Bypass multi-point injection type gravel filling screen pipe
By designing a sandblasting ring structure that bypasses the multi-point injection gravel-packing screen, the existing technology problems of low flow cross-section utilization and insufficient mortar transportation capacity of the bypass pipe are solved, achieving uniform distribution and efficient transportation of mortar. , shortening the construction time and reducing ground pollution.
Patent Information
- Application Number
- CN202420449971.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The flow cross-section utilization rate of the bypass pipe of the existing gravel-packing screen pipe is low, and the mortar transportation capacity is limited, resulting in long construction time and serious formation pollution.
A bypass multi-point injection gravel filling screen is designed. The bypass pipe is connected through a sandblasting ring. The mortar is divided at the sandblasting ring. Part of it enters the annular space and the other part enters the downstream bypass pipe to ensure the uniformity of the mortar. Distribution and efficient delivery.
It improves the conveying capacity of the bypass pipe, avoids long construction time and formation contamination, and ensures a stable circulation pressure drop of the mortar.
Smart Images

Figure CN221856693U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of petroleum exploitation, in particular to a bypass multi-point injection type gravel filling screen pipe. Background Art
[0002] Gravel packing technology is a commonly used sand control method for horizontal wells. The mortar is introduced into the annulus of the screen (the annular space outside the screen) through the filling tool. The solid components in the mortar are blocked outside the screen, and the liquid components in the mortar enter the screen. The screen blocks the solid components, and the solid components block the formation sand, ultimately achieving the purpose of sand control.
[0003] The Chinese utility model patent with publication number CN110593825A provides an erosion-resistant filling bypass screen for oil field development, which integrates five bypass pipes, and at least two of the five bypass pipes are provided with one or more filling channels. Through the screw connection of the upper joint and the lower joint, multiple screens can be used in series, and the bypass pipes of each screen can be connected. At the beginning of construction, the outer annulus of the screen in the upper well section of the bridge plug (or desanding point) is filled first. Then it enters the mortar bypass transportation stage, at which time the bypass pipe guides the mortar to cross the bridge plug (or desanding point) and continue to transport it to the front, thereby eliminating the filling deficit area and effectively improving the circulation filling efficiency.
[0004] The above patents have many limitations in actual use. First, at least two bypass pipes are provided with more than one filling channel, resulting in low utilization rate of the flow section of the bypass pipe and limited mortar conveying capacity of the bypass pipe. Secondly, although the five bypass pipes can guarantee the overall conveying capacity of the mortar, due to the limitation of the size of the screen pipe, the five bypass pipes have the problem of excessively blocking the filtering surface of the screen pipe. Finally, since the main body of the screen pipe is independent of each other and the mortar in the bypass pipe is only collected at the end of the screen pipe, it is easy to cause uneven distribution of mortar flow in each bypass pipe. Moreover, when the construction enters the mortar bypass conveying stage, the circulating pressure drop of the mortar increases significantly because the flow section of the bypass pipe is smaller than the annular section outside the screen pipe. In order to avoid fracturing the reservoir and channeling the water layer, the mortar flow must be appropriately reduced, which will lead to excessive construction time and aggravate the contamination of the formation by the liquid components in the mortar. Utility Model Content
[0005] Based on the above problems existing in the prior art, the utility model provides a bypass multi-point injection gravel filling screen pipe, which has a bypass pipe with a larger flow cross-section, has a strong mortar conveying capacity and anti-clogging ability, can avoid the gravel filling bypass conveying stage construction time is too long, and effectively reduce the formation pollution.
[0006] The utility model adopts a technical solution to solve the technical problem: provide a gravel packing screen pipe, comprising a base pipe, a plurality of filter sand filling units sleeved outside the base pipe, and a sand blasting ring arranged between two adjacent filter sand filling units, each of the filter sand filling units comprises a bypass pipe for conveying mortar,
[0007] The sandblasting ring is configured to enable the bypass pipes to communicate with each other and to enable the bypass pipes to communicate with the annular space outside the screen pipe, so that the slurry transported in the bypass pipe of the upstream sand filter filling unit can be diverted at the sandblasting ring, resulting in a portion of the slurry flowing into the annular space and another portion of the slurry entering the bypass pipe of the downstream sand filter filling unit.
[0008] Furthermore, the sandblasting ring includes a first limiting portion, a second limiting portion arranged outside the first limiting portion, and a connecting portion arranged between the first limiting portion and the second limiting portion, the connecting portion is provided with a fourth through hole connecting two adjacent bypass pipes and extending axially, and the second limiting portion is provided with a fifth through hole connecting the fourth through hole and the annular space outside the screen tube and extending radially.
[0009] Furthermore, the first limiting portion and the second limiting portion define receiving grooves at both side end surfaces of the connecting portion that can be plugged into the ends of the sand filter filling units, so that the sandblasting ring can be installed between two adjacent sand filter filling units.
[0010] Furthermore, an annular flow channel connected to the fourth through hole is also provided in the connecting portion, and the flow channel is configured to gather the mortar in each of the bypass pipes located in the upstream direction of the sandblasting ring to distribute the mortar to the fifth through hole and each of the bypass pipes located in the downstream direction of the sandblasting ring.
