Cable-stayed bridge embedded sleeve positioning structure and cable-stayed bridge

By adjusting the angle of the casing parts through the rotation of the arc plate support pad and the laser transmitter, and pouring concrete in the positioning box, the problem of insufficient stability in the embedded casing positioning structure of the traditional cable-stayed bridge is solved, and efficient construction and Cost reduction.

CN221855305UActive Publication Date: 2024-10-18HAIYI HENGAN PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420415788.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-10-18
Estimated Expiration
2034-03-05

AI Technical Summary

Technical Problem

In the traditional embedded casing positioning structure of cable-stayed bridges, the problem of loose screws and threaded sleeves leads to insufficient stability of the casing, affecting construction quality and efficiency.

Method used

An arc-shaped plate is used to support the rotation of the backing plate, a laser transmitter is used to adjust the angle of the casing parts, concrete is poured into the positioning box to improve stability, and a reusable laser transmitter is set up to reduce costs.

Benefits of technology

Through the reinforcement of the casing parts after the concrete is solidified, the stability of the casing parts is improved, and the use cost is reduced through the reuse of the laser transmitter, the construction process is simplified, and the construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855305U_ABST
    Figure CN221855305U_ABST
Patent Text Reader

Abstract

The utility model discloses a cable-stayed bridge pre-embedded casing pipe positioning structure and a cable-stayed bridge, and particularly relates to the cable-stayed bridge technical field, the cable-stayed bridge pre-embedded casing pipe positioning structure comprises a positioning box and a casing pipe piece, the casing pipe piece is arranged in the positioning box, a base plate is arranged in the positioning box, a rotating rod fixedly penetrates through the bottom of the base plate, and the front end and the rear end of the rotating rod are rotatably connected with the inner wall of the positioning box; a first threaded hole is formed in the top of the base plate, threads are machined at the bottom of the outer wall of the sleeve part, and the sleeve part is in threaded connection with the first threaded hole through the threads. The arc-shaped plate supports the base plate to rotate, the laser transmitter adjusts the angle of the sleeve piece, the bolt is tightened to be tightly attached to the inner wall of the arc-shaped groove, so that the sleeve piece is fixed, concrete is poured into the positioning box, the sleeve piece is reinforced after the concrete is solidified, then a constructor takes down the hollow pipe, the operation is repeated, and the construction efficiency is improved. And subsequent sleeve parts are continuously fixed, and a laser transmitter is arranged for repeated utilization, so that the use cost can be greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cable-stayed bridges, in particular to a cable-stayed bridge pre-buried casing positioning structure and a cable-stayed bridge. Background Art

[0002] Cable-stayed bridges have been widely used in municipal, highway and railway bridges due to their rigid and flexible shape and strong spanning capacity. Cable-stayed bridges are a triangular geometric structure consisting of bridge towers, bridge bodies and cables. Traditionally, most cable-stayed bridges adopt gate-shaped, diamond-shaped, inverted Y-shaped and other shapes, which are similar in shape, complex in structure and difficult to construct. The positioning accuracy of the embedded casing of the cable-stayed bridge is high, and it is difficult to control during the construction process, which is one of the key factors directly affecting the overall engineering quality of the cable-stayed bridge.

[0003] For example, the prior art publication number CN219385978U is a cable-stayed bridge embedded sleeve positioning structure and a cable-stayed bridge. The utility model supports the embedded sleeve by a supporting mechanism to keep the embedded sleeve in an inclined state at a desired angle, thereby facilitating the manufacture of the cable-stayed bridge embedded sleeve positioning structure. The laser positioning mechanism is used to emit a laser to align with the alignment part on the main tower to confirm the installation position of the embedded sleeve relative to the main tower, thereby making the cable-stayed bridge embedded sleeve positioning structure and the embedded sleeve positioning quick and accurate, thereby improving construction efficiency.

