Injection device for hot-dip galvanized steel pipe production
By designing a blowing device for hot-dip galvanized steel pipes, the combination of an air outlet rod and a turntable is used to achieve uniform blowing of steam, and through the cooperation of a translation motor and a threaded rod, the problem of uneven blowing in the existing technology is solved. problem and improve the injection efficiency.
Patent Information
- Application Number
- CN202323311792.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-06
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-06
AI Technical Summary
It is difficult for existing injection devices to achieve uniform steam injection on long steel pipes, resulting in uneven injection and low work efficiency.
A blowing device including a base, a positioning mechanism and a blowing mechanism is designed. Through the combination of the air outlet rod and the turntable, the steam can be sprayed evenly on the inner and outer walls of the steel pipe. Through the cooperation of the translation motor and the threaded rod, the steel pipe can be conveniently sprayed. positioning and removal.
The uniformity and efficiency of steam injection are improved, the injection time is shortened, and the work efficiency is improved.
Smart Images

Figure CN221877141U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hot-dip galvanized steel pipes, in particular to a spraying device used for the production of hot-dip galvanized steel pipes. Background Art
[0002] Hot-dip galvanizing is also called hot-dip galvanizing. It is a method of obtaining a metal coating by immersing a steel pipe in molten zinc liquid. The whole process of hot-dip galvanizing is to immerse the pretreated steel pipe in molten zinc liquid at 440-460℃ (the melting point of zinc is 419.5℃). The steel pipe absorbs a large amount of heat instantly. The zinc liquid on the surface of the steel pipe suddenly cools and solidifies on the surface of the steel pipe, forming a solid shell. Due to the continuous large amount of heat supply, this shell is quickly heated and melted. When the surface temperature of the steel pipe reaches equilibrium with the temperature of the zinc liquid, the molten zinc The liquid begins to interact with the steel matrix. After a period of time, an iron-zinc alloy layer is formed on the surface of the steel pipe. The outer side of the iron-zinc alloy layer is connected to the pure zinc layer. When cooled, the pure zinc layer crystallizes and the inner side is connected to the steel matrix. The whole process is relatively complicated. It includes physical changes and chemical changes. The solid steel and the molten zinc liquid are infiltrated, diffused, and dissolved. The process changes with the chemical composition of the steel, the temperature of the zinc liquid, the time and depth of zinc immersion. After the steel pipe is hot-dip galvanized, it is necessary to use a spraying device to make the surface zinc layer sprayed evenly. The following problems exist in the existing technology:
[0003] Because the existing steel pipes are generally long, and most of the blowing devices usually have the air outlet located on one side of the steel pipe during blowing, it is difficult to spray the blown steam evenly on the surface of the steel pipe, resulting in uneven spraying, a long blowing time, low work efficiency, and different steam and wind forces at different positions of the steel pipe, resulting in poor spraying effect. Utility Model Content
[0004] The utility model provides a spraying device for hot-dip galvanized steel pipe production to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0006] A blowing device for hot-dip galvanized steel pipe production, comprising a base and a positioning mechanism, wherein the top outer wall of the base is provided with a blowing mechanism, the blowing mechanism comprises a fixed disk, an air pipe is passed through and fixedly connected to the right side of the fixed disk, an air outlet rod 1 is passed through and fixedly connected to the top of the left end of the air pipe, a plurality of air outlet holes are evenly opened on the outer wall of the air outlet rod 1, a bearing is movably installed on the lower outer wall of the air outlet rod 1, a turntable is fixedly installed on the outer wall of the bearing, the side outer wall of the turntable overlaps with the groove of the top outer wall of the fixed disk, a gear 2 is fixedly installed on the bottom outer wall of the turntable, a rotating motor is fixedly installed on the front inner cavity of the fixed disk, a gear 1 is fixedly installed on the outer wall of the output shaft of the rotating motor, the side outer wall of the gear 1 is meshed with the side outer wall of the gear 2, the top outer wall of the air pipe away from the air outlet rod 1 is passed through and fixedly connected to the air outlet rod 2, the air outlet rod 2 passes through the right top of the fixed disk, and a plurality of air outlet pipes are evenly passed through and fixedly installed on the left outer wall of the air outlet rod 2.