[0011] Furthermore, the sand filter filling unit also includes a sand filter net sleeved outside the base pipe, a first protective tube arranged outside the sand filter net and used to protect the sand filter net, and a second protective tube for protecting the screen pipe. The sand filter filling unit is configured to allow the liquid component in the mortar to pass through the second protective tube and several sixth through holes on the first protective tube, the sand filter net, and several third through holes on the base pipe in sequence into the base pipe.
[0012] Furthermore, the sand filter filling unit also includes a support frame arranged between the first protective tube and the second protective tube, and the support frame is configured to radially support the first protective tube and the second protective tube so that the first protective tube and the second protective tube always remain coaxial, and the support frame is also configured to circumferentially support at least two of the bypass tubes so that the bypass tubes are always connected to the fourth through hole.
[0013] Furthermore, the support frame includes a plurality of axially extending connecting rods and a plurality of support plates arranged axially along the connecting rods, the side of the support plate close to the bypass pipe is provided with a concave surface capable of abutting against the bypass pipe, and the inner surface of the support plate is provided with a connecting groove so that the liquid component in the mortar can flow axially through the support plate.
[0014] Furthermore, the screen pipe also includes an upper connecting assembly connected to the upper end of the base pipe and a lower connecting assembly connected to the lower end of the base pipe, and the upper connecting assembly and the lower connecting assembly are configured to be interconnected and enable the bypass pipes of two adjacent screen pipes to be fluidically connected.
[0015] Furthermore, the upper connecting assembly includes a coupling for connecting the lower connecting assembly, an upper joint connected to the upper end of the base pipe, and an upper ring sleeve connected to the upper joint and the first sand filter filling unit, and the outer diameter of the first conveying part of the upper joint is smaller than the inner diameter of the upper ring sleeve, so that a first channel for mortar circulation is formed between the upper ring sleeve and the upper joint.
[0016] Furthermore, a first through hole extending radially is provided on the first conveying part, a second through hole extending axially is provided on the first boss of the first conveying part, and the first channel connects the first through hole and the second through hole, so that the mortar from the upstream adjacent screen pipe can flow from the first through hole through the first channel and the second through hole in sequence into the bypass pipe of the first filter sand filling unit.
[0017] Furthermore, the lower connecting assembly includes a central plug pipe connected to the lower end of the base pipe, a lower joint connected to the central plug pipe, and a lower ring sleeve connected to the lower joint and the last of the filter sand filling units. The outer diameter of the second conveying part of the lower joint is smaller than the inner diameter of the lower ring sleeve, so that a fourth channel for mortar circulation is formed between the lower ring sleeve and the lower joint.
[0018] Furthermore, a seventh through hole extending axially is provided on the second boss of the second conveying part, and an eighth through hole extending radially is also provided on the second conveying part. The fourth channel connects the seventh through hole and the eighth through hole, so that the mortar in the bypass pipe of the last filter sand filling unit can flow from the seventh through hole through the fourth channel and the eighth through hole in sequence and enter the downstream adjacent screen pipe.
[0019] Furthermore, the central insert is configured to be inserted into the upper joint and to form a second channel and a third channel interconnected with the upper joint and the lower joint, respectively, so that when two adjacent sieve tubes are connected, the eighth through hole of the upstream sieve tube and the first through hole of the downstream sieve tube are connected through the second channel and the third channel.
[0020] Beneficial effects of the utility model: The bypass multi-point injection gravel packing screen provided by the utility model has at least the following effects. First, the sandblasting ring is used to fill the annular space outside the screen, and the bypass pipe is completely used to transport mortar, so that the flow cross-section of the bypass pipe is fully utilized, effectively improving the conveying capacity of the bypass pipe. Furthermore, since the conveying capacity of the bypass pipe is effectively improved, even if it is limited by the size of the screen, the bypass pipe will not excessively block the filtering surface of the screen.
[0021] Secondly, the mortar in the bypass pipe is collected at the sandblasting ring, so that the mortar flow in each bypass pipe is evenly distributed, thereby effectively improving the conveying efficiency of the bypass pipe. If a bypass pipe is blocked, the mortar can be sandblasted around the blocked bypass pipe and then conveyed forward through other unblocked bypass pipes.
[0022] Finally, when the construction enters the mortar bypass transportation stage, the mortar circulation pressure drop is relatively stable due to the high transportation capacity of the bypass pipe. Therefore, there is no need to appropriately reduce the mortar flow rate, thereby shortening the construction time and reducing the pollution of the liquid components in the mortar to the formation. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0024] Figure 1 Shown is a structural cross-sectional view of a bypass multi-point injection gravel packing screen.
[0025] Figure 2 Shown Figure 1 AA section view of the mid-bypass multi-point injection gravel pack screen.
[0026] Figure 3 Shown is a structural cross-sectional view of the coupling.
[0027] Figure 4 Shown is a structural cross-sectional view of the upper joint.
[0028] Figure 5 Shown is a structural cross-sectional view of the upper ring sleeve.
[0029] Figure 6 Shown is a structural cross-sectional view of the base pipe.
[0030] Figure 7 Shown is a structural cross-sectional view of a sandblasting ring.
[0031] Figure 8 Shown is a structural cross-sectional view of a filter sand filling unit.
