Building construction clamp

By adopting a suspension fixing frame and an auxiliary fixing mechanism in the building construction fixture, and utilizing a dual-axis synchronous servo motor and a sliding splint mechanism, the problems of clamping position offset and insufficient adaptability in the existing technology are solved, and the problem of different clamping positions is realized. Stable clamping and transportation of small diameter pipes.

CN221876334UActive Publication Date: 2024-10-22余明亚
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420596465.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-10-22
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

Existing construction hoisting fixtures are prone to problems such as clamping position deviation and steel cable shaking affecting the clamping degree when clamping pipe fittings. In addition, the adaptability to different pipe diameters is insufficient, resulting in unstable clamping.

Method used

A construction clamp is designed, which uses a suspension fixing frame, a clamping mechanism and an auxiliary fixing mechanism. Through the dual-axis synchronous servo motor transmission and the sliding mechanism of the auxiliary splint, it can clamp and fix pipes of different diameters and enhance the clamping Stability and adaptability.

Benefits of technology

It improves the stability of pipeline transportation and clamping adaptability, ensures stable clamping of pipelines in different sizes, and reduces the phenomenon of unstable clamping.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221876334U_ABST
    Figure CN221876334U_ABST
Patent Text Reader

Abstract

The utility model discloses a building construction clamp which comprises a suspension fixing frame and further comprises a clamping mechanism and auxiliary fixing mechanisms, the bottom end of the suspension fixing frame is connected with the clamping mechanism used for clamping and fixing a pipe fitting, and the middle of the clamping mechanism is connected with four sets of auxiliary fixing mechanisms used for fixing the pipe fitting. The clamping mechanism comprises hanging rods, sliding rods, a transmission assembly, a guide assembly, a driven assembly and a clamping assembly, the hanging rods are fixedly connected to the two ends of the hanging fixing frame, and the sliding rods are fixedly connected to the ends, away from the auxiliary hanging fixing frame, of the hanging rods. According to the building construction clamp provided by the utility model, the auxiliary fixing mechanism is arranged, and when the clamping jaw clamps the pipeline, the auxiliary clamping plate slides in the storage groove, so that the pipelines with different pipe diameters can be clamped and fixed, and the adaptability of the clamping jaw to the sizes of the pipelines can be further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a building construction clamp. Background Art

[0002] Construction hoisting refers to the process of using lifting machinery or other special equipment to accurately lift heavy construction materials, components, equipment and other items that need to be moved or installed on the construction site from the ground or other locations through hoisting operations, and place them safely and accurately in designated locations.

[0003] For example, a Chinese utility model patent (CN211226031 U) discloses a pipe lifting clamp for construction, which records: "It is convenient to install it on the top of the loose and tightening threaded rod through threaded fixing to achieve lifting and lowering. During lifting and lowering, the force plate is transmitted through the clamping linkage plate to clamp or loosen the bottom, which is convenient for locking the pipe before lifting. Even if the steel cable shakes, it will not affect the clamping degree of the pipe." It also records: "The existing pipe lifting clamp is to lift the top so that the bottom of the scissor structure clamps the pipe. It gradually clamps as the lifting is slow until the pipe is completely clamped off the ground. This method easily causes the clamping position to shift and affects the lifting balance. In addition, the shaking of the lifting steel cable will affect the clamping degree of the pipe." Technical problems.

[0004] In summary, it can be known that in the prior art, the arc-shaped clamping plate is clamped and fixed to the pipe fitting by applying an inward clamping force to the arc-shaped clamping plate through the transmission of the force-bearing plate. However, the above-mentioned device also has the following technical problems: Since the curvature of the arc-shaped plate in the device is fixed, there are many types of pipe fittings used in construction, and the above-mentioned device will have unstable clamping when clamping pipes with smaller and larger diameters. Therefore, it is necessary to propose a construction clamp to provide a new technical solution to solve the technical problems mentioned in the above-mentioned patent. Utility Model Content

[0005] Based on this, it is necessary to provide a construction clamp to address the above technical problems. By setting an auxiliary fixing mechanism, when the clamp clamps the pipe, the auxiliary clamp slides inside the storage groove, so that pipes of different diameters can be clamped and fixed, thereby further increasing the adaptability of the clamp to the size of the pipe.

[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0007] A building construction clamp is used for hoisting building construction pipe fittings.

[0008] The construction fixture specifically includes a suspension fixing frame, a clamping mechanism and an auxiliary fixing mechanism. The bottom end of the suspension fixing frame is connected to a clamping mechanism for clamping and fixing the pipe fittings, and the middle part of the clamping mechanism is connected to four groups of auxiliary clamping mechanisms for fixing the pipe fittings.