[0007] A further improvement of the technical solution of the utility model is that: the positioning mechanism includes a fixed vertical plate, a lifting motor is fixedly installed on the top outer wall of the fixed vertical plate, a sliding groove is opened on the front outer wall of the fixed vertical plate, a screw rod is fixedly installed on the bottom outer wall of the output shaft of the lifting motor, the bottom outer wall of the screw rod is movably connected to the bottom inner wall of the sliding groove, a moving block is threadedly connected to the outer wall of the screw rod, the side outer wall of the moving block is overlapped with the side inner wall of the sliding groove, and a positioning plate is fixedly installed on the front outer wall of the moving block.
[0008] A further improvement of the technical solution of the utility model is that a fixing rod is fixedly installed on the top of the inner wall of the positioning plate, a movable disk is movably installed on the outer wall of the bottom end of the fixing rod, the side outer wall of the movable disk overlaps the side of the groove at the bottom of the positioning plate, and four convex block pressure plates are fixedly installed in a circular array on the bottom outer wall of the movable disk.
[0009] A further improvement of the technical solution of the utility model is that a translation motor is fixedly installed on the right rear outer wall of the base, a threaded rod is fixedly installed on the outer wall of the output shaft of the translation motor, a moving cabin is opened on the top rear outer wall of the base, the left end outer wall of the threaded rod is movably connected with the left outer wall of the moving cabin, a moving plate is fixedly installed on the bottom right outer wall of the fixed vertical plate, and the outer wall of the threaded rod is threadedly connected with the middle end hole of the moving plate.
[0010] A further improvement of the technical solution of the utility model is that the bottom outer wall of the fixed vertical plate overlaps with the top outer wall of the base, and the front and rear outer walls of the movable plate overlap with the front and rear inner walls of the movable cabin.
[0011] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:
[0012] 1. The utility model provides a blowing device for hot-dip galvanized steel pipe production. Through the blowing mechanism on the base, the hot-dip galvanized steel pipe can use the first and second air outlet rods to evenly blow steam to the inner wall and the outer wall, thereby reducing the time required for blowing, making the blowing uniform and improving the blowing efficiency.
[0013] 2. The utility model provides a blowing device for hot-dip galvanized steel pipe production. By translating the threaded rod on the outer wall of the motor output shaft, the overall positioning mechanism can be translated by the movement of the moving plate on the threaded rod, thereby facilitating the removal of the hot-dip galvanized steel pipe from the air outlet rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is an overall schematic diagram of the structure of the utility model;
[0015] Figure 2 It is a cross-sectional schematic diagram of a fixed disk of the utility model structure;
[0016] Figure 3 It is a cross-sectional schematic diagram of a fixed vertical plate of the structure of the utility model;
[0017] Figure 4 It is a cross-sectional schematic diagram of the positioning plate of the utility model structure;
[0018] Figure 5 It is an exploded schematic diagram of the fixed vertical plate and the base of the structure of the utility model.