[0032] Fig. 9 Shown is a schematic structural diagram of the support frame.
[0033] Fig.10 Shown is a schematic diagram of the flow of mortar between filter sand filling units (arrows indicate the flow direction of the mortar).
[0034] Fig.11 Shown is a structural cross-sectional view of a central cannula.
[0035] Fig.12 Shown is a cross-sectional view of the lower joint
[0036] Fig.13 Shown is a structural cross-sectional view of the lower ring sleeve.
[0037] Fig.14 Shown is a schematic diagram of the flow of mortar between screen pipes (arrows indicate the flow direction of the mortar).
[0038] Among them, the reference numerals in the figure are: 100, screen tube; 10, upper connecting assembly; 11, coupling; 111, first thread; 112, second thread; 12, upper joint; 121, first connecting part; 122, first conveying part; 123, third thread; 124, fourth thread; 125, fifth thread; 126, first through hole; 127, first boss; 128, second through hole; 129, sealing groove; 1291, sealing ring; 13, upper ring sleeve; 131, sixth thread; 132, groove;
[0039] 20. base pipe; 21. seventh thread; 22. eighth thread; 23. third through hole;
[0040] 30. sandblasting ring; 31. first limiting portion; 32. connecting portion; 321. fourth through hole; 322. flow channel; 33. second limiting portion; 331. fifth through hole; 34. receiving groove;
[0041] 40. Sand filter filling unit; 41. Sand filter net; 42. First protection tube; 421. Sixth through hole; 43. Bypass tube; 44. Support frame; 441. Connecting rod; 442. Support plate; 4421. Concave surface; 4422. Connecting groove; 45. Second protection tube;
[0042] 50, lower connecting assembly; 51, central cannula; 511, ninth thread; 52, lower joint; 521, second conveying portion; 5211, second boss; 5212, seventh through hole; 5213, eighth through hole; 5214, stabilizing nail hole; 522, second connecting portion; 5221, tenth thread; 5222, eleventh thread; 523, stabilizing nail; 53, lower ring sleeve; 531, twelfth thread;
[0043] 61, first channel; 62, second channel; 63, third channel; 64, fourth channel. DETAILED DESCRIPTION
[0044] In order to make the technical problems, technical solutions and beneficial effects to be solved by the utility model clearer, the utility model is now described in detail in conjunction with the accompanying drawings. This figure is a simplified schematic diagram, which only illustrates the basic structure of the utility model in a schematic manner, so it only shows the composition related to the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0045] It should be noted that the directional terms or qualifiers "upper" and "lower" used in this application are all directed to the referenced Figure 1 Directional terms used in this application include "inward" refers to the direction close to the central axis of the gravel pack screen, "outward" refers to the direction away from the central axis of the gravel pack screen. "Upstream" refers to the direction close to the upper connecting assembly, and "downstream" refers to the direction close to the lower connecting assembly. "Axial" refers to the direction parallel to the axis of the gravel pack screen, and "radial" refers to the direction parallel to the diameter of the gravel pack screen.
[0046] refer to Figure 1 and Figure 2As shown, a bypass multi-point injection gravel packing screen pipe 100 provided by the utility model comprises a base pipe 20, an upper connecting assembly 10 installed at the upper end of the base pipe 20, a plurality of filter sand filling units 40 sleeved outside the base pipe 20, a sandblasting ring 30 arranged between the plurality of filter sand filling units 40, and a lower connecting assembly 50 installed at the lower end of the base pipe 20. The upper connecting assembly 10 is used to connect with a sand supply device (not shown) or a lower connecting assembly 50 of another screen pipe 100, and the mortar in the sand supply device or another screen pipe 100 can be transported to the bypass pipe 43 in the filter sand filling unit 40 through the upper connecting assembly 10. After being transported through the bypass pipe 43, the mortar can be sprayed out by the plurality of sandblasting rings 30 between the plurality of filter sand filling units 40. Under the filtering effect of the filter sand filling unit 40, the liquid component in the sprayed mortar re-enters the base pipe 20, while the solid component in the mortar remains in the annular space outside the screen pipe 100, thereby achieving the purpose of filling the annular space outside the screen pipe 100. The lower connecting assembly 50 can be used to install a plug (not shown) or to connect with the upper connecting assembly 10 of another screen pipe 100.
[0047] refer to Figure 1 and Figure 3-5 As shown, the upper connection assembly 10 includes a coupling 11 for connecting with the lower connection assembly 50 of the sand supply device or another screen pipe 100, an upper joint 12 connected to the coupling 11, and an upper ring 13 sleeved outside the upper joint 12 and the first filter sand filling unit 40. The coupling 11 is a hollow cylindrical structure with two ends open, and the coupling 11 is provided with a first thread 111 for connecting with the lower connection assembly 50 of the sand supply device or another screen pipe 100 and a second thread 112 for connecting with the upper joint 12. The first thread 111 is provided on the inner wall of the upper end of the coupling 11, and the second thread 112 is provided on the inner wall of the lower end of the coupling 11. In some other embodiments not shown, the connection between the coupling 11 and the sand supply device can also be clamped or bolted, and the connection between the coupling 11 and the upper joint 12 can also be clamped or bolted.
