Geological investigation and detection equipment for preventing debris flow
By introducing the limit structure and lifting structure into the geological survey and testing equipment, the problem of the equipment being inconvenient to remove soil is solved, and convenient soil sampling and efficient work processes are achieved.
Patent Information
- Application Number
- CN202420205581.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-09-11
AI Technical Summary
Existing geological survey and testing equipment used to prevent debris flow is inconvenient to remove soil, resulting in low applicability.
A geological survey and testing equipment including a chassis, running wheels, limiting structure, lifting structure and fixed structure is designed. Through components such as limiting plates, servo motors, threaded rods and drill bits, soil removal, limiting and lifting are facilitated. function.
It improves the applicability and convenience of the equipment during use, enhances work efficiency, and makes soil sampling more convenient and efficient.
Smart Images

Figure CN221859983U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological survey and detection equipment, in particular to a geological survey and detection equipment used for preventing debris flow. Background Art
[0002] The outbreak of debris flow has caused serious disasters and damage to humans and nature. It is necessary to detect the soil that is prone to debris flow. Therefore, a geological survey and detection equipment for preventing debris flow will be used;
[0003] To this end, the patent with publication number CN215833040U discloses a rock and soil detection device for preventing debris flow; a through hole is opened above the base, the support frame is fixedly connected to the base and is located above the base, the height movement mechanism is arranged on the support frame, the sampling mechanism is arranged on the height movement mechanism, the first motor is fixedly connected to the support frame and is located above the support frame, the number of threaded rods is two, the two threaded rods pass through the top of the support frame respectively, and are symmetrically arranged on both sides of the threaded rods, and one end of the two threaded rods is respectively rotatably connected to the base, the number of rotating wheels is two, the two rotating wheels are respectively sleeved on the outside of the corresponding threaded rods, and the belt is sleeved on the outside of the two rotating wheels. Through the above mechanism arrangement, the device saves time and effort during detection, and greatly improves the efficiency of detection;
[0004] When the above-mentioned rock and soil detection device for preventing debris flow is used, the operator can remove the rock and soil samples on the sampling mechanism for observation and detection through the mutual cooperation between the installed components. However, it is inconvenient to remove the soil during use, which makes it less suitable for use. Utility Model Content
[0005] The utility model aims to provide a geological survey and detection device for preventing debris flow, so as to solve the defect that the existing geological survey and detection device for preventing debris flow is inconvenient to take out soil.
[0006] In order to solve the above technical problems, the utility model provides the following technical solutions: a geological survey and detection device for preventing debris flow, comprising a chassis and running wheels;
[0007] A support plate is fixed on one side of the top of the base frame, a push handle is fixed on one side of the top of the support plate, walking wheels are evenly installed on both sides of the base frame, and a limiting structure is provided on the outer wall of the base frame on one side of the walking wheel;
[0008] A fixing seat is fixed at the top of the base frame, a lifting structure is arranged inside the fixing seat, a fixing plate is arranged on one side of the lifting structure, a driving motor is installed at the top of the fixing plate, a drill rod is passed through the fixing plate, and a drill bit is installed at the bottom end of the drill rod;
[0009] A through groove is provided on one side of the drill bit, and fixing blocks are fixed on the inner walls of the drill bit at both ends of the through groove, and a fixing structure is provided inside the through groove, and the fixing structure includes a clamping groove, a clamping block, a reserved groove, a baffle and a groove, and the baffle is provided inside the through groove, and grooves are provided at both ends of the baffle away from the fixed block, a clamping groove is provided inside the fixed block on one side of the groove, a clamping block is provided inside the clamping groove, and a reserved groove is provided inside the clamping block.
[0010] When the device is used, by providing a fixed structure, the function of the device being easy to remove soil is realized, thereby improving the applicability of the geological survey and detection equipment for preventing mudslides when in use; by providing a limited position structure, the function of the device being easy to limit is realized, thereby improving the convenience of the geological survey and detection equipment for preventing mudslides when in use; by providing a lifting structure, the function of the device being easy to lift is realized, thereby improving the work efficiency of the geological survey and detection equipment for preventing mudslides when in use.
[0011] Preferably, the limiting structure includes a limiting plate, a first magnetic block and a second magnetic block. The limiting plate is hinged on the outer wall of the base frame on one side of the walking wheel. The second magnetic block is fixed to the top of the base frame above the limiting plate. The first magnetic block is arranged on the side of the limiting plate close to the base frame.
[0012] Preferably, one side of the bottom of the limit plate is inclined, and the limit plates are symmetrically distributed on both sides of the chassis. The limit plate is rotated to separate the first magnetic block from the second magnetic block, and at this time, one end of the limit plate moves to one side of the running wheel, and under the action of the limit plate, the running wheel stops moving.
