Refuse landfill hole-forming synchronous grouting equipment
By using a drilling rig to drive a down-the-hole hammer in the landfill hole-forming grouting equipment to crush the holes and spray quick-setting liquid, the problem of poor quick-setting grouting effect was solved, and rapid wall solidification and safe construction were achieved.
Patent Information
- Application Number
- CN202323408924.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-13
AI Technical Summary
In the existing hole-forming grouting technology for landfills, the grouting quick-setting effect is poor, which can easily lead to grout leakage and hole collapse accidents, affecting construction safety and providing poor support effects.
A synchronous grouting equipment for hole formation in a landfill is designed, including a drill rod, a down-the-hole hammer and a quick-setting structure. The drilling rig drives the down-the-hole hammer to rotate and drill the crushing hole, and starts when the down-the-hole hammer is lifted back. The quick-setting tube group sprays quick-setting liquid through the liquid injection hole to realize the filling of quick-setting liquid, quickly solidify the wall, and reduce the risk of slurry leakage and hole collapse.
It can effectively accelerate the solidification of the protective wall, improve the support strength, reduce the risk of slurry leakage and hole collapse accidents, and enhance construction safety.
Smart Images

Figure CN221855526U_ABST
Abstract
Description
Technical Field
[0001] This utility model patent relates to the technical field of hole-forming and grouting in landfills, and specifically to synchronous hole-forming and grouting equipment in landfills. Background Art
[0002] A landfill is a place where garbage is disposed of by landfilling. The geology of the landfill layer is relatively loose, and the support of the landfill is achieved through drilling and grouting.
[0003] At present, impact rotary drilling is often performed using a down-the-hole hammer in conjunction with a drilling rig and corresponding drilling tools to achieve drilling and forming holes, followed by grouting to complete the support.
[0004] In the existing technology, the grouting rapid setting effect is poor, which can easily cause accidents such as leakage and hole collapse, affecting construction safety, and the support effect is poor. Utility Model Content
[0005] The utility model aims to provide a landfill hole forming synchronous grouting device, aiming to solve the problem of poor rapid setting effect of landfill hole forming grouting in the prior art.
[0006] The present invention is implemented as follows: a synchronous grouting device for forming holes in a landfill comprises a drill rod, a down-the-hole hammer and a quick-setting structure, wherein the drill rod and the down-the-hole hammer are assembled and arranged, the drill rod is driven by a drilling rig to drive the down-the-hole hammer to perform rotary drilling, and the down-the-hole hammer is used to break holes in the landfill; the quick-setting structure comprises a plurality of quick-setting tube groups, each of which is arranged in a ring-shaped interval and in correspondence, the down-the-hole hammer has a plurality of injection holes, each of which is arranged in a one-to-one correspondence with the injection holes, and the quick-setting tube groups are embedded in the injection holes, and the quick-setting tube groups are used to inject quick-setting liquid outward.
[0007] Furthermore, the quick-setting tube group includes a tube body, an injection head and a deflection cylinder. The injection head is installed on the tube body, and the injection head and the tube body are connected. The deflection cylinder is connected to the injection head, and the deflection cylinder is used to drive the injection head to be reciprocatingly deflected.
[0008] Furthermore, the down-the-hole hammer has an inner hammer groove, which is arranged in a concave direction, and the injection hole is formed in the middle of the inner hammer groove. The injection head is arranged in the inner hammer groove, and the inner hammer groove is arranged in a flared shape in a direction away from the injection head.
[0009] Furthermore, the landfill hole-forming synchronous grouting equipment includes a hammer bracket, which is arranged horizontally and inside the down-the-hole hammer, and the hammer bracket and the down-the-hole hammer are assembled; the middle of the hammer bracket is provided with a hammer bracket hole, the hammer bracket hole is used for the passage of a grouting pipe, and the hammer bracket hole is used to position the grouting pipe; the extension of the hammer bracket forms a plurality of hammer bracket grooves, the hammer bracket grooves are arranged through, the pipe body passes through the hammer bracket grooves, and the hammer bracket grooves are used to position the pipe body.
[0010] Furthermore, the landfill hole-forming synchronous grouting equipment includes a rod bracket, which is arranged horizontally and above the hammer bracket, and a plurality of frame connecting rods are connected between the rod bracket and the hammer bracket, and each of the frame connecting rods is arranged in a circular manner and spaced apart; the grouting pipe passes through the rod bracket, and the rod bracket and the hammer bracket are used to synchronously position the grouting pipe, the pipe body is arranged in a vertically extending manner, and the pipe body synchronously passes through the rod bracket and the hammer bracket slot, and the rod bracket and the hammer bracket are used to synchronously position each of the pipe bodies.