[0048] Combination Figure 1 and Figure 4As shown, in some embodiments, the upper joint 12 is generally a hollow cylindrical structure with two ends open, and the upper joint 12 includes a first connecting portion 121 and a first conveying portion 122 located below the first connecting portion 121. The first connecting portion 121 is provided with a third thread 123 for threading with the second thread 112 and a fourth thread 124 for connecting the upper ring sleeve 13. The end of the first conveying portion 122 close to the first connecting portion 121 is provided with a plurality of first through holes 126 penetrating the side wall of the upper joint 12, and the plurality of first through holes 126 are evenly arranged along the circumference of the upper joint 12. The inner wall of the end of the first conveying portion 122 away from the first connecting portion 121 is provided with a fifth thread 125 for connecting the base pipe 20. The outer wall of the end of the first conveying portion 122 away from the first connecting portion 121 is provided with a first boss 127, and the first boss 127 extends radially outward from the upper joint 12. At least two second through holes 128 are evenly arranged on the first boss 127 along its circumference, and the second through holes 128 penetrate the first boss 127 along the axial direction of the upper joint 12 .
[0049] refer to Figure 5 As shown, in some embodiments, the upper inner wall of the upper ring sleeve 13 is provided with a sixth thread 131 for threaded engagement with the fourth thread 124, and the lower inner wall of the upper ring sleeve 13 is provided with a groove 132 corresponding to the first boss 127. The inner diameter of the groove 132 is the same as the outer diameter of the first boss 127, so that the groove wall of the groove 132 can slide with the circumferential side wall of the first boss 127. The groove surface of the groove 132 can also abut against the table surface of the first boss 127 to ensure that the upper ring sleeve 13 and the upper joint 12 are installed in place.
[0050] Combination Figure 1 and Fig.14 As shown, when the upper connection assembly 10 is in the assembled state, the coupling 11 is connected to the lower connection assembly 50 of the sand supply device or another screen pipe 100 through the first thread 111. The coupling 11 is connected to the upper joint 12 by the threaded cooperation of the second thread 112 and the third thread 123. The upper joint 12 is connected to the upper ring sleeve 13 by the threaded cooperation of the fourth thread 124 and the sixth thread 131. Since the inner diameter of the upper ring sleeve 13 is larger than the outer diameter of the first conveying portion 122 of the upper joint 12, a first channel 61 for connecting the first through hole 126 and the second through hole 128 is formed between the upper ring sleeve 13 and the first conveying portion 122 of the upper joint 12. The mortar conveyed by the sand supply device can enter the bypass pipe 43 in the filter sand filling unit 40 through the first through hole 126, the first channel 61 and the second through hole 128 in sequence.
[0051] Recombination Figure 1 and Figure 4As shown, in some embodiments, a sealing groove 129 is further provided on the inner wall of the first conveying portion 122 of the upper joint 12, and a sealing ring 1291 is provided in the sealing groove 129. The sealing ring 1291 can seal the sand supply device and the lower end of the first conveying portion 122 of the upper joint 12 to prevent the liquid component in the refluxed mortar from mixing with the mortar conveyed by the sand supply device. The sealing ring 1291 can also seal the lower connection assembly 50 of another screen pipe 100 with the upper joint 12 to prevent the liquid component in the refluxed mortar from mixing with the mortar conveyed by another screen pipe 100.
[0052] Combination Figure 6 As shown, in some embodiments, the upper end of the base tube 20 is provided with a seventh thread 21 for threaded engagement with the fifth thread 125 on the inner wall of the first conveying portion 122, and the lower end of the base tube 20 is provided with an eighth thread 22 for connecting to the lower connecting assembly 50. A plurality of third through holes 23 for the liquid component to pass through are also provided on the side wall of the base tube 20. In some of the embodiments, according to the actual production or manufacturing requirements, the base tube 20 can adopt a split or integral structure.
[0053] refer to Figure 7 As shown, in some embodiments, the longitudinal cross section of the sandblasting ring 30 is substantially an I-shaped cross section. The sandblasting ring 30 includes a first limiting portion 31 close to one side of the base pipe 20, a second limiting portion 33 away from one side of the base pipe 20, and a connecting portion 32 arranged between the first limiting portion 31 and the second limiting portion 33. A fourth through hole 321 for inserting a bypass pipe 43 is provided on the connecting portion 32. A fifth through hole 331 is provided on the circumferential side wall of the second limiting portion 33 along the radial direction of the sandblasting ring 30, and the fifth through hole 331 is connected to the fourth through hole 321. Since both ends of the first limiting portion 31 and the second limiting portion 33 are higher than the end surface of the connecting portion 32, a receiving groove 34 for receiving the ends of the adjacent filter sand filling unit 40 is formed between the first limiting portion 31, the second limiting portion 33 and the connecting portion 32, thereby improving the stability of the connection between the filter sand filling unit 40 and the sandblasting ring 30.