[0009] The clamping mechanism comprises a suspension rod, a sliding rod, a transmission assembly, a guide assembly, a driven assembly and a clamping assembly. Both ends of the suspension fixing frame are fixedly connected with the suspension rod, and one end of the suspension rod away from the auxiliary suspension fixing frame is fixedly connected with the sliding rod.

[0010] As a preferred embodiment of the construction clamp provided by the utility model, the transmission assembly includes a dual-axis synchronous servo motor and a screw rod, the bottom surface of the suspension fixing frame is fixedly connected to the dual-axis synchronous servo motor, and the output ends on both sides of the dual-axis synchronous servo motor are transmission-connected with the screw rod.

[0011] As a preferred embodiment of the construction clamp provided by the utility model, the guide assembly includes a threaded block, a guide frame and a cross guide groove, the surface of the screw rod is threadedly connected with the threaded block, the bottom surface of the threaded block is fixedly connected with the guide frame, a cross guide groove is opened in the middle of the guide frame, both ends of the guide frame are slidably connected to the surface of the sliding rods on both sides, and the two guide frames are symmetrically connected to the surface of the sliding rods.

[0012] As a preferred embodiment of the construction clamp provided by the utility model, the driven component includes a slider, a connecting rod, a shaft rod and a scissor-type pushing frame, the inner wall of the cross guide groove is slidably connected to the slider, the bottom surface of the slider is fixedly connected to the connecting rod, the bottom surface of the dual-axis synchronous servo motor is fixedly connected to the shaft rod, the surface of the shaft rod is rotatably connected to the scissor-type pushing frame, and the end points of the scissor-type pushing frame away from the shaft rod are rotatably connected to the surface of the connecting rod.

[0013] As a preferred embodiment of the construction clamp provided by the utility model, the clamping assembly includes a clamping claw and a receiving groove, the end of the connecting rod away from the slider is fixedly connected with the clamping claw, and the receiving groove is provided on the surface of the clamping claw.

[0014] As a preferred embodiment of the construction clamp provided by the utility model, the auxiliary fixing mechanism includes a telescopic rod, an auxiliary splint, a limit block and a spring, the middle part of the clamp is slidably connected with the telescopic rod, one end of the telescopic rod is fixedly connected with the auxiliary splint, the end of the telescopic rod away from the auxiliary splint is fixedly connected with the limit block, the surface of the telescopic rod is sleeved with a spring, and the two ends of the spring are respectively fixedly connected to the clamp and the auxiliary splint.

[0015] Compared with the prior art, the utility model has the following beneficial effects:

[0016] The construction clamp provided by the utility model can realize multi-point clamping of the pipeline by arranging a clamping mechanism and driving the clamping claws on both sides to approach the middle at the same time through a dual-axis synchronous servo motor, thereby improving the stability of the device when clamping the pipeline, and further increasing the stability of the pipeline in aerial transportation.

[0017] The construction clamp provided by the utility model is provided with an auxiliary fixing mechanism. When the clamping jaws clamp the pipe, the auxiliary clamping plate slides inside the receiving groove, thereby clamping and fixing pipes of different diameters, thereby further increasing the adaptability of the clamping jaws to the size of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the scheme in the utility model, a brief introduction is given below to the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 A schematic diagram of the overall structure of the construction fixture provided by the utility model;

[0020] Figure 2 A schematic diagram of the structure of the clamping mechanism of the construction clamp provided by the utility model;

[0021] Figure 3 A schematic diagram of the connection structure of the construction fixture guide frame and the dual-axis synchronous servo motor provided by the utility model;

[0022] Figure 4 A schematic diagram of the connection structure of the scissor-type push frame and the guide frame of the construction clamp provided by the utility model;

[0023] Figure 5 The utility model is a schematic structural diagram of the auxiliary fixing mechanism of the construction clamp provided by the utility model.

[0024] The markings in the figure are as follows:

[0025] 1. Suspension fixing frame; 2. Clamping mechanism; 3. Auxiliary fixing mechanism; 4. Suspension rod; 5. Sliding rod; 6. Dual-axis synchronous servo motor; 7. Screw rod; 8. Threaded block; 9. Guide frame; 10. Cross guide groove; 11. Sliding block; 12. Connecting rod; 13. Shaft rod; 14. Scissor-type pushing frame; 15. Clamping claw; 16. Storage groove; 17. Telescopic rod; 18. Auxiliary splint; 19. Limit block; 20. Spring. DETAILED DESCRIPTION

[0026] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is only a part of the embodiment of the utility model, not all of the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the utility model.

[0027] As described in the background art, since the curvature of the arc plate in the device is fixed and there are many types of pipe fittings used in construction, the above device will be unstable when clamping pipes with smaller or larger diameters.

[0028] In order to solve this technical problem, the utility model provides a construction clamp, which is used for hoisting pipe fittings in construction.

