Cantilever crane system suitable for operation in narrow and small space
By introducing the connection between the main arm and the bottom section arm of the tower arm and the tower arm luffing system into the crawler crane tower arm system, the self-disassembly and assembly of the tower arm is realized, which solves the problems of assembly difficulties and the use of auxiliary cranes in small spaces, and improves Improve construction efficiency and adaptability.
Patent Information
- Application Number
- CN202420549456.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-21
AI Technical Summary
The existing crawler crane tower boom system is difficult to assemble in a small space and requires a large site and auxiliary crane, resulting in increased costs and low efficiency.
A boom system suitable for operations in narrow spaces is designed. Through the connection between the main arm and the bottom section arm of the tower arm, the tower arm luffing system and the pulling plate (or cable or wire rope) are used to realize the self-disassembly and assembly of the tower arm. Reduce assembly site requirements and avoid the use of auxiliary cranes.
It effectively reduces the need for assembly sites, reduces costs, and improves construction efficiency. It is suitable for scenes with small spaces and large lifting heights.
Smart Images

Figure CN221876424U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of cranes, in particular to a boom system suitable for operations in narrow spaces. Background Art
[0002] With the rapid economic development and accelerated urbanization in my country, in order to continuously improve people's housing conditions and implement the concept of green development, projects such as shantytown reconstruction, municipal construction, and industrial facility upgrading are being promoted in full swing. The scale of national infrastructure construction is getting larger and larger. In order to enhance the lifting capacity of crawler cranes, long boom combinations are widely used.
[0003] Taking safety and travel efficiency into consideration, crawler cranes are not allowed to travel on roads and need to be disassembled and transported to the work site for assembly. The various components of the crane are heavy, so an auxiliary crane is required for lifting during assembly. This will undoubtedly increase costs, and the costs will increase as the lifting capacity of the auxiliary crane increases. At the same time, the crawler crane adopts a truss boom structure. During the assembly process, the boom sections need to be laid out and assembled one by one. After assembly, the boom is pulled up using its own variable amplitude system. Therefore, a larger assembly site is required. The longer the boom system, the larger the assembly site required. For construction scenarios with narrow space and many obstacles, the existing boom system is difficult to cope with, so higher requirements are placed on the crane's adaptability to narrow space operations and construction efficiency.
[0004] The crane boom system of the prior art is usually designed to install a tower-type auxiliary boom (referred to as the tower boom). The tower boom rear bracket and the tower boom are arranged at different hinge points on the main boom head, and the tower boom front bracket is arranged at the lower part of the tower boom bottom section arm (the front and rear brackets of the small and medium-tonnage tower boom working conditions can also be placed at the lower part of the tower boom bottom section arm at the same time); the tower boom and the front bracket are connected by the tower boom front pull plate, and the three form a triangular structure with a fixed angle; the tower boom luffing wire rope is wound between the front and rear brackets, and the tower boom angle is changed by retracting and releasing the tower boom luffing wire rope on the tower boom luffing mechanism; the change of the main boom angle is achieved by retracting and releasing the wire rope of the main luffing system. When assembling the tower boom working condition, all boom sections are laid out and assembled one by one, and auxiliary cranes are required to assist the main boom and each boom section of the tower boom during the process.
[0005] The existing technology has the following problems: 1. When disassembling and assembling the tower arm of the existing crawler crane, all arm sections need to be laid out in sequence for assembly, which requires a large assembly site and has poor adaptability to narrow construction sites. 2. When disassembling and assembling the tower arm sections of the existing crawler crane, an auxiliary crane is required, and the auxiliary crane station requires a certain amount of space, and the use of the auxiliary crane will increase certain costs.
[0006] Therefore, it is necessary to develop a boom system suitable for operations in narrow spaces, reduce the space occupied during assembly, reduce the difficulty and cost of disassembly and assembly, and improve efficiency. Utility Model Content
[0007] Purpose of the utility model: In view of the shortcomings and defects of the prior art, the utility model provides a boom system suitable for operations in narrow spaces, which reduces the space occupied during assembly, reduces the difficulty and cost of disassembly and assembly, and improves efficiency.