[0054] In some embodiments, an annular flow channel 322 is further provided in the connecting portion 32, and the flow channel 322 connects all the fourth through holes 321, thereby connecting all the bypass pipes 43 on both sides of the sandblasting ring 30. The fifth through hole 331 can be directly connected to the fourth through hole 321, and the fifth through hole 331 can also be indirectly connected to the fourth through hole 321 through the flow channel 322. Since the sandblasting ring 30 connects all the bypass pipes 43 located upstream and downstream of the sandblasting ring 30 through the fourth through hole 321 and the flow channel 322, the mortar transported in the bypass pipe 43 located upstream of the sandblasting ring 30 can be timely and evenly distributed to each bypass pipe 43 downstream of the sandblasting ring 30 through the fourth through hole 321 and the flow channel 322, thereby effectively improving the transport efficiency of the bypass pipe 43. If a bypass pipe 43 is blocked, the mortar can bypass the blocked bypass pipe 43 through the sandblasting ring 30, and then continue to be transported forward through other unblocked bypass pipes 43.
[0055] In some other embodiments not shown, the fourth through hole 321 and the fifth through hole 331 are arranged at 90° intervals in the circumferential direction of the sandblasting ring 30. When the screen 100 is lowered into the horizontal wellbore, it is possible to prevent impurities such as mud cake or rock cuttings attached to the wellbore wall from directly entering the bypass pipe 43 through the fifth through hole 331 and the fourth through hole 321, thereby preventing the bypass pipe 43 from being blocked.
[0056] refer to Figure 8 As shown, the filter sand filling unit 40 includes a filter sand net 41 sleeved outside the base pipe 20, a first protection pipe 42 arranged outside the filter sand net 41, a bypass pipe 43 and a support frame 44 arranged outside the first protection pipe 42, and a second protection pipe 45 arranged on the side of the bypass pipe 43 and the support frame 44 away from the first protection pipe 42. After the mortar transported by the sand supply device or another screen pipe 100 passes through the first through hole 126, the first channel 61 and the second through hole 128 in sequence and enters the bypass pipe 43 in the filter sand filling unit 40, a part of the mortar passes through the fourth through hole 321 of the sand blasting ring 30 and is sprayed out from the fifth through hole 331, and another part of the mortar passes through the fourth through hole 321 and the flow channel 322 of the sand blasting ring 30 and enters the bypass pipe 43 in the adjacent filter sand filling unit 40. The sprayed mortar is filtered by the filter sand net 41 in the filter sand filling unit 40, and the solid components in the mortar fill the annular space outside the screen pipe 100. The liquid components in the mortar enter the base pipe 20 through the second protection pipe 45, the first protection pipe 42 and the sand filter 41 in sequence, and then flow back for reuse. This not only fills the annular space outside the screen pipe 100, achieving the purpose of sand prevention, but also prevents a large amount of liquid components in the mortar from entering the formation, thereby preventing the formation from being contaminated.
[0057] In some embodiments, the sand filter 41 is a cylinder made of a material having a filtering function, and the circumferential side walls of the sand filter 41 are all filtering surfaces. When the sand filter 41 is sleeved on the base pipe 20, the upper end surface of the sand filter 41 can abut against the lower end surface of the upper joint 12 or the lower end surface of the first limiting portion 31 of the sandblasting ring 30, and the lower end surface of the sand filter 41 can abut against the upper end surface of the lower connecting assembly 50 or the upper end surface of the first limiting portion 31 of another adjacent sandblasting ring 30.
[0058] In some embodiments, the first protection tube 42 and the second protection tube 45 are provided with a plurality of sixth through holes 421 for liquid components to pass through on the circumferential side walls. The first protection tube 42 and the second protection tube 45 are preferably made of hard materials, such as iron metal or iron alloy materials, so that the first protection tube 42 and the second protection tube 45 can respectively protect the sand filter 41 and the screen tube 100 as a whole. It can be understood that by controlling the size of the sixth through holes 421 and the relative size of the solid components in the mortar, the first protection tube 42 and the second protection tube 45 can play a preliminary filtering role on the mortar. When the first protection tube 42 and the second protection tube 45 are installed on the screen tube 100, the upper end faces of the first protection tube 42 and the second protection tube 45 can abut against the lower end face of the first boss 127 or the lower end face of the connecting portion 32 of the sandblasting ring 30, and the lower end faces of the first protection tube 42 and the second protection tube 45 can abut against the upper end face of the lower connecting assembly 50 or the upper end face of the connecting portion 32 of another adjacent sandblasting ring 30. That is, the upper ends or lower ends of the first protection tube 42 and the second protection tube 45 can be inserted into the receiving groove 34 of the adjacent sandblasting ring 30 , thereby improving the stability of the connection between the sand filter filling unit 40 and the sandblasting ring 30 .
[0059] Recombination Figure 8 As shown, in some embodiments, the cross section of the bypass pipe 43 is waist-shaped. One side of the bypass pipe 43 is in close contact with the outer wall of the first protection tube 42, and the other side of the bypass pipe 43 is in close contact with the inner wall of the second protection tube 45. The end of the bypass pipe 43 can be inserted into the second through hole 128 of the first boss 127 or the fourth through hole 321 of the sandblasting ring 30. In order to ensure the tightness of the connection between the bypass pipe 43 and the second through hole 128, the second through hole 128 on the first boss 127 is a waist-shaped hole.
