Pay-off device for constructional engineering
By designing the pay-off device and using laser-assisted alignment and locking mechanisms, the problem of inaccuracies in pay-out and alignment during construction was solved, the accuracy and stability of construction were improved, and the accuracy and stability of the wire ropes were ensured. Fixed length improves construction quality.
Patent Information
- Application Number
- CN202420476749.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Inaccuracies in setting out and positioning during construction affect construction quality, leading to problems with construction accuracy and stability.
A pay-off device for construction engineering is designed, including a pay-off box, a wire reel, a limit rod, a wire pulley, a wire support wheel, a laser transmitter, a wire rope locking component and a return spring. The laser-assisted line positioning and locking The stop mechanism ensures the accuracy and fixed length of the cord.
It achieves the accuracy and convenience of setting out and setting the line, ensures the stability and accuracy of the wire rope during the construction process, and improves the construction quality.
Smart Images

Figure CN221853820U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, and in particular to a wire-laying device for construction engineering. Background Art
[0002] There is a process of laying out lines in construction projects. Laying out lines is mainly for the convenience of workers and to ensure that construction can be carried out strictly in accordance with the design drawings. Generally speaking, all building axes can be called major lines, and the corresponding minor lines are the side lines and dimension lines of structural components.
[0003] The main idea of laying out the lines is to copy the size of the design drawings to the ground according to the size shown in the diagram. Whether the size of the entire project is in accordance with the size of the design drawings has a great impact on the accuracy of the laying out of the lines. The laying out of the baseline is a relatively important link in the construction process of the building project. It is directly related to the construction accuracy of the entire building and is also a relatively complex link before construction.
[0004] At present, the alignment operation is very important in the process of building construction. Inaccurate and unstable alignment will also affect the quality of construction. Therefore, how to accurately lay out and determine the lines is an important issue that needs to be solved in the process of building construction. Utility Model Content
[0005] The utility model aims to provide a wire-laying device for construction engineering, so as to solve the problem of how to effectively lay out and determine wires proposed in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a wire-laying device for construction engineering, comprising a wire-laying box, a wire drum is rotatably arranged inside the wire-laying box, a limiting rod is installed on one side of the wire drum, at least one limiting rod is provided and is installed on the top surface of the wire-laying box; a wire guide wheel is rotatably installed on the other end of the limiting rod, at least one wire-supporting wheel is fixedly arranged on the inner side wall of the wire-laying box, and a wire-fixing assembly is arranged on one side of the wire-supporting wheel;
[0007] The line-fixing assembly includes a line-fixing wheel rotatably mounted in the line-releasing box, and the line-fixing wheel is correspondingly mounted up and down; a measuring line is wound around the wire drum, and the measuring line sequentially bypasses the wire guide wheel and the line-fixing wheel assembly and passes through a threading groove arranged on the side of the line-releasing box, and a laser transmitter is fixedly mounted on the lower side of the threading groove. Multiple groups of balls are arranged in the threading groove.
[0008] It also includes a wire rope locking assembly, which includes a locking box fixed on one side of the wire release box, a "W"-shaped locking groove is arranged inside the locking box, a locking block corresponding to the locking groove is arranged on the upper part of the locking box, and a sliding block is arranged on one side of the locking block; a sliding groove is arranged on the wire release box, the sliding block extends into the sliding groove, and the sliding block is slidably connected to the sliding groove.
[0009] Furthermore, a return spring is arranged at the bottom of the sliding groove, and the other end of the return spring is fixed on the sliding block.
[0010] Furthermore, a rotating shaft is provided at the center of the wire drum, and the rotating shaft extends out of the back side of the wire release box. A connecting handle is fixedly connected to the rotating shaft, and a wire taking-up handle is rotatably installed at the other end of the connecting handle.
[0011] Furthermore, a double door is arranged on the front of the wire release box, and a transparent window for observing the winding amount of the wire reel is arranged on the double door located on one side of the wire reel.
[0012] Furthermore, a locking hole is provided on the side of the locking box, a locking screw is threaded in the locking hole, and the locking screw is matched and connected with a limiting groove arranged on the locking block.
[0013] Beneficial effects: Compared with the prior art, the beneficial effects of the utility model are: accurate line positioning can be ensured, the operation is convenient, and the line positioning is accurate through the provision of a line-setting wheel and a laser transmitter fixedly installed on the upper side of the threading groove; the wire rope locking assembly provided on the side of the wire release box can effectively lock the released wire rope at a fixed length, facilitating further operation by construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 The utility model is a schematic diagram of the overall structure of a wire-laying device for construction engineering proposed by the utility model.
[0015] Figure 2 The utility model is a cross-sectional schematic diagram of a wire-laying device for construction engineering proposed by the utility model. DETAILED DESCRIPTION
[0016] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0017] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0018] Example
[0019] Please refer to the drawings of the specification. In the embodiment of the utility model, this embodiment provides a wire-laying device for construction engineering, which includes a wire-laying box 1, a wire drum 2 is rotatably arranged inside the wire-laying box 1, a limiting rod 3 is installed on one side of the wire drum 2, and at least one limiting rod 3 is provided and installed on the inner top surface of the wire-laying box 1; a wire guide wheel 4 is rotatably installed on the other end of the limiting rod 3, at least one wire support wheel 5 is fixedly arranged on the inner side wall of the wire-laying box 1, and a wire fixing assembly is arranged on one side of the wire support wheel 5;
[0020] The line-fixing assembly includes a line-fixing wheel 6 rotatably mounted in the line-releasing box 1, and the line-fixing wheel 6 is correspondingly mounted up and down; a measuring line 7 is wound around the wire drum 2, and the measuring line 7 sequentially bypasses the wire guide wheel 4 and the line-fixing wheel assembly and passes through a threading groove 8 arranged on the side of the line-releasing box, and a laser transmitter 9 is fixedly mounted on the lower side of the threading groove 8. Multiple groups of balls are arranged in the threading groove 8.