[0008] Technical solution: The utility model is a boom system suitable for operations in a narrow space, characterized in that it includes a main boom, a tower boom bottom section boom, a tower boom front bracket and a tower boom rear bracket which are interconnected at one end, the top of the main boom is connected to the main luffing system through a main boom pull plate, the bottom of the main boom is connected to the main luffing system, the bottom of the main boom is connected to the top of the tower boom rear bracket through a rear pull plate and a tower boom luffing mechanism, the top of the tower boom rear bracket is connected to the top of the tower boom front bracket through a tower boom luffing wire rope, the top of the tower boom front bracket is connected to the top of the tower boom bottom section boom through a disassembly pull plate, the tower boom bottom section boom is connected to the tower boom, and the top of the tower boom is connected to the top of the tower boom front bracket through a front pull plate.
[0009] Among them, the front pull plate, the rear pull plate, the pull plate for assembly and disassembly, and the main arm pull plate are pull plates, cables or wire rope structures.
[0010] Wherein, the tower arm includes a plurality of arm sections.
[0011] Among them, several arm sections are connected through pins on the upper side and the lower side.
[0012] Wherein, the tower arm bottom section arm and the second section arm section are connected through pins on the upper side and the lower side.
[0013] Wherein, the disassembly and assembly pulling plate is connected with the pin shaft on the upper side of the bottom arm section of the tower arm and the second arm section.
[0014] Wherein, the main arm and main luffing system are located on the crane.
[0015] Beneficial effects: Compared with the prior art, the utility model has the following significant advantages: the main arm system of the utility model is assembled and connected to the bottom section of the tower arm, and then the tower arm system is assembled, and the size of the site required for the assembly of the arm system is reduced. The site size required by the prior art for the sum of the length of the main arm and the tower arm is reduced to the sum of the length of the main arm and the bottom section of the tower arm, solving the problem of the large assembly site required in the prior art, and can be better applied to scenes where the work site is limited and a large lifting height is required. The utility model uses a tower arm bracket crane to realize the self-disassembly and assembly of the tower arm system, solving the problem of the need for an auxiliary crane in the assembly process of the prior art, and no auxiliary crane is needed, saving costs. At the same time, since no auxiliary crane is used, the problem of the auxiliary crane station and the additional occupation of the site is also solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of a crane boom system in the prior art;
[0017] Figure 2 It is a schematic diagram of step 1) in the installation method of the utility model;
[0018] Figure 3 It is a schematic diagram of step 2) in the installation method of the utility model;
[0019] Figure 4 It is a schematic diagram of step 3) in the installation method of the utility model;
[0020] Figure 5 It is a schematic diagram of step 4) in the installation method of the utility model;
[0021] Figure 6 It is a schematic diagram of step 5) in the installation method of the utility model;
[0022] In the figure, 1 is the main boom; 2 is the tower boom; 3 is the front bracket of the tower boom; 4 is the rear bracket of the tower boom; 5 is the bottom arm of the tower boom; 6 is the front pull plate; 7 is the rear pull plate; 8 is the pull plate for assembly and disassembly; 9 is the tower boom luffing wire rope; 10 is the tower boom luffing mechanism; 11 is the main luffing system; 12 is the main boom pull plate. DETAILED DESCRIPTION
[0023] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.