[0029] Specifically, please refer to Figure 1-Figure 5 The construction fixture specifically includes a suspension fixing frame 1, a clamping mechanism 2 and an auxiliary fixing mechanism 3. The bottom end of the suspension fixing frame 1 is connected with a clamping mechanism 2 for clamping and fixing the pipe fittings, and the middle part of the clamping mechanism 2 is connected with four sets of auxiliary clamping mechanisms 2 for fixing the pipe fittings.

[0030] The clamping mechanism 2 includes a suspension rod 4, a slide rod 5, a transmission assembly, a guide assembly, a driven assembly and a clamping assembly. The two ends of the suspension fixing frame 1 are fixedly connected with the suspension rod 4, and the end of the suspension rod 4 away from the auxiliary suspension fixing frame 1 is fixedly connected with the slide rod 5.

[0031] The construction clamp provided by the utility model is provided with an auxiliary fixing mechanism 3. When the clamping jaws 15 clamp the pipe, the auxiliary clamping plate 18 slides inside the receiving groove 16, so that pipes of different diameters can be clamped and fixed, thereby further increasing the adaptability of the clamping jaws 15 to the pipe size.

[0032] In order to enable those skilled in the art to better understand the solution of the utility model, the technical solution in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings.

[0033] Embodiment 1:

[0034] Please refer to Figure 2-Figure 4 A construction fixture includes a suspension fixing frame 1, a clamping mechanism 2 and an auxiliary fixing mechanism 3. The bottom end of the suspension fixing frame 1 is connected with the clamping mechanism 2 for clamping and fixing a pipe fitting, and the middle part of the clamping mechanism 2 is connected with four sets of auxiliary clamping mechanisms 2 for fixing the pipe fittings.

[0035] The clamping mechanism 2 includes a suspension rod 4, a slide rod 5, a transmission assembly, a guide assembly, a driven assembly and a clamping assembly. The two ends of the suspension fixing frame 1 are fixedly connected to the suspension rod 4, and the end of the suspension rod 4 away from the auxiliary suspension fixing frame 1 is fixedly connected to the slide rod 5.

[0036] Specifically, the transmission assembly includes a dual-axis synchronous servo motor 6 and a lead screw 7. The dual-axis synchronous servo motor 6 is fixedly connected to the bottom surface of the suspension fixing frame 1, and the lead screw 7 is transmission-connected to the output ends of both sides of the dual-axis synchronous servo motor 6.

[0037] Specifically, the guide assembly includes a threaded block 8, a guide frame 9 and a cross guide groove 10. The surface of the screw rod 7 is threadedly connected to the threaded block 8, the bottom surface of the threaded block 8 is fixedly connected to the guide frame 9, a cross guide groove 10 is opened in the middle of the guide frame 9, both ends of the guide frame 9 are slidably connected to the surface of the sliding rod 5 on both sides, and the two guide frames 9 are symmetrically connected to the surface of the sliding rod 5.

[0038] Specifically, the driven component includes a slider 11, a connecting rod 12, a shaft rod 13 and a scissor-type pushing frame 14. The inner wall of the cross guide groove 10 is slidably connected to the slider 11, the bottom surface of the slider 11 is fixedly connected to the connecting rod 12, the bottom surface of the dual-axis synchronous servo motor 6 is fixedly connected to the shaft rod 13, the surface of the shaft rod 13 is rotatably connected to the scissor-type pushing frame 14, and the end points of the scissor-type pushing frame 14 away from the shaft rod 13 are rotatably connected to the surface of the connecting rod 12.

[0039] Specifically, the clamping assembly includes a clamping jaw 15 and a receiving groove 16 . The end of the connecting rod 12 away from the slider 11 is fixedly connected with the clamping jaw 15 , and the receiving groove 16 is formed on the surface of the clamping jaw 15 .

[0040] Through the above structural design, when the device is used, first make the pipe to be transported in the middle of the clamping jaws 15 on both sides, and then start the dual-axis synchronous servo motor 6. The dual-axis synchronous servo motor 6 drives the screw rod 7 to rotate, and the screw rod 7 rotates through the threaded block 8 to push the guide frame 9 to slide in the opposite direction on the surface of the slide rod 5. When the guide frame 9 moves outward, the scissor-type pushing frame 14 pulls the slider 11 to slide toward the middle on the inner wall of the cross guide groove 10 at the same time. When the slider 11 slides, the clamping jaws 15 at the bottom are driven to move toward the middle at the same time through the connecting rod 12, thereby completing the clamping and fixing of the pipe. When the pipe is transported to the specified position, the dual-axis synchronous servo motor 6 is controlled to reverse, so that when the guide frame 9 moves toward the middle at the same time, the clamping jaws 15 at the bottom of the connecting rod 12 can move away from each other, thereby completing the unloading of the pipe.

