in that: The hot melt assembly comprises a second mounting frame and two electric heating plates, and the two electric heating plates are respectively mounted on both sides of the second mounting frame.
9. The hot-melt butt-melting device for connecting composite pipes according to claim 8, characterized in that: The mounting seat is provided with a second driving motor, and the driving end of the second driving motor is drivingly connected to the second mounting bracket.
10. The hot-melt butt-melting device for connecting composite pipes according to claim 1, characterized in that: A universal wheel is installed at the bottom of the mounting seat.