[0011] Furthermore, the down-the-hole hammer includes a hammer body, a first-stage hammer head, a second-stage hammer head and a third-stage hammer head. The first-stage hammer head, the second-stage hammer head and the third-stage hammer head are respectively arranged at the bottom of the hammer body, and the top of the hammer body is assembled with the drill rod. Along the direction away from the hammer body, the third-stage hammer head, the second-stage hammer head and the first-stage hammer head are arranged in a stepped manner.
[0012] Furthermore, the first-level hammer head is in the middle, the second-level hammer head is above the first-level hammer head, and the second-level hammer head is arranged correspondingly along the circumference of the first-level hammer head; the third-level hammer head is above the second-level hammer head, and the third-level hammer head is arranged correspondingly along the circumference of the second-level hammer head.
[0013] Furthermore, the down-the-hole hammer includes a hammer body, a first-level hammer head and a second-level hammer head, the first-level hammer head and the second-level hammer head are respectively installed at the bottom of the hammer body, and the top of the hammer body is assembled with the drill rod; along the direction away from the hammer body, the second-level hammer head and the first-level hammer head are arranged in a stepped manner.
[0014] Furthermore, the quick-setting tube group includes a quick-setting frame, which is installed inside the down-the-hole hammer, and the injection head is installed on the quick-setting frame. The tube body is embedded in the quick-setting frame and assembled with the injection head.
[0015] Furthermore, the quick-setting frame includes a main frame section, a first frame section and a second frame section, the two ends of the main frame section are respectively connected to the inner end of the first frame section and the inner end of the second frame section, the outer end of the second frame section is movably connected to the inner wall of the down-the-hole hammer, the outer end of the first frame section is connected to the adjusting cylinder, the tube body and the adjusting cylinder are overlapped, and the tube body is passed through the first frame section and extends to be assembled with the injection head.
[0016] Compared with the prior art, the synchronous grouting equipment for landfill hole formation provided by the utility model, when the landfill is drilling and hole forming operations, the down-the-hole hammer is driven by the drilling rig to perform rotary drilling, the landfill is broken and holes are formed, the slag is squeezed against the retaining wall, and the support strength is improved. Then, concrete is poured, and while the down-the-hole hammer is pulled back, the quick-setting structure is started, and each quick-setting pipe group synchronously sprays quick-setting liquid toward the retaining wall through each injection hole to achieve the filling of the quick-setting liquid; in this way, under the action of the quick-setting liquid, the solidification effect of the retaining wall is greatly accelerated, which plays a role in quickly consolidating the wall, effectively reducing the risks of accidents such as leakage and hole collapse, thereby enhancing the support safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a three-dimensional schematic diagram of the landfill hole-forming synchronous grouting equipment provided by the utility model;
[0018] Figure 2 This is a schematic diagram of the main view of the landfill hole-forming synchronous grouting equipment provided by the utility model;
[0019] Figure 3 It is a three-dimensional schematic diagram of a quick-setting tube group of a landfill hole-forming synchronous grouting equipment provided by the utility model;
[0020] Figure 4 This is a three-dimensional schematic diagram of the injection head of the landfill hole forming synchronous grouting equipment provided by the utility model
[0021] Figure 5 It is a three-dimensional schematic diagram of a hammer bracket of a landfill hole-forming synchronous grouting equipment provided by the utility model;
[0022] Figure 6 It is a plan view of the inner hammer slot of the landfill hole forming synchronous grouting equipment provided by the utility model. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0024] The implementation of the present invention is described in detail below with reference to specific embodiments.
[0025] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of this utility model, it should be understood that if there are terms such as "upper", "lower", "left", "right", etc. indicating directions or positional relationships, they are based on the directions or positional relationships shown in the drawings. This is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0026] Reference Figure 1-6 The figure shows a preferred embodiment of the present invention.
[0027] The synchronous grouting equipment for forming holes in a landfill includes a drill rod, a down-the-hole hammer 1 and a quick-setting structure 2. The drill rod and the down-the-hole hammer 1 are assembled and arranged. The drill rod is driven by a drilling rig to drive the down-the-hole hammer 1 to perform rotary drilling. The down-the-hole hammer 1 is used to break and form holes in the landfill; the quick-setting structure 2 includes multiple quick-setting tube groups 21, and each quick-setting tube group 21 is arranged in a ring-shaped interval. The down-the-hole hammer 1 has multiple injection holes, and each quick-setting tube group 21 is arranged in a one-to-one correspondence with the injection hole, and the quick-setting tube group 21 is embedded in the injection hole arrangement. The quick-setting tube group 21 is used to inject quick-setting liquid outward.