[0041] Embodiment 2:

[0042] The construction fixture provided in Example 1 is further optimized, specifically, as follows: Figure 4-Figure 5As shown, the auxiliary fixing mechanism 3 includes a telescopic rod 17, an auxiliary splint 18, a limit block 19 and a spring 20. The middle part of the clamp 15 is slidably connected with the telescopic rod 17, one end of the telescopic rod 17 is fixedly connected with the auxiliary splint 18, and the end of the telescopic rod 17 away from the auxiliary splint 18 is fixedly connected with the limit block 19. The surface of the telescopic rod 17 is sleeved with a spring 20, and the two ends of the spring 20 are respectively fixedly connected to the clamp 15 and the auxiliary splint 18.

[0043] Through the above structural design, when the clamping jaws 15 clamp the pipe, the auxiliary splint 18 first contacts the surface of the pipe fitting. When the auxiliary splint 18 squeezes the pipe, the auxiliary splint 18 is subjected to the reaction force of the pipe. After being subjected to the reaction force, the auxiliary splint 18 pushes the telescopic rod 17 to slide to the outside of the clamping jaws 15. At the same time, the auxiliary splint 18 cooperates with the clamping jaws 15 to contract the spring 20 to accumulate elastic potential energy, thereby achieving the purpose of automatic adaptation and fixation according to the different diameters of the pipe fittings.

Claims

1. A construction fixture, comprising a suspension fixing frame (1), characterized in that ; It also comprises a clamping mechanism (2) and an auxiliary fixing mechanism (3), wherein the bottom end of the suspension fixing frame (1) is connected to a clamping mechanism (2) for clamping and fixing the pipe fitting, and the middle part of the clamping mechanism (2) is connected to four groups of auxiliary clamping mechanisms (2) for fixing the pipe fitting; The clamping mechanism (2) comprises a suspension rod (4), a sliding rod (5), a transmission assembly, a guide assembly, a driven assembly and a clamping assembly; the two ends of the suspension fixing frame (1) are fixedly connected to the suspension rod (4); and the end of the suspension rod (4) away from the auxiliary suspension fixing frame (1) is fixedly connected to the sliding rod (5).

2. The construction fixture according to claim 1, characterized in that: The transmission assembly comprises a double-axis synchronous servo motor (6) and a screw (7); the bottom surface of the suspension fixing frame (1) is fixedly connected to the double-axis synchronous servo motor (6); and the screw (7) is transmission-connected to the output ends on both sides of the double-axis synchronous servo motor (6).

3. The construction fixture according to claim 2, characterized in that: The guide assembly comprises a threaded block (8), a guide frame (9) and a cross guide groove (10); the surface of the screw rod (7) is threadedly connected to the threaded block (8); the bottom surface of the threaded block (8) is fixedly connected to the guide frame (9); a cross guide groove (10) is provided in the middle of the guide frame (9); both ends of the guide frame (9) are slidably connected to the surfaces of the sliding rods (5) on both sides; the two guide frames (9) are symmetrically connected to the surfaces of the sliding rods (5).

4. The construction fixture according to claim 3, characterized in that: The driven component comprises a slider (11), a connecting rod (12), a shaft rod (13) and a scissor-type pushing frame (14); the inner wall of the cross guide groove (10) is slidably connected to the slider (11); the bottom surface of the slider (11) is fixedly connected to the connecting rod (12); the bottom surface of the dual-axis synchronous servo motor (6) is fixedly connected to the shaft rod (13); the surface of the shaft rod (13) is rotatably connected to the scissor-type pushing frame (14); and the end points of the scissor-type pushing frame (14) away from the shaft rod (13) are both rotatably connected to the surface of the connecting rod (12).

5. The construction fixture according to claim 4, characterized in that: The clamping assembly comprises a clamping claw (15) and a receiving groove (16); one end of the connecting rod (12) away from the slider (11) is fixedly connected with the clamping claw (15); and the receiving groove (16) is provided on the surface of the clamping claw (15).

6. The construction fixture according to claim 5, characterized in that: The auxiliary fixing mechanism (3) comprises a telescopic rod (17), an auxiliary splint (18), a limit block (19) and a spring (20); the middle part of the clamping jaw (15) is slidably connected with the telescopic rod (17); one end of the telescopic rod (17) is fixedly connected with the auxiliary splint (18); one end of the telescopic rod (17) away from the auxiliary splint (18) is fixedly connected with the limit block (19); a spring (20) is sleeved on the surface of the telescopic rod (17); two ends of the spring (20) are respectively fixedly connected with the clamping jaw (15) and the auxiliary splint (18).

Citation Information

Cited By

  • Mechanical clamping jaw for box parts

    CN119871503A

  • A mechanical gripper for box-shaped parts

    CN119871503B