[0019] In the figure: 1. base; 11. translation motor; 111. threaded rod; 12. moving cabin; 2. blowing mechanism; 21. fixed plate; 211. rotating motor; 2111. gear one; 22. air pipe; 221. turntable; 222. gear two; 223. bearing; 23. air outlet rod one; 231. air outlet hole; 24. air outlet rod two; 241. air outlet pipe; 3. positioning mechanism; 31. fixed vertical plate; 311. slide groove; 312. moving plate; 32. lifting motor; 321. screw rod; 33. positioning plate; 331. moving block; 332. fixed rod; 333. movable plate; 334. convex block pressure plate. DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0021] like Figure 1 , Figure 2As shown, the utility model provides a blowing device for hot-dip galvanized steel pipe production, including a base 1 and a positioning mechanism 3. The top outer wall of the base 1 is provided with a blowing mechanism 2, and the blowing mechanism 2 includes a fixed plate 21. The right side of the fixed plate 21 is penetrated and fixedly connected with an air pipe 22, and the air pipe 22 is externally connected with a steam device required for blowing. The top of the left end of the air pipe 22 is penetrated and fixedly connected with an air outlet rod 23, and the outer wall of the air outlet rod 23 is evenly provided with a plurality of air outlet holes 231. A bearing 223 is movably installed on the outer wall below the air outlet rod 23, and a rotating disk 221 is fixedly installed on the outer wall of the bearing 223. The rotating disk 22 The side outer wall of the rotating disk 221 overlaps with the groove of the top outer wall of the fixed disk 21, a gear 222 is fixedly installed on the bottom outer wall of the rotating disk 221, a rotating motor 211 is fixedly installed on the front inner cavity of the fixed disk 21, a gear 1 2111 is fixedly installed on the outer wall of the output shaft of the rotating motor 211, and the side outer wall of the gear 1 2111 is meshed with the side outer wall of the gear 2 222, and the top outer wall of the air pipe 22 away from the air outlet rod 1 23 is penetrated and fixedly connected with the air outlet rod 24, the air outlet rod 24 penetrates the right top of the fixed disk 21, and the left outer wall of the air outlet rod 24 is evenly penetrated and fixedly installed with a plurality of air outlet pipes 241;
[0022] After the hot-dip galvanized steel pipe is inserted into the air outlet rod 23, the bottom contacts the top outer wall of the turntable 221, and the rotating motor 211 in the inner cavity of the fixed disk 21 is started, and the gear 2111 on its output shaft is engaged with the gear 222 on the bottom outer wall of the turntable 221, so that the turntable 221 can be driven to rotate by the bearing 223, so that the hot-dip galvanized steel pipe on the top outer wall of the turntable 221 is also rotated, and then the steam can be sprayed from the multiple air outlet holes 231 evenly opened on the outer wall of the air outlet rod 23 to the inner wall of the hot-dip galvanized steel pipe through the air pipe 22, and the air outlet pipe 241 evenly installed on the left outer wall of the air outlet rod 24 is used to evenly spray the outer wall of the rotating hot-dip galvanized steel pipe.
[0023] like Figure 3 , Figure 4 As shown, the positioning mechanism 3 includes a fixed vertical plate 31, a lifting motor 32 is fixedly installed on the top outer wall of the fixed vertical plate 31, a sliding groove 311 is opened on the front outer wall of the fixed vertical plate 31, a screw rod 321 is fixedly installed on the outer wall of the bottom end of the output shaft of the lifting motor 32, the bottom outer wall of the screw rod 321 is movably connected with the bottom inner wall of the sliding groove 311, a moving block 331 is threadedly connected to the outer wall of the screw rod 321, the side outer wall of the moving block 331 overlaps the side inner wall of the sliding groove 311, a positioning plate 33 is fixedly installed on the front outer wall of the moving block 331, a fixed rod 332 is fixedly installed on the top of the inner wall of the positioning plate 33, a movable disk 333 is movably installed on the bottom outer wall of the fixed rod 332, the side outer wall of the movable disk 333 overlaps the side of the groove at the bottom of the positioning plate 33, and four convex block pressure plates 334 are fixedly installed in an annular array on the bottom outer wall of the movable disk 333;
[0024] Before rotary blowing, the threaded rod 111 can be driven to rotate in the inner cavity of the movable cabin 12 by starting the translation motor 11, thereby driving the movable plate 312 to move to the right, so that the fixed vertical plate 31 is moved to be aligned with the top of the base 1, and then the lifting motor 32 is started to drive the screw rod 321 to rotate in the slide groove 311, so that the moving block 331 on the threaded outer wall of the screw rod 321 drives the positioning plate 33 to move downward on the inner wall of the slide groove 311, so that the convex pressure plate 334 at the bottom end of the movable disk 333 at the bottom of the positioning plate 33 contacts the outer wall of the top of the hot-dip galvanized steel pipe and squeezes and fixes it, and when the four convex pressure plates 334 squeeze the top of the hot-dip galvanized steel pipe, the steam can be discharged through the gap between them to avoid steam clogging in the steel pipe.