[0060] Combination Figure 2As shown, when the bypass pipe 43 is installed on the screen pipe 100, the side wall of the bypass pipe 43 will cover part of the filtering surface of the sand filter net 41, affecting the filtering efficiency of the sand filter net 41. In this embodiment, two bypass pipes 43 are provided, and the two bypass pipes 43 are evenly arranged along the circumference of the screen pipe 100. Since the two bypass pipes 43 transport the mortar to the sandblasting ring 30, the sandblasting ring 30 sprays the mortar to the annular space outside the screen pipe 100. Therefore, the flow cross-section of the two bypass pipes 43 is fully utilized, and there is no need to increase the flow cross-section by increasing the number of bypass pipes 43, thereby avoiding excessive covering of the filtering surface of the sand filter net 41, thereby maintaining the stability of the mortar circulation pressure drop.
[0061] In some of the embodiments, considering the cross-sectional size of the screen 100 and the actual construction requirements, three, four or six bypass pipes 43 can be provided, as long as the mortar circulation pressure drop is stable. It is understandable that in some other embodiments, the circumferential span of the bypass pipe 43 relative to the screen 100 can be increased, and the thickness of the filling pipe 43 can be reduced, so that the flow cross-section of the filling pipe 43 remains unchanged, thereby increasing the specifications of the base pipe 20 while maintaining a reasonable outer diameter of the screen 100, thereby meeting the requirements of some oil production and well repair operations for a large diameter screen 100.
[0062] Combination Figure 2 , Figure 8 and Fig. 9 As shown, in some embodiments, the support frame 44 includes a plurality of connecting rods 441 parallel to the axial direction of the screen tube 100 and a plurality of supporting plates 442 uniformly arranged along the axial direction of the connecting rods 441. The plurality of supporting plates 442 are generally arc-shaped, one side of the plurality of supporting plates 442 abuts against the outer wall of the first protection tube 42, and the other side of the plurality of supporting plates 442 abuts against the inner wall of the second protection tube 45. The side of the plurality of supporting plates 442 close to the bypass tube 43 is provided with a concave surface 4421, and the concave surface 4421 can abut against the longitudinal end surface of the bypass tube 43. The side of the plurality of supporting plates 442 close to the first protection tube 42 is also provided with a connecting groove 4422, so that the liquid component in the mortar can freely flow along the axial direction of the sand filter net 41 through the supporting plate 442, thereby improving the filtering efficiency of the sand filter net 41. By providing the support frame 44, the first protection tube 42 and the second protection tube 45 can be supported in the radial direction of the screen tube 100, so that the first protection tube 42 and the second protection tube 45 always have good coaxiality. The support frame 44 can also support the bypass pipe 43 in the circumferential direction of the screen pipe 100 , so that the bypass pipe 43 is always connected with the second through hole 128 of the first boss 127 or the fourth through hole 321 of the sandblasting ring 30 .
[0063] Combination Fig.10As shown, the first process of mortar flowing from the filter sand filling unit 40a to the filter sand filling unit 40b is as follows. The mortar in the bypass pipe 43a flows to the fourth through hole 321 of the sandblasting ring 30, wherein a part of the mortar enters the annular space outside the screen tube 100 through the fifth through hole 331, and the other part of the mortar directly passes through the fourth through hole 321 and enters the bypass pipe 43b of the filter sand filling unit 40b. By analogy, each time the mortar passes through a sandblasting ring 30, a part of the mortar enters the annular space outside the screen tube 100 through the fifth through hole 331 and fills it, thereby achieving the purpose of multi-point injection filling. The other part of the mortar is evenly distributed to each bypass pipe 43b of the filter sand filling unit 40b through the flow channel 332, and then continues to be transported downstream.
[0064] refer to Figure 1 and Figure 11-14 As shown, the lower connection assembly 50 includes a central insert pipe 51 connected to the base pipe 20, a lower joint 52 connected to the central insert pipe 51, and a lower ring sleeve 53 sleeved on the lower joint 52 and the last filter sand filling unit 40. The central insert pipe 51 is a hollow cylindrical structure with two ends open, and the inner wall of the upper end of the central insert pipe 51 is provided with a ninth thread 511 for threaded engagement with the eighth thread 22 at the lower end of the base pipe 20. The lower end of the central insert pipe 51 can be inserted into the coupling 11 and the upper joint 12 of the upper connection assembly 10 of another adjacent screen pipe 100, and is sealed with the upper joint 12 through a sealing ring 1291. Since the inner diameter of the upper joint 12 is larger than the outer diameter of the central insert pipe 51, a second channel 62 for mortar circulation is formed between the central insert pipe 51 and the upper joint 12.
[0065] Combination Fig.12 As shown, in some embodiments, the lower joint 52 is also a hollow cylindrical structure with two ends open, and the lower joint 52 includes a second conveying portion 521 and a second connecting portion 522 located below the second conveying portion 521. A second boss 5211 is provided on the outer wall of one end of the second conveying portion 521 away from the second connecting portion 522, and the second boss 5211 extends radially outward from the lower joint 52, and a seventh through hole 5212 for inserting the bypass pipe 43 is provided on the second boss 5211. The second conveying portion 521 is also provided with an eighth through hole 5213 for mortar circulation and a stabilizing nail hole 5214 for installing a stabilizing nail 523. The second connecting portion 522 is provided with a tenth thread 5221 for connecting the lower ring sleeve 53 and an eleventh thread 5222 for threading with the first thread 111 of the coupling 11.