[0028] The above-mentioned synchronous grouting equipment for drilling holes in a landfill is used. When drilling holes in a landfill, the down-the-hole hammer 1 is driven by the drill rig to rotate and drill, thereby breaking holes in the landfill. The crushed slag squeezes the protective wall to increase the support strength. Then, concrete is poured. While the down-the-hole hammer 1 is pulled back, the quick-setting structure 2 is started, and each quick-setting tube group 21 synchronously sprays quick-setting liquid toward the protective wall through each injection hole to achieve the filling of the quick-setting liquid. In this way, under the action of the quick-setting liquid, the solidification effect of the protective wall is greatly accelerated, which plays a role in quickly consolidating the wall, effectively reducing the risks of accidents such as leakage and hole collapse, thereby enhancing the support safety.
[0029] The quick-setting tube group 21 includes a tube body, a liquid injection head 25 and a deflection cylinder. The liquid injection head 25 is installed in the tube body, and the liquid injection head 25 and the tube body are connected. The deflection cylinder is connected to the liquid injection head 25 and is used to drive the liquid injection head 25 to be reciprocatingly deflected.
[0030] In this way, under the action of the deflection oil cylinder, the filling direction of the liquid filling head 25 is changed, the filling range of the liquid filling head 25 is increased, the area covered by the quick-setting liquid is increased, and the quick-setting effect of the quick-setting liquid is improved.
[0031] The down-the-hole hammer 1 has an inner hammer groove 14, which is arranged in a concave direction and has an injection hole formed in the middle of the inner hammer groove 14. The injection head 25 is arranged in the inner hammer groove 14 and is arranged in a flared shape in a direction away from the injection head 25. Under the action of the inner hammer groove 14, the down-the-hole hammer 1 is prevented from being restricted in the injection of the injection head 25, the injection range of the injection head 25 is increased, the area covered by the quick-setting liquid is increased, and the quick-setting effect of the quick-setting liquid is improved.
[0032] The landfill hole-forming synchronous grouting equipment includes a hammer bracket 26, which is arranged horizontally. The hammer bracket 26 is arranged inside the down-the-hole hammer 1, and the hammer bracket 26 and the down-the-hole hammer 1 are assembled; the hammer bracket 26 helps to increase the pressure on the down-the-hole hammer 1 itself and improve the service life of the down-the-hole hammer 1.
[0033] There is a hammer bracket hole 27 in the middle of the hammer bracket 26, which is used for the grouting pipe to pass through and to position the grouting pipe. Under the action of the hammer bracket 26, the stability of the grouting pipe is improved, the normal progress of the grouting operation is guaranteed, and the shaking of the grouting pipe is effectively avoided, thereby improving the drilling stability.
[0034] The extension of the hammer bracket 26 forms a plurality of hammer bracket grooves, which are arranged through the hammer bracket grooves. The pipe body passes through the hammer bracket grooves, and the hammer bracket grooves are used to position the pipe body. The hammer bracket 26 plays a positioning role for each pipe body, improves the setting stability of each pipe body, and ensures the normal progress of the quick-setting liquid filling operation.
[0035] The landfill hole-forming synchronous grouting equipment includes a rod support, which is arranged horizontally and above the hammer support 26. A plurality of frame connecting rods are connected between the rod support and the hammer support 26, and each frame connecting rod is arranged in a circular manner and spaced apart. In this way, the rod support, the hammer support 26 and the plurality of frame connecting rods are integrated to improve the bearing capacity, thereby ensuring the quick-setting liquid filling operation and grouting operation.
[0036] The grouting pipe passes through the rod bracket, and the rod bracket and the hammer bracket 26 are used to synchronously position the grouting pipe. The pipe body is arranged to extend vertically, and the pipe body synchronously passes through the rod bracket and the hammer bracket slot. The rod bracket and the hammer bracket 26 are used to synchronously position each pipe body.
[0037] In this way, under the joint action of the rod bracket and the hammer bracket 26, the positioning effect of the pipe body is improved, and the setting stability of the pipe body is greatly increased.
