Filling structure for filling cementing material for mine
By designing a strip-shaped mining filling cementitious material filling structure, using yellow phosphorus slag to replace cement and combining concrete and gravel layers, the problem of high cost and resource waste of mining filling cementitious materials has been solved, and the cost has been achieved. It reduces and improves strength, and promotes the resource utilization of yellow phosphorus tailings slag, providing technical support for green and low-carbon development of mines.
Patent Information
- Application Number
- CN202323333786.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-07
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-07
AI Technical Summary
Existing mining filling cementitious materials are high in cost, waste resources and lack adaptability, and cannot effectively utilize different types of yellow phosphorus tailings slag.
A strip-shaped mining filling cementitious material is used to fill the structure. It is prepared through a specific mass ratio of water, tailings, phosphorus slag powder, phosphogypsum, and cement. Yellow phosphorus slag is used to replace cement, and the filling body is composed of concrete and gravel layers. , and during the curing process, the volcanic ash effect of yellow phosphorus slag is used to improve the compressive strength.
It reduces the mine filling cost by 35%, improves the strength of the filling body, and realizes the resource utilization of yellow phosphorus tailings slag, providing green, low-carbon and high-quality development technical support for the mine.
Smart Images

Figure CN221856796U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building materials, and in particular relates to a filling structure of a mining filling gelling material. Background Art
[0002] Existing cementitious materials for mine filling mainly use cement, gypsum and other materials as raw materials, and are made through mixing, stirring, curing and other processes. This type of cementitious material has high strength and stability and can meet the requirements of mine filling. However, this existing solution has the following defects:
[0003] 1. High cost: The cost of using raw materials such as cement and gypsum to make mining filling cementitious materials is relatively high. In addition, the supply of these raw materials is limited and the prices fluctuate greatly, which brings certain pressure to production.
[0004] 2. Waste of resources: Traditionally, yellow phosphorus tailings are disposed of as waste and have not been effectively utilized, which not only puts pressure on the environment but also wastes its potential utilization value.
[0005] 3. Lack of adaptability: This existing solution may not achieve the best utilization effect for different types of yellow phosphorus tailings because the composition and properties of different types of yellow phosphorus tailings may be different.
[0006] Therefore, it is necessary to develop a new synthetic structure of mining filling cementitious materials. Summary of the invention
[0007] The purpose of the utility model is to make up for the shortcomings of the prior art and provide a filling structure of a mine filling cementitious material, aiming to reduce the mine filling cost, improve the filling safety and quality, and at the same time realize the efficient conversion and utilization of yellow phosphorus tailings powder resources.
[0008] The technical solution of this utility model:
[0009] A filling structure of a cementitious filling material for mining, the filling structure is in a strip shape, the filling structure is divided into a top and a bottom, and two seals are respectively provided from bottom to top, the bottom seal is provided with a bottom sealing first filling layer and a bottom sealing second filling layer, the top seal is provided with a top sealing first filling layer and a top sealing second filling layer, a first filling body is provided between the bottom sealing first filling layer and the top sealing first filling layer, and a second filling body and a third filling body are provided in sequence above the first filling body between the bottom sealing second filling layer and the top sealing second filling layer.
[0010] Preferably, steel membranes are provided on both sides of the filling structure.
[0011] Preferably, the sealing first filling layer, the bottom sealing second filling layer, the top sealing first filling layer and the top sealing second filling layer are slurry layers.
[0012] Preferably, the first filling body and the second filling body are composed of concrete layers on both sides and a crushed stone layer in the middle.
[0013] Preferably, the first filling body is 1.2-1.7 meters high and 5-7 meters wide, the concrete layers on both sides are 0.5-1.5 meters wide, and the gravel layer is 3.5-4.5 meters wide.
[0014] Preferably, the third filling body is 0.7-0.8 meters high and is made of a slurry layer.
[0015] Preferably, the mass ratio of water, tailings, phosphorus slag powder, phosphogypsum and cement is (15-25):(62-65):(8.5-9):(1.4-1.8):(5.4-5.8).
[0016] Preferably, the mass ratio of water, waste rock, tailings, phosphorus slag powder, phosphogypsum and cement in the concrete layer (9) is (15-25): (35-45): (30-35): (4-4.8): (0.6-1.2): (2.4-3.2).