[0013] Preferably, the lifting structure includes a servo motor, a threaded rod, a movable seat and a fixed rod. The threaded rod is arranged inside the fixed seat, a servo motor is installed on the outer wall of the fixed seat at the top of the threaded rod, the outer side of the threaded rod is threadedly connected to the movable seat, and a fixed rod passes through one side of the movable seat.
[0014] Preferably, the top end of the threaded rod passes through the fixed seat and is fixedly connected to the output end of the servo motor, and the movable seat and the fixed rod form a sliding structure. When the servo motor is started, the servo motor drives the threaded rod to rotate inside the fixed seat, and the threaded rod drives the movable seat to move outside the threaded rod, and the movable seat slides outside the fixed rod.
[0015] Preferably, one end of the movable seat extends to the outside of the fixed seat and is fixedly connected to one side of the fixed plate, and both ends of the fixed rod are fixedly connected to the inner wall of the fixed seat. Under the action of the fixed rod, the movable seat is prevented from rotating with the threaded rod, and the movable seat drives the fixed plate to move up and down, and the driving motor is started. The driving motor drives the drill bit to rotate through the drill rod, so that the drill bit samples the soil.
[0016] Preferably, the top end of the drill rod passes through a fixing plate and is fixedly connected to an output end of a driving motor, and the bottom end of the drill bit is evenly provided with saw teeth.
[0017] Preferably, the clamping block and the fixed block form a clamping structure through a clamping groove, one end of the clamping block extends to the outside of the fixed block and is fixedly connected to the baffle, and the main cross-section of the groove is designed in an "L" shape. The baffle is moved to the inside of the through groove through the groove, so that one end of the clamping block contacts one end of the clamping groove, and the baffle is pushed. Under the action of the reserved groove, the baffle drives the clamping block to move to the inside of the clamping groove, thereby fixing the baffle and the drill bit to each other. After the drill bit samples the soil, the "L"-shaped design of the groove provides a force point for the finger, and the baffle is pulled through the groove, thereby separating the baffle and the fixed block from each other, and moving the baffle to the outside of the drill bit, so that the soil inside the drill bit can be easily removed.
[0018] The utility model provides a geological survey and detection device for preventing debris flow, which has the advantages of:
[0019] By providing a fixing structure, the baffle is moved to the inside of the through groove through the groove, so that one end of the clamping block contacts one end of the clamping groove, and the baffle is pushed. Under the action of the reserved groove, the baffle drives the clamping block to move to the inside of the clamping groove, so that the baffle and the drill bit are fixed to each other. When the drill bit samples the soil, the "L"-shaped design of the groove provides a force point for the finger, and the baffle is pulled through the groove, so that the baffle and the fixed block are separated from each other, and the baffle is moved to the outside of the drill bit, so that the soil inside the drill bit can be easily taken out, thereby realizing the function of the device to facilitate soil removal, thereby improving the applicability of the geological survey and detection equipment for preventing debris flow when in use;
[0020] By setting a limit structure and rotating the limit plate, the first magnetic block and the second magnetic block are separated from each other. At this time, one end of the limit plate moves to one side of the running wheel. Under the action of the limit plate, the running wheel stops moving, realizing the function of facilitating the limit of the device, thereby improving the convenience of the geological survey and detection equipment for preventing debris flow when in use;
[0021] By providing a lifting structure, starting the servo motor, the servo motor drives the threaded rod to rotate inside the fixed seat, the threaded rod drives the moving seat to move on the outside of the threaded rod, and the moving seat slides on the outside of the fixed rod. Under the action of the fixed rod, the moving seat is prevented from rotating with the threaded rod. The moving seat drives the fixed plate to move up and down, and the driving motor is started. The driving motor drives the drill bit to rotate through the drill rod, so that the drill bit samples the soil, realizing the function of facilitating lifting of the device, thereby improving the working efficiency of the geological survey and detection equipment for preventing mud and rock flows when in use. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0023] Figure 2 This is a schematic diagram of the main cross-sectional structure of the utility model;
[0024] Figure 3 For the utility model Figure 2 The enlarged structural diagram at A in the middle;
[0025] Figure 4 It is a schematic diagram of the cross-sectional structure of the utility model in a top view;
[0026] Figure 5 It is a three-dimensional structural schematic diagram of the limiting structure of the utility model.