[0004] However, the above-mentioned prior art still has the following problems when in use: the upper screw, the screw sleeve and the lower screw are used together to adjust the height of the embedded sleeve. After long-term use, the upper screw and the lower screw are prone to loosening in the screw sleeve, thereby affecting the stability of the embedded sleeve. Based on this, the utility model provides a cable-stayed bridge embedded sleeve positioning structure and a cable-stayed bridge with high stability. Utility Model Content

[0005] In order to overcome the above-mentioned defects of the prior art, the utility model provides a cable-stayed bridge embedded casing positioning structure and a cable-stayed bridge, which supports the rotation of a pad by an arc plate, adjusts the angle of the casing by a laser transmitter, and pours concrete into the interior of the positioning box, and greatly improves the stability of the casing by the solidified concrete, and sets a laser transmitter for repeated use, thereby greatly reducing the use cost and solving the problems arising from the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a cable-stayed bridge embedded sleeve positioning structure, comprising a positioning box and a sleeve member, the sleeve member is arranged inside the positioning box, a pad is provided inside the positioning box, a rotating rod is fixedly passed through the bottom of the pad, the front and rear ends of the rotating rod are rotatably connected to the inner wall of the positioning box, a first threaded hole is provided at the top of the pad, a thread is processed at the bottom of the outer wall of the sleeve member, the sleeve member is threadedly connected to the first threaded hole through the thread, a second threaded hole is provided at the top of the sleeve member, a hollow tube is threadedly connected in the second threaded hole, a laser emitter is fixed at the top of the hollow tube, arc grooves are provided on the inner wall surfaces on the front and rear sides of the positioning box, arc plates are fixedly provided on the outer walls on the front and rear sides of the pad, and the arc plates are slidably arranged in the arc grooves.

[0007] In a preferred embodiment, bolts are threadedly connected to the two arc plates, and one end of the bolt away from the backing plate contacts the inner wall of the arc groove. The arc plates are fixed by bolts, thereby completing the rapid fixation of the backing plate and the sleeve member.

[0008] In a preferred embodiment, concrete is provided inside the positioning box. After the concrete solidifies, the sleeve member and the backing plate can be fixed together with the positioning box, thereby improving the stability of the sleeve member.

[0009] In a preferred embodiment, positioning blocks are fixedly provided on the tops of the front and rear outer walls of the positioning box, and lifting rings are fixedly provided on the tops of the two positioning blocks, and the positioning blocks and the positioning box are hoisted with the help of lifting equipment.

[0010] In a preferred embodiment, a rechargeable battery is provided inside the hollow tube, and the rechargeable battery is arranged inside the laser emitter. A sealing plate is provided at the bottom of the rechargeable battery, and the outer wall surface of the sealing plate and the inner wall surface of the hollow tube are both processed with threads. The sealing plate and the hollow tube are threadedly connected to each other, which facilitates the removal of the sealing plate and the installation and removal of the rechargeable battery.

[0011] The utility model also includes a cable-stayed bridge for installing a pre-embedded sleeve positioning structure of the cable-stayed bridge, including a bridge body, and multiple pre-embedded grooves compatible with positioning boxes are opened on both sides of the top of the bridge body for installing multiple positioning boxes, and each pre-embedded groove has positioning grooves compatible with positioning blocks on both sides of the front and rear. The positioning grooves and the positioning blocks cooperate to facilitate the installation of the positioning boxes.

[0012] In a preferred embodiment, a main tower is fixedly provided at the center of the top of the bridge body, and mounting holes cooperating with the laser emitter are opened on the outer walls on both sides of the main tower. The number of the mounting holes is set to be multiple, and the mounting holes cooperate with the sleeve parts, so that the sleeve parts and the main tower can be fixed together using steel cables and steel bars.

[0013] Technical effects and advantages of the utility model:

[0014] 1. The utility model supports the rotation of the pad by the arc plate, adjusts the angle of the sleeve by the laser transmitter, and tightens the bolts to fit closely with the inner wall of the arc groove, so as to fix the sleeve, and pours concrete into the positioning box. After the concrete solidifies, the sleeve is reinforced. After that, the construction personnel remove the hollow tube, repeat the above operation, continue to fix the subsequent sleeve, and set a laser transmitter for repeated use, so as to greatly reduce the use cost.

[0015] 2. The positioning block and the positioning slot are used to facilitate the lifting of the positioning box. Then, the sleeve fittings are fixed to the mounting holes on the main tower using steel cables. There is no need to position the sleeve fittings again, so that the steel cables on both sides of the main tower can be symmetrically distributed, thereby completing the erection of the cable-stayed bridge. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 It is a schematic diagram of concrete solidification of the utility model;

[0018] Figure 3 This is a structural diagram of the sealing plate and hollow tube of the utility model;

[0019] Figure 4 It is a top view of the pad of the utility model;

[0020] Figure 5 It is a schematic diagram of a cable-stayed bridge of the utility model;

[0021] Figure 6 For this utility model Figure 5 Enlarged view of part A in the middle.