[0021] It also includes a wire rope locking assembly, which includes a locking box 10 fixed to one side of the wire release box 1, a "W"-shaped locking groove 11 is arranged inside the locking box 10, a locking block 12 corresponding to the locking groove 11 is arranged on the upper part of the locking box 10, and a sliding block 13 is arranged on one side of the locking block 12; a sliding groove 14 is arranged on the wire release box 1, the sliding block 13 extends to the inside of the sliding groove 14, and the sliding block 13 is slidably connected with the sliding groove 14.
[0022] Furthermore, a return spring 15 is disposed at the bottom of the sliding groove 14 , and the other end of the return spring 15 is fixed on the sliding block 13 .
[0023] Furthermore, a rotating shaft is provided at the center of the wire drum 2, and the rotating shaft extends out of the back side of the wire release box 1. A connecting handle is fixedly connected to the rotating shaft, and a wire taking-up handle is rotatably installed at the other end of the connecting handle.
[0024] Furthermore, the front of the wire-releasing box 1 is provided with a double door, and the double door located on one side of the wire reel 2 is provided with a transparent window 16 for observing the winding amount of the wire reel 2.
[0025] Furthermore, a locking hole is provided on the side of the locking box, a locking screw 17 is threaded into the locking hole, and the locking screw is matched and connected with a limiting groove provided on the locking block 12 .
[0026] The specific usage of the above embodiment is as follows:
[0027] First, place the wire-releasing box to the place where the wire is to be released, and then adjust the direction; install the wound wire reel on the rotating shaft, and then pass one end of the measuring wire rope through the wire guide wheel and the fixed wire wheel group from the threading groove arranged on the side of the wire-releasing box; when pulling the wire rope, the laser beam emitted by the laser transmitter can be used to further determine whether the traction is horizontal; when it is necessary to fix the wire rope so that it does not move, it is only necessary to slide the locking block 12 into the locking groove 11, and then rotate the locking screw to lock the locking block 12 in the locking groove 11. Since a rubber sheet with large friction is provided at the bottom of the locking block 12, the wire rope can be tightly fixed in the locking groove 11.
[0028] In the above embodiments and working principles, the device has a simple structure, and with the assistance of a line-fixing wheel and a laser transmitter fixedly installed on the upper side of the threading groove, accurate line fixing can be ensured, and the operation is convenient and accurate. The wire rope locking assembly arranged on the side of the wire release box can effectively lock the released wire rope at a fixed length, which is convenient for further operation by the construction personnel.
[0029] The above are only preferred implementations of the utility model. It should be pointed out that for those skilled in the art, several modifications and improvements can be made without departing from the concept of the utility model. These should also be regarded as the protection scope of the utility model. These will not affect the effect of the implementation of the utility model and the practicality of the patent.
Claims
1. A wire-laying device for construction engineering, comprising a wire-laying box (1), characterized in that: A wire drum (2) is rotatably arranged inside the wire-releasing box (1), a limiting rod (3) is installed on one side of the wire drum (2), at least one limiting rod (3) is provided and is installed on the inner top surface of the wire-releasing box (1); a wire guide wheel (4) is rotatably installed on the other end of the limiting rod (3), at least one wire support wheel (5) is fixedly arranged on the inner side wall of the wire-releasing box (1), and a wire fixing assembly is arranged on one side of the wire support wheel (5); The line-fixing assembly comprises a line-fixing wheel (6) rotatably mounted in the line-releasing box (1), and the line-fixing wheel (6) is mounted correspondingly up and down; a measuring line (7) is wound around the line reel (2), and the measuring line (7) sequentially passes around the guide wheel (4) and the line-fixing wheel assembly and passes through a threading groove (8) arranged on the side of the line-releasing box, and a laser transmitter (9) is fixedly mounted on the lower side of the threading groove (8); and a plurality of groups of balls are arranged in the threading groove (8).
2. A construction engineering laying-out device according to claim 1, characterized in that: The wire rope locking assembly also includes a locking box (10) fixed to one side of the wire release box (1), a "W"-shaped locking groove (11) being arranged inside the locking box (10), a locking block (12) corresponding to the locking groove (11) being arranged on the upper part of the locking box (10), and a sliding block (13) being arranged on one side of the locking block (12); a sliding groove (14) being arranged on the wire release box (1), the sliding block (13) extending into the interior of the sliding groove (14), and the sliding block (13) being slidably connected to the sliding groove (14).
3. A construction engineering laying-out device according to claim 2, characterized in that: A return spring (15) is arranged at the bottom of the sliding groove (14), and the other end of the return spring (15) is fixed on the sliding block (13).
4. A construction engineering laying-out device according to claim 1, characterized in that: A rotating shaft is arranged at the center of the wire drum (2), and the rotating shaft extends out of the back side of the wire release box (1). A connecting handle is fixedly connected to the rotating shaft, and a wire reel handle is rotatably mounted on the other end of the connecting handle.
5. A construction engineering laying-out device according to claim 1, characterized in that: The front of the wire unwinding box (1) is provided with a double-leaf door, and the double-leaf door located on one side of the wire reel (2) is provided with a transparent window (16) for conveniently observing the winding amount of the wire reel (2).
6. A construction engineering laying-out device according to claim 2, characterized in that: A locking hole is provided on the side of the locking box, a locking screw (17) is threaded in the locking hole, and the locking screw is matched and connected with a limiting groove arranged on the locking block (12).