[0027] Explanation of the reference numerals in the figure: 1. base frame; 2. walking wheel; 3. limiting structure; 301. limiting plate; 302. first magnetic block; 303. second magnetic block; 4. supporting plate; 5. push handle; 6. fixed seat; 7. lifting structure; 701. servo motor; 702. threaded rod; 703. moving seat; 704. fixed rod; 8. driving motor; 9. fixing plate; 10. drill rod; 11. drill bit; 12. fixing block; 13. fixing structure; 1301. snap-in groove; 1302. snap-in block; 1303. reserved groove; 1304. baffle; 1305. groove; 14. through groove. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0029] See also Figure 1-Figure 5The utility model provides a geological survey and detection equipment for preventing debris flow, including a base frame 1 and walking wheels 2, a support plate 4 is fixed to one side of the top of the base frame 1, a push handle 5 is fixed to one side of the top of the support plate 4, walking wheels 2 are evenly installed on both sides of the base frame 1, and a limiting structure 3 is arranged on the outer wall of the base frame 1 on one side of the walking wheel 2. The limiting structure 3 includes a limiting plate 301, a first magnetic block 302 and a second magnetic block 303. The limiting plate 301 is hinged to the outer wall of the base frame 1 on one side of the walking wheel 2, and the second magnetic block 303 is fixed to the top of the base frame 1 above the limiting plate 301. The first magnetic block 302 is arranged on the side of the limiting plate 301 close to the base frame 1, and one side of the bottom of the limiting plate 301 is inclined, and the limiting plates 301 are symmetrically distributed on both sides of the base frame 1.
[0030] Reference Figure 1 and Figure 5 As shown, the limiting plate 301 is rotated to separate the first magnetic block 302 and the second magnetic block 303 from each other. At this time, one end of the limiting plate 301 moves to one side of the running wheel 2. Under the action of the limiting plate 301, the running wheel 2 stops moving.
[0031] A fixed seat 6 is fixed at the top of the base frame 1, and a lifting structure 7 is arranged inside the fixed seat 6. The lifting structure 7 includes a servo motor 701, a threaded rod 702, a movable seat 703 and a fixed rod 704. The threaded rod 702 is arranged inside the fixed seat 6, and the servo motor 701 is installed on the outer wall of the fixed seat 6 at the top of the threaded rod 702. The outer side of the threaded rod 702 is threadedly connected with the movable seat 703, and a fixed rod 704 passes through one side of the movable seat 703. The top of the threaded rod 702 passes through the fixed seat 6 and is fixedly connected to the output end of the servo motor 701. The movable seat 703 and the fixed rod 704 constitute a sliding structure. One end of the movable seat 703 extends to the outside of the fixed seat 6 and is fixedly connected to one side of the fixed plate 9. Both ends of the fixed rod 704 are fixedly connected to the inner wall of the fixed seat 6.
[0032] Reference Figure 2 and Figure 4 As shown, the servo motor 701 is started, and the servo motor 701 drives the threaded rod 702 to rotate inside the fixed seat 6. The threaded rod 702 drives the movable seat 703 to move outside the threaded rod 702. At the same time, the movable seat 703 slides outside the fixed rod 704. Under the action of the fixed rod 704, the movable seat 703 is prevented from rotating with the threaded rod 702. The movable seat 703 drives the fixed plate 9 to move up and down, and the driving motor 8 is started. The driving motor 8 drives the drill bit 11 to rotate through the drill rod 10, so that the drill bit 11 samples the soil.
[0033] A fixing plate 9 is provided on one side of the lifting structure 7, a driving motor 8 is installed on the top of the fixing plate 9, a drill rod 10 is passed through the inside of the fixing plate 9, a drill bit 11 is installed on the bottom end of the drill rod 10, a through groove 14 is provided on one side of the drill bit 11, and a fixing block 12 is fixed on the inner wall of the drill bit 11 at both ends of the through groove 14, and a fixing structure 13 is provided inside the through groove 14, and the fixing structure 13 includes a clamping groove 1301, a clamping block 1302, a reserved groove 1303, a baffle 1304 and a groove 1305, and the baffle 1304 is arranged inside the through groove 14, and both ends of the baffle 1304 away from the fixed block 12 are provided inside the baffle 1304. There is a groove 1305, and a clamping groove 1301 is provided inside the fixed block 12 on one side of the groove 1305, and a clamping block 1302 is provided inside the clamping groove 1301. A reserved groove 1303 is provided inside the clamping block 1302. The clamping block 1302 and the fixed block 12 form a clamping structure through the clamping groove 1301. One end of the clamping block 1302 extends to the outside of the fixed block 12 and is fixedly connected to the baffle 1304. The main view section of the groove 1305 is designed in an "L" shape. The top end of the drill rod 10 passes through the fixed plate 9 and is fixedly connected to the output end of the drive motor 8. The bottom end of the drill bit 11 is evenly provided with serrations.