[0022] The accompanying drawings are marked as follows: 1. positioning box; 2. sleeve; 3. pad; 4. rotating rod; 5. first threaded hole; 6. second threaded hole; 7. hollow tube; 8. laser emitter; 9. arc groove; 10. arc plate; 11. bolt; 12. concrete; 13. positioning block; 14. lifting ring; 15. rechargeable battery; 16. sealing plate; 17. bridge body; 18. embedded groove; 19. positioning groove; 20. main tower; 21. mounting hole. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Refer to the instruction manual Figure 1-Figure 5 The utility model provides a cable-stayed bridge embedded casing positioning structure, including a positioning box 1 and a casing member 2, the casing member 2 is arranged inside the positioning box 1, a pad 3 is arranged inside the positioning box 1, a rotating rod 4 is fixedly passed through the bottom of the pad 3, and the front and rear ends of the rotating rod 4 are rotatably connected to the inner wall of the positioning box 1, a first threaded hole 5 is opened on the top of the pad 3, and a thread is processed on the bottom of the outer wall of the casing member 2, and the casing member 2 is threadedly connected to the first threaded hole 5 through a thread;

[0025] In addition, a second threaded hole 6 is provided at the top of the sleeve member 2, a hollow tube 7 is connected to the inner thread of the second threaded hole 6, a laser emitter 8 is fixed to the top of the hollow tube 7, arc grooves 9 are provided on the inner wall surfaces of the front and rear sides of the positioning box 1, and arc plates 10 are fixed on the outer walls of the front and rear sides of the pad 3, and the arc plates 10 are slidably arranged in the arc grooves 9;

[0026] Moreover, the two arc plates 10 are both threadedly connected with bolts 11, and the end of the bolts 11 away from the backing plate 3 contacts the inner wall of the arc groove 9. The arc plates 10 are fixed by means of the bolts 11, so as to complete the rapid fixation of the backing plate 3 and the sleeve member 2. Concrete 12 is provided inside the positioning box 1. After the concrete 12 solidifies, the sleeve member 2 and the backing plate 3 can be fixed together with the positioning box 1, so as to improve the stability of the sleeve member 2.

[0027] Positioning blocks 13 are fixedly provided on the top of the outer walls on both the front and rear sides of the positioning box 1, and lifting rings 14 are fixedly provided on the top of the two positioning blocks 13. The positioning blocks 13 and the positioning box 1 are hoisted with the help of lifting equipment. A rechargeable battery 15 is provided inside the hollow tube 7, and the rechargeable battery 15 is arranged on the inner side of the laser emitter 8. A sealing plate 16 is provided at the bottom of the rechargeable battery 15. The outer wall surface of the sealing plate 16 and the inner wall surface of the hollow tube 7 are both processed with threads. The sealing plate 16 is threadedly connected to the hollow tube 7, which is convenient for disassembling the sealing plate 16 and installing and disassembling the rechargeable battery 15.

[0028] When in use, the construction personnel first use the laser transmitter 8 to emit laser, use the arc plate 10 in the two arc grooves 9 to support the pad 3 to rotate, then the construction personnel grasp the sleeve member 2 to rotate, so as to adjust the angle of the sleeve member 2, and tighten the bolt 11, so that one end of the bolt 11 is closely fitted with the inner wall of the arc groove 9, so as to firmly fix the sleeve member 2, and then pour concrete 12 into the positioning box 1, and after the concrete 12 solidifies, the reinforcement of the sleeve member 2 can be completed;

[0029] Afterwards, the construction personnel remove the hollow tube 7 in the sleeve member 2 and put it into the next sleeve member 2, repeat the above operation, and continue to fix the sleeve member 2. The laser emitter 8 can be reused, thereby greatly reducing the use cost of the laser emitter 8.