[0024] The utility model is suitable for a boom system for narrow space operation, comprising a main boom 1, a tower boom bottom section boom 5, a tower boom front bracket 3 and a tower boom rear bracket 4, which are connected to each other at one end, the top of the main boom 1 is connected to the main luffing system 11 through a main boom pull plate 12, the bottom of the main boom 1 is connected to the main luffing system 11, the bottom of the main boom 1 is connected to the top of the tower arm rear bracket 4 through a rear pull plate 7 and a tower arm luffing mechanism 10, respectively, the top of the tower arm rear bracket 4 is connected to the top of the tower arm front bracket 3 through a tower arm luffing wire rope 9, the top of the tower arm front bracket 3 is connected to the top of the tower arm bottom section boom 5 through a disassembly pull plate 8, the tower arm bottom section boom 5 is connected to the tower arm 2, and the top of the tower arm 2 is connected to the top of the tower arm front bracket 3 through a front pull plate 6. Among them, the front pull plate 6, the rear pull plate 7, the disassembly pull plate 8, and the main arm pull plate 12 are pull plates, cables or wire rope structures. Among them, the tower arm 2 includes a plurality of boom sections. The plurality of boom sections are connected by pins on the upper side and the lower side. The tower arm bottom section 5 is connected to the second section arm section through the pins on the upper and lower sides. The disassembly and assembly pull plate 8 is connected to the tower arm bottom section 5 and the pins on the upper side of the second section arm section. The main arm 1 and the main luffing system 11 are located on the crane.
[0025] The utility model is suitable for the arm support system of narrow space operation, and the installation includes the following steps:
[0026] 1) If Figure 2 , assemble the main boom 1, the tower boom bottom section boom 5, the tower boom front bracket 3 and the tower boom rear bracket 4, connect one end of the disassembly and assembly pull plate 8 to the tower boom front bracket 3, and the other end to the joint of the tower boom bottom section boom 5; connect one end of the front pull plate 6 to the tower boom front bracket 3, and the other end is in a free state.
[0027] 2) If Figure 3 , pull up the assembled parts for a certain distance, so that the disassembly and assembly pulling plate 8 is in a straight state, and by contracting the tower arm luffing wire rope 9, the tower arm bottom section boom 5 is connected to the upper side of the second boom section of the tower arm 2 through a pin shaft, and the disassembly and assembly pulling plate 8 is connected to both sides of the pin shaft, and the tower arm luffing wire rope 9 is continued to be contracted to connect the tower arm bottom section boom 5 with the lower side of the second boom section of the tower arm 2 through a pin shaft.
[0028] 3) If Figure 4 , pull up the main boom 1 to a certain angle, loosen the tower boom luffing wire rope 9, make the tower boom front bracket 3 and the assembled tower boom 2 part tilt at a certain angle, and assemble the remaining boom sections.
[0029] 4) If Figure 5 Repeat steps 2)-3) until the tower arm 2 is assembled, and connect the free end of the front pull plate 6 to the arm head of the tower arm 2. Prepare to pull up the tower arm 2 to the working state.
[0030] 5) If Figure 6 , lift the main boom 1, reel in the tower boom luffing wire rope 9, pull the tower boom 2 to the working state, put the disassembly and assembly pull plate 8 in a relaxed state, and use the boom system.
[0031] When disassembling the boom system, just follow the installation process in reverse order.
[0032] The utility model aims to solve the practical problems of difficulty and low efficiency in assembling a long boom in a narrow working space. It innovatively changes the fixed angle between the tower arm and the front bracket into a variable angle, and proposes a new boom system and disassembly and assembly method. Figure 1The disassembly and assembly method of the utility model is as follows: first assemble the main boom, the tower boom bottom section boom and the front and rear brackets, the front bracket is connected with a pull plate (or a pull cable, a wire rope) for hoisting the tower boom bottom section boom, then lift the main boom to a certain angle, connect the upper side of the second boom section of the tower boom with the tower boom bottom section boom through a pin shaft, pull up the front and rear brackets to a certain angle through the tower boom luffing system, at this time connect the tower boom bottom section boom with the lower side of the second boom section of the tower boom through a pin shaft, and proceed in sequence to complete the assembly of all boom sections of the tower boom. This process only requires the crane itself to carry out lifting, without the need for auxiliary lifting. Therefore, the use of an auxiliary crane is eliminated during the disassembly and assembly of the tower arm, solving the problem in the prior art that the disassembly and assembly process requires an auxiliary crane, which leads to high costs. At the same time, the entire disassembly and assembly process requires a smaller site (the prior solution requires the site to be the sum of the main arm length + the tower arm length, while the utility model requires the site only for the sum of the main arm length + the tower arm bottom section arm length), solving the problem in the prior art that the crawler crane boom system occupies a large site during disassembly and assembly, especially during the tower arm working condition, and can better meet the operating requirements of a small space and a large lifting height.