[0038] Down-the-hole hammer 1 embodiment 1:
[0039] The down-the-hole hammer 1 includes a hammer body, a first-stage hammer head 11, a second-stage hammer head 12 and a third-stage hammer head 13. The first-stage hammer head 11, the second-stage hammer head 12 and the third-stage hammer head 13 are respectively arranged at the bottom of the hammer body, and the top of the hammer body is assembled with the drill rod. In the direction away from the hammer body, the third-stage hammer head 13, the second-stage hammer head 12 and the first-stage hammer head 11 are arranged in a stepped manner.
[0040] Under the coordinated action of the tertiary hammer head 13, the secondary hammer head 12 and the primary hammer head 11, the primary hammer head 11 first crushes the landfill and squeezes the debris along both sides. The secondary hammer head 12 squeezes the debris along both sides while drilling and crushing. The tertiary hammer head 13 squeezes the debris along both sides while drilling and crushing. In this way, the debris is crushed layer by layer, which improves the drilling effect and facilitates drilling, and the debris is squeezed to the retaining wall to improve the support strength of the retaining wall.
[0041] The first-level hammer head 11 is in the middle, the second-level hammer head 12 is above the first-level hammer head 11, and the second-level hammer head 12 is correspondingly arranged along the circumference of the first-level hammer head 11; the third-level hammer head 13 is above the second-level hammer head 12, and the third-level hammer head 13 is correspondingly arranged along the circumference of the second-level hammer head 12.
[0042] In this way, the slag is squeezed toward both sides along the middle, which facilitates squeezing the slag toward the retaining wall and improves the support strength of the retaining wall.
[0043] Example 2 of down-the-hole hammer 1:
[0044] The down-the-hole hammer 1 includes a hammer body, a primary hammer head 11 and a secondary hammer head 12. The primary hammer head 11 and the secondary hammer head 12 are respectively arranged at the bottom of the hammer body, and the top of the hammer body is assembled with the drill rod. In the direction away from the hammer body, the secondary hammer head 12 and the primary hammer head 11 are arranged in a stepped manner.
[0045] Under the cooperation of the secondary hammer head 12 and the primary hammer head 11, the primary hammer head 11 first crushes the landfill and squeezes the debris along both sides. The secondary hammer head 12 squeezes the debris along both sides while drilling and crushing. In this way, the debris is crushed layer by layer, which improves the drilling effect and facilitates drilling, and the debris is squeezed to the retaining wall to improve the support strength of the retaining wall.
[0046] The primary hammer head 11 is located in the middle, the secondary hammer head 12 is located above the primary hammer head 11 , and the secondary hammer heads 12 are correspondingly arranged along the circumference of the primary hammer head 11 .
[0047] In this way, the slag is squeezed toward both sides along the middle, which facilitates squeezing the slag toward the retaining wall and improves the support strength of the retaining wall.
[0048] Example of quick-setting tube group 21:
[0049] The quick-setting tube group 21 includes a quick-setting frame, which is installed inside the down-the-hole hammer 1. The injection head 25 is installed on the quick-setting frame. The tube body is embedded in the quick-setting frame and assembled with the injection head 25. Under the action of the quick-setting frame, the setting of the injection head 25 is facilitated, and the tube body is positioned and reinforced, which facilitates the cooperation between the tube body and the injection head 25.
[0050] The quick-setting frame includes a main frame section 22, a first frame section 23 and a second frame section 24. The two ends of the main frame section 22 are connected to the inner ends of the first frame section 23 and the inner ends of the second frame section 24 respectively. The outer end of the second frame section 24 is movably connected to the inner wall of the down-the-hole hammer 1. The outer end of the first frame section 23 is connected to the regulating cylinder. The pipe body and the regulating cylinder are overlapped, and the pipe body is passed through the first frame section 23 and extends to be assembled with the injection head 25.
[0051] In this way, under the cooperation of the main frame section 22, the first frame section 23 and the second frame section 24, the quick-setting tube group 21 can meet the needs of down-the-hole hammers 1 of different specifications and different drilling operations.
[0052] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. Landfill hole forming synchronous grouting equipment, It is characterized in that It comprises a drill rod, a down-the-hole hammer and a quick-setting structure, wherein the drill rod and the down-the-hole hammer are assembled and arranged, the drill rod is driven by a drilling rig to drive the down-the-hole hammer to perform rotary drilling, and the down-the-hole hammer is used to break holes in a landfill; the quick-setting structure comprises a plurality of quick-setting tube groups, each of which is arranged in a ring-shaped interval and in correspondence, the down-the-hole hammer has a plurality of injection holes, each of which is arranged in a one-to-one correspondence with the injection holes, and the quick-setting tube groups are embedded in the injection holes, and the quick-setting tube groups are used to inject quick-setting liquid outward.