[0034] Reference Figure 2 and Figure 3 As shown, the baffle 1304 is moved to the inside of the through groove 14 through the groove 1305, so that one end of the clamping block 1302 is in conflict with one end of the clamping groove 1301, pushing the baffle 1304. Under the action of the reserved groove 1303, the baffle 1304 drives the clamping block 1302 to move to the inside of the clamping groove 1301, thereby fixing the baffle 1304 and the drill bit 11 to each other. After the drill bit 11 samples the soil, the "L"-shaped design of the groove 1305 provides a force point for the finger, and the baffle 1304 is pulled through the groove 1305, thereby separating the baffle 1304 and the fixing block 12 from each other, and moving the baffle 1304 to the outside of the drill bit 11, so that the soil inside the drill bit 11 can be easily removed.
[0035] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A geological survey and detection device for preventing debris flow, comprising a base frame (1) and running wheels (2); Features: A support plate (4) is fixed to one side of the top of the base frame (1), a push handle (5) is fixed to one side of the top of the support plate (4), running wheels (2) are evenly installed on both sides of the base frame (1), and a limiting structure (3) is provided on the outer wall of the base frame (1) on one side of the running wheel (2); A fixing seat (6) is fixed at the top of the base frame (1), a lifting structure (7) is arranged inside the fixing seat (6), a fixing plate (9) is arranged on one side of the lifting structure (7), a driving motor (8) is installed at the top of the fixing plate (9), a drill rod (10) passes through the inside of the fixing plate (9), and a drill bit (11) is installed at the bottom end of the drill rod (10); A through groove (14) is provided on one side of the drill bit (11), and fixing blocks (12) are fixed on the inner walls of the drill bit (11) at both ends of the through groove (14). A fixing structure (13) is provided inside the through groove (14), and the fixing structure (13) comprises a clamping groove (1301), a clamping block (1302), a reserved groove (1303), a baffle (1304) and a groove (1305). The baffle (1304) is provided inside the through groove (14), and grooves (1305) are provided at both ends of the baffle (1304) on a side away from the fixing block (12). A clamping groove (1301) is provided inside the fixing block (12) on one side of the groove (1305), a clamping block (1302) is provided inside the clamping groove (1301), and a reserved groove (1303) is provided inside the clamping block (1302).
2. The geological survey and detection equipment for preventing debris flow according to claim 1, characterized in that: The limiting structure (3) comprises a limiting plate (301), a first magnetic block (302) and a second magnetic block (303); the limiting plate (301) is hinged to the outer wall of the base frame (1) on one side of the running wheel (2); the second magnetic block (303) is fixed to the top of the base frame (1) above the limiting plate (301); and the first magnetic block (302) is arranged on the side of the limiting plate (301) close to the base frame (1).
3. The geological survey and detection equipment for preventing debris flow according to claim 2, characterized in that: One side of the bottom of the limiting plate (301) is designed to be inclined, and the limiting plates (301) are symmetrically distributed on both sides of the base frame (1).
4. The geological survey and detection equipment for preventing debris flow according to claim 1, characterized in that: The lifting structure (7) comprises a servo motor (701), a threaded rod (702), a movable seat (703) and a fixed rod (704); the threaded rod (702) is arranged inside the fixed seat (6); the servo motor (701) is installed on the outer wall of the fixed seat (6) at the top of the threaded rod (702); the outer side of the threaded rod (702) is threadedly connected to the movable seat (703); and the fixed rod (704) passes through one side of the movable seat (703).
5. The geological survey and detection equipment for preventing debris flow according to claim 4, characterized in that: The top end of the threaded rod (702) passes through the fixed seat (6) and is fixedly connected to the output end of the servo motor (701), and the movable seat (703) and the fixed rod (704) form a sliding structure.
6. The geological survey and detection equipment for preventing debris flow according to claim 4, characterized in that: One end of the movable seat (703) extends to the outside of the fixed seat (6) and is fixedly connected to one side of the fixed plate (9), and both ends of the fixed rod (704) are fixedly connected to the inner wall of the fixed seat (6).
7. The geological survey and detection equipment for preventing debris flow according to claim 1, characterized in that: The top end of the drill rod (10) passes through the fixing plate (9) and is fixedly connected to the output end of the driving motor (8), and the bottom end of the drill bit (11) is evenly provided with saw teeth.
8. The geological survey and detection equipment for preventing debris flow according to claim 1, characterized in that: The clamping block (1302) and the fixed block (12) form a clamping structure via the clamping groove (1301); one end of the clamping block (1302) extends to the outside of the fixed block (12) and is fixedly connected to the baffle (1304); and the main cross-section of the groove (1305) is designed to be "L"-shaped.