Grouting device for treating mountain cracks
By designing a grouting device including a mixer, grout pipe, grouting machine and grouting branch pipe, combined with the mixing and stirring of cement and fly ash, and adding water glass when necessary, the poor repair effect of mountain cracks has been solved. solve the problem and achieve the stability of the mountain and landslide protection.
Patent Information
- Application Number
- CN202420421601.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The existing technology is not effective in repairing mountain cracks, resulting in unstable slopes and prone to large-scale landslides.
A grouting device including a mixer, grouting pipe, grouting machine, grouting main pipe and multiple grouting branch pipes is designed. The grouting device is ensured through grouting sleeves and rubber plugs, and is controlled by pressure gauges and grouting stop valves. Pressure, combined with the mixing of cement and fly ash, and adding water glass when necessary to improve the bonding and fixing effect.
It effectively ensures the stability of the mountain and prevents the occurrence of large-scale landslides. The grouting machine is used to pour cement, fly ash slurry and cement slurry into the curtain holes to ensure the stability of the slope.
Smart Images

Figure CN221855496U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a grouting device for treating mountain cracks, belonging to the technical field of mountain repair. Background Art
[0002] During the highway construction process, for large excavation sections, the construction process strictly follows the specifications and design drawings to implement the first-level excavation and first-level protection techniques. However, rainfall and excavation (blasting, etc.) disturb the mountain and affect the overall stability of the soil. Large open cracks appear on the slope outside the intercepting ditch at the top of the slope. In order to ensure that there will be no deformation in the later stage and cause large-scale slope landslides, the mountain needs to be treated. The current treatment method is to directly inject grouting into the cracks, but this repair method has a poor repair effect. Utility Model Content
[0003] The utility model provides a grouting device for treating mountain cracks, which solves the problem that the repairing effect of the current treatment method is not good.
[0004] The utility model relates to a grouting device for treating mountain cracks, comprising a mixer, a bottom outlet of the mixer is connected with a grouting pipe, the grouting pipe is connected with a grouting machine, the outlet of the grouting machine is connected with a grouting main pipe, a plurality of grouting branch pipes are connected to the grouting main pipe, a grouting sleeve is fixed to the lower end of the grouting branch pipe, a pressure gauge and a grouting stop valve are arranged on the grouting branch pipe, and a rubber plug is sleeved at the connection between the grouting branch pipe and the grouting sleeve.
[0005] As a preferred embodiment, a three-way valve is provided at the connection between the grouting branch pipe and the grouting main pipe for easy connection.
[0006] As a preferred embodiment, a booster pump is provided on the top of each grouting branch pipe to ensure the grouting pressure and ensure that the slurry is always injected until saturated.
[0007] As a preferred embodiment, a bracket is fixed on the top of the mixer, a weighing bin is installed on the bracket, the bottom outlet of the weighing bin extends into the mixer, two guide bins are arranged above the weighing bin, the guide bins are fixed on the bracket, a conveying auger is arranged above each guide bin, a cement tank and a fly ash tank are arranged next to the mixer, the inlets of the two conveying auger are respectively connected to the outlets of the cement tank and the fly ash tank, and a water inlet pipe is connected to the upper part of the mixer. Cement and fly ash can be conveniently and accurately mixed and stirred.
[0008] As a preferred embodiment, a water glass tank is provided beside the mixer, a delivery pipe is fixed to the bottom outlet of the water glass tank, the other end of the delivery pipe is fixed to the upper part of the mixer, a delivery pump is provided on the delivery pipe, and flow meters are provided on the delivery pipe and the water inlet pipe. For deep cracks, which cause the pressure of individual grouting branches to fluctuate and always fail to reach the specified pressure, water glass of the specified standard can be added to the slurry to increase the bonding and fixing effect, so that the cracks can be repaired quickly.
[0009] The utility model has the following beneficial effects:
[0010] The grouting casing in the curtain hole is injected with cement and fly ash slurry through a grouting machine, and then cement slurry is injected into the crack position to stabilize the slope and ensure that no large-scale landslides will occur again. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model;
[0012] Figure 2 It is a structural schematic diagram of the grouting casing;
[0013] Figure 3 Schematic diagram of the arrangement structure of the grouting casing Figure 1 ;
[0014] Figure 4 Schematic diagram of the arrangement structure of the grouting casing Figure 2 ;
[0015] In the figure: 1. mixer, 2. slurry delivery pipe, 3. grouting machine, 4. pressure gauge, 5. grouting main pipe, 6. slurry stop valve, 7. three-way valve, 8. rubber plug, 9. grouting branch pipe, 10. grouting sleeve, 11. flow meter, 12. water inlet pipe, 13. weighing bin, 14. material guide bin, 15. cement tank, 16. conveying auger, 17. fly ash tank, 18. water glass tank, 19. conveying pipe, 20. conveying pump, 21. booster pump. DETAILED DESCRIPTION
[0016] The utility model is further described below in conjunction with embodiments.
[0017] Embodiment 1, as Figures 1 to 4 As shown, the utility model is a grouting device for treating mountain cracks, including a mixer 1, the bottom outlet of the mixer 1 is connected to a grouting pipe 2, the grouting pipe 2 is connected to a grouting machine 3, the outlet of the grouting machine 3 is connected to a grouting main pipe 5, a plurality of grouting branch pipes 9 are connected to the grouting main pipe 5, a grouting sleeve 10 is fixed to the lower end of the grouting branch pipe 9, a pressure gauge 4 and a grouting stop valve 6 are provided on the grouting branch pipe 9, and a rubber plug 8 is provided at the connection between the grouting branch pipe 9 and the grouting sleeve 10.