[0030] Refer to the instruction manual Figure 5-Figure 6 The utility model provides a cable-stayed bridge, including a bridge body 17, wherein a plurality of embedded grooves 18 adapted to the positioning box 1 are provided on both sides of the top of the bridge body 17, and are used to install a plurality of positioning boxes 1, and a positioning groove 19 adapted to the positioning block 13 is provided on both sides of the front and rear of each embedded groove 18, and the positioning groove 19 cooperates with the positioning block 13 to facilitate the installation of the positioning box 1;

[0031] In addition, a main tower 20 is fixedly provided at the top center of the bridge body 17, and mounting holes 21 cooperating with the laser emitter 8 are opened on the outer walls on both sides of the main tower 20. The number of the mounting holes 21 is set to be multiple. With the help of the mounting holes 21 cooperating with the sleeve 2, the sleeve 2 and the main tower 20 can be fixed together using steel cables and steel bars.

[0032] By setting a plurality of embedded grooves 18 on the top of the bridge body 17, placing the positioning box 1 in the plurality of embedded grooves 18, after the sleeve fittings 2 in the positioning box 1 are fixed, the sleeve fittings 2 and the mounting holes 21 on the main tower 20 can be fixed together using steel cables. There is no need to position the sleeve fittings 2 again, and the symmetrical distribution of the steel cables on both sides of the main tower 20 can be ensured, thereby completing the erection of the cable-stayed bridge.

[0033] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A cable-stayed bridge embedded casing positioning structure, comprising a positioning box (1) and a casing member (2), wherein the casing member (2) is arranged inside the positioning box (1), and is characterized in that: A pad (3) is provided inside the positioning box (1), a rotating rod (4) is fixedly passed through the bottom of the pad (3), and the front and rear ends of the rotating rod (4) are rotatably connected to the inner wall of the positioning box (1); A first threaded hole (5) is formed at the top of the backing plate (3); a thread is processed at the bottom of the outer wall of the sleeve member (2); the sleeve member (2) is threadedly connected to the first threaded hole (5) via the thread; a second threaded hole (6) is formed at the top of the sleeve member (2); a hollow tube (7) is internally threadedly connected to the second threaded hole (6); a laser emitter (8) is fixed at the top of the hollow tube (7); The front and rear inner wall surfaces of the positioning box (1) are both provided with arc grooves (9), and the front and rear outer walls of the pad (3) are both fixed with arc plates (10), and the arc plates (10) are slidably arranged in the arc grooves (9).

2. The cable-stayed bridge embedded casing positioning structure according to claim 1, characterized in that: Bolts (11) are threadedly connected to the two arc-shaped plates (10), and one end of the bolts (11) away from the backing plate (3) contacts the inner wall of the arc-shaped groove (9) for fixing the arc-shaped plates (10).

3. The cable-stayed bridge embedded casing positioning structure according to claim 1, characterized in that: Concrete (12) is provided inside the positioning box (1) for fixing the sleeve member (2) and the backing plate (3).

4. The cable-stayed bridge embedded casing positioning structure according to claim 1, characterized in that: Positioning blocks (13) are fixedly provided on the tops of the outer walls on both the front and rear sides of the positioning box (1), and hanging rings (14) are fixedly provided on the tops of the two positioning blocks (13).

5. The cable-stayed bridge embedded casing positioning structure according to claim 1, characterized in that: A rechargeable battery (15) is provided inside the hollow tube (7), and the rechargeable battery (15) is arranged inside the laser emitter (8). A sealing plate (16) is provided at the bottom of the rechargeable battery (15), and the outer wall surface of the sealing plate (16) and the inner wall surface of the hollow tube (7) are both processed with threads. The sealing plate (16) and the hollow tube (7) are threadedly connected to each other, so that the sealing plate (16) is easy to remove.

6. A cable-stayed bridge equipped with the cable-stayed bridge embedded casing positioning structure according to any one of claims 1 to 5, characterized in that: It comprises a bridge body (17), wherein a plurality of pre-buried grooves (18) adapted to the positioning boxes (1) are provided on both sides of the top of the bridge body (17) for installing the plurality of positioning boxes (1), and a positioning groove (19) adapted to the positioning block (13) is provided on both sides of the front and rear of each pre-buried groove (18).

7. The cable-stayed bridge according to claim 6, characterized in that: A main tower (20) is fixedly provided at the center of the top of the bridge body (17), and mounting holes (21) matching with the laser emitter (8) are provided on the outer walls on both sides of the main tower (20), and the number of the mounting holes (21) is set to be multiple.