[0033] After the main arm system of the utility model is assembled, the tower arm bottom section arm is connected, and then the tower arm system is assembled. The size of the site required for the arm system assembly is reduced. The site size required by the prior art for the sum of the length of the main arm and the tower arm is reduced to the sum of the length of the main arm and the bottom section arm of the tower arm, solving the problem of the large assembly site required in the prior art, and can be better applied to scenes where the work site is limited and a large lifting height is required. The utility model uses a tower arm bracket crane to realize the self-assembly and disassembly of the tower arm system, solving the problem of the prior art that an auxiliary crane is required during the assembly process. There is no need to use an auxiliary crane, saving costs. At the same time, since no auxiliary crane is used, the problem of the auxiliary crane station and the additional occupation of the site is also solved.
[0034] The utility model adopts a tower arm support crane, that is, by adding a pull plate (pull cable or wire rope) for disassembly and assembly to the front bracket, using the tower arm luffing system to retract and release the tower arm luffing wire rope, and changing the angle between the front bracket and the tower arm, the tower arm assembly is completed, and it can be used as an auxiliary crane for self-disassembly and assembly of the whole machine. The tower arm arm section self-disassembly and assembly structure of the utility model uses a tower arm support crane to achieve self-disassembly and assembly of the tower arm. The utility model is used for the structure of the arm assembly in a narrow space. Through innovative changes in the angle between the tower arm and the front bracket from a fixed angle to a variable angle, the tower arm is assembled as a whole and hoisted as a whole using a tower arm support crane. The assembly site only requires the sum of the length of the main arm and the tower arm bottom section arm.
Claims
1. A boom system suitable for working in narrow spaces. Features: The invention comprises a main arm (1), a tower arm bottom section arm (5), a tower arm front bracket (3) and a tower arm rear bracket (4) which are connected to each other at one end; the top of the main arm (1) is connected to a main luffing system (11) through a main arm pull plate (12); the bottom of the main arm (1) is connected to the main luffing system (11); the bottom of the main arm (1) is connected to the top of the tower arm rear bracket (4) through a rear pull plate (7) and a tower arm luffing mechanism (10); the top of the tower arm rear bracket (4) is connected to the top of the tower arm front bracket (3) through a tower arm luffing steel wire rope (9); the top of the tower arm front bracket (3) is connected to the top of the tower arm bottom section arm (5) through a disassembly pull plate (8); the tower arm bottom section arm (5) is connected to the tower arm (2); and the top of the tower arm (2) is connected to the top of the tower arm front bracket (3) through a front pull plate (6).
2. The boom system suitable for narrow space operation according to claim 1, Features: The front pull plate (6), the rear pull plate (7), the pull plate for assembly and disassembly (8), and the main arm pull plate (12) are pull plates, cables or steel wire rope structures.
3. The boom system suitable for narrow space operation according to claim 1, Features: The tower arm (2) comprises a plurality of arm sections.
4. The boom system suitable for narrow space operation according to claim 3, Features: The arm sections are connected via pins on the upper and lower sides.
5. The boom system suitable for narrow space operation according to claim 3, Features: The tower arm bottom section (5) is connected to the second arm section via pins on the upper and lower sides.
6. The boom system suitable for narrow space operation according to claim 5, Features: The disassembly and assembly pulling plate (8) is connected with the pins on the upper side of the tower arm bottom section (5) and the second section arm section.
7. The boom system suitable for narrow space operation according to claim 1, Features: The main arm (1) and the main luffing system (11) are located on the crane.