[0018] During operation: drill a hole with a diameter of 9.1 cm next to the crack, stop drilling after entering the rock for 1 m, lower the grouting sleeve 10 to prevent the hole from collapsing, temporarily seal the top of the grouting sleeve 10 with a rubber plug 8 to prevent debris from entering and blocking the grouting sleeve 10, and arrange the slurry outlets of the grouting sleeve 10 in a dispersed manner to facilitate the outflow of slurry during grouting; after the grouting sleeves 10 are all installed, connect the tops of all the grouting sleeves 10 to the grouting main pipe 5 through the grouting branch pipe 9, connect the grouting sleeves 10 to the grouting branch pipe 9, and seal the connection with mortar, then grouting is performed simultaneously through the grouting machine 3, and each branch grouting The grouting branch pipe 9 is equipped with a pressure gauge 4 and a grouting stop valve 6. The grouting pressure is gradually increased from 0 MPa to 1.5 MPa, and the pressure is continuously maintained at 1.3-1.5 MPa. When the pressure no longer increases and is reduced to a stable level of 1.4 MPa, the grouting stop valves 6 on the grouting branch pipes 9 are closed to stop pressurizing. After the pressure is stabilized at 1.4 MPa for 10 minutes, the grouting stop valve 6 is closed. After the last grouting branch pipe 9 has been grouted for 10 minutes, the grouting stop valve 6 is opened again to increase the pressure for grouting. The grouting is stopped when the pressure gauge is maintained at 1.3-1.5 MPa to achieve a curtain grouting effect.
[0019] Embodiment 2, based on embodiment 1, a three-way valve 7 is provided in the connection between the grouting branch pipe 9 and the grouting main pipe 5 .
[0020] A booster pump 21 is provided on the top of each grouting branch pipe 9. The diameter of the grouting sleeve 10 is about 8 cm and the wall thickness is about 2 mm. It is permanently buried in the hole. Figure 3 and 4 As shown, the holes are vertical holes on both sides of the crack and then cross-oblique holes are drilled on both sides of the crack in an alternating arrangement.
[0021] A bracket is fixed on the top of the mixer 1, and a weighing bin 13 is installed on the bracket. The bottom outlet of the weighing bin 13 extends into the mixer 1. Two material guide bins 14 are arranged above the weighing bin 13. The material guide bins 14 are fixed on the bracket. A conveying auger 16 is arranged above each material guide bin 14. A cement tank 15 and a fly ash tank 17 are arranged next to the mixer 1. The inlets of the two conveying augers 16 are respectively connected to the outlets of the cement tank 15 and the fly ash tank 17. The upper part of the mixer 1 is connected to a water inlet pipe 12.
[0022] A water glass tank 18 is also provided beside the mixer 1. A delivery pipe 19 is fixed to the bottom outlet of the water glass tank 18. The other end of the delivery pipe 19 is fixed to the upper part of the mixer 1. A delivery pump 20 is provided on the delivery pipe 19. A flow meter 11 is provided on the delivery pipe 19 and the water inlet pipe 12. During grouting, if the pressure of individual grouting branches 9 fluctuates and cannot reach the specified pressure, the delivery pump 20 can be started, and water glass of the specified standard can be added to the slurry, and the remaining grouting branches 9 can be grouted again. After the grouting solidifies, pour the grouting into the cracks again, add a little water glass to the slurry, and infiltrate into the exposed gaps until the self-leveling stabilizes and no longer sinks, and then stop grouting.
[0023] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
[0024] In the description of the present invention, the terms "inside", "outside", "longitudinal", "lateral", "upper", "lower", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention.
Claims
1. A grouting device for treating mountain cracks, characterized in that: The invention comprises a mixer (1), wherein the bottom outlet of the mixer (1) is connected to a grouting pipe (2), the grouting pipe (2) is connected to a grouting machine (3), the outlet of the grouting machine (3) is connected to a grouting main pipe (5), a plurality of grouting branch pipes (9) are connected to the grouting main pipe (5), a grouting sleeve (10) is fixed to the lower end of the grouting branch pipe (9), a pressure gauge (4) and a grouting stop valve (6) are provided on the grouting branch pipe (9), and a rubber plug (8) is sleeved at the connection between the grouting branch pipe (9) and the grouting sleeve (10).
2. The grouting device for treating mountain cracks according to claim 1 is characterized in that: A three-way valve (7) is provided between the grouting branch pipe (9) and the grouting main pipe (5).
3. The grouting device for treating mountain cracks according to claim 1 is characterized in that: A booster pump (21) is provided on the upper portion of each grouting branch pipe (9).
4. The grouting device for treating mountain cracks according to claim 1 is characterized in that: A bracket is fixed on the top of the mixer (1), a weighing bin (13) is installed on the bracket, the bottom outlet of the weighing bin (13) extends into the mixer (1), two material guide bins (14) are arranged above the weighing bin (13), the material guide bins (14) are fixed on the bracket, a conveying auger (16) is arranged above each material guide bin (14), a cement tank (15) and a fly ash tank (17) are arranged beside the mixer (1), the inlets of the two conveying auger (16) are respectively connected to the outlets of the cement tank (15) and the fly ash tank (17), and a water inlet pipe (12) is connected to the upper part of the mixer (1).
5. The grouting device for treating mountain cracks according to claim 4 is characterized in that: A water glass tank (18) is also provided beside the mixer (1). A delivery pipe (19) is fixed to the bottom outlet of the water glass tank (18). The other end of the delivery pipe (19) is fixed to the upper part of the mixer (1). A delivery pump (20) is provided on the delivery pipe (19). Both the delivery pipe (19) and the water inlet pipe (12) are provided with flow meters (11).