[0025] like Figure 5 As shown, a translation motor 11 is fixedly installed on the right rear outer wall of the base 1, and a threaded rod 111 is fixedly installed on the outer wall of the output shaft of the translation motor 11. A moving cabin 12 is opened on the top rear outer wall of the base 1, and the left end outer wall of the threaded rod 111 is movably connected with the left outer wall of the moving cabin 12. A moving plate 312 is fixedly installed on the bottom right outer wall of the fixed vertical plate 31, and the outer wall of the threaded rod 111 and the middle end hole of the moving plate 312 are threadedly connected, and the bottom outer wall of the fixed vertical plate 31 overlaps the top outer wall of the base 1, and the front and rear outer walls of the moving plate 312 overlap the front and rear inner walls of the moving cabin 12, so that when the outer wall of the threaded rod 111 moves, the moving plate 312 performs limited movement in the moving cabin 12 to prevent it from rotating with the threaded rod 111.
[0026] By starting the translation motor 11 to drive the threaded rod 111 to rotate in the inner cavity of the moving cabin 12, the moving plate 312 is driven to move to the right, so that the fixed vertical plate 31 moves to align with the top of the base 1, which is convenient for fixing the hot-dip galvanized steel pipe. At the same time, by starting the translation motor 11 to drive the threaded rod 111 to reverse, the moving plate 312 drives the fixed vertical plate 31 to move to the left, so that the hot-dip galvanized steel pipe that has been sprayed can be easily removed.
[0027] The following is a detailed description of the working principle of the blowing device used in the production of hot-dip galvanized steel pipes.
[0028] like Figure 1-5As shown, after the hot-dip galvanized steel pipe is inserted into the air outlet rod 23, the bottom contacts the outer wall of the top of the turntable 221, and then the translation motor 11 is started to drive the threaded rod 111 to rotate in the inner cavity of the moving cabin 12, thereby driving the moving plate 312 to move to the right, so that the fixed vertical plate 31 moves to align with the top of the base 1, and then the lifting motor 32 is started to drive the screw rod 321 to rotate in the slide groove 311, so that the moving block 331 of the threaded outer wall of the screw rod 321 drives the positioning plate 33 downward on the inner wall of the slide groove 311, so that the convex pressing plate 334 at the bottom of the movable disk 333 at the bottom of the positioning plate 33 contacts the outer wall of the top of the hot-dip galvanized steel pipe and squeezes and fixes it, and then the rotating motor 211 in the inner cavity of the fixed disk 21 is started to use the gear 211 on its output shaft The meshing of the gear 222 with the outer wall of the bottom of the turntable 221 can drive the turntable 221 to rotate by the bearing 223, so that the hot-dip galvanized steel pipe on the outer wall of the top of the turntable 221 can also rotate, and then the steam can be sprayed from the plurality of air outlet holes 231 evenly opened on the outer wall of the air outlet rod 1 23 to the inner wall of the hot-dip galvanized steel pipe by the air pipe 22, and the air outlet pipe 241 evenly installed on the left outer wall of the air outlet rod 24 is used to evenly spray the outer wall of the rotating hot-dip galvanized steel pipe. After the spraying, the lifting motor 32 can be started first to drive the screw rod 321 to reverse, so that the positioning plate 33 rises, and then the translation motor 11 is started to drive the threaded rod 111 to reverse, so that the movable plate 312 drives the fixed vertical plate 31 to move to the left, so that the sprayed hot-dip galvanized steel pipe can be conveniently removed.