[0066] Combination Fig.13 As shown, in some embodiments, the inner wall of the lower end of the lower ring sleeve 53 is provided with a twelfth thread 531 threadedly engaged with the tenth thread 5221 .
[0067] Combination Figure 1 and Fig.14 As shown, when the lower connection assembly 50 is in the assembled state, the central insert 51 is connected to the lower end of the base pipe 20 by the threaded fit of the ninth thread 511 and the eighth thread 22. The lower joint 52 is connected to the central insert 51 by the stabilizing nail 523 installed in the stabilizing nail hole 5214, and a third channel 63 for mortar circulation is formed between the central insert 51 and the lower joint 52. The lower joint 52 is connected to the lower ring sleeve 53 by the threaded fit of the tenth thread 5221 and the twelfth thread 531. Since the inner diameter of the lower ring sleeve 53 is larger than the outer diameter of the second conveying portion 521 of the lower joint 52, a fourth channel 64 for connecting the seventh through hole 5212 and the eighth through hole 5213 is formed between the lower ring sleeve 53 and the second conveying portion 521 of the lower joint 52. The mortar in the bypass pipe 43 can enter the third channel 63 between the central insert 51 and the lower joint 52 through the seventh through hole 5212, the fourth channel 64 and the eighth through hole 5213 in sequence.
[0068] Combination Fig.14 As shown, the second process of the mortar flowing from the screen pipe 100c to the screen pipe 100d is as follows. The mortar enters the fourth channel 64 through the bypass pipe 43c in the upper screen pipe 100c and the seventh through hole 5212c of the lower joint 52c, and then enters the third channel 63 and the second channel 62 in sequence through the eighth through hole 5213c of the lower joint 52c, and then enters the first channel 61 of the screen pipe 100d through the first through hole 126d of the upper joint 12d, and finally enters the bypass pipe 43d of the screen pipe 100d through the second through hole 128d of the upper joint 12d.
[0069] In the actual construction process, the technicians first connect several bypass multi-point jet gravel packing screens 100 in series to form a production string, and then lower them to the designated position in the horizontal wellbore. After the filling construction begins, the mortar will be preferentially transported forward through the annular space outside the screen 100 until it encounters a bridge blockage point. In the annular space outside the screen 100 in front of the bridge blockage point, the solid components in the mortar continue to deposit until the annular space in front of the bridge blockage point is filled densely to form a filling belt. At this time, the mortar is forced to enter the bypass pipe 43 of the screen 100 at the front end of the horizontal wellbore, cross the formed filling belt and enter the annular space outside the screen 100 behind the bridge blockage point, and the construction thus enters the bypass transportation stage. In the bypass transportation stage, the mortar performs the first process and the second process multiple times in the screen 100 pipe string behind the bridge blockage point. The mortar enters the annular space and continuously deposits solid components until the annular space outside the screen 100 of the entire horizontal wellbore is filled densely.
[0070] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, it can be a mechanical connection, it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0071] It should be understood that the terms "length", "width", "up", "down", "front and back", "left and right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0072] The above is based on the ideal embodiment of the utility model. Through the above description, relevant staff can make various changes and modifications without departing from the scope of the utility model. The technical scope of this utility model is not limited to the content in the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A bypass multi-point injection gravel packing screen, It is characterized in that The invention comprises a base pipe (20), a plurality of filter sand filling units (40) sleeved outside the base pipe (20), and a sand blasting ring (30) arranged between two adjacent filter sand filling units (40), each of the filter sand filling units (40) comprising a bypass pipe (43) for conveying mortar. The sandblasting ring (30) is configured to enable the bypass pipes (43) to communicate with each other and to enable the bypass pipe (43) to communicate with the annular space outside the screen pipe (100), so that the mortar transported in the bypass pipe (43) of the upstream sand filter filling unit (40) can be diverted at the sandblasting ring (30), resulting in a portion of the mortar flowing into the annular space and another portion of the mortar entering the bypass pipe (43) of the downstream sand filter filling unit (40).
2. The bypass multi-point injection gravel packing screen according to claim 1, It is characterized in that The sandblasting ring (30) comprises a first limiting portion (31), a second limiting portion (33) arranged outside the first limiting portion (31), and a connecting portion (32) arranged between the first limiting portion (31) and the second limiting portion (33), wherein the connecting portion (32) is provided with a fourth through hole (321) connecting two adjacent bypass pipes (43) and extending in the axial direction, and the second limiting portion (33) is provided with a fifth through hole (331) connecting the fourth through hole (321) and the annular space outside the screen tube (100) and extending in the radial direction.
3. The bypass multi-point injection gravel packing screen according to claim 2, It is characterized in that The first limiting portion (31) and the second limiting portion (33) define receiving grooves (34) capable of being plugged into the ends of the sand filter filling units (40) at the end surfaces on both sides of the connecting portion (32), so that the sand blasting ring (30) can be installed between two adjacent sand filter filling units (40).