2. The landfill hole forming synchronous grouting equipment as claimed in claim 1, It is characterized in that The quick-setting tube group includes a tube body, a liquid injection head and a deflection cylinder. The liquid injection head is installed on the tube body, and the liquid injection head is connected to the tube body. The deflection cylinder is connected to the liquid injection head, and the deflection cylinder is used to drive the liquid injection head to be reciprocatingly deflected.
3. The synchronous grouting equipment for forming holes in landfills as claimed in claim 2, It is characterized in that The down-the-hole hammer has an inner hammer groove, which is arranged concavely, and the injection hole is formed in the middle of the inner hammer groove. The injection head is arranged in the inner hammer groove, and the inner hammer groove is arranged in a flared shape in a direction away from the injection head.
4. The landfill hole forming synchronous grouting equipment as claimed in claim 2, It is characterized in that The landfill hole-forming synchronous grouting equipment includes a hammer bracket, which is arranged horizontally and inside the down-the-hole hammer, and the hammer bracket and the down-the-hole hammer are assembled; the middle of the hammer bracket is provided with a hammer bracket hole, the hammer bracket hole is used for a grouting pipe to pass through, and the hammer bracket hole is used to position the grouting pipe; the extension of the hammer bracket forms a plurality of hammer bracket grooves, the hammer bracket grooves are arranged through, the pipe body passes through the hammer bracket grooves, and the hammer bracket grooves are used to position the pipe body.
5. The landfill hole forming synchronous grouting equipment as claimed in claim 4, It is characterized in that The landfill hole-forming synchronous grouting equipment includes a rod bracket, which is horizontally arranged and arranged above the hammer bracket, and a plurality of frame connecting rods are connected between the rod bracket and the hammer bracket, and each of the frame connecting rods is arranged in a circular manner and at intervals; the grouting pipe passes through the rod bracket, and the rod bracket and the hammer bracket are used to synchronously position the grouting pipe, the pipe body is vertically extended, and the pipe body synchronously passes through the rod bracket and the hammer bracket slot, and the rod bracket and the hammer bracket are used to synchronously position each of the pipe bodies.
6. The landfill hole forming synchronous grouting equipment according to any one of claims 1 to 5, It is characterized in that The down-the-hole hammer comprises a hammer body, a primary hammer head, a secondary hammer head and a tertiary hammer head. The primary hammer head, the secondary hammer head and the tertiary hammer head are respectively arranged at the bottom of the hammer body, and the top of the hammer body is assembled with the drill rod. Along the direction away from the hammer body, the tertiary hammer head, the secondary hammer head and the primary hammer head are arranged correspondingly in a stepped shape.
7. The synchronous grouting equipment for forming holes in landfills as claimed in claim 6, It is characterized in that The first-stage hammer head is in the middle, the second-stage hammer head is above the first-stage hammer head, and the second-stage hammer head is arranged correspondingly along the circumference of the first-stage hammer head; the third-stage hammer head is above the second-stage hammer head, and the third-stage hammer head is arranged correspondingly along the circumference of the second-stage hammer head.
8. The landfill hole forming synchronous grouting equipment according to any one of claims 1 to 5, It is characterized in that The down-the-hole hammer comprises a hammer body, a primary hammer head and a secondary hammer head, wherein the primary hammer head and the secondary hammer head are respectively arranged at the bottom of the hammer body, and the top of the hammer body is assembled with the drill rod; along the direction away from the hammer body, the secondary hammer head and the primary hammer head are arranged correspondingly in a stepped shape.
9. The landfill hole forming synchronous grouting equipment according to any one of claims 2 to 5, It is characterized in that The quick-setting tube group comprises a quick-setting frame, which is arranged inside the down-the-hole hammer, and the injection head is arranged on the quick-setting frame. The tube body is embedded in the quick-setting frame and assembled with the injection head.
10. The landfill hole forming synchronous grouting equipment as claimed in claim 9, It is characterized in that The quick-setting frame includes a main frame section, a first frame section and a second frame section. The two ends of the main frame section are connected to the inner ends of the first frame section and the second frame section respectively. The outer end of the second frame section is movably connected to the inner wall of the down-the-hole hammer. The outer end of the first frame section is connected to the adjusting cylinder. The tube body is overlapped with the adjusting cylinder, and the tube body is passed through the first frame section and extends to be assembled with the injection head.