[0029] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not depart from the spirit of the present invention are within the scope of protection of the present invention.
Claims
1. A blowing device for hot-dip galvanized steel pipe production, comprising a base (1) and a positioning mechanism (3), characterized in that: The top outer wall of the base (1) is provided with a blowing mechanism (2), the blowing mechanism (2) comprising a fixed plate (21), an air pipe (22) passing through and fixedly connected to the right side of the fixed plate (21), an air outlet rod (23) passing through and fixedly connected to the top of the left end of the air pipe (22), a plurality of air outlet holes (231) are evenly arranged on the outer wall of the air outlet rod (23), a bearing (223) is movably mounted on the lower outer wall of the air outlet rod (23), a rotating plate (221) is fixedly mounted on the outer wall of the bearing (223), the side outer wall of the rotating plate (221) is overlapped with the groove of the top outer wall of the fixed plate (21), and the rotating plate (221) is provided with a plurality of air outlet holes (231) on the outer wall of the lower outer wall of the air outlet rod (23). A gear 2 (222) is fixedly mounted on the bottom outer wall of the fixed disk (221), a rotating motor (211) is fixedly mounted on the front inner cavity of the fixed disk (21), a gear 1 (2111) is fixedly mounted on the outer wall of the output shaft of the rotating motor (211), the side outer wall of the gear 1 (2111) is meshed with the side outer wall of the gear 2 (222), the top outer wall of the air pipe (22) away from the air outlet rod 1 (23) is penetrated and fixedly connected with an air outlet rod 2 (24), the air outlet rod 2 (24) penetrates the right top of the fixed disk (21), and a plurality of air outlet pipes (241) are evenly penetrated and fixedly mounted on the left outer wall of the air outlet rod 2 (24).
2. The spraying device for hot-dip galvanized steel pipe production according to claim 1, characterized in that: The positioning mechanism (3) comprises a fixed vertical plate (31), a lifting motor (32) is fixedly mounted on the top outer wall of the fixed vertical plate (31), a sliding groove (311) is provided on the front outer wall of the fixed vertical plate (31), a screw rod (321) is fixedly mounted on the bottom outer wall of the output shaft of the lifting motor (32), the bottom outer wall of the screw rod (321) is movably connected to the bottom inner wall of the sliding groove (311), a moving block (331) is threadedly connected to the outer wall of the screw rod (321), the side outer wall of the moving block (331) is overlapped with the side inner wall of the sliding groove (311), and a positioning plate (33) is fixedly mounted on the front outer wall of the moving block (331).
3. The blowing device for hot-dip galvanized steel pipe production according to claim 2, characterized in that: A fixing rod (332) is fixedly mounted on the top of the inner wall of the positioning plate (33), a movable disk (333) is movably mounted on the outer wall of the bottom end of the fixing rod (332), the side outer wall of the movable disk (333) overlaps the side of the groove at the bottom of the positioning plate (33), and four convex pressure plates (334) are fixedly mounted in a circular array on the bottom outer wall of the movable disk (333).
4. The spraying device for hot-dip galvanized steel pipe production according to claim 2, characterized in that: A translation motor (11) is fixedly mounted on the right rear outer wall of the base (1), a threaded rod (111) is fixedly mounted on the outer wall of the output shaft of the translation motor (11), a moving cabin (12) is provided on the top rear outer wall of the base (1), the left end outer wall of the threaded rod (111) is movably connected to the left outer wall of the moving cabin (12), a moving plate (312) is fixedly mounted on the bottom right outer wall of the fixed vertical plate (31), and the outer wall of the threaded rod (111) is threadedly connected to the middle end hole of the moving plate (312).
5. The blowing device for hot-dip galvanized steel pipe production according to claim 4, characterized in that: The bottom outer wall of the fixed vertical plate (31) overlaps with the top outer wall of the base (1), and the front and rear outer walls of the movable plate (312) overlap with the front and rear inner walls of the movable cabin (12).