4. The bypass multi-point injection gravel packing screen according to claim 2, It is characterized in that The connecting portion (32) is also provided with an annular flow channel (322) connected to the fourth through hole (321), and the flow channel (322) is configured to converge the mortar in each of the bypass pipes (43) located in the upstream direction of the sandblasting ring (30) so as to distribute the mortar to the fifth through hole (331) and each of the bypass pipes (43) located in the downstream direction of the sandblasting ring (30).
5. The bypass multi-point injection gravel packing screen according to any one of claims 2 to 4, It is characterized in that The sand filter filling unit (40) further comprises a sand filter net (41) sleeved outside the base pipe (20), a first protection pipe (42) arranged outside the sand filter net (41) and used to protect the sand filter net (41), and a second protection pipe (45) used to protect the screen pipe (100). The sand filter filling unit (40) is configured to allow liquid components in the mortar to enter the base pipe (20) in sequence through the second protection pipe (45), a plurality of sixth through holes (421) on the first protection pipe (42), the sand filter net (41), and a plurality of third through holes (23) on the base pipe (20).
6. The bypass multi-point injection gravel packing screen according to claim 5, It is characterized in that The sand filter filling unit (40) further comprises a support frame (44) arranged between the first protection tube (42) and the second protection tube (45), wherein the support frame (44) is configured to radially support the first protection tube (42) and the second protection tube (45), so that the first protection tube (42) and the second protection tube (45) always remain coaxial, and the support frame (44) is also configured to circumferentially support at least two bypass tubes (43), so that the bypass tubes (43) are always connected to the fourth through hole (321).
7. The bypass multi-point injection gravel packing screen according to claim 6, It is characterized in that The support frame (44) includes a plurality of axially extending connecting rods (441) and a plurality of support plates (442) axially arranged along the connecting rods (441); the side of the support plate (442) close to the bypass pipe (43) is provided with a concave surface (4421) capable of abutting against the bypass pipe (43); the inner surface of the support plate (442) is provided with a connecting groove (4422) so that the liquid component in the mortar can flow axially through the support plate (442).
8. The bypass multi-point injection gravel packing screen according to any one of claims 1 to 4, It is characterized in that The screen pipe (100) further comprises an upper connection assembly (10) connected to the upper end of the base pipe (20) and a lower connection assembly (50) connected to the lower end of the base pipe (20); the upper connection assembly (10) and the lower connection assembly (50) are configured to be interconnected and to allow the bypass pipes (43) of two adjacent screen pipes (100) to be fluidically connected.
9. The bypass multi-point injection gravel packing screen according to claim 8, It is characterized in that The upper connection assembly (10) comprises a coupling (11) for connecting to a lower connection assembly (50), an upper joint (12) connected to the upper end of the base pipe (20), and an upper ring sleeve (13) connected to the upper joint (12) and the first filter sand filling unit (40), wherein the lower part of the upper joint (12) has a first conveying portion (122), and the outer diameter of the first conveying portion (122) is smaller than the inner diameter of the upper ring sleeve (13), so that a first channel (61) for mortar circulation is formed between the upper ring sleeve (13) and the upper joint (12).
10. The bypass multi-point injection gravel packing screen according to claim 9, It is characterized in that The first conveying portion (122) is provided with a first through hole (126) extending radially, the first boss (127) of the first conveying portion (122) is provided with a second through hole (128) extending axially, and the first channel (61) is connected with the first through hole (126) and the second through hole (128), so that mortar from upstream can flow from the first through hole (126) through the first channel (61) and the second through hole (128) in sequence and enter the bypass pipe (43) of the first sand filter filling unit (40) of the screen pipe (100).
11. The bypass multi-point injection gravel packing screen according to claim 10, It is characterized in that The lower connection assembly (50) comprises a central insert pipe (51) connected to the lower end of the base pipe (20), a lower joint (52) connected to the central insert pipe (51), and a lower ring sleeve (53) connected to the lower joint (52) and the last of the filter sand filling units (40), wherein the upper portion of the lower joint (52) has a second conveying portion (521), the outer diameter of the second conveying portion (521) being smaller than the inner diameter of the lower ring sleeve (53), so that a fourth channel (64) for mortar circulation is formed between the lower ring sleeve (53) and the lower joint (52).
12. The bypass multi-point injection gravel packing screen according to claim 11, It is characterized in that A seventh through hole (5212) extending axially is provided on the second boss (5211) of the second conveying portion (521), and an eighth through hole (5213) extending radially is also provided on the second conveying portion (521), and the fourth channel (64) is connected to the seventh through hole (5212) and the eighth through hole (5213), so that the mortar in the bypass pipe (43) of the last filter sand filling unit (40) can flow from the seventh through hole (5212) through the fourth channel (64) and the eighth through hole (5213) in sequence and flow downstream.
13. The bypass multi-point injection gravel packing screen according to claim 12, It is characterized in that The central insert (51) is configured to be inserted into the upper joint (12) and to form a second channel (62) and a third channel (63) that are interconnected with the upper joint (12) and the lower joint (52), respectively, so that when two adjacent sieve tubes (100) are connected, the eighth through hole (5213) of the sieve tube (100) located upstream and the first through hole (126) of the sieve tube (100) located downstream are connected via the second channel (62) and the third channel (63).