[0017] The utility model has the following beneficial effects:
[0018] The utility model is a technology and method for preparing filling cementitious materials by using yellow phosphorus slag to replace cement, which can not only significantly reduce the mine filling cost by 35%, but also effectively improve the strength of the cemented filling body. At the same time, the method realizes the resource utilization of yellow phosphorus tailings, and provides technical support for the green, low-carbon and high-quality development of underground mines. The use of yellow phosphorus slag to partially replace cement as a cementitious material to prepare the filling body will reduce the compressive strength of the filling body, and as the amount of yellow phosphorus slag increases, the greater the reduction in the compressive strength of the filling body. However, as the curing age increases, due to the volcanic ash effect of yellow phosphorus slag, the compressive strength of the filling body mixed with yellow phosphorus slag in the later stage of curing continues to increase, and it is even possible to exceed the compressive strength of the pure cement filling body. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 : The utility model is a filling structure of a mine-filling gelling material;
[0020] Figure 2 : The first filling body and the second filling body structure of the utility model;
[0021] Among them: bottom sealing first filling layer 1 and bottom sealing second filling layer 2, top sealing first filling layer 3, top sealing second filling layer 4, first filling body 5, second filling body 6, third filling body 7, steel membrane 8, concrete layer 9, gravel layer 10. DETAILED DESCRIPTION
[0022] The following will be combined with the specific embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example 1
[0024] A filling structure of a cementitious filling material for mining, the filling structure is in the shape of a strip, the filling structure is divided into a top and a bottom, and two seals are respectively provided from bottom to top, the bottom seal is provided with a bottom sealing first filling layer 1 and a bottom sealing second filling layer 2, the top seal is provided with a top sealing first filling layer 3 and a top sealing second filling layer 4, a first filling body 5 is provided between the bottom sealing first filling layer 1 and the top sealing first filling layer 3, and a second filling body 6 and a third filling body 7 are provided in sequence above the first filling body 5 between the bottom sealing second filling layer 2 and the top sealing second filling layer 4.
[0025] Preferably, steel films 8 are provided on both sides of the filling structure. Preferably, the sealing first filling layer 1, the bottom sealing second filling layer 2, the top sealing first filling layer 3 and the top sealing second filling layer 4 are slurry layers.
[0026] Preferably, the first filling body 5 and the second filling body 6 are composed of concrete layers 9 on both sides and a crushed stone layer 10 in the middle. Preferably, the first filling body 5 is 1.2-1.7 meters high and 5-7 meters wide, the concrete layers 9 on both sides are 0.5-1.5 meters wide, and the crushed stone layer 10 is 3.5-4.5 meters wide. Preferably, the third filling body 7 is 0.7-0.8 meters high and made of a slurry layer.
[0027] The slurry layer includes, by mass fraction, 20% water, 64% tailings, 8.8% phosphorus slag powder, 1.6% phosphogypsum, and 5.6% cement. The slurry layer includes, by mass fraction, 20% water, 40% waste rock, 32% tailings, 4.4% phosphorus slag powder, 0.8% phosphogypsum, and 2.8% cement.
[0028] The operation process of this utility model:
[0029] Step 1: dig the foundation trench;
[0030] Step 2: The bottom of the first sealing layer corresponds to the first filling layer 1 of the bottom sealing;
[0031] Step 3: Fill the foundation trench with the first layer, 1.5 meters high, corresponding to the first filling body 5;
[0032] Step 4: The second layer of sealing is connected to the top and bottom, which corresponds to the second filling layer 2 of the bottom sealing;
[0033] Step 5: The second layer is filled to a height of 1.5 meters, corresponding to the second filling body 4;
[0034] Step 6: The top of the first sealing layer corresponds to the top sealing first filling layer 3;
[0035] Step 7: The third layer is filled to 0.8 meters and the top corresponds to the third filling body 5;
[0036] Step 8: Sealing the top portion corresponds to sealing the second filling layer 4 at the top portion.
[0037] Note: The tunnel height is 3.8 meters, and the seals are divided into bottom and top. The bottom seal will be constructed first.
[0038] The above are only relatively preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A filling structure of a mining filling cementitious material, characterized in that: The filling structure is in the shape of a strip. The filling structure is divided into a top and a bottom. Two seals are respectively provided from bottom to top. The bottom seal is provided with a bottom seal first filling layer (1) and a bottom seal second filling layer (2). The top seal is provided with a top seal first filling layer (3) and a top seal second filling layer (4). A first filling body (5) is provided between the bottom seal first filling layer (1) and the top seal first filling layer (3). A second filling body (6) and a third filling body (7) are provided in sequence above the first filling body (5) between the bottom seal second filling layer (2) and the top seal second filling layer (4).
2. The filling structure of the mining filling cementitious material according to claim 1 is characterized in that: Steel membranes (8) are provided on both sides of the filling structure.
3. The filling structure of the mining filling cementitious material according to claim 1 is characterized in that: The sealing first filling layer (1), the bottom sealing second filling layer (2), the top sealing first filling layer (3) and the top sealing second filling layer (4) are slurry layers.
4. The filling structure of the mining filling cementitious material according to claim 1 is characterized in that: The first filling body (5) and the second filling body (6) are composed of concrete layers (9) on both sides and a crushed stone layer (10) in the middle.
5. The filling structure of the mining filling cementitious material according to claim 1 is characterized in that: The first filling body (5) has a height of 1.2-1.7 meters and a width of 5-7 meters. The widths of the concrete layers (9) on both sides are 0.5-1.5 meters respectively, and the width of the crushed stone layer (10) is 3.5-4.5 meters.
6. The filling structure of the mining filling cementitious material according to claim 1 is characterized in that: The third filling body (7) is 0.7-0.8 meters high and is made